- Apr 2024 to Aug 2026
7 permits since 2000 (engineer on 7 permits): 2 completed, 5 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Top Line Remodeling Inc (2), Bradford Construction, Forsythe General Contractors, Ignacio Camarillo Reyes, John Woo Constructionllc, Maven Maintenance Inc, Spnr Built Inc.
- Architects
- Joseph Armin, Kathryn Rogers, Zachary Olczak
- Engineers
- Alex Rood, Chad Chad Hamilton
Where they worked
- Single-family 6
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2026 | In progress filed Aug 2026, not yet issued | 1971 14th Av | Bradford Construction | revision to 202109299481 additional soil retention per geotech at recommendation at rear of propery, less then 50 cu.yd soil removalDetails
revision to 202109299481 additional soil retention per geotech at recommendation at rear of propery, less then 50 cu.yd soil removal | $20,000 |
| Dec 17, 2025 | In progress issued Feb 2026 | 716 Montgomery St | Ignacio Camarillo Reyes | studio a- bring (e) stair case to mezzaine to code extending mezz area, remodel bathroom, add mens/womens, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unitDetails
studio a- bring (e) stair case to mezzaine to code extending mezz area, remodel bathroom, add mens/womens, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit | $190,000 |
| Oct 27, 2025 | In progress issued Oct 2025 | 182 Eureka St | Top Line Remodeling Inc | shoring to contain soil @ back of the houseDetails
shoring to contain soil @ back of the house | $40,000 |
| Feb 5, 2025 | In progress issued Jun 2025 | 175 Saint Germain Av | Spnr Built Inc., Forsythe General Contractors | revision to bpa# 202404190359: lower level bathroom renovation, fixtures to be replaced in kind. 1/f kitchen renovation. 2/f bedroom and bathroom renovation. new skylights at roof. new hvac system and electrical system upgrades. exterior patching in kind replacement of cladding as needed.Details
revision to bpa# 202404190359: lower level bathroom renovation, fixtures to be replaced in kind. 1/f kitchen renovation. 2/f bedroom and bathroom renovation. new skylights at roof. new hvac system and electrical system upgrades. exterior patching in kind replacement of cladding as needed. | $100,000 |
| Jan 9, 2025 | In progress issued Jun 2025 | 182 Eureka St | Top Line Remodeling Inc | basement: new reinforced foundation and slab to replace (e) brick foundation (84lf) and slab.(e) wood supporting beam replaced w/steel beam.(n) conditioned,non-habitable full bath within garage and (n) storage addition @ rear.build out corner so garage door can be widened.1/f:unconditioned...Details
basement: new reinforced foundation and slab to replace (e) brick foundation (84lf) and slab.(e) wood supporting beam replaced w/steel beam.(n) conditioned,non-habitable full bath within garage and (n) storage addition @ rear.build out corner so garage door can be widened.1/f:unconditioned... | $720,000 |
| Jun 7, 2024 | Completed final sign-off Oct 2024 | 375 Santa Clara Av | Maven Maintenance Inc | replace damaged concrete corner with in kind concrete column, work to be done at lower floor garage opening. work does not affect public right-of-wayDetails
replace damaged concrete corner with in kind concrete column, work to be done at lower floor garage opening. work does not affect public right-of-way | $20,000 |
| Apr 23, 2024 | Completed final sign-off Dec 2024 | 524 Euclid Av | John Woo Constructionllc | remodel (e) kitchen. add (n) bi-fold window. enlarge opening between kitchen + dining.Details
remodel (e) kitchen. add (n) bi-fold window. enlarge opening between kitchen + dining. | $95,000 |