Back to bathroom remodel contractors
Ignacio Camarillo Reyes
- Based in
- San Rafael
- On San Francisco permits
- Aug 2010 to Dec 2025
- Last 24 months
- 6 permits filed
59 permits since 2000: 49 completed, 3 in progress, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 17 completed, 3 in progress, 2 expired or cancelled. Typically 4 days from filing to permit and 267 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2025 | In progress issued Feb 2026 | 716 Montgomery St | studio a- bring (e) stair case to mezzaine to code extending mezz area, remodel bathroom, add mens/womens, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unitDetails
studio a- bring (e) stair case to mezzaine to code extending mezz area, remodel bathroom, add mens/womens, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit | $190,000 |
| Aug 20, 2025 | In progress issued Feb 2026 | 716 Montgomery St | studio b - bring (e) stair case to mezzanine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unitDetails
studio b - bring (e) stair case to mezzanine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit | $210,000 |
| Aug 20, 2025 | In progress issued Feb 2026 | 716 Montgomery St | studio c- bring (e) stair case to meszzaine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unitDetails
studio c- bring (e) stair case to meszzaine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit | $210,000 |
| Apr 3, 2024 | Completed final sign-off Mar 2025 | 2502 Jackson St | remodel 6 (e) bathrooms. remodel (e) kitchen and open wall into family room. move (e) washer & dryer to the second level. replace (e) wood decking at the roof at the rear. replace glass guardrail panels for 1" height increase (41"-42")Details
remodel 6 (e) bathrooms. remodel (e) kitchen and open wall into family room. move (e) washer & dryer to the second level. replace (e) wood decking at the roof at the rear. replace glass guardrail panels for 1" height increase (41"-42") | $200,000 |
| Apr 6, 2022 | Completed final sign-off Feb 2024 | 1320 Dolores St | remodel in kind - 2 full bathrooms, kitchen. no walls movingDetails
remodel in kind - 2 full bathrooms, kitchen. no walls moving | $18,500 |
| Feb 23, 2022 | Completed final sign-off Jan 2023 | 4824 Fulton St | in kind single bathroom remodel. non structuralDetails
in kind single bathroom remodel. non structural | $22,000 |
| Feb 10, 2022 | Completed final sign-off Sep 2023 | 1320 Guerrero St | rev to pa 202201256600: kitchen remodel, modifty wall openings. new study, new wall & new door. relocate living room doorway. new closet in bedroom 2. relocate master bedroom door. master bathroom remodel.Details
rev to pa 202201256600: kitchen remodel, modifty wall openings. new study, new wall & new door. relocate living room doorway. new closet in bedroom 2. relocate master bedroom door. master bathroom remodel. | $45,000 |
| Feb 8, 2021 | Completed final sign-off Jul 2023 | 2186 Vallejo St | (unit 2186a): kitchen, half bath, & master bath remodel. no structural work to be performed.Details
(unit 2186a): kitchen, half bath, & master bath remodel. no structural work to be performed. | $80,000 |
| Mar 29, 2019 | Completed final sign-off Nov 2019 | 2220 Sacramento St | update 1 bathrooms: replacing pplumbing & elecrical fxtures in-kind. to complaince with t24 & current codes.Details
update 1 bathrooms: replacing pplumbing & elecrical fxtures in-kind. to complaince with t24 & current codes. | $28,000 |
| Sep 14, 2017 | Completed final sign-off Feb 2019 | 263 Ripley St | bathroom upgrade - replace all bathroom plumbing fixtures in kind and same location. comply with title 24 for electical and water flow in fixturesDetails
bathroom upgrade - replace all bathroom plumbing fixtures in kind and same location. comply with title 24 for electical and water flow in fixtures | $29,000 |
| Oct 12, 2016 | Completed final sign-off Dec 2016 | 2372 Broadway | upgrade bathroom in existing ground floor. replaceing wall and floor tile, plumbing fixtures in kind. comply with title - 24 for electrical including fan with humidity sensor.Details
upgrade bathroom in existing ground floor. replaceing wall and floor tile, plumbing fixtures in kind. comply with title - 24 for electrical including fan with humidity sensor. | $14,000 |
| Apr 22, 2016 | Expired or cancelled cancelled Jan 2026 | 1350 Lake St | convert 1 bath into 2 baths partially taking closet space from adjacent bedroom. comply with title 24 and add fan to each bathDetails
convert 1 bath into 2 baths partially taking closet space from adjacent bedroom. comply with title 24 and add fan to each bath | $23,500 |
| Jan 15, 2016 | Completed final sign-off Nov 2019 | 32 Avila St | one story vertical addition to (e) 2 story residence, including new bathroom, bedroom, and interior remodeling. n/a for maher ordinance no.155-13Details
one story vertical addition to (e) 2 story residence, including new bathroom, bedroom, and interior remodeling. n/a for maher ordinance no.155-13 | $425,000 |
| Apr 18, 2014 | Completed final sign-off Apr 2017 | 135 Alhambra St | interior alteration to the 1st,2nd & 3rd floors including groung floor garage structural upgrade (removing two wood columns), replacement kitchens & baths. gr floor conditioned space on a separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
interior alteration to the 1st,2nd & 3rd floors including groung floor garage structural upgrade (removing two wood columns), replacement kitchens & baths. gr floor conditioned space on a separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $328,800 |
| Apr 3, 2013 | Completed final sign-off Oct 2013 | 3226 Octavia St | remodel upper unit at 3rd floor:add new roof deck as part of upper unit. remodel bathroom and kitchen. add bathroom and new balcony at rear elevation. work at 3226. octavia onlyDetails
remodel upper unit at 3rd floor:add new roof deck as part of upper unit. remodel bathroom and kitchen. add bathroom and new balcony at rear elevation. work at 3226. octavia only | $60,000 |
| Jul 30, 2012 | Completed final sign-off May 2013 | 1100 Church St | interior renovation to (e) 4 unit bldg, ground floor infill under (e) rear sunroom. add (2) bedroom & (2) baths at ground floor. (2) (n) garage doors and (3) (n) windows at side elevation. (n) roof deck under separate permit. building to be fully sprinklered under separate permit.Details
interior renovation to (e) 4 unit bldg, ground floor infill under (e) rear sunroom. add (2) bedroom & (2) baths at ground floor. (2) (n) garage doors and (3) (n) windows at side elevation. (n) roof deck under separate permit. building to be fully sprinklered under separate permit. | $250,000 |
| Oct 26, 2011 | Completed final sign-off Nov 2011 | 449 Carl St | replace 17 windows at street face and 2 windows at lightwell. all to be wood inside and out except for 1 bathroom window to be vinyl. all to keep same frame, size and design. replace in kind. no stuctural work, no egress changes. u- factor = .40 maxDetails
replace 17 windows at street face and 2 windows at lightwell. all to be wood inside and out except for 1 bathroom window to be vinyl. all to keep same frame, size and design. replace in kind. no stuctural work, no egress changes. u- factor = .40 max | $12,000 |
| Jul 25, 2011 | Expired or cancelled expired Jul 2015 | 26 Mallorca Wy | upgrade kitchen & bathroom with new tile, cabinets, plumbing fixtures & paint. electrical work to comply w/title 24 @ kitchen & bathroom, new lights & outlets throughout unit. lighting must comply w/cec 150 (k).Details
upgrade kitchen & bathroom with new tile, cabinets, plumbing fixtures & paint. electrical work to comply w/title 24 @ kitchen & bathroom, new lights & outlets throughout unit. lighting must comply w/cec 150 (k). | $35,000 |
| Apr 12, 2011 | Completed final sign-off May 2011 | 1239 07th Av | bathroom renovation, replace tub, sink, toilet, shower valve, new wall & floor tile. install new fan, gfci. comply with title 24. remove non-bearing wall between toilet room & tub-sink room, close old doorway to toilet room. lighting to comply with cec 150(k)Details
bathroom renovation, replace tub, sink, toilet, shower valve, new wall & floor tile. install new fan, gfci. comply with title 24. remove non-bearing wall between toilet room & tub-sink room, close old doorway to toilet room. lighting to comply with cec 150(k) | $6,500 |
| Feb 18, 2011 | Completed final sign-off May 2011 | 3470 Scott St | revision to pa# 2011.01.06.8006. adding bedroom and full bath at ground floor, and new interior stairs from 2nd floor unit at 3479 to ground floor. replace some windows in the back of the building and add 1 full bath on top floor unit at 3472.Details
revision to pa# 2011.01.06.8006. adding bedroom and full bath at ground floor, and new interior stairs from 2nd floor unit at 3479 to ground floor. replace some windows in the back of the building and add 1 full bath on top floor unit at 3472. | $105,000 |
| Jan 6, 2011 | Completed final sign-off May 2011 | 3470 Scott St | upgrade 2 kitchens and 2 bathrooms with new cabinets, appliances and electric and plumbing fixtures upgrade all electrical wiring in units to comply with title 24, new tile in bathrooms & flooring in kitchens new lighting to comply with cec 150(k) nochange to walls windows doorsDetails
upgrade 2 kitchens and 2 bathrooms with new cabinets, appliances and electric and plumbing fixtures upgrade all electrical wiring in units to comply with title 24, new tile in bathrooms & flooring in kitchens new lighting to comply with cec 150(k) nochange to walls windows doors | $120,000 |
| Aug 19, 2010 | Completed final sign-off Oct 2010 | 2549 Clay St | master bathroom upgrade: replacing electrical & plumbing fixtures, tile & vanity, all fixtures to remain in same location; verify title 24 compliance, provide high efficiency lightsDetails
master bathroom upgrade: replacing electrical & plumbing fixtures, tile & vanity, all fixtures to remain in same location; verify title 24 compliance, provide high efficiency lights | $22,000 |