Shaun E. Moynahan
- Listed as
- architect, attorney, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Semco Engineering Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Sep 2026
540 permits since 2000 (engineer on 520 permits, architect on 20 permits, attorney on 1 permit, authorized agent-others on 1 permit, pmt consultant/expediter on 1 permit): 374 completed, 65 in progress, 53 never finaled, 48 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 540.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 67 Everson St | A L Martin Construction | renovate (e) 2 story house. provide veritcal addition above (e) residence. convert part of (e) basement into new adu. new windows & finishes throughout. new deck at rear yard. new open fence at front yard. seismic upgrade & new fire sprinkler system throughout.Details
renovate (e) 2 story house. provide veritcal addition above (e) residence. convert part of (e) basement into new adu. new windows & finishes throughout. new deck at rear yard. new open fence at front yard. seismic upgrade & new fire sprinkler system throughout. | $1,194,404 |
| Sep 15, 2026 | In progress issued Oct 2026 | 512 Nevada St | Custom Construction Enterprises | site wall replacement at rear property line.Details
site wall replacement at rear property line. | $25,000 |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 4039 Noriega St | S A Baxter Inc. | revision to bpa#202605191518, removal of plywood stiffening @first floor vestibuleDetails
revision to bpa#202605191518, removal of plywood stiffening @first floor vestibule | |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 3948 26th St | Ashbury Gen Constructing & Eng | floor 1: relocate unit 1 from floor 2 to currently non-habitable floor 1. unit1: 3 bedroom, 3 bath, powder, kitchen, living, dining & study. floor 2: expand floor 2 into previous occupied unit 1. renovate kitchen, living, dining, 4-bathrooms.Details
floor 1: relocate unit 1 from floor 2 to currently non-habitable floor 1. unit1: 3 bedroom, 3 bath, powder, kitchen, living, dining & study. floor 2: expand floor 2 into previous occupied unit 1. renovate kitchen, living, dining, 4-bathrooms. | $250,000 |
| Aug 27, 2026 | In progress filed Aug 2026, not yet issued | 3 Peralta Av | horizontal expansion of first and second floor per section 311. within rear yard. demo calculations consistent of section 317. addition of interior stair from first to second level. no loss of dwelling units per section 317.Details
horizontal expansion of first and second floor per section 311. within rear yard. demo calculations consistent of section 317. addition of interior stair from first to second level. no loss of dwelling units per section 317. | $20,000 | |
| Jul 23, 2026 | In progress issued Jul 2026 | 651 19th Av | Rake Construction Inc | underpinning (e) foundation(4'6") at rear north property lineDetails
underpinning (e) foundation(4'6") at rear north property line | $10,000 |
| Jul 16, 2026 | In progress filed Jul 2026, not yet issued | 207 Hoffman Av | add new stair to lower level, rework bedroom closets. bathroom & kitchen remodel on 2nd floor. add (e) lower level (849 sqft) as conditioned space.Details
add new stair to lower level, rework bedroom closets. bathroom & kitchen remodel on 2nd floor. add (e) lower level (849 sqft) as conditioned space. | $200,000 | |
| Jul 10, 2026 | In progress issued Aug 2026 | 1 Bradford St | Alward Const. Co Inc A Ca Corp | revisions to pa #202510248057. change function of 2 windows on rear elevation.Details
revisions to pa #202510248057. change function of 2 windows on rear elevation. | |
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 2880 21st St | on rear dwelling unit (2880 21st st) convert (e) uninhabited roof plane to usable space to include: acess stair to roof plane. 330 gross sq ft addition to contain: 1 bdr,1 ba, 215 useable sqft roof deck, 60 sqft fixed planter,electrical,mechanical,plumbing sprinkler work associated with the additionDetails
on rear dwelling unit (2880 21st st) convert (e) uninhabited roof plane to usable space to include: acess stair to roof plane. 330 gross sq ft addition to contain: 1 bdr,1 ba, 215 useable sqft roof deck, 60 sqft fixed planter,electrical,mechanical,plumbing sprinkler work associated with the addition | $250,000 | |
| Jul 2, 2026 | In progress issued Aug 2026 | 1306 York St | Division Sf Inc Dba: Hawke Bldg Company | mep includes (n) heat pump, lighting, electrical, electrical, plumbing. install wsher dryer hookup on 3rd fl, new bathroom on 3rd floor. raise primary 3rd floor bedroom ceiling from 8'4"-9'. new skylightsDetails
mep includes (n) heat pump, lighting, electrical, electrical, plumbing. install wsher dryer hookup on 3rd fl, new bathroom on 3rd floor. raise primary 3rd floor bedroom ceiling from 8'4"-9'. new skylights | $195,000 |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 2245 Union St | work includes a small rear horizontal addition at the existing 1st and 2nd flrs, a new basement level below the house. for a garage and storage spaces, and an interior remodel of other existing spaces of the home. exterior improvements include new garage door, reframe existing front walk-up stairs.Details
work includes a small rear horizontal addition at the existing 1st and 2nd flrs, a new basement level below the house. for a garage and storage spaces, and an interior remodel of other existing spaces of the home. exterior improvements include new garage door, reframe existing front walk-up stairs. | $990,000 | |
| Jun 8, 2026 | In progress issued Jun 2026 | 1073 Filbert St | Citywest Construction Inc. | revision to 202503263093. interior remodel of (e) living space in unit 1 (1073 filbert) to include new interior partition, doors, ceiling, lighting and plumbing fixtures. no added conditioned sq. ft proposed. no proposed exterior work visible from prow. ref permit 202604149377.Details
revision to 202503263093. interior remodel of (e) living space in unit 1 (1073 filbert) to include new interior partition, doors, ceiling, lighting and plumbing fixtures. no added conditioned sq. ft proposed. no proposed exterior work visible from prow. ref permit 202604149377. | $146,000 |
| Jun 3, 2026 | In progress filed Jun 2026, not yet issued | 259 Maynard St | add an interior stair connecting the (e) level 1 with the (e) basement. convert the storage area in the basement into habitable space. replace the (e) furnace & water heater & remove the (e) exteior wd stair at the rear yard.Details
add an interior stair connecting the (e) level 1 with the (e) basement. convert the storage area in the basement into habitable space. replace the (e) furnace & water heater & remove the (e) exteior wd stair at the rear yard. | $181,000 | |
| Jun 2, 2026 | In progress filed Jun 2026, not yet issued | 2033 Broderick St | interior remodel, lower garage floor, convert 731 sf existing storage at garage to habitable space, remove fire place and chimney. no expansion of envelope.Details
interior remodel, lower garage floor, convert 731 sf existing storage at garage to habitable space, remove fire place and chimney. no expansion of envelope. | $350,000 | |
| May 15, 2026 | Completed final sign-off Jun 2026 | 3615 Market St | Belvoir Construction Inc. | revision to bpa 202604089104, elimination of underpinning & new footing through garage door opening. new concrete curb @ front facade, and new slab on grade in garage.Details
revision to bpa 202604089104, elimination of underpinning & new footing through garage door opening. new concrete curb @ front facade, and new slab on grade in garage. | |
| May 15, 2026 | In progress issued Sep 2026 | 231 08th Av | Cardea Bldg Dba Dimension Design Group | new curb (8"x12") over (e) footing in garage, across +- 14 ft.Details
new curb (8"x12") over (e) footing in garage, across +- 14 ft. | $10,000 |
| Apr 28, 2026 | In progress issued Aug 2026 | 4174 26th St | Ewen Utting Inc. | scope of work to include adding a new floor to existing single family dwelling to consist of a new primary bedroom, bathroom, closet, and a modest north deck.Details
scope of work to include adding a new floor to existing single family dwelling to consist of a new primary bedroom, bathroom, closet, and a modest north deck. | $426,000 |
| Apr 24, 2026 | In progress issued Aug 2026 | 1532 Diamond St | North Bay Construction | remodel of (e) 2-story residence with associated mep work. 3-story vertical addtion. convert 1/f to state adu program.Details
remodel of (e) 2-story residence with associated mep work. 3-story vertical addtion. convert 1/f to state adu program. | $500,000 |
| Apr 17, 2026 | In progress issued Apr 2026 | 405 Buchanan St | revision to apn 202511200121. updated footing detail northside, framing updates for basement chimney removal, alternate shearwall specifications @ east end of basement + west end of first floor.Details
revision to apn 202511200121. updated footing detail northside, framing updates for basement chimney removal, alternate shearwall specifications @ east end of basement + west end of first floor. | $5,000 | |
| Apr 8, 2026 | Completed final sign-off Jun 2026 | 3615 Market St | Belvoir Construction Inc. | first floor foundation + underpining. foundation repair and underpinning, approx 10ft at the frontDetails
first floor foundation + underpining. foundation repair and underpinning, approx 10ft at the front | $15,000 |
| Mar 9, 2026 | In progress filed Mar 2026, not yet issued | 722 19th Av | partial demo (e) sfd at rear lot. remodel int of (e) rear bldg, excavate lower finish floor, replace siding and windows. construct new 3-story addition w/stair penthouse to roof deck. (n) nfpa 13r systemDetails
partial demo (e) sfd at rear lot. remodel int of (e) rear bldg, excavate lower finish floor, replace siding and windows. construct new 3-story addition w/stair penthouse to roof deck. (n) nfpa 13r system | $500,000 | |
| Mar 6, 2026 | In progress issued Mar 2026 | 16 Sloat Bl | Modern Craft Construction | revision to issued permit # 202505075965. minor changes to windows at sides and skylights. structural updates per plans.Details
revision to issued permit # 202505075965. minor changes to windows at sides and skylights. structural updates per plans. | |
| Feb 18, 2026 | In progress issued Feb 2026 | 255 10th Av | Arflor Construction Inc | revision to pa 202403046977 & 202407247153 e new habitable areas at the 1st floor (family rm, office, bathrm, hallway); (n) windows, opening 1st fl on side facades (nort/south facades, not viewable from public row), new door & window @ 1st fl rear facade; new below grade patio @ rear yard accessibleDetails
revision to pa 202403046977 & 202407247153 e new habitable areas at the 1st floor (family rm, office, bathrm, hallway); (n) windows, opening 1st fl on side facades (nort/south facades, not viewable from public row), new door & window @ 1st fl rear facade; new below grade patio @ rear yard accessible | $80,000 |
| Feb 13, 2026 | In progress issued Jul 2026 | 1559 Willard St | Planart Construction Corp | replacement of door for wider sliding door & replacement of window and lowering sill. expansion of existing deck to include lower level with a hot tubDetails
replacement of door for wider sliding door & replacement of window and lowering sill. expansion of existing deck to include lower level with a hot tub | $45,000 |
| Feb 12, 2026 | In progress issued Jul 2026 | 1573 34th Av | Blair Burke General Contractors Inc | new 3rd story vertical addition to (e) sfd and interior remodel @ 1st & 2md story to include: remodel & expand (e) kitchen, and 2 (e) bathjs, new primary bedroom and abath, new windows @ addition, (e)courtyard and rear elevation, replace (e) foundation for new clg hgt @ 1st story, new structuralDetails
new 3rd story vertical addition to (e) sfd and interior remodel @ 1st & 2md story to include: remodel & expand (e) kitchen, and 2 (e) bathjs, new primary bedroom and abath, new windows @ addition, (e)courtyard and rear elevation, replace (e) foundation for new clg hgt @ 1st story, new structural | $850,000 |
| Feb 6, 2026 | Expired or cancelled suspend Aug 2026 | 15 Park Hill Av | North Bay Construction | rev 201908068086-s1 & 202508213586:horizontal expanding at g/f to include a bedroom and play room. new g/f deck and stairs to garden below. and new deck above g/f horizontal expansion for floor 2.new stairs from floor 2 deck to g/f deck below. new crawl space storage beneath horizontal g/f addition.Details
rev 201908068086-s1 & 202508213586:horizontal expanding at g/f to include a bedroom and play room. new g/f deck and stairs to garden below. and new deck above g/f horizontal expansion for floor 2.new stairs from floor 2 deck to g/f deck below. new crawl space storage beneath horizontal g/f addition. | |
| Feb 5, 2026 | In progress issued Mar 2026 | 833 Lake St | Urban Builder General Contracting Inc | (n) foundation & structural framing to replace (e), reducing garage sf to create room for storage, pantry & bedroom, (n) interior stair, remodel upper level bathroom, (n) closets in primary bedrm, slight modification to rear deck & paint front of house. electric upgrade,replace (e) furnace w/ heat..Details
(n) foundation & structural framing to replace (e), reducing garage sf to create room for storage, pantry & bedroom, (n) interior stair, remodel upper level bathroom, (n) closets in primary bedrm, slight modification to rear deck & paint front of house. electric upgrade,replace (e) furnace w/ heat.. | $850,000 |
| Jan 12, 2026 | In progress issued May 2026 | 147 04th Av | Blair Burke General Contractors Inc | modify 1/f, 2/f & 3/f at rear for horizontal expansion of (e) residential building including seismic upgrade.Details
modify 1/f, 2/f & 3/f at rear for horizontal expansion of (e) residential building including seismic upgrade. | $568,000 |
| Jan 7, 2026 | In progress issued Jun 2026 | 3759 22nd St | extension on 2nd & 3rd floor. 2nd floor: a new family room extension & extension of (e) deck. 3rd floor: reconfiguration of (e) primary bedroom, new bedroom & new bath. new windows, sliding doors, skylingts & a new flat roof over the extension. updated plumbing fixture in kitchen. newDetails
extension on 2nd & 3rd floor. 2nd floor: a new family room extension & extension of (e) deck. 3rd floor: reconfiguration of (e) primary bedroom, new bedroom & new bath. new windows, sliding doors, skylingts & a new flat roof over the extension. updated plumbing fixture in kitchen. new | $450,000 | |
| Jan 4, 2026 | In progress issued Jul 2026 | 321 Rutledge St | Ava Jamshidnejad | garage level: voluntary foundation replacement, new retaining walls, shoring, excavate rear crawl space, total excavation of 22 cubic yards; 1/f kitchen renovation, (n) bathroom; 2/f bathroom renovation. alteration of rear existing porch roof.Details
garage level: voluntary foundation replacement, new retaining walls, shoring, excavate rear crawl space, total excavation of 22 cubic yards; 1/f kitchen renovation, (n) bathroom; 2/f bathroom renovation. alteration of rear existing porch roof. | $10,000 |
| Dec 22, 2025 | Completed final sign-off Jun 2026 | 1570 12th Av | Sarris Construction | all work is interior - revision to pa 202506209070 structural modifications based on (e) conditions; reconstruct stair to basement; replace windows, doors and skylights in (e) openings @ rear in-kind; remove (e) brick flue and install (n) cabinetry @ dining room & kitchenDetails
all work is interior - revision to pa 202506209070 structural modifications based on (e) conditions; reconstruct stair to basement; replace windows, doors and skylights in (e) openings @ rear in-kind; remove (e) brick flue and install (n) cabinetry @ dining room & kitchen | $40,000 |
| Dec 19, 2025 | In progress issued Mar 2026 | 131 Peralta Av | Dimension Construction Inc | lower floor in existing laundry room - replace failing site retaining walls wit no change to grades.Details
lower floor in existing laundry room - replace failing site retaining walls wit no change to grades. | $180,000 |
| Dec 17, 2025 | In progress issued Sep 2026 | 2900 Scott St | Andrew Vanni Builders Inc | convert storage to media room. reconfigure interiors of the lower 2 units. reconfigure interiors & horizontal addition of the upper unit with a roof deck. replace in kind all (e) windows. new drywall, lights & electrical.Details
convert storage to media room. reconfigure interiors of the lower 2 units. reconfigure interiors & horizontal addition of the upper unit with a roof deck. replace in kind all (e) windows. new drywall, lights & electrical. | $1,800,000 |
| Dec 11, 2025 | Completed final sign-off Aug 2026 | 338 28th St | Keegan Contruction Inc. | unit 2: removal of east lightwell to create 2nd bathroom. removal of interior wall b/t kitchen and living room. replacement of 2 windows at rear with in-swing french door. related electrical and plumbing. proposed infill will only obsure 36" vertical of adjacent lightwell. 45 sf added area.Details
unit 2: removal of east lightwell to create 2nd bathroom. removal of interior wall b/t kitchen and living room. replacement of 2 windows at rear with in-swing french door. related electrical and plumbing. proposed infill will only obsure 36" vertical of adjacent lightwell. 45 sf added area. | $38,000 |
| Dec 11, 2025 | In progress issued Feb 2026 | 2578 Great Hy | remodel of (e) 3 story single family residence. horizontal addition on 3 levels in rear. add one bedroom local program adu on 1st floor. vertical extension with new siding & windows throughout.Details
remodel of (e) 3 story single family residence. horizontal addition on 3 levels in rear. add one bedroom local program adu on 1st floor. vertical extension with new siding & windows throughout. | $450,000 | |
| Dec 9, 2025 | In progress filed Dec 2025, not yet issued | 1953 Webster St | Scott & Warner Builders Inc | revision to 202509115147: bay window enclose e) void @ rear of property increasing conditional space by 58 sf. install new electrical in hall, new gas line to bbq area @ rear of property. relocate e) downspout at rear exterior to side yardDetails
revision to 202509115147: bay window enclose e) void @ rear of property increasing conditional space by 58 sf. install new electrical in hall, new gas line to bbq area @ rear of property. relocate e) downspout at rear exterior to side yard | $30,000 |
| Dec 2, 2025 | In progress issued Jul 2026 | 137 Chilton Av | Daylight Construction | convert 1/f and part of (e) garage to adu. the (e) 2/f will remain separate residential unit. no addition is proposed, all work to be within the footprint of (e) bldg. rear 2/f deck and portions of rear structure will be repaired and replaced inkind as required. new windows at 1/f.Details
convert 1/f and part of (e) garage to adu. the (e) 2/f will remain separate residential unit. no addition is proposed, all work to be within the footprint of (e) bldg. rear 2/f deck and portions of rear structure will be repaired and replaced inkind as required. new windows at 1/f. | $125,000 |
| Nov 10, 2025 | In progress issued May 2026 | 1 Bradford St | Alward Const. Co Inc A Ca Corp | horizontal additions on 1/f & 2/f. vertical addition for new 3/f. create adu on 1/f using local program.Details
horizontal additions on 1/f & 2/f. vertical addition for new 3/f. create adu on 1/f using local program. | $550,000 |
| Oct 31, 2025 | In progress issued Mar 2026 | 647 19th Av | Rake Construction Inc | horizontal addition w/new rooms down to convert e) 3 bedroom, 1 bath house to a 4 bedroom & 3 bath house plus media rm. extending e) residence in 1=story addition into rear yard, infill north lightwell on upper level, partial infill lightwell on south side, both within neighbor approval.Details
horizontal addition w/new rooms down to convert e) 3 bedroom, 1 bath house to a 4 bedroom & 3 bath house plus media rm. extending e) residence in 1=story addition into rear yard, infill north lightwell on upper level, partial infill lightwell on south side, both within neighbor approval. | $398,000 |
| Oct 27, 2025 | Completed final sign-off Feb 2026 | 505 Grand View Av | Otto Miller Development Inc | revision for issued permit pa#:202307061528. renovation(e)6 units on level 2 & 3: (1)interior renovation w/ (n) mech system (2) new roof assembly (3)repair exterior stucco if needed(4) remove common laundry room; provide private laundry wash& dryer ea. unit 5) new front door & window 6)replace railDetails
revision for issued permit pa#:202307061528. renovation(e)6 units on level 2 & 3: (1)interior renovation w/ (n) mech system (2) new roof assembly (3)repair exterior stucco if needed(4) remove common laundry room; provide private laundry wash& dryer ea. unit 5) new front door & window 6)replace rail | |
| Oct 27, 2025 | In progress issued Nov 2025 | 527 30th St | Ben Hardy & Company | revision to pa 202408057976 deletion of previousely proposed dormers. interior remodeling mezzanine reframing. revision to windows, doors and skylightsDetails
revision to pa 202408057976 deletion of previousely proposed dormers. interior remodeling mezzanine reframing. revision to windows, doors and skylights | |
| Sep 26, 2025 | Completed final sign-off Nov 2025 | 32 Ellert St | Custom Construction Enterprises | revision 202509044605- additional foundation upgrade to address an undersized foundation discovered during project. interior work.Details
revision 202509044605- additional foundation upgrade to address an undersized foundation discovered during project. interior work. | $7,000 |
| Sep 19, 2025 | Completed final sign-off May 2026 | 142 15th Av | O'shea Co. Home Grown Construction | revision to 202502059709. at rear 1st fl level patio, widen the stairs to rear yard, increase size of structural beam above. at 1st fl level remodel existing laundry rm and add refrigerator cabinet in media room, at rear yard add new deck which will be +19" above grade. add new sauna enclosure,Details
revision to 202502059709. at rear 1st fl level patio, widen the stairs to rear yard, increase size of structural beam above. at 1st fl level remodel existing laundry rm and add refrigerator cabinet in media room, at rear yard add new deck which will be +19" above grade. add new sauna enclosure, | $10,000 |
| Sep 11, 2025 | In progress issued Oct 2025 | 1953 Webster St | Scott & Warner Builders Inc | replace existing wall in garage with structural posts. new sheetrock and install new laundry area in garage. new door at trash area, replace existing water heater with new tankless water heater. remodel existing kitchen in kind, new casework in media room, replace single window in kitchen in kind.Details
replace existing wall in garage with structural posts. new sheetrock and install new laundry area in garage. new door at trash area, replace existing water heater with new tankless water heater. remodel existing kitchen in kind, new casework in media room, replace single window in kitchen in kind. | $68,400 |
| Sep 4, 2025 | Completed final sign-off Nov 2025 | 32 Ellert St | Custom Construction Enterprises | demo existing foundation along south east corner and upgrade to new foundation according to schematics.Details
demo existing foundation along south east corner and upgrade to new foundation according to schematics. | $16,000 |
| Aug 21, 2025 | In progress issued Oct 2025 | 15 Park Hill Av | North Bay Construction | revision to pa: 201908068086(s1):second unit deleted; ground fl renovation for a family room & full bath. demo exterior stairs to floor two. at 2nd fl, renovate kitchen and bathroom. at third fl, add a bathroom and renovate (e) bathroom. all new windows to replace existing. new skylights.Details
revision to pa: 201908068086(s1):second unit deleted; ground fl renovation for a family room & full bath. demo exterior stairs to floor two. at 2nd fl, renovate kitchen and bathroom. at third fl, add a bathroom and renovate (e) bathroom. all new windows to replace existing. new skylights. | |
| Aug 11, 2025 | In progress issued Mar 2026 | 457 Duncan St | Cardea Bldg Dba Dimension Design Group | 1st flr-horizontal addition @ rear yard w/ bedrm,bathrm,office & storage;convert (e)garage area into (conditioned space w/ laundry rm & mudrm;(n) interior stairs conneting 1st & 2nd flr;4)excavate grade @ rear yard. 2nd flr-demolish rear portion of bldg, deck & exterior stairs; horizontal 2025072512Details
1st flr-horizontal addition @ rear yard w/ bedrm,bathrm,office & storage;convert (e)garage area into (conditioned space w/ laundry rm & mudrm;(n) interior stairs conneting 1st & 2nd flr;4)excavate grade @ rear yard. 2nd flr-demolish rear portion of bldg, deck & exterior stairs; horizontal 2025072512 | $390,000 |
| Aug 8, 2025 | Completed final sign-off Jul 2026 | 250 Mullen Av | Sean Kelly Construction | interior renovation of bathroom area, laundry area, and bedroom closet on 2nd floor. repair hvac.Details
interior renovation of bathroom area, laundry area, and bedroom closet on 2nd floor. repair hvac. | $10,000 |
| Jul 29, 2025 | In progress issued Jul 2025 | 45 Normandie Tr | Noa Construction Llc | revision to permit 2025-0131-9447. windows to be replaced in kind, 2 doors replaced in kind. new concrete slab, new sink in garage. change to domestic hot water (dhw) system. reconfiguration of lower stairs and upper floor bathrooms.Details
revision to permit 2025-0131-9447. windows to be replaced in kind, 2 doors replaced in kind. new concrete slab, new sink in garage. change to domestic hot water (dhw) system. reconfiguration of lower stairs and upper floor bathrooms. | $30,000 |
| Jul 23, 2025 | In progress issued Nov 2025 | 814 Grove St | Custom Construction Enterprises | partial foundation replacement;legalizing an unauthorized dwelling unit (udu) on the g/f into adu (1 bed/1 bath) using the state adu program;replace (e) unpermitted rear yard deck and stair w/ (n) conforming structures;widen driveway and garage door;rebuilding the (e) dry-rotted exterior wood entryDetails
partial foundation replacement;legalizing an unauthorized dwelling unit (udu) on the g/f into adu (1 bed/1 bath) using the state adu program;replace (e) unpermitted rear yard deck and stair w/ (n) conforming structures;widen driveway and garage door;rebuilding the (e) dry-rotted exterior wood entry | $400,000 |
| Jul 16, 2025 | In progress issued Dec 2025 | 4221 Cesar Chavez St | Mission Home Remodeling Inc | state priority -(n) adu at first floor with minor rear horizontal infill below (e) 2nd floor overhang. interior remodel of unit 2 at 3rd and 4th floors. limited to (n) adu, unit 2, and garage. exterior work visible to public right of way to include (n) replacement windows and minor plaster repair.Details
state priority -(n) adu at first floor with minor rear horizontal infill below (e) 2nd floor overhang. interior remodel of unit 2 at 3rd and 4th floors. limited to (n) adu, unit 2, and garage. exterior work visible to public right of way to include (n) replacement windows and minor plaster repair. | $350,000 |
| Jul 8, 2025 | In progress issued Jul 2025 | 43 Whitney St | Blackline Construction | infill 533 sf ground floor, below existing deck to include new primary suite with bedroom, bathroom, 2 closets, and direct garden access. relocate existing deck stair with new fire rated wall at property line. waterproof existing main floor terrace & relocate associated stair. create new serviceDetails
infill 533 sf ground floor, below existing deck to include new primary suite with bedroom, bathroom, 2 closets, and direct garden access. relocate existing deck stair with new fire rated wall at property line. waterproof existing main floor terrace & relocate associated stair. create new service | $200,000 |
| Jul 7, 2025 | Completed final sign-off Jul 2026 | 818 43rd Av | Sage Construction Services | remodel 2 bathrooms & bedrooms on 2nd fl; relocate laundry; voluntary structural strengthening @ garage/crawl space. 2 new skylights.Details
remodel 2 bathrooms & bedrooms on 2nd fl; relocate laundry; voluntary structural strengthening @ garage/crawl space. 2 new skylights. | $150,000 |
| Jun 25, 2025 | In progress issued Oct 2025 | 839 North Point St | Finbarr Collins Construction Inc. | horizontal addition at the 3rd lvl to accommodate new bedroom, office and exterior deck at rear. removal of (e) exterior walls and roof at 2nd lvl to accommodate horizontal addition at 3rd lvl. removal (e) roof over (e) bedroom to accommodate raised head height. removal (e) doors, finihes & fixturesDetails
horizontal addition at the 3rd lvl to accommodate new bedroom, office and exterior deck at rear. removal of (e) exterior walls and roof at 2nd lvl to accommodate horizontal addition at 3rd lvl. removal (e) roof over (e) bedroom to accommodate raised head height. removal (e) doors, finihes & fixtures | $110,000 |
| Jun 18, 2025 | In progress issued Jun 2025 | 1214 York St | remodel & addition to sfd: excavate 1st fl slab @ garden rm; central lightwell & exterior patio; add (n) slab & finishes; add (n) habitable structure below (e) overhanging 2nd fl structure, to be (n) sauna & (n) toilet room - rebuild (n) rear deck, rebuild (e) exterior stair in (n) location; add (n)Details
remodel & addition to sfd: excavate 1st fl slab @ garden rm; central lightwell & exterior patio; add (n) slab & finishes; add (n) habitable structure below (e) overhanging 2nd fl structure, to be (n) sauna & (n) toilet room - rebuild (n) rear deck, rebuild (e) exterior stair in (n) location; add (n) | $61,000 | |
| Jun 17, 2025 | In progress issued Jun 2025 | 295 Hazelwood Av | converting a portion of e lower level. currently used for mechanical and storage purposes into conditioned sq footage to include 1 bedroom, den, multi purpose room, full bath, 1/2 bath, rear doors to patio,retaining wall.Details
converting a portion of e lower level. currently used for mechanical and storage purposes into conditioned sq footage to include 1 bedroom, den, multi purpose room, full bath, 1/2 bath, rear doors to patio,retaining wall. | $120,000 | |
| Jun 12, 2025 | In progress issued Jun 2025 | 814 Grove St | Custom Construction Enterprises | perimeter foundation replacement and voluntary seismic improvememtsDetails
perimeter foundation replacement and voluntary seismic improvememts | $70,000 |
| Jun 5, 2025 | Completed final sign-off Apr 2026 | 66 28th St | Mullan Enterprises Inc | revision to pa #2024-1004-2297 widen & center slider at rear of 1st fl. change first fl rear window to door. move post in garage, voluntary foundation upgrade through garage, new beam support at roofDetails
revision to pa #2024-1004-2297 widen & center slider at rear of 1st fl. change first fl rear window to door. move post in garage, voluntary foundation upgrade through garage, new beam support at roof | $40,000 |
| May 23, 2025 | In progress issued Oct 2025 | 1073 Filbert St | Citywest Construction Inc. | interior remodel of upper unit to include infill of (e) light well, remodeled kitchen, dining room, guest bathroom, primary suite and den. new interior finishes, partitions, doors, ceilings, lighting and plumbing fixtures throughout upper unit. exterior work: window replacement at 2nd & 3rd fl.Details
interior remodel of upper unit to include infill of (e) light well, remodeled kitchen, dining room, guest bathroom, primary suite and den. new interior finishes, partitions, doors, ceilings, lighting and plumbing fixtures throughout upper unit. exterior work: window replacement at 2nd & 3rd fl. | $600,000 |
| May 9, 2025 | In progress issued Jun 2025 | 140 Lundys Ln | Pjd Construction Inc | partial foundation replacement at east end of basement. no change to basement floor excavation. new front stairs at grade. remove (e) front wood fence & replace with (n) open steel fenceDetails
partial foundation replacement at east end of basement. no change to basement floor excavation. new front stairs at grade. remove (e) front wood fence & replace with (n) open steel fence | $60,000 |
| May 7, 2025 | In progress issued Jul 2025 | 16 Sloat Bl | Modern Craft Construction | expand living space into part of garage add new code compliant interior stair to conncet floors reconfigure bedrooms and kitchen as needed and bathrooms at both levels remove fireplace and cantilevered masonry chimneyDetails
expand living space into part of garage add new code compliant interior stair to conncet floors reconfigure bedrooms and kitchen as needed and bathrooms at both levels remove fireplace and cantilevered masonry chimney | $240,000 |
| Apr 28, 2025 | Completed final sign-off Oct 2025 | 36 Whitney St | g/f - horizontal addition of approximately 117 sq.ft. at rear of existing property with landing and steps down to existing deck.Details
g/f - horizontal addition of approximately 117 sq.ft. at rear of existing property with landing and steps down to existing deck. | $50,000 | |
| Apr 22, 2025 | In progress issued Jul 2025 | 82 Shore View Av | Meryl & Miller Llc | remodel of existing kitchen and mudroom including associated plumbing, electrical and mechnical work. no additional conditioned square footage and no expansion of existing building envelopeDetails
remodel of existing kitchen and mudroom including associated plumbing, electrical and mechnical work. no additional conditioned square footage and no expansion of existing building envelope | $75,000 |
| Apr 17, 2025 | Completed final sign-off Dec 2025 | 339 College Av | Modern Craft Construction | partial interior remodel with no change to building footprint. kitchen remodel with (n) skylight, window replacement, new stairwell to replace non-code compliant (e) one in-kind. partial mudroom and bath remodel. entry brick stairs to be repaired, front setback to be partially permeable per code.Details
partial interior remodel with no change to building footprint. kitchen remodel with (n) skylight, window replacement, new stairwell to replace non-code compliant (e) one in-kind. partial mudroom and bath remodel. entry brick stairs to be repaired, front setback to be partially permeable per code. | $250,000 |
| Apr 4, 2025 | Completed final sign-off Aug 2025 | 324 27th St | Alchemy Builders Inc | lower unit 324 kitchen remodel & wall removal. bath remodel & new exhaust fan. no work garage basement or upper unit 322Details
lower unit 324 kitchen remodel & wall removal. bath remodel & new exhaust fan. no work garage basement or upper unit 322 | $22,000 |
| Apr 4, 2025 | Completed final sign-off Aug 2025 | 67 Capistrano Av | Keegan Contruction Inc. | partial foundation replacementDetails
partial foundation replacement | $110,000 |
| Mar 28, 2025 | Completed final sign-off Jul 2026 | 2731 38th Av | Oscar E Maldonado | interior renovation of (e) single family dwelling consisting of conversion of ground floor basement/garage into habitable space, replacement floor slab and foundations, renovated bathroom, relocated gas furance, new gas hwh, and assoc. electrical work; and enclosure of (e) undercroft into habitableDetails
interior renovation of (e) single family dwelling consisting of conversion of ground floor basement/garage into habitable space, replacement floor slab and foundations, renovated bathroom, relocated gas furance, new gas hwh, and assoc. electrical work; and enclosure of (e) undercroft into habitable | $251,027 |
| Feb 27, 2025 | In progress issued Mar 2026 | 512 Nevada St | Custom Construction Enterprises | comply w/ dbi internal audit violation# 202418808 rear building expansion, new entry door, and adjacent window. new garage door, replacement windows & skylight. new rear yard stair addition.Details
comply w/ dbi internal audit violation# 202418808 rear building expansion, new entry door, and adjacent window. new garage door, replacement windows & skylight. new rear yard stair addition. | |
| Feb 5, 2025 | Completed final sign-off May 2026 | 142 15th Av | O'shea Co. Home Grown Construction | provide a new rear yard deck with a spiral stair to access the rear yard. provide a new 1 hour rated wall b/t deck and south property line. new patio doors at 1/f and 2/f on the rear facade. remodel (e) 1/f bathroom, fixture locations to remain.Details
provide a new rear yard deck with a spiral stair to access the rear yard. provide a new 1 hour rated wall b/t deck and south property line. new patio doors at 1/f and 2/f on the rear facade. remodel (e) 1/f bathroom, fixture locations to remain. | $30,000 |
| Feb 4, 2025 | Completed final sign-off Feb 2026 | 2115 Kirkham St | R Diaz Construction | revision to permit 202307202645. revision is for increase of area where concrete slab will be demolished and replaced.Details
revision to permit 202307202645. revision is for increase of area where concrete slab will be demolished and replaced. | |
| Feb 3, 2025 | Completed final sign-off Aug 2025 | 1749 Sanchez St | Keegan Contruction Inc. | revision 202412036057- (n) primary bath/closet layout on 3rd floor. enlarge opening between kitchen and sitting room on 2nd floorDetails
revision 202412036057- (n) primary bath/closet layout on 3rd floor. enlarge opening between kitchen and sitting room on 2nd floor | |
| Feb 3, 2025 | In progress filed Feb 2025, not yet issued | 610 Page St | complete exterior concrete work, including reinforced concrete stairs and landing areas.Details
complete exterior concrete work, including reinforced concrete stairs and landing areas. | $10,000 | |
| Jan 31, 2025 | In progress issued Feb 2025 | 45 Normandie Tr | Noa Construction Llc | significant structural remodel on all stories of a sfr. creation of a new bedroom and 2 new bathrooms. new electrical and lighting throughout. removal and replacement of windows and add 10 (n) skylights (not visible from street). minor foundation work and minor framing work on all floors inc. roof.Details
significant structural remodel on all stories of a sfr. creation of a new bedroom and 2 new bathrooms. new electrical and lighting throughout. removal and replacement of windows and add 10 (n) skylights (not visible from street). minor foundation work and minor framing work on all floors inc. roof. | $200,000 |
| Dec 20, 2024 | Completed final sign-off Apr 2026 | 407 Precita Av | Bay Cities General Contractor Inc | partial foundatin repair and front stair replacement. minor plumbing & electrical roughins for future bathroom. minor electrical receptable for future ev charging.Details
partial foundatin repair and front stair replacement. minor plumbing & electrical roughins for future bathroom. minor electrical receptable for future ev charging. | $100,000 |
| Dec 18, 2024 | Completed final sign-off Jan 2025 | 378 Franconia St | Yefa Construction Inc | revision to permit 202405172402. reduce concrete strength to 2800 psi.Details
revision to permit 202405172402. reduce concrete strength to 2800 psi. | |
| Nov 15, 2024 | Completed final sign-off Nov 2025 | 3233 Jackson St | Orchard Construction | replace site retaining wall at property line (southwest)Details
replace site retaining wall at property line (southwest) | $80,000 |
| Oct 18, 2024 | Completed final sign-off Apr 2026 | 66 28th St | Mullan Enterprises Inc | gr flr horiz. addition w/ new bath & storage. new exterior fenestrations, new roofing and insulation in areas of work. infrastructure upgrades new plumbing, electrical and hvac systems throughout. (n) site upgrades; unit 66- kitchen and bath remodel, add 2nd bath, new rear balcony, 2-new skylights,Details
gr flr horiz. addition w/ new bath & storage. new exterior fenestrations, new roofing and insulation in areas of work. infrastructure upgrades new plumbing, electrical and hvac systems throughout. (n) site upgrades; unit 66- kitchen and bath remodel, add 2nd bath, new rear balcony, 2-new skylights, | $300,000 |
| Sep 27, 2024 | Completed final sign-off Oct 2025 | 2104 Castro St | B Birmingham Inc. | (n) retaining wall north rear property line of 31 feet. excavate 13.25 cubic yards of rear yard for level area.Details
(n) retaining wall north rear property line of 31 feet. excavate 13.25 cubic yards of rear yard for level area. | $25,000 |
| Aug 27, 2024 | Completed final sign-off Dec 2025 | 1238 26th Av | Brendan Waters Construction Inc | remodel to existing 3-story single family dwelling including existing kitchen and bathrooms plus a new 1/2 bath. no additional square footing and no explansion of existing building envelope.Details
remodel to existing 3-story single family dwelling including existing kitchen and bathrooms plus a new 1/2 bath. no additional square footing and no explansion of existing building envelope. | $200,000 |
| Aug 23, 2024 | Completed final sign-off Oct 2024 | 2440 Washington St | Damar Construction And Remodeling Inc | revision to pa# 202206156359, to omit special inspection requirements.omit #6 high strength bolting, 13 special grading 19 shear walls and 20 hold downsDetails
revision to pa# 202206156359, to omit special inspection requirements.omit #6 high strength bolting, 13 special grading 19 shear walls and 20 hold downs | |
| Aug 2, 2024 | In progress issued Oct 2024 | 255 10th Av | Arflor Construction Inc | revision to pa# 202403046977, provide full seismic upgrade to building; replace (e) brick foundation w/new concrete foundation and interior grade beams; remove (e) interior stair & provide new interior stair from 1/f to 4/f; stair scope of work to include new habitable area @ 1/f for stair landing..Details
revision to pa# 202403046977, provide full seismic upgrade to building; replace (e) brick foundation w/new concrete foundation and interior grade beams; remove (e) interior stair & provide new interior stair from 1/f to 4/f; stair scope of work to include new habitable area @ 1/f for stair landing.. | $90,000 |
| Aug 1, 2024 | Expired or cancelled expired Jan 2026 | 3676 17th St | Harmony Design & Development Inc | revision to pa # 2022-1206-7705 remove & replace siding at rear & side btwn grid g & h. replace dry rotted posts at grid h1 + h4; reframe 2nd fl wall on grid 1 btwn grid g & h. adjust preapproved deck supports; shift preapproved 1st & 2nd fl stairs 12" east; remove siding at lightwell.Details
revision to pa # 2022-1206-7705 remove & replace siding at rear & side btwn grid g & h. replace dry rotted posts at grid h1 + h4; reframe 2nd fl wall on grid 1 btwn grid g & h. adjust preapproved deck supports; shift preapproved 1st & 2nd fl stairs 12" east; remove siding at lightwell. | $10,000 |
| Jul 29, 2024 | In progress issued Oct 2024 | 60 Clifford Tr | Oak Leaf Construction | revision to permit# 201801168698: revision of stair layout and strengthening roof deck framing and supporting walls. ref pa 202407297478Details
revision to permit# 201801168698: revision of stair layout and strengthening roof deck framing and supporting walls. ref pa 202407297478 | $10,000 |
| Jul 25, 2024 | Completed final sign-off May 2025 | 10 San Benito Wy | J5 Real Estate Development Co | revision to 202311160908: replace all (e) foundation. adjustment of shearwall & framingDetails
revision to 202311160908: replace all (e) foundation. adjustment of shearwall & framing | |
| Jul 24, 2024 | Completed final sign-off Nov 2025 | 434 Hearst Av | O'shea Co. Home Grown Construction | new 2 story horizontal addition in the rear yard to provide an interior stair connecting 1st & 2nd fl levels. replace existing furnace with high efficiancy furnace unit.Details
new 2 story horizontal addition in the rear yard to provide an interior stair connecting 1st & 2nd fl levels. replace existing furnace with high efficiancy furnace unit. | $90,000 |
| May 24, 2024 | In progress issued Aug 2024 | 1290 Stanyan St | Cardoza Builder Llc, D E F Co | revision to pa# 201910073775, reconfigure wood framed front stairs and guardraul; replace exterior wood siding; convert storage @ 1/f to bedroom, bathroom; minor improvements @ 2nd & 3rd flr; add 4 sklylightsDetails
revision to pa# 201910073775, reconfigure wood framed front stairs and guardraul; replace exterior wood siding; convert storage @ 1/f to bedroom, bathroom; minor improvements @ 2nd & 3rd flr; add 4 sklylights | $45,000 |
| May 21, 2024 | Completed final sign-off Apr 2025 | 15 Clairview Ct | O'shea Co. Home Grown Construction | revision to pa #2023-0710-1811 remove exterior stairs & chimney at east facade. provide exterior stairs at the east facade. remove the concrete painter box on the south facade from scope of workDetails
revision to pa #2023-0710-1811 remove exterior stairs & chimney at east facade. provide exterior stairs at the east facade. remove the concrete painter box on the south facade from scope of work | $10,000 |
| May 17, 2024 | Completed final sign-off Jan 2025 | 378 Franconia St | Yefa Construction Inc | new retaining wall @ rear property line, no changes to (e) grades.Details
new retaining wall @ rear property line, no changes to (e) grades. | $25,000 |
| Apr 15, 2024 | In progress issued May 2024 | 2030 Golden Gate Av | Cuan Construction | rebuild (e) front entry stairs and adjacent retaining walls. remove (e) interior spiral stairs and provide (n) interior elevator from 1st to 2nd flDetails
rebuild (e) front entry stairs and adjacent retaining walls. remove (e) interior spiral stairs and provide (n) interior elevator from 1st to 2nd fl | $20,000 |
| Mar 20, 2024 | Completed final sign-off May 2024 | 591 Diamond St | Hearth Corporation | revision to pa #202311281508 addition of powder room on first floor. move laundry room on first floor. remov step & build ramp.Details
revision to pa #202311281508 addition of powder room on first floor. move laundry room on first floor. remov step & build ramp. | $35,000 |
| Mar 13, 2024 | In progress issued Jun 2024 | 255 10th Av | Arflor Construction Inc | remove the (e) bathrooms at the interior stair landings. new interior layout at 3rd and 4th floor; add (2) bathrooms at 3rd fl, add laundry room, add bathroom at 4th floor. add new windows at 3rd and 4th floor at rear facade. remove the (e) exterior stair and landing at 3rd and 4th floors....Details
remove the (e) bathrooms at the interior stair landings. new interior layout at 3rd and 4th floor; add (2) bathrooms at 3rd fl, add laundry room, add bathroom at 4th floor. add new windows at 3rd and 4th floor at rear facade. remove the (e) exterior stair and landing at 3rd and 4th floors.... | $125,000 |
| Feb 20, 2024 | Completed final sign-off Sep 2024 | 512 Nevada St | Custom Construction Enterprises | revision to pa# 202401053534, remove & replace foundations along rear patio. remove & replace footings around 1st floor mudroom.Details
revision to pa# 202401053534, remove & replace foundations along rear patio. remove & replace footings around 1st floor mudroom. | $30,000 |
| Feb 12, 2024 | Completed final sign-off Jun 2025 | 2741 Union St | Norman Charles Construction | replacement and expansion of (e) rear deck with (n) deck and firewallDetails
replacement and expansion of (e) rear deck with (n) deck and firewall | $30,000 |
| Jan 25, 2024 | Completed final sign-off Sep 2024 | 1579 Funston Av | Arrow Builders Inc | new deck in the rear. meeting section 130 & 134 of sf planning code. new exterior lightsDetails
new deck in the rear. meeting section 130 & 134 of sf planning code. new exterior lights | $25,000 |
| Jan 5, 2024 | Completed final sign-off Sep 2024 | 512 Nevada St | Custom Construction Enterprises | foundation repairs at northwest corner, drainage upgrades, and new interior mudroom at front entry.Details
foundation repairs at northwest corner, drainage upgrades, and new interior mudroom at front entry. | $75,000 |
| Dec 18, 2023 | Completed final sign-off Apr 2025 | 132 Fairmount St | Grip Art Inc. Dba Jan Heyneker Custom Wk | revision to permit 202306140116. interior remodel of (e) bathroom. no bathroom addition, revised closet, ceiling framing, door/window, skylight changes. no change to building footprint.Details
revision to permit 202306140116. interior remodel of (e) bathroom. no bathroom addition, revised closet, ceiling framing, door/window, skylight changes. no change to building footprint. | |
| Nov 28, 2023 | Completed final sign-off May 2024 | 591 Diamond St | Hearth Corporation | partial foundation replacement along northside of building. no excavation or changes to floor elevation.Details
partial foundation replacement along northside of building. no excavation or changes to floor elevation. | $35,000 |
| Nov 22, 2023 | Completed final sign-off Sep 2024 | 315 Montcalm St | B Birmingham Inc. | new retaining wall at rear property lineDetails
new retaining wall at rear property line | $20,000 |
| Nov 16, 2023 | Completed final sign-off May 2025 | 10 San Benito Wy | J5 Real Estate Development Co | conversion of (e) basement storage & crawlspace to (n) habitable space, relocate stairs down, 1/f: (e) 1/2-bath & hallway renovation, (4) (n) wood windows & (1) wood door/side lite @ basement (not visible from street)Details
conversion of (e) basement storage & crawlspace to (n) habitable space, relocate stairs down, 1/f: (e) 1/2-bath & hallway renovation, (4) (n) wood windows & (1) wood door/side lite @ basement (not visible from street) | $180,000 |
| Sep 11, 2023 | Completed final sign-off Mar 2024 | 2152 Larkin St | Saturn Construction Co | revision to bpa 2021-0323-7121 s1 new hss to hss retailDetails
revision to bpa 2021-0323-7121 s1 new hss to hss retail |