Ignacio Camarillo Reyes
- Based in
- San Rafael
- On San Francisco permits
- Aug 2010 to Dec 2025
- Last 24 months
- 6 permits filed
59 permits since 2000: 49 completed, 3 in progress, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2025 | In progress issued Feb 2026 | 716 Montgomery St | studio a- bring (e) stair case to mezzaine to code extending mezz area, remodel bathroom, add mens/womens, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unitDetails
studio a- bring (e) stair case to mezzaine to code extending mezz area, remodel bathroom, add mens/womens, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit | $190,000 |
| Aug 20, 2025 | In progress issued Feb 2026 | 716 Montgomery St | studio b - bring (e) stair case to mezzanine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unitDetails
studio b - bring (e) stair case to mezzanine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit | $210,000 |
| Aug 20, 2025 | In progress issued Feb 2026 | 716 Montgomery St | studio c- bring (e) stair case to meszzaine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unitDetails
studio c- bring (e) stair case to meszzaine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit | $210,000 |
| Jun 24, 2025 | Completed final sign-off Jun 2026 | 716 Montgomery St | suite c - demo existing cabinetry, plumbing and electrical fixtures, wall finishes, per sfbc ab-017.Details
suite c - demo existing cabinetry, plumbing and electrical fixtures, wall finishes, per sfbc ab-017. | $3,000 |
| Jun 24, 2025 | Completed final sign-off Jun 2026 | 716 Montgomery St | suite a - demo existing cabinetry, plumbing and electrical fixtures, wall finishes, per sfbc ab-017.Details
suite a - demo existing cabinetry, plumbing and electrical fixtures, wall finishes, per sfbc ab-017. | $3,000 |
| Jun 24, 2025 | Completed final sign-off Jun 2026 | 716 Montgomery St | suite b - demo existing cabinetry, plumbing and electrical fixtures, wall finishes, per sfbc ab-017.Details
suite b - demo existing cabinetry, plumbing and electrical fixtures, wall finishes, per sfbc ab-017. | $3,000 |
| Apr 3, 2024 | Completed final sign-off Mar 2025 | 2502 Jackson St | remodel 6 (e) bathrooms. remodel (e) kitchen and open wall into family room. move (e) washer & dryer to the second level. replace (e) wood decking at the roof at the rear. replace glass guardrail panels for 1" height increase (41"-42")Details
remodel 6 (e) bathrooms. remodel (e) kitchen and open wall into family room. move (e) washer & dryer to the second level. replace (e) wood decking at the roof at the rear. replace glass guardrail panels for 1" height increase (41"-42") | $200,000 |
| Oct 24, 2023 | Completed final sign-off Feb 2024 | 1320 Dolores St | revision to pa# 202204111980. to reflect garage door will not be changed. revision to special inspections and s2.1.Details
revision to pa# 202204111980. to reflect garage door will not be changed. revision to special inspections and s2.1. | $100 |
| Jul 21, 2023 | Completed final sign-off Feb 2024 | 1320 Dolores St | revision to 202204111980 2nd fl infill of 3 windows and 1 window replacement in lightwell. not visable from street.Details
revision to 202204111980 2nd fl infill of 3 windows and 1 window replacement in lightwell. not visable from street. | $5,000 |
| Apr 11, 2022 | Completed final sign-off Feb 2024 | 1320 Dolores St | new garage door. removal of general storage on 1/f. remodel unit #1320 on 2/f.Details
new garage door. removal of general storage on 1/f. remodel unit #1320 on 2/f. | $52,000 |
| Apr 6, 2022 | Completed final sign-off Feb 2024 | 1320 Dolores St | remodel in kind - 2 full bathrooms, kitchen. no walls movingDetails
remodel in kind - 2 full bathrooms, kitchen. no walls moving | $18,500 |
| Feb 23, 2022 | Completed final sign-off Jan 2023 | 4824 Fulton St | in kind single bathroom remodel. non structuralDetails
in kind single bathroom remodel. non structural | $22,000 |
| Feb 10, 2022 | Completed final sign-off Sep 2023 | 1320 Guerrero St | rev to pa 202201256600: kitchen remodel, modifty wall openings. new study, new wall & new door. relocate living room doorway. new closet in bedroom 2. relocate master bedroom door. master bathroom remodel.Details
rev to pa 202201256600: kitchen remodel, modifty wall openings. new study, new wall & new door. relocate living room doorway. new closet in bedroom 2. relocate master bedroom door. master bathroom remodel. | $45,000 |
| Jan 25, 2022 | Completed final sign-off Sep 2023 | 1320 Guerrero St | demo kitchen cabinets, fixturs 7 finishes. demo one side of 2 sided fireplace at siting room, demo built in cabinets at living room. all remodelling under separate permitDetails
demo kitchen cabinets, fixturs 7 finishes. demo one side of 2 sided fireplace at siting room, demo built in cabinets at living room. all remodelling under separate permit | $6,000 |
| Jun 3, 2021 | Completed final sign-off Feb 2022 | 166 Ewing Tr | residential interior remodel of kitchen. cosmetic changes/upgrades throughout. replacement of existing windows in rear, non-visible from streetDetails
residential interior remodel of kitchen. cosmetic changes/upgrades throughout. replacement of existing windows in rear, non-visible from street | $50,000 |
| Mar 11, 2021 | Completed final sign-off Dec 2021 | 2230 Mason St | kitchen remodel, new hardwood floors, new recessed lighting in hall, living room & kitchenDetails
kitchen remodel, new hardwood floors, new recessed lighting in hall, living room & kitchen | $58,000 |
| Feb 8, 2021 | Completed final sign-off Jul 2023 | 2186 Vallejo St | (unit 2186a): kitchen, half bath, & master bath remodel. no structural work to be performed.Details
(unit 2186a): kitchen, half bath, & master bath remodel. no structural work to be performed. | $80,000 |
| Sep 27, 2019 | Expired or cancelled expired Nov 2024 | 3025 Scott St | revision to bpa# 201903296690. replace siding at front, side and rear. stucco at second and third level at front. cedar siding at sides and rear. replace 3 windows on side. replace garage door in-kind (wood).Details
revision to bpa# 201903296690. replace siding at front, side and rear. stucco at second and third level at front. cedar siding at sides and rear. replace 3 windows on side. replace garage door in-kind (wood). | $26,500 |
| Jun 6, 2019 | Completed final sign-off Jun 2019 | 137 Alhambra St | repair landing floor section at service stairs in-kind. compy with complaint 201959501Details
repair landing floor section at service stairs in-kind. compy with complaint 201959501 | $490 |
| Mar 29, 2019 | Expired or cancelled expired Nov 2024 | 3025 Scott St | replace existing lower front and side siding all in kind. replace existing upper rear façade siding with 1 x 10 cedar siding and trim. no composite.Details
replace existing lower front and side siding all in kind. replace existing upper rear façade siding with 1 x 10 cedar siding and trim. no composite. | $9,500 |
| Mar 29, 2019 | Completed final sign-off Nov 2019 | 2220 Sacramento St | update 1 bathrooms: replacing pplumbing & elecrical fxtures in-kind. to complaince with t24 & current codes.Details
update 1 bathrooms: replacing pplumbing & elecrical fxtures in-kind. to complaince with t24 & current codes. | $28,000 |
| Feb 19, 2019 | Completed final sign-off May 2019 | 2372 Broadway | repair inkind 2 rear existing decks due to severe dry rot damage. portion of railing to be repaired/replaced to comply with current building codes. less than 50% repair/replace.Details
repair inkind 2 rear existing decks due to severe dry rot damage. portion of railing to be repaired/replaced to comply with current building codes. less than 50% repair/replace. | $24,000 |
| Dec 12, 2017 | Completed final sign-off Feb 2019 | 3025 Scott St | comply with 201723511. revision to 201707111496. make new foundation on covered porch at rear. replace rear door in kind. replace side windows into light well in kind. relocate laundry . not visible from street. maher may be required.Details
comply with 201723511. revision to 201707111496. make new foundation on covered porch at rear. replace rear door in kind. replace side windows into light well in kind. relocate laundry . not visible from street. maher may be required. | $16,000 |
| Sep 14, 2017 | Completed final sign-off Feb 2019 | 263 Ripley St | bathroom upgrade - replace all bathroom plumbing fixtures in kind and same location. comply with title 24 for electical and water flow in fixturesDetails
bathroom upgrade - replace all bathroom plumbing fixtures in kind and same location. comply with title 24 for electical and water flow in fixtures | $29,000 |
| Jul 11, 2017 | Completed final sign-off Feb 2019 | 3025 Scott St | kitchen and rear room remodel in 1st fl. close doorway & add closet in 2nd fl. comply with t-24 in remodeled areas. maher naDetails
kitchen and rear room remodel in 1st fl. close doorway & add closet in 2nd fl. comply with t-24 in remodeled areas. maher na | $69,000 |
| May 22, 2017 | Completed final sign-off Jan 2018 | 263 Ripley St | revision to bpa 201612306335 repair dry rot around windows and replace 2 45-minute fire-rated windows in kind.Details
revision to bpa 201612306335 repair dry rot around windows and replace 2 45-minute fire-rated windows in kind. | $7,500 |
| Dec 30, 2016 | Completed final sign-off Jan 2018 | 263 Ripley St | otc approval for repair of west side siding and add new 8" lap siding. roof and trim patch work as needed to received new siding hardie plank, lap siding smoooth .313 approx 1,700 sfDetails
otc approval for repair of west side siding and add new 8" lap siding. roof and trim patch work as needed to received new siding hardie plank, lap siding smoooth .313 approx 1,700 sf | $26,000 |
| Oct 12, 2016 | Completed final sign-off Dec 2016 | 2372 Broadway | upgrade bathroom in existing ground floor. replaceing wall and floor tile, plumbing fixtures in kind. comply with title - 24 for electrical including fan with humidity sensor.Details
upgrade bathroom in existing ground floor. replaceing wall and floor tile, plumbing fixtures in kind. comply with title - 24 for electrical including fan with humidity sensor. | $14,000 |
| Sep 29, 2016 | Never finaled issued Sep 2016, no final | 32 Avila St | initial demo. remove all floor finishes, including cabinetry, tile and fixtures on the inside of house only. no structural demo. n/a maher ord. 155-13Details
initial demo. remove all floor finishes, including cabinetry, tile and fixtures on the inside of house only. no structural demo. n/a maher ord. 155-13 | $4,500 |
| Sep 29, 2016 | Completed final sign-off Apr 2017 | 137 Alhambra St | revision to 201310179619 & 201503302175 extend door awning at roofDetails
revision to 201310179619 & 201503302175 extend door awning at roof | $1,800 |
| Apr 22, 2016 | Expired or cancelled cancelled Jan 2026 | 1350 Lake St | convert 1 bath into 2 baths partially taking closet space from adjacent bedroom. comply with title 24 and add fan to each bathDetails
convert 1 bath into 2 baths partially taking closet space from adjacent bedroom. comply with title 24 and add fan to each bath | $23,500 |
| Jan 15, 2016 | Completed final sign-off Nov 2019 | 32 Avila St | one story vertical addition to (e) 2 story residence, including new bathroom, bedroom, and interior remodeling. n/a for maher ordinance no.155-13Details
one story vertical addition to (e) 2 story residence, including new bathroom, bedroom, and interior remodeling. n/a for maher ordinance no.155-13 | $425,000 |
| Mar 30, 2015 | Completed final sign-off Apr 2017 | 135 Alhambra St | revision to pa# 2013 1017 9619 - stair enclosure to roof. clarification to roof deck guardrail to be solid wall. maher - not req'dDetails
revision to pa# 2013 1017 9619 - stair enclosure to roof. clarification to roof deck guardrail to be solid wall. maher - not req'd | |
| Aug 26, 2014 | Completed final sign-off Oct 2014 | 3224 Octavia St | to comply with physical inspection report #cc-7759Details
to comply with physical inspection report #cc-7759 | $1,500 |
| Apr 18, 2014 | Completed final sign-off Apr 2017 | 135 Alhambra St | interior alteration to the 1st,2nd & 3rd floors including groung floor garage structural upgrade (removing two wood columns), replacement kitchens & baths. gr floor conditioned space on a separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
interior alteration to the 1st,2nd & 3rd floors including groung floor garage structural upgrade (removing two wood columns), replacement kitchens & baths. gr floor conditioned space on a separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $328,800 |
| Dec 26, 2013 | Completed final sign-off Jan 2014 | 2239 Leavenworth St | to comply with physical inspection report #cc-7399Details
to comply with physical inspection report #cc-7399 | $1,000 |
| Oct 17, 2013 | Completed final sign-off Apr 2017 | 135 Alhambra St | new stairs to roof (renovation to 3rd fl) with (n) minimum stair enclosure at roof level, w/ roof deck for 137 alhambra ground floor new conditioned space for 135 alhambraDetails
new stairs to roof (renovation to 3rd fl) with (n) minimum stair enclosure at roof level, w/ roof deck for 137 alhambra ground floor new conditioned space for 135 alhambra | $26,300 |
| Sep 5, 2013 | Completed final sign-off Nov 2013 | 3224 Octavia St | repl windows at front facade w/milguard essene windows- casement single windows @ sides & fixed picture windows @ center, total of 7 windows @ facade, rev to pa 201307293018 to repl front facade window to milguard u max 0.4 cec 151cDetails
repl windows at front facade w/milguard essene windows- casement single windows @ sides & fixed picture windows @ center, total of 7 windows @ facade, rev to pa 201307293018 to repl front facade window to milguard u max 0.4 cec 151c | |
| Jul 31, 2013 | Expired or cancelled cancelled May 2015 | 3485 21st St | enclose (e) courtyard @ property to laundry room. replace (e) window w/ door. reconfigure access to boiler room. replace (e) boiler. build a laundry room on (e) courtyard. to be accessed from hallway at ground floor.Details
enclose (e) courtyard @ property to laundry room. replace (e) window w/ door. reconfigure access to boiler room. replace (e) boiler. build a laundry room on (e) courtyard. to be accessed from hallway at ground floor. | $9,500 |
| Jul 15, 2013 | Completed final sign-off Oct 2013 | 3224 Octavia St | revision to app#201304033710,201302049448,201301097614, to reflect extg as built conditions. new retaining walls and stairs @ rear yardDetails
revision to app#201304033710,201302049448,201301097614, to reflect extg as built conditions. new retaining walls and stairs @ rear yard | $10,000 |
| Jun 3, 2013 | Completed final sign-off Aug 2013 | 2243 Leavenworth St | add closet to existing living room and convert to a bedroom. convert existing bedroom to a family room. kitchen remodel to open area with new family room. add recessed lights in kitchen, laudry, new family room and new bedroom. add new outlets to family room and bed room in a afci add new beam.Details
add closet to existing living room and convert to a bedroom. convert existing bedroom to a family room. kitchen remodel to open area with new family room. add recessed lights in kitchen, laudry, new family room and new bedroom. add new outlets to family room and bed room in a afci add new beam. | $20,000 |
| Apr 19, 2013 | Completed final sign-off May 2013 | 1020 Union St | build closet in (e) den, relocate (e) closet door, install door in (e) doorway, replace double over w/single oven. relocate 3 recessed lights, relocate 2 outlets, make 24"x48" opening in kithcen & living roomDetails
build closet in (e) den, relocate (e) closet door, install door in (e) doorway, replace double over w/single oven. relocate 3 recessed lights, relocate 2 outlets, make 24"x48" opening in kithcen & living room | $7,500 |
| Apr 3, 2013 | Completed final sign-off Oct 2013 | 3226 Octavia St | remodel upper unit at 3rd floor:add new roof deck as part of upper unit. remodel bathroom and kitchen. add bathroom and new balcony at rear elevation. work at 3226. octavia onlyDetails
remodel upper unit at 3rd floor:add new roof deck as part of upper unit. remodel bathroom and kitchen. add bathroom and new balcony at rear elevation. work at 3226. octavia only | $60,000 |
| Feb 8, 2013 | Completed final sign-off May 2013 | 1100 Church St | revision permit to clarify revison permit #201212035283 that automatic sprinkler are to be removed from original pa# 201207306070 per ab005. original sheet a2.1 included to clarify extent of conversion from "u" to "r-2" occupancy.Details
revision permit to clarify revison permit #201212035283 that automatic sprinkler are to be removed from original pa# 201207306070 per ab005. original sheet a2.1 included to clarify extent of conversion from "u" to "r-2" occupancy. | |
| Jan 9, 2013 | Completed final sign-off Oct 2013 | 3224 Octavia St | garage level beam & foundation replacement in localized areas. related lateral strengthening.Details
garage level beam & foundation replacement in localized areas. related lateral strengthening. | $50,000 |
| Dec 3, 2012 | Completed final sign-off May 2013 | 1100 Church St | revision to app#201207306070. to remove sprinkler requirements.sprinkler requirement retained in originla permit for furture roof deck permit. roof deck not to be pursued,sprinklers not reaq for r-2 occupancy,existing egress complies w/r-2 requrements for work performed inpermit @ 201207306070 (e)3Details
revision to app#201207306070. to remove sprinkler requirements.sprinkler requirement retained in originla permit for furture roof deck permit. roof deck not to be pursued,sprinklers not reaq for r-2 occupancy,existing egress complies w/r-2 requrements for work performed inpermit @ 201207306070 (e)3 | |
| Nov 29, 2012 | Expired or cancelled expired Jun 2014 | 1852 Stockton St | repair back stairs for dry rot as needed- same for sameDetails
repair back stairs for dry rot as needed- same for same | $7,500 |
| Jul 30, 2012 | Completed final sign-off May 2013 | 1100 Church St | interior renovation to (e) 4 unit bldg, ground floor infill under (e) rear sunroom. add (2) bedroom & (2) baths at ground floor. (2) (n) garage doors and (3) (n) windows at side elevation. (n) roof deck under separate permit. building to be fully sprinklered under separate permit.Details
interior renovation to (e) 4 unit bldg, ground floor infill under (e) rear sunroom. add (2) bedroom & (2) baths at ground floor. (2) (n) garage doors and (3) (n) windows at side elevation. (n) roof deck under separate permit. building to be fully sprinklered under separate permit. | $250,000 |
| Mar 23, 2012 | Completed final sign-off Apr 2012 | 601 Clayton St | replace top roof door, 1 3/4" metal door, with self closing system, 1 hr rated, no roof deckDetails
replace top roof door, 1 3/4" metal door, with self closing system, 1 hr rated, no roof deck | $1,200 |
| Oct 27, 2011 | Completed final sign-off Dec 2011 | 26 Mallorca Wy | install new deck with stairs at rear yard of (e) 2nd floorDetails
install new deck with stairs at rear yard of (e) 2nd floor | $4,000 |
| Oct 26, 2011 | Completed final sign-off Nov 2011 | 449 Carl St | replace 17 windows at street face and 2 windows at lightwell. all to be wood inside and out except for 1 bathroom window to be vinyl. all to keep same frame, size and design. replace in kind. no stuctural work, no egress changes. u- factor = .40 maxDetails
replace 17 windows at street face and 2 windows at lightwell. all to be wood inside and out except for 1 bathroom window to be vinyl. all to keep same frame, size and design. replace in kind. no stuctural work, no egress changes. u- factor = .40 max | $12,000 |
| Jul 25, 2011 | Expired or cancelled expired Jul 2015 | 26 Mallorca Wy | upgrade kitchen & bathroom with new tile, cabinets, plumbing fixtures & paint. electrical work to comply w/title 24 @ kitchen & bathroom, new lights & outlets throughout unit. lighting must comply w/cec 150 (k).Details
upgrade kitchen & bathroom with new tile, cabinets, plumbing fixtures & paint. electrical work to comply w/title 24 @ kitchen & bathroom, new lights & outlets throughout unit. lighting must comply w/cec 150 (k). | $35,000 |
| Jun 10, 2011 | Completed final sign-off Aug 2011 | 263 Ripley St | replace existing (12) windows on front face. install new siding on 2nd and 3rd floor (front). replace (12) windows on 2nd and 3rd floor on rear facde and trim only. (u-factor max. 0.4)Details
replace existing (12) windows on front face. install new siding on 2nd and 3rd floor (front). replace (12) windows on 2nd and 3rd floor on rear facde and trim only. (u-factor max. 0.4) | $28,000 |
| May 16, 2011 | Completed final sign-off May 2011 | 3470 Scott St | revision to pa# 2011.02.18.0583. submit as built drawings to delete not required footings from plansDetails
revision to pa# 2011.02.18.0583. submit as built drawings to delete not required footings from plans | |
| Apr 12, 2011 | Completed final sign-off May 2011 | 1239 07th Av | bathroom renovation, replace tub, sink, toilet, shower valve, new wall & floor tile. install new fan, gfci. comply with title 24. remove non-bearing wall between toilet room & tub-sink room, close old doorway to toilet room. lighting to comply with cec 150(k)Details
bathroom renovation, replace tub, sink, toilet, shower valve, new wall & floor tile. install new fan, gfci. comply with title 24. remove non-bearing wall between toilet room & tub-sink room, close old doorway to toilet room. lighting to comply with cec 150(k) | $6,500 |
| Mar 24, 2011 | Completed final sign-off May 2011 | 3470 Scott St | rebuilt extg deck at rear of 3rd floor. replacing in kind. remove 2nd floor deck.Details
rebuilt extg deck at rear of 3rd floor. replacing in kind. remove 2nd floor deck. | $2,000 |
| Feb 18, 2011 | Completed final sign-off May 2011 | 3470 Scott St | revision to pa# 2011.01.06.8006. adding bedroom and full bath at ground floor, and new interior stairs from 2nd floor unit at 3479 to ground floor. replace some windows in the back of the building and add 1 full bath on top floor unit at 3472.Details
revision to pa# 2011.01.06.8006. adding bedroom and full bath at ground floor, and new interior stairs from 2nd floor unit at 3479 to ground floor. replace some windows in the back of the building and add 1 full bath on top floor unit at 3472. | $105,000 |
| Jan 6, 2011 | Completed final sign-off May 2011 | 3470 Scott St | upgrade 2 kitchens and 2 bathrooms with new cabinets, appliances and electric and plumbing fixtures upgrade all electrical wiring in units to comply with title 24, new tile in bathrooms & flooring in kitchens new lighting to comply with cec 150(k) nochange to walls windows doorsDetails
upgrade 2 kitchens and 2 bathrooms with new cabinets, appliances and electric and plumbing fixtures upgrade all electrical wiring in units to comply with title 24, new tile in bathrooms & flooring in kitchens new lighting to comply with cec 150(k) nochange to walls windows doors | $120,000 |
| Aug 19, 2010 | Completed final sign-off Oct 2010 | 2549 Clay St | master bathroom upgrade: replacing electrical & plumbing fixtures, tile & vanity, all fixtures to remain in same location; verify title 24 compliance, provide high efficiency lightsDetails
master bathroom upgrade: replacing electrical & plumbing fixtures, tile & vanity, all fixtures to remain in same location; verify title 24 compliance, provide high efficiency lights | $22,000 |