Ignacio Camarillo Reyes
- Based in
- San Rafael
- On San Francisco permits
- Aug 2010 to Dec 2025
- Last 24 months
- 6 permits filed
59 permits since 2000: 49 completed, 3 in progress, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 6 completed, 3 in progress, 1 expired or cancelled. Typically 8 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2025 | In progress issued Feb 2026 | 716 Montgomery St | studio a- bring (e) stair case to mezzaine to code extending mezz area, remodel bathroom, add mens/womens, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unitDetails
studio a- bring (e) stair case to mezzaine to code extending mezz area, remodel bathroom, add mens/womens, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit | $190,000 |
| Aug 20, 2025 | In progress issued Feb 2026 | 716 Montgomery St | studio b - bring (e) stair case to mezzanine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unitDetails
studio b - bring (e) stair case to mezzanine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit | $210,000 |
| Aug 20, 2025 | In progress issued Feb 2026 | 716 Montgomery St | studio c- bring (e) stair case to meszzaine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unitDetails
studio c- bring (e) stair case to meszzaine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit | $210,000 |
| Jun 6, 2019 | Completed final sign-off Jun 2019 | 137 Alhambra St | repair landing floor section at service stairs in-kind. compy with complaint 201959501Details
repair landing floor section at service stairs in-kind. compy with complaint 201959501 | $490 |
| Mar 30, 2015 | Completed final sign-off Apr 2017 | 135 Alhambra St | revision to pa# 2013 1017 9619 - stair enclosure to roof. clarification to roof deck guardrail to be solid wall. maher - not req'dDetails
revision to pa# 2013 1017 9619 - stair enclosure to roof. clarification to roof deck guardrail to be solid wall. maher - not req'd | |
| Oct 17, 2013 | Completed final sign-off Apr 2017 | 135 Alhambra St | new stairs to roof (renovation to 3rd fl) with (n) minimum stair enclosure at roof level, w/ roof deck for 137 alhambra ground floor new conditioned space for 135 alhambraDetails
new stairs to roof (renovation to 3rd fl) with (n) minimum stair enclosure at roof level, w/ roof deck for 137 alhambra ground floor new conditioned space for 135 alhambra | $26,300 |
| Jul 15, 2013 | Completed final sign-off Oct 2013 | 3224 Octavia St | revision to app#201304033710,201302049448,201301097614, to reflect extg as built conditions. new retaining walls and stairs @ rear yardDetails
revision to app#201304033710,201302049448,201301097614, to reflect extg as built conditions. new retaining walls and stairs @ rear yard | $10,000 |
| Nov 29, 2012 | Expired or cancelled expired Jun 2014 | 1852 Stockton St | repair back stairs for dry rot as needed- same for sameDetails
repair back stairs for dry rot as needed- same for same | $7,500 |
| Oct 27, 2011 | Completed final sign-off Dec 2011 | 26 Mallorca Wy | install new deck with stairs at rear yard of (e) 2nd floorDetails
install new deck with stairs at rear yard of (e) 2nd floor | $4,000 |
| Feb 18, 2011 | Completed final sign-off May 2011 | 3470 Scott St | revision to pa# 2011.01.06.8006. adding bedroom and full bath at ground floor, and new interior stairs from 2nd floor unit at 3479 to ground floor. replace some windows in the back of the building and add 1 full bath on top floor unit at 3472.Details
revision to pa# 2011.01.06.8006. adding bedroom and full bath at ground floor, and new interior stairs from 2nd floor unit at 3479 to ground floor. replace some windows in the back of the building and add 1 full bath on top floor unit at 3472. | $105,000 |