Permit GraphSan Francisco building permits since 2000

Block 1425, lot 006

231 08th Ave

City’s use
Single Family Residential
Built
1911
Stories
3
Units
1
Rooms
5 bedrooms, 4 bathrooms
Building
4,439 sq ft
Lot
3,000 sq ft
Zoning
RH2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

11 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 25, 2026Completed
final sign-off Aug 2026
231 08th AvAdvantage Roofing (See Notes)re-roofing: remove and replace roofing material / existing roofing material (in-kind)
Details
Permit
202606253940
Status
complete
Filed
Jun 25, 2026
Permit issued
Jun 25, 2026
Final sign-off
Aug 13, 2026
Declared cost
$31,048
Address
231 08th Av

re-roofing: remove and replace roofing material / existing roofing material (in-kind)

Open the permit page

$31,048
May 15, 2026In progress
issued Sep 2026
231 08th AvCardea Bldg Dba Dimension Design Groupnew curb (8"x12") over (e) footing in garage, across +- 14 ft.
Details
Permit
202605151381
Status
issued
Filed
May 15, 2026
Permit issued
Sep 18, 2026
Declared cost
$10,000
Address
231 08th Av

new curb (8"x12") over (e) footing in garage, across +- 14 ft.

Open the permit page

$10,000
Dec 11, 2025In progress
issued Dec 2025
231 08th AvCardea Bldg Dba Dimension Design Groupoverlay (e) front stairs with stone tile.
Details
Permit
202512111488
Status
issued
Filed
Dec 11, 2025
Permit issued
Dec 11, 2025
Declared cost
$5,000
Address
231 08th Av

overlay (e) front stairs with stone tile.

Open the permit page

$5,000
Mar 7, 2024Completed
final sign-off May 2024
231 08th AvFreemodel Inc.in kind repairs of siding and roof flashing on the front south elevation. repaint exterior facade to match exising color. 50 sq ft of siding and flashing to be repaired.
Details
Permit
202403077302
Status
complete
Filed
Mar 7, 2024
Permit issued
Mar 7, 2024
Final sign-off
May 7, 2024
Declared cost
$2,500
Address
231 08th Av

in kind repairs of siding and roof flashing on the front south elevation. repaint exterior facade to match exising color. 50 sq ft of siding and flashing to be repaired.

Open the permit page

$2,500
May 6, 2011Completed
final sign-off Jun 2014
231 08th AvZion Engineeringrevise 200808189435.replc window@frt insulate in kind. reconfig utility area @garage.reloc bar&firepl@lower level.recongif stair to yard.switch window for door@rear 2/level terr.switch tile @terraces.reloc alternate tread device to exterior rear.reconfig bath & closets@frt rms on tp fl.railing@balc
Details
Permit
201105065535
Status
complete
Filed
May 6, 2011
Permit issued
Jan 23, 2012
Final sign-off
Jun 17, 2014
Declared cost
$20,000
Address
231 08th Av

revise 200808189435.replc window@frt insulate in kind. reconfig utility area @garage.reloc bar&firepl@lower level.recongif stair to yard.switch window for door@rear 2/level terr.switch tile @terraces.reloc alternate tread device to exterior rear.reconfig bath & closets@frt rms on tp fl.railing@balc

Open the permit page

$20,000
Apr 7, 2011Completed
final sign-off Sep 2011
231 08th AvLevel 8 Construction Incnew hydronic heating installation 80k btu, boiler in garage, refer to 200808189435
Details
Permit
201104073632
Status
complete
Filed
Apr 7, 2011
Permit issued
Apr 7, 2011
Final sign-off
Sep 16, 2011
Declared cost
$25,000
Address
231 08th Av

new hydronic heating installation 80k btu, boiler in garage, refer to 200808189435

Open the permit page

$25,000
Feb 18, 2011Completed
final sign-off Sep 2012
231 08th AvZion Engineeringzion engineering to install sprinklers at 1st & 4th floors per fire dept comments, 24 pendents to be added. (no undg work) new 1-1/2" comb fire service connect at meter. refer to p/a#2008-0818-9435 s1. new sprinkler system per nfpa
Details
Permit
201102180606
Status
complete
Filed
Feb 18, 2011
Permit issued
Feb 24, 2011
Final sign-off
Sep 17, 2012
Declared cost
$10,794
Address
231 08th Av

zion engineering to install sprinklers at 1st & 4th floors per fire dept comments, 24 pendents to be added. (no undg work) new 1-1/2" comb fire service connect at meter. refer to p/a#2008-0818-9435 s1. new sprinkler system per nfpa

Open the permit page

$10,794
Dec 31, 2010Expired or cancelled
cancelled Jan 2026
231 08th Avopen walls & floors to determine existing structural conditions & some mechanic/elec locations. in preparation for work under pending permit #2008-0818-9435-s1
Details
Permit
201012317723
Status
cancelled
Filed
Dec 31, 2010
Declared cost
$500
Address
231 08th Av

open walls & floors to determine existing structural conditions & some mechanic/elec locations. in preparation for work under pending permit #2008-0818-9435-s1

Open the permit page

$500
Dec 31, 2010Completed
final sign-off Jun 2014
231 08th AvQse Constructionopen walls and floors to determine existing structural conditions and some mechanic/elec locations. in preparation for work under pening permit 200808189435s
Details
Permit
201012317726
Status
complete
Filed
Dec 31, 2010
Permit issued
Dec 31, 2010
Final sign-off
Jun 17, 2014
Declared cost
$500
Address
231 08th Av

open walls and floors to determine existing structural conditions and some mechanic/elec locations. in preparation for work under pening permit 200808189435s

Open the permit page

$500
Aug 18, 2008Expired or cancelled
expired Jun 2014
231 08th AvOccidental Expressextension of rear of building all 4 stories. legalize attic. expand family room, excavate rear portion @ ground, extend family & deck @ 2nd. extend master bedroom @ 3rd & make roof deck over kitchen. legalize attic by raising roof.
Details
Permit
200808189435
Status
expired
Filed
Aug 18, 2008
Permit issued
Dec 7, 2010
Declared cost
$300,000
Address
231 08th Av

extension of rear of building all 4 stories. legalize attic. expand family room, excavate rear portion @ ground, extend family & deck @ 2nd. extend master bedroom @ 3rd & make roof deck over kitchen. legalize attic by raising roof.

Open the permit page

$300,000
Jan 3, 2008Never finaled
issued Jan 2008, no final
231 08th Avstreet space & sidewalk
Details
Permit
M101385
Status
issued
Filed
Jan 3, 2008
Permit issued
Jan 3, 2008
Address
231 08th Av

street space & sidewalk

Open the permit page

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.

Filter the results