Joseph Armin
- Listed as
- architect
- Firm
- Jza Architure
- Based in
- Sanf Rancisco
- On San Francisco permits
- Dec 2011 to Feb 2026
26 permits since 2000 (architect on 26 permits): 14 completed, 5 in progress, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 27, 2026 | Completed final sign-off Jul 2026 | 1426 07th Av | legalize rear bathroom thjat was installed lwithout permits on 3rd floor by previous owern in the top unit in (e) 3 story two unit residential buidlingDetails
legalize rear bathroom thjat was installed lwithout permits on 3rd floor by previous owern in the top unit in (e) 3 story two unit residential buidling | $80,000 | |
| Jan 29, 2026 | In progress issued May 2026 | 3690 18th St | Melo Willard Tabudlo Dba Dreamt Design | ref 202508143066- ti to include revise bathroom layout, build partitions , 2 service counters to create customer area and back of house. recess and rebuild front doorways. remove rear windows and move rear doorway. raise rear floor. (n) floor, wall and ceiling finishes throughout.Details
ref 202508143066- ti to include revise bathroom layout, build partitions , 2 service counters to create customer area and back of house. recess and rebuild front doorways. remove rear windows and move rear doorway. raise rear floor. (n) floor, wall and ceiling finishes throughout. | $140,000 |
| Jun 27, 2025 | In progress issued Aug 2025 | 59 Whitney St | 1st story, (n) lowerd slab & reinforced foundation to replcae most of (e)[in accordance with cebc chapter a3], (n) bedroom & full bath added, rear of 1st story work/storage area extended. (e) interior stair down to 1st replaced w/ (n) stair. exterior front lightwell createdDetails
1st story, (n) lowerd slab & reinforced foundation to replcae most of (e)[in accordance with cebc chapter a3], (n) bedroom & full bath added, rear of 1st story work/storage area extended. (e) interior stair down to 1st replaced w/ (n) stair. exterior front lightwell created | $207,000 | |
| May 9, 2025 | In progress issued Jun 2025 | 140 Lundys Ln | Pjd Construction Inc | partial foundation replacement at east end of basement. no change to basement floor excavation. new front stairs at grade. remove (e) front wood fence & replace with (n) open steel fenceDetails
partial foundation replacement at east end of basement. no change to basement floor excavation. new front stairs at grade. remove (e) front wood fence & replace with (n) open steel fence | $60,000 |
| Jan 9, 2025 | In progress issued Jun 2025 | 182 Eureka St | Top Line Remodeling Inc | basement: new reinforced foundation and slab to replace (e) brick foundation (84lf) and slab.(e) wood supporting beam replaced w/steel beam.(n) conditioned,non-habitable full bath within garage and (n) storage addition @ rear.build out corner so garage door can be widened.1/f:unconditioned...Details
basement: new reinforced foundation and slab to replace (e) brick foundation (84lf) and slab.(e) wood supporting beam replaced w/steel beam.(n) conditioned,non-habitable full bath within garage and (n) storage addition @ rear.build out corner so garage door can be widened.1/f:unconditioned... | $720,000 |
| Jun 17, 2021 | Completed final sign-off Dec 2021 | 3832 Kirkham St | add 740sf of new habitable space at garage story. new rooms include bedroom, bath, office, hall, family room. within addition area, rear windows to be replaced, floor to be leveled, rear exterior doorway to be riased and new door installedDetails
add 740sf of new habitable space at garage story. new rooms include bedroom, bath, office, hall, family room. within addition area, rear windows to be replaced, floor to be leveled, rear exterior doorway to be riased and new door installed | $125,000 | |
| Dec 30, 2020 | Completed final sign-off May 2022 | 220 San Jose Av | Zarin Gollogly Design & Build | rev to pa# 2018-1214-8349; front exterior work widen driveway add landscaping repair steps, replace handrail and guards, replace garage door, add (n) 10'00" fence [5'-10" fence] along north and west property lineDetails
rev to pa# 2018-1214-8349; front exterior work widen driveway add landscaping repair steps, replace handrail and guards, replace garage door, add (n) 10'00" fence [5'-10" fence] along north and west property line | $10,000 |
| Feb 24, 2020 | In progress issued Jul 2026 | 1945 Oakdale Av | comply with 2018-003514enf: legalize rear horizontal additiona w/in require rear yard & (e) unpermit unit as a density-conforming dwelling unit with an accessory artist studio & 1 off-street parking space. legalize associated exterior modifications. convert (e) commercial into single dwelling unit.Details
comply with 2018-003514enf: legalize rear horizontal additiona w/in require rear yard & (e) unpermit unit as a density-conforming dwelling unit with an accessory artist studio & 1 off-street parking space. legalize associated exterior modifications. convert (e) commercial into single dwelling unit. | ||
| Oct 1, 2019 | Completed final sign-off Apr 2020 | 3430 Quintara St | Lemus Construction Co | rev to pa 2019-0425-8960 remove wood siding @ front facade gable and replace w/stucco. add decorative moulding band. enlarge kitchen window & change configuration to top operable ssash w/2 awning sashes @ bottom. change configuration @ living room window; fixed top sash w/2 operable awning sashes @Details
rev to pa 2019-0425-8960 remove wood siding @ front facade gable and replace w/stucco. add decorative moulding band. enlarge kitchen window & change configuration to top operable ssash w/2 awning sashes @ bottom. change configuration @ living room window; fixed top sash w/2 operable awning sashes @ | $1,000 |
| Aug 6, 2019 | Completed final sign-off Jun 2021 | 2669 Mission St | change of use from retail to limited restaurant (ice cream store) ti improvement. entrance for barrier removal. new counter/portion.Details
change of use from retail to limited restaurant (ice cream store) ti improvement. entrance for barrier removal. new counter/portion. | ||
| Jun 6, 2019 | Completed final sign-off Sep 2021 | 2551 15th Av | M Pizzolon Construction | rear horizontal addition @ 1st & 2nd level. remodel @ upper flr: (n) 3/4 bath. removel of windows. openings @ both stories. install (n) wdw. openings @ upper story, relacement of door opening @ lower story. upgrade to stuct support upper lvl.(n) bdrm @ rear. replace (e) wdw. patio w/ (n) wd patio.Details
rear horizontal addition @ 1st & 2nd level. remodel @ upper flr: (n) 3/4 bath. removel of windows. openings @ both stories. install (n) wdw. openings @ upper story, relacement of door opening @ lower story. upgrade to stuct support upper lvl.(n) bdrm @ rear. replace (e) wdw. patio w/ (n) wd patio. | $150,000 |
| Dec 14, 2018 | Completed final sign-off May 2022 | 220 San Jose Av | two story rear addition to existing sfd. interior remodel at main & upper stories including rebuilding kitchen & relocating bathrooms,net increse of 1 bed & 1 bath @ garage rear, excavate earth.expanding story install new interior stiars between garage & main stories, redo roof, upgrade mech, elecDetails
two story rear addition to existing sfd. interior remodel at main & upper stories including rebuilding kitchen & relocating bathrooms,net increse of 1 bed & 1 bath @ garage rear, excavate earth.expanding story install new interior stiars between garage & main stories, redo roof, upgrade mech, elec | $450,000 | |
| May 3, 2018 | Never finaled filed May 2018, never issued | 1615 California St | unit#6 only. ti. to (e) commercial space to create new thai massage spa. work includes new partition of space into reception, several massage areas. unisex accessible restroom & employee area. install new light & water heater. no change to (e) heating or to (e) envelope. rev to pa# 2017/11/22/4740.Details
unit#6 only. ti. to (e) commercial space to create new thai massage spa. work includes new partition of space into reception, several massage areas. unisex accessible restroom & employee area. install new light & water heater. no change to (e) heating or to (e) envelope. rev to pa# 2017/11/22/4740. | $146,000 | |
| Mar 26, 2018 | Completed final sign-off Dec 2018 | 320 Alabama St | Zarin Gollogly Design & Build, Rhodes Construction Inc. | unit #21 - proposed 199 sf new wood deck atop (e) roof. install steel cuardrails attached to (e) bld parapets maher naDetails
unit #21 - proposed 199 sf new wood deck atop (e) roof. install steel cuardrails attached to (e) bld parapets maher na | $12,000 |
| Nov 3, 2017 | Never finaled issued Jan 2018, no final | 2551 15th Av | structural upgrade to rear extension of house at the lower levelDetails
structural upgrade to rear extension of house at the lower level | $10,000 | |
| Nov 2, 2017 | Expired or cancelled cancelled Nov 2022 | 1559 Willard St | Forsythe General Contractors | existing free-standing single story garage at front of lot to be expanded in depth & structure upgraded. new guard & handrail installed at (e) adjacent stairway. (e) two-story single family residence at rear of lot & (e) yard, stairway & path to remain unchanged.Details
existing free-standing single story garage at front of lot to be expanded in depth & structure upgraded. new guard & handrail installed at (e) adjacent stairway. (e) two-story single family residence at rear of lot & (e) yard, stairway & path to remain unchanged. | $60,000 |
| May 4, 2017 | Never finaled issued May 2017, no final | 437 Burnett Av | Forsythe General Contractors | rev to pa#201403181004: due to previous fire damage and substandard/unsafe framing conditions in the upper western level, the original wall and roof framing is being reinfored with new stud framing that will be sistered to the (e) walls as required. all oridinal siding to remain.Details
rev to pa#201403181004: due to previous fire damage and substandard/unsafe framing conditions in the upper western level, the original wall and roof framing is being reinfored with new stud framing that will be sistered to the (e) walls as required. all oridinal siding to remain. | |
| Jul 13, 2016 | Never finaled issued Aug 2016, no final | 437 Burnett Av | Forsythe General Contractors | install new retaining wall at east end of propertyDetails
install new retaining wall at east end of property | $15,000 |
| May 2, 2016 | Completed final sign-off Feb 2017 | 1559 Willard St | Forsythe General Contractors | removal of upper level entrance including removal of exterior door & 2 windows/interior wall. replacing exterior wall. replacement of 2 window openings & replacment of (e) garage doors inkindDetails
removal of upper level entrance including removal of exterior door & 2 windows/interior wall. replacing exterior wall. replacement of 2 window openings & replacment of (e) garage doors inkind | $50,000 |
| Feb 4, 2016 | Completed final sign-off Feb 2017 | 1559 Willard St | Forsythe General Contractors | revision to pa 2015-0720-1952: (e) rear window is no longer removed. both new exterior doors are switched to aluminumb glass. (n) lower level deck & spiral stair to be added at front exterior of residence. (e) front window pair replaced by (n) aluminum/glass doorway for deck access. interior remodelDetails
revision to pa 2015-0720-1952: (e) rear window is no longer removed. both new exterior doors are switched to aluminumb glass. (n) lower level deck & spiral stair to be added at front exterior of residence. (e) front window pair replaced by (n) aluminum/glass doorway for deck access. interior remodel | $20,000 |
| Jul 20, 2015 | Completed final sign-off Feb 2017 | 1559 Willard St | Forsythe General Contractors, D Lopez Jr Concrete Construction | upper flr int. remodel including add 2 new bedrooms & 1 bath, door replacement & window removal, door installation @ rear. 951 s.f. of (e) 1st floor to become habitable including move kitchen, living to lower level. add 1/2 bath + mech rm, foundation. replacement (n) shear walls. footprint unchangeDetails
upper flr int. remodel including add 2 new bedrooms & 1 bath, door replacement & window removal, door installation @ rear. 951 s.f. of (e) 1st floor to become habitable including move kitchen, living to lower level. add 1/2 bath + mech rm, foundation. replacement (n) shear walls. footprint unchange | $550,000 |
| Oct 20, 2014 | Completed final sign-off Dec 2014 | 231 Cortland Av | Kotas Construction Inc | to erect single faced non electric wall projecting signDetails
to erect single faced non electric wall projecting sign | $1,000 |
| Oct 17, 2014 | Completed final sign-off Mar 2015 | 601 04th St | Reveal Partners | #321 - bathroom remodel & kitchen remodel, new wood floor, new lighting. compliance with maher ordinance no 155-13 not required.Details
#321 - bathroom remodel & kitchen remodel, new wood floor, new lighting. compliance with maher ordinance no 155-13 not required. | $55,000 |
| Sep 8, 2014 | Completed final sign-off Sep 2014 | 231 Cortland Av | Occidental Express | revision to pa #2013.1216.4267 & #2013.1126.2959: as-built drawings - providing accessible entry, new counter.Details
revision to pa #2013.1216.4267 & #2013.1126.2959: as-built drawings - providing accessible entry, new counter. | |
| Mar 18, 2014 | Never finaled issued Jan 2016, no final | 437 Burnett Av | Forsythe General Contractors | 890 s.f addition @ rear + living area is extended into (e) unconditioned basement. also interior remodel to (e) upper level. (n) standing seam metal roof installed over (e) upper level + (n) green roof is installed over main level. (e) residence is legally non conforming. it extends into 45% rear ydDetails
890 s.f addition @ rear + living area is extended into (e) unconditioned basement. also interior remodel to (e) upper level. (n) standing seam metal roof installed over (e) upper level + (n) green roof is installed over main level. (e) residence is legally non conforming. it extends into 45% rear yd | $200,000 |
| Dec 14, 2011 | Expired or cancelled withdrawn May 2016 | 1910 Mission St | change of use/conversion of vacant 1268 sq ft comm'l space to a full-service restaurant. incl slight rework of (e) storefront to accomodate (n) accessible entrance, new dining area, bar, kitchen, storage areas & accessible bathroom to be constructed.Details
change of use/conversion of vacant 1268 sq ft comm'l space to a full-service restaurant. incl slight rework of (e) storefront to accomodate (n) accessible entrance, new dining area, bar, kitchen, storage areas & accessible bathroom to be constructed. | $20,000 |