Jeffrey Eade
- Listed as
- architect, authorized agent-others, designer
- Firm
- Jeffrey A. Eade Architect
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Oct 2026
151 permits since 2000 (architect on 142 permits, authorized agent-others on 9 permits, designer on 3 permits): 107 completed, 21 in progress, 15 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 151.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 191 Devonshire Wy | 7 Hills Construction | add (n) hose bib @ front yard. remove (e) chain link fence along the side & front property line. provide (n) 6ft tall privacy fence along the side property line & (n) 4ft-3in tall metal fence along the side & front property line (75% open).Details
add (n) hose bib @ front yard. remove (e) chain link fence along the side & front property line. provide (n) 6ft tall privacy fence along the side property line & (n) 4ft-3in tall metal fence along the side & front property line (75% open). | $5,000 |
| Jul 27, 2026 | In progress issued Aug 2026 | 1575 17th Av | O'shea Co. Home Grown Construction | revision to 202407237063: remove scope of work @ 2nd/f: new scope only include new interior stair, remove kitchen, add laundry rm, update proposed scope @ 1st/f to include in-fill south light well @ 1st/f only, update structural work @ 1st/f to lardwate w/ previously approved plan layoutDetails
revision to 202407237063: remove scope of work @ 2nd/f: new scope only include new interior stair, remove kitchen, add laundry rm, update proposed scope @ 1st/f to include in-fill south light well @ 1st/f only, update structural work @ 1st/f to lardwate w/ previously approved plan layout | |
| Jul 27, 2026 | In progress issued Jul 2026 | 511 Webster St | Artisan Builders Inc. | bathroom remodel turning closet into powder room in existing bathroom, a shower & bathtub. closet next to bathroom will be powder room.Details
bathroom remodel turning closet into powder room in existing bathroom, a shower & bathtub. closet next to bathroom will be powder room. | $36,000 |
| Jun 23, 2026 | In progress issued Jun 2026 | 650 Laguna Honda Bl | Custom Construction Enterprises | revision 202512051071 and ref 202601284677- remove scope to reinforce the (e) celiing, beam at 1st floor, add (n) concrete grade beam. remove the (e) brick front steps (threads and risers). due to water damage and replace with (n) terra cotta steps. remove wet bar at 1st floor from scope of workDetails
revision 202512051071 and ref 202601284677- remove scope to reinforce the (e) celiing, beam at 1st floor, add (n) concrete grade beam. remove the (e) brick front steps (threads and risers). due to water damage and replace with (n) terra cotta steps. remove wet bar at 1st floor from scope of work | $7,000 |
| May 11, 2026 | In progress issued May 2026 | 87 Hernandez Av | Doran Construction & Design | revision to pa# 202502190589: remove existing front exterior stair. provide new layout for new stair. new framing of existing exterior walls and new stucco finish at front and north side due to dryrot. replace (e) windows at front and north/south facades w/ (n) windows in (e) openings. move locationDetails
revision to pa# 202502190589: remove existing front exterior stair. provide new layout for new stair. new framing of existing exterior walls and new stucco finish at front and north side due to dryrot. replace (e) windows at front and north/south facades w/ (n) windows in (e) openings. move location | $50,000 |
| Apr 30, 2026 | In progress issued May 2026 | 1476 Willard St | J & T Construction | remodel (e) powder room and expand floor area into an adjacent closet. 2nd floor add (n) powder room. remove and infill (e) window on the side not visible from streetDetails
remodel (e) powder room and expand floor area into an adjacent closet. 2nd floor add (n) powder room. remove and infill (e) window on the side not visible from street | $10,000 |
| Apr 24, 2026 | In progress issued Apr 2026 | 27 Scott St | Pro-Crete Builders Inc. | remove the raised planting wall on south side of driveway and replace with 6" curb. provide new retaining wall at west side of planting area & foundation for existing post support. remove and replace the drivway and widen 12"Details
remove the raised planting wall on south side of driveway and replace with 6" curb. provide new retaining wall at west side of planting area & foundation for existing post support. remove and replace the drivway and widen 12" | $10,000 |
| Apr 14, 2026 | In progress issued Apr 2026 | 19 Scott St | Pro-Crete Builders Inc. | remove the north & south brick structured walls of the existing, exterior front stairs & replace w/ new concrete walls w stucco finish.Details
remove the north & south brick structured walls of the existing, exterior front stairs & replace w/ new concrete walls w stucco finish. | $20,000 |
| Mar 26, 2026 | In progress filed Mar 2026, not yet issued | 195 02nd Av | provide new laundry closet accessible from the 1st floor entry hallway.Details
provide new laundry closet accessible from the 1st floor entry hallway. | $6,000 | |
| Feb 18, 2026 | In progress issued Feb 2026 | 255 10th Av | Arflor Construction Inc | revision to pa 202403046977 & 202407247153 e new habitable areas at the 1st floor (family rm, office, bathrm, hallway); (n) windows, opening 1st fl on side facades (nort/south facades, not viewable from public row), new door & window @ 1st fl rear facade; new below grade patio @ rear yard accessibleDetails
revision to pa 202403046977 & 202407247153 e new habitable areas at the 1st floor (family rm, office, bathrm, hallway); (n) windows, opening 1st fl on side facades (nort/south facades, not viewable from public row), new door & window @ 1st fl rear facade; new below grade patio @ rear yard accessible | $80,000 |
| Feb 17, 2026 | In progress issued Feb 2026 | 134 Tiffany Av | revision 202505136384 to revise heating at adu units 134a,140a,140b, adu 4 to be by electric unitsDetails
revision 202505136384 to revise heating at adu units 134a,140a,140b, adu 4 to be by electric units | ||
| Jan 28, 2026 | In progress issued Jan 2026 | 650 Laguna Honda Bl | Custom Construction Enterprises | struc'l eng: atrium struc'l eng. revision to 202512051071; remove & replace (e) foundation & concrete slab except in the area of the garage. remove & replace the (e) window @ 1st fl office @ front & south side facades; provide (n) patio door & exterior steps to rear yard from 1st fl family room; (n)Details
struc'l eng: atrium struc'l eng. revision to 202512051071; remove & replace (e) foundation & concrete slab except in the area of the garage. remove & replace the (e) window @ 1st fl office @ front & south side facades; provide (n) patio door & exterior steps to rear yard from 1st fl family room; (n) | $70,000 |
| Dec 5, 2025 | In progress issued Dec 2025 | 650 Laguna Honda Bl | Custom Construction Enterprises | 1st fl: add new laundry closet, remodel existing bathroom. 2nd fl remove wall between rear bedroom and kitchen to create a dining/kitchen area. relocate existing window on south facade. remodel kitchen; remodel existing bathroom. 3rd fl: remodel existing bathroom,Details
1st fl: add new laundry closet, remodel existing bathroom. 2nd fl remove wall between rear bedroom and kitchen to create a dining/kitchen area. relocate existing window on south facade. remodel kitchen; remodel existing bathroom. 3rd fl: remodel existing bathroom, | $110,000 |
| Nov 26, 2025 | In progress issued Jun 2026 | 1025 Ashbury St | Igreen Builders Inc. | garage/basement lvl: excavate vertical & horizontal (e)garage area to create ceiling height & flr area; excavate adjacent crawl space area for (n) habitable areas (office, bathrm, inter stairs,laundry rm); 1/f inter remodel & in-fill (e) light well on south facade; 2/f inter remodel & in-fill (e) lDetails
garage/basement lvl: excavate vertical & horizontal (e)garage area to create ceiling height & flr area; excavate adjacent crawl space area for (n) habitable areas (office, bathrm, inter stairs,laundry rm); 1/f inter remodel & in-fill (e) light well on south facade; 2/f inter remodel & in-fill (e) l | $650,000 |
| Nov 19, 2025 | In progress issued Nov 2025 | 901 Noriega St | add 24" of lattice to the top of (e) 6 foot wood fence in the rear yardDetails
add 24" of lattice to the top of (e) 6 foot wood fence in the rear yard | $2,000 | |
| Nov 5, 2025 | In progress issued Mar 2026 | 40 Fanning Wy | O'shea Co. Home Grown Construction | 1 story horizontal rear yard addition interior remodel of the existing 1st floor level and basement levelDetails
1 story horizontal rear yard addition interior remodel of the existing 1st floor level and basement level | $250,000 |
| Oct 20, 2025 | Completed final sign-off Mar 2026 | 736 Haight St | Pro-Crete Builders Inc. | unit 736-remodel (e) bathroom to include remove bathtub and add showerDetails
unit 736-remodel (e) bathroom to include remove bathtub and add shower | $12,000 |
| Sep 19, 2025 | Completed final sign-off May 2026 | 142 15th Av | O'shea Co. Home Grown Construction | revision to 202502059709. at rear 1st fl level patio, widen the stairs to rear yard, increase size of structural beam above. at 1st fl level remodel existing laundry rm and add refrigerator cabinet in media room, at rear yard add new deck which will be +19" above grade. add new sauna enclosure,Details
revision to 202502059709. at rear 1st fl level patio, widen the stairs to rear yard, increase size of structural beam above. at 1st fl level remodel existing laundry rm and add refrigerator cabinet in media room, at rear yard add new deck which will be +19" above grade. add new sauna enclosure, | $10,000 |
| Aug 13, 2025 | Completed final sign-off Feb 2026 | 2334 North Point St | Rinaldi Construction | lower unit: kitchen remodel, bathroom remodel, remodel e) powder rm into a laundry closet, remodel e) laundry closet & adjacent bedroom cloest into a full bathroom, provide a new gas insert applicance fireplace in the e) fireplace openingDetails
lower unit: kitchen remodel, bathroom remodel, remodel e) powder rm into a laundry closet, remodel e) laundry closet & adjacent bedroom cloest into a full bathroom, provide a new gas insert applicance fireplace in the e) fireplace opening | $83,000 |
| Jul 10, 2025 | Completed final sign-off Dec 2025 | 4626 Fulton St | Andes Project Contractor Corp | permit to repair and reinforce exterior stairs at rear leading from 3/f down to the backyard. less than 50% repair in kind.Details
permit to repair and reinforce exterior stairs at rear leading from 3/f down to the backyard. less than 50% repair in kind. | $8,000 |
| Jul 1, 2025 | Completed final sign-off Sep 2025 | 261 San Carlos St | to comply with nov 202538464 - remove (e) balcony/planter box on the front exterior @ 2nd fl of 261 san carlos stDetails
to comply with nov 202538464 - remove (e) balcony/planter box on the front exterior @ 2nd fl of 261 san carlos st | $1,000 | |
| May 8, 2025 | Completed final sign-off Jan 2026 | 2454 16th Av | Andes Project Contractor Corp | revision to 202502109987: remove and replace exterior stucco at 3rd fl front facade. remove ext wood siding at 3rd fl level on side and rear facades. replace w cement board siding, remove existing alum single glazed window on 3rd fl. front facade and replace w new fiberglass dbl glazed window,updateDetails
revision to 202502109987: remove and replace exterior stucco at 3rd fl front facade. remove ext wood siding at 3rd fl level on side and rear facades. replace w cement board siding, remove existing alum single glazed window on 3rd fl. front facade and replace w new fiberglass dbl glazed window,update | $5,000 |
| Apr 7, 2025 | Completed final sign-off Nov 2025 | 54 Sea View Tr | Burdell Construction | new 2 story horizontal addition on the eastside (side elevation) 146 sqft total; interior remodel to include remodel of kitchen and interior doors ; remocve and replace windows; new hot tub at grade in rear yard; replace existing rear yard fence with new wall and replace interior stail railingDetails
new 2 story horizontal addition on the eastside (side elevation) 146 sqft total; interior remodel to include remodel of kitchen and interior doors ; remocve and replace windows; new hot tub at grade in rear yard; replace existing rear yard fence with new wall and replace interior stail railing | $50,000 |
| Mar 7, 2025 | In progress issued Jul 2025 | 87 Hernandez Av | Doran Construction & Design | remodel the (e) 1st fl to habitable spaces to include a bedroom, bath, media room, and laundry room. new concrete slab and partial foundation replacement at 1st floor. remodel the existing 2nd floor kitchen, bathroom, and powder room. widen the existing garage door.Details
remodel the (e) 1st fl to habitable spaces to include a bedroom, bath, media room, and laundry room. new concrete slab and partial foundation replacement at 1st floor. remodel the existing 2nd floor kitchen, bathroom, and powder room. widen the existing garage door. | $355,000 |
| Mar 4, 2025 | Completed final sign-off Nov 2025 | 4626 Fulton St | Andes Project Contractor Corp | remove & replace 5 double hung windows (in kind, in the same openings) on the front facade @ the 3rd fl unit; new windows shall be double hung windows, wood (n) aluminum exterior cladding with divided lights to match the existing divided light pattern of the existing windows. all windows to be replaDetails
remove & replace 5 double hung windows (in kind, in the same openings) on the front facade @ the 3rd fl unit; new windows shall be double hung windows, wood (n) aluminum exterior cladding with divided lights to match the existing divided light pattern of the existing windows. all windows to be repla | $2,500 |
| Feb 10, 2025 | Completed final sign-off Jan 2026 | 2454 16th Av | Andes Project Contractor Corp | work @ 1st/f related to proprosed 2nd/f. 2nd/f: remodel e) kitchen, n) opening btw kitchen & dinning, n) opening btw dining/hallway, remodel hallway bath w/ new finishes, e) fixture locations to remain, remodel hallway water closet, relocate toilet, add sink, n) en-suite bath @ e)bedroom, n)windowsDetails
work @ 1st/f related to proprosed 2nd/f. 2nd/f: remodel e) kitchen, n) opening btw kitchen & dinning, n) opening btw dining/hallway, remodel hallway bath w/ new finishes, e) fixture locations to remain, remodel hallway water closet, relocate toilet, add sink, n) en-suite bath @ e)bedroom, n)windows | $160,000 |
| Feb 5, 2025 | Completed final sign-off May 2026 | 142 15th Av | O'shea Co. Home Grown Construction | provide a new rear yard deck with a spiral stair to access the rear yard. provide a new 1 hour rated wall b/t deck and south property line. new patio doors at 1/f and 2/f on the rear facade. remodel (e) 1/f bathroom, fixture locations to remain.Details
provide a new rear yard deck with a spiral stair to access the rear yard. provide a new 1 hour rated wall b/t deck and south property line. new patio doors at 1/f and 2/f on the rear facade. remodel (e) 1/f bathroom, fixture locations to remain. | $30,000 |
| Jan 28, 2025 | Completed final sign-off Jan 2025 | 84 Hernandez Av | Lynch Construction Inc | to obtain final inspection for work approved under pa# 202103156567 and 202212309470. all work is complete.Details
to obtain final inspection for work approved under pa# 202103156567 and 202212309470. all work is complete. | |
| Nov 12, 2024 | Completed final sign-off Nov 2025 | 4626 Fulton St | Andes Project Contractor Corp | interior removel work at unit 4628.relocate kitchen to e living rm,remodel e kitchenvto be a n living rm,remodel e bath,replace e windows on rear facade.replace e exterior door at rear facade. int remodel unit 4626. new struc post related to vwork at 4628,patch/repair walls.2 n pad footings at garagDetails
interior removel work at unit 4628.relocate kitchen to e living rm,remodel e kitchenvto be a n living rm,remodel e bath,replace e windows on rear facade.replace e exterior door at rear facade. int remodel unit 4626. new struc post related to vwork at 4628,patch/repair walls.2 n pad footings at garag | $200,000 |
| Aug 2, 2024 | In progress issued Oct 2024 | 255 10th Av | Arflor Construction Inc | revision to pa# 202403046977, provide full seismic upgrade to building; replace (e) brick foundation w/new concrete foundation and interior grade beams; remove (e) interior stair & provide new interior stair from 1/f to 4/f; stair scope of work to include new habitable area @ 1/f for stair landing..Details
revision to pa# 202403046977, provide full seismic upgrade to building; replace (e) brick foundation w/new concrete foundation and interior grade beams; remove (e) interior stair & provide new interior stair from 1/f to 4/f; stair scope of work to include new habitable area @ 1/f for stair landing.. | $90,000 |
| Jul 24, 2024 | Completed final sign-off Nov 2025 | 434 Hearst Av | O'shea Co. Home Grown Construction | new 2 story horizontal addition in the rear yard to provide an interior stair connecting 1st & 2nd fl levels. replace existing furnace with high efficiancy furnace unit.Details
new 2 story horizontal addition in the rear yard to provide an interior stair connecting 1st & 2nd fl levels. replace existing furnace with high efficiancy furnace unit. | $90,000 |
| Jun 13, 2024 | Completed final sign-off Jan 2025 | 84 Hernandez Av | Lynch Construction Inc | revision to permit #202103156567 and 202212309470: reduce exterior framing on the existing rear elevation walls at the 1st and 2nd floor due to dry rot.Details
revision to permit #202103156567 and 202212309470: reduce exterior framing on the existing rear elevation walls at the 1st and 2nd floor due to dry rot. | $4,000 |
| May 21, 2024 | Completed final sign-off Apr 2025 | 15 Clairview Ct | O'shea Co. Home Grown Construction | revision to pa #2023-0710-1811 remove exterior stairs & chimney at east facade. provide exterior stairs at the east facade. remove the concrete painter box on the south facade from scope of workDetails
revision to pa #2023-0710-1811 remove exterior stairs & chimney at east facade. provide exterior stairs at the east facade. remove the concrete painter box on the south facade from scope of work | $10,000 |
| Mar 13, 2024 | In progress issued Jun 2024 | 255 10th Av | Arflor Construction Inc | remove the (e) bathrooms at the interior stair landings. new interior layout at 3rd and 4th floor; add (2) bathrooms at 3rd fl, add laundry room, add bathroom at 4th floor. add new windows at 3rd and 4th floor at rear facade. remove the (e) exterior stair and landing at 3rd and 4th floors....Details
remove the (e) bathrooms at the interior stair landings. new interior layout at 3rd and 4th floor; add (2) bathrooms at 3rd fl, add laundry room, add bathroom at 4th floor. add new windows at 3rd and 4th floor at rear facade. remove the (e) exterior stair and landing at 3rd and 4th floors.... | $125,000 |
| Dec 19, 2023 | Completed final sign-off Dec 2024 | 1683 11th Av | C & H Home Construction | revision to pa# 202309126401, add new foundation at interior side of existing foundation at south & west exterior walls, existing foundation to remain.Details
revision to pa# 202309126401, add new foundation at interior side of existing foundation at south & west exterior walls, existing foundation to remain. | $5,000 |
| Dec 19, 2023 | Completed final sign-off Jun 2025 | 1451 Larkin St | Hammerhouse Construction | revision to 202307242803: revise bathroom layout at unit 2,4,5,8,9,12,13. comply w/ nov 202287580 & 202287600 repair work in kindDetails
revision to 202307242803: revise bathroom layout at unit 2,4,5,8,9,12,13. comply w/ nov 202287580 & 202287600 repair work in kind | |
| Nov 6, 2023 | Completed final sign-off Dec 2023 | 255 10th Av | change of use from existing residential care facility to single family dwelling unit, no proposed construction.Details
change of use from existing residential care facility to single family dwelling unit, no proposed construction. | ||
| Sep 12, 2023 | Completed final sign-off Dec 2024 | 1683 11th Av | C & H Home Construction | remodel (e) 1st fl family room, playrooms, bathroom (areas previously permitted under pa# 764523 + 9421301) to a bedroom, family room, & bathroom. new window + door in (e) openings at 1st fl on the rear facade.Details
remodel (e) 1st fl family room, playrooms, bathroom (areas previously permitted under pa# 764523 + 9421301) to a bedroom, family room, & bathroom. new window + door in (e) openings at 1st fl on the rear facade. | $135,000 |
| Aug 17, 2023 | Completed final sign-off Feb 2024 | 162 Funston Av | Zarc Construction Inc | revision to pa# 202109077851: add a skylight.Details
revision to pa# 202109077851: add a skylight. | $1,000 |
| Aug 17, 2023 | Completed final sign-off Dec 2023 | 15 Yerba Buena Av | rev to pa# 202211176726, to remove proposed rear deck from scope of work; revise new washer/dryer to only add doors at 2nd flr hallway closet.' & revise scope to add 'repair in-kind areas due to water damage fron 2nd flr bathrm flooding; rr (e) drywal.Details
rev to pa# 202211176726, to remove proposed rear deck from scope of work; revise new washer/dryer to only add doors at 2nd flr hallway closet.' & revise scope to add 'repair in-kind areas due to water damage fron 2nd flr bathrm flooding; rr (e) drywal. | ||
| Jul 27, 2023 | Completed final sign-off Jul 2024 | 17 Scott St | Hammerhouse Construction | revision to 202105130298. 1) update to existing/demo plans to show additional demo of walls at the following location due to (e) substandard framing conditions. a rear south wall at 1st flr gridline c-d and d-e; b interior wall at 1st flr btw dining room. kitchen at grid line c; interior wall atDetails
revision to 202105130298. 1) update to existing/demo plans to show additional demo of walls at the following location due to (e) substandard framing conditions. a rear south wall at 1st flr gridline c-d and d-e; b interior wall at 1st flr btw dining room. kitchen at grid line c; interior wall at | $2,000 |
| Jul 24, 2023 | Completed final sign-off Jun 2025 | 1451 Larkin St | Hammerhouse Construction | to comply w/nov# 202287580 & 202287600, repair fire damage to units 2,4,5,8,9,12,13 & hllway due to smoke & water damage caused by fire suppression @ 4th flr, unit 12, scope includes replaacement of approx. 48sf of plywood sheathing at roof layer, repair inter finishes incl wall, ceiling & flooring,Details
to comply w/nov# 202287580 & 202287600, repair fire damage to units 2,4,5,8,9,12,13 & hllway due to smoke & water damage caused by fire suppression @ 4th flr, unit 12, scope includes replaacement of approx. 48sf of plywood sheathing at roof layer, repair inter finishes incl wall, ceiling & flooring, | $250,000 |
| Jul 10, 2023 | Completed final sign-off Apr 2025 | 15 Clairview Ct | O'shea Co. Home Grown Construction | garage: remodel garage & storage area to (n) bedroom, bath, laundry, living rm w/ access to rear yard. 2nd fl: remodel kitchen opening sitting area, remodel bathooms, remove fireplace, (n) windows, (n) rear deck. (n) batten screen at fornt facade, paint exterior. add 702 sf conditioned spaceDetails
garage: remodel garage & storage area to (n) bedroom, bath, laundry, living rm w/ access to rear yard. 2nd fl: remodel kitchen opening sitting area, remodel bathooms, remove fireplace, (n) windows, (n) rear deck. (n) batten screen at fornt facade, paint exterior. add 702 sf conditioned space | $215,000 |
| Jun 23, 2023 | Completed final sign-off Jun 2024 | 555 Teresita Bl | revision to pa# 202102054171, infill exsiting interior garage door tp sunroom, add cedar siding to the garage wall inside the sun room.Details
revision to pa# 202102054171, infill exsiting interior garage door tp sunroom, add cedar siding to the garage wall inside the sun room. | $2,000 | |
| Jun 6, 2023 | Completed final sign-off Aug 2024 | 275 San Benito Wy | Itu Construction | revision to bpa#202209303518 & 202301260781. revise mechanical to remove furnace unit, add (3)heat pump units, (3) outdoor units will be located @ south ext not visible from street, (2) heat pump distr units @ (e) attic area, (1)distrib unit @ garage. replace (e)wood beam @ basement w/new wood beamDetails
revision to bpa#202209303518 & 202301260781. revise mechanical to remove furnace unit, add (3)heat pump units, (3) outdoor units will be located @ south ext not visible from street, (2) heat pump distr units @ (e) attic area, (1)distrib unit @ garage. replace (e)wood beam @ basement w/new wood beam | $5,000 |
| Apr 20, 2023 | Completed final sign-off Sep 2024 | 146 Jordan Av | revision to pa# 201911278326, to add structural plans and details for the scope of work approved in previous permit.Details
revision to pa# 201911278326, to add structural plans and details for the scope of work approved in previous permit. | ||
| Jan 26, 2023 | Completed final sign-off Jul 2024 | 275 San Benito Wy | Itu Construction | revision to bpa#202209303518, new window material from wood to wood/clad, remove windows @ 2/f southside facade, remove (2) windows/add (2) windows @ bedroom 205, revise layout of laundry room, floor sink @ garageDetails
revision to bpa#202209303518, new window material from wood to wood/clad, remove windows @ 2/f southside facade, remove (2) windows/add (2) windows @ bedroom 205, revise layout of laundry room, floor sink @ garage | |
| Jan 4, 2023 | Completed final sign-off Mar 2025 | 3250 Ortega St | Zarc Construction Inc | prove new habitable area @ 1st fl (living rm + (2) bedrooms) with access to the rear yard. 1st fl rear in-fill area below the (e) 2nd fl rear area. remodel (e) 2nd fk to include a (n) full bathroom, closet, bedroom + powder rm. provide a (n) fence gate at the (e) fence along the south property line.Details
prove new habitable area @ 1st fl (living rm + (2) bedrooms) with access to the rear yard. 1st fl rear in-fill area below the (e) 2nd fl rear area. remodel (e) 2nd fk to include a (n) full bathroom, closet, bedroom + powder rm. provide a (n) fence gate at the (e) fence along the south property line. | $105,000 |
| Dec 30, 2022 | Expired or cancelled expired Jan 2025 | 84 Hernandez Av | Lynch Construction Inc | revision to 202103156567. replace e wood and vinyl windows on the east, south, west facades with new wood windows w aluminum cladding. new windows to matche e functions, sizes, mullion patterns. remove e stucco on e partial front facade. south and west facades. new stucco to match e texture andDetails
revision to 202103156567. replace e wood and vinyl windows on the east, south, west facades with new wood windows w aluminum cladding. new windows to matche e functions, sizes, mullion patterns. remove e stucco on e partial front facade. south and west facades. new stucco to match e texture and | $25,000 |
| Nov 17, 2022 | Completed final sign-off Dec 2023 | 15 Yerba Buena Av | Hammerhouse Construction | kitchen and pantry remodel, remove interior wall at kitchen and provide new beam add washer & dryer to closet at 2nd fl. hallway, add a rear yard deck at the 1st fl.Details
kitchen and pantry remodel, remove interior wall at kitchen and provide new beam add washer & dryer to closet at 2nd fl. hallway, add a rear yard deck at the 1st fl. | $30,000 |
| Nov 8, 2022 | Completed final sign-off Dec 2023 | 2487 35th Av | O'shea Co. Home Grown Construction | remodel (e) 1st flr garage and storage area into habitable space, new windows on rear facade. new siding & trim the rear facade(not visible from street)Details
remodel (e) 1st flr garage and storage area into habitable space, new windows on rear facade. new siding & trim the rear facade(not visible from street) | $75,000 |
| Sep 30, 2022 | Completed final sign-off Aug 2024 | 275 San Benito Wy | Itu Construction | remodel e kitchen, remodel e primary bathroom install new underground fire service andand closet, replace e windows with new wood windows to match e. replace e french doors at rear and front facade with new wood fr doors o match e, new window north elevation at primary bath,n garage door,widen opengDetails
remodel e kitchen, remodel e primary bathroom install new underground fire service andand closet, replace e windows with new wood windows to match e. replace e french doors at rear and front facade with new wood fr doors o match e, new window north elevation at primary bath,n garage door,widen openg | $150,000 |
| Sep 12, 2022 | In progress issued Dec 2024 | 122 Tiffany Av | remove existing exterior wood stairs and deck at the rear yard. add a two new exterior wood stairs and deck at the rear yard.Details
remove existing exterior wood stairs and deck at the rear yard. add a two new exterior wood stairs and deck at the rear yard. | $20,000 | |
| Aug 8, 2022 | Completed final sign-off Oct 2023 | 1779 10th Av | Christopher Gate Construction Inc | 1/f: new habitable space - family room, office, bathroom, laundry room. rmeodel (e) kitchen and hall bathroom on 2/f.Details
1/f: new habitable space - family room, office, bathroom, laundry room. rmeodel (e) kitchen and hall bathroom on 2/f. | $85,000 |
| May 31, 2022 | Completed final sign-off Jan 2023 | 52 Buena Vista Tr | Igor Kurikov | revision to permit #202203210398. remove scope of work to remodel 2 extg bathrooms on the 2nd floor.Details
revision to permit #202203210398. remove scope of work to remodel 2 extg bathrooms on the 2nd floor. | |
| Mar 21, 2022 | Never finaled issued Mar 2022, no final | 52 Buena Vista Tr | Igor Kurikov | remodel (e) kitchen, (2) (e) bathrooms on 2/f, (e) master bathroom, replace (6) windows & (1) patio door on the rear facade @ 1/fDetails
remodel (e) kitchen, (2) (e) bathrooms on 2/f, (e) master bathroom, replace (6) windows & (1) patio door on the rear facade @ 1/f | $70,000 |
| Nov 5, 2021 | Expired or cancelled withdrawn Aug 2022 | 173 Parker Av | Miann Builder | addition of two dormers at the rear roof area; interior remodel of 2/f unit (175 parker); interior remodel of 3/f unit (173 parker); interior remodel of 4/f unit (173a parker); infill area below the existing rear mudroom.Details
addition of two dormers at the rear roof area; interior remodel of 2/f unit (175 parker); interior remodel of 3/f unit (173 parker); interior remodel of 4/f unit (173a parker); infill area below the existing rear mudroom. | $290,000 |
| Sep 23, 2021 | In progress issued Oct 2023 | 269 Stratford Dr | Yefa Construction Inc | new addition above the existing kitchen and dining room areas. new addition to provide one bedroom, full bathroom, and new stairs to access the addition from the existing hallway.Details
new addition above the existing kitchen and dining room areas. new addition to provide one bedroom, full bathroom, and new stairs to access the addition from the existing hallway. | $105,000 |
| Sep 7, 2021 | Completed final sign-off Feb 2024 | 162 Funston Av | Zarc Construction Inc | new addition at the third floor rear. new addition and adjacent existing area to include a bedroom, remodel and expand the existing bathroom, and two closets. work at the existing areas of the 1st and 2nd floor to provide new structural posts and shear walls required for new 3rd floor addition.Details
new addition at the third floor rear. new addition and adjacent existing area to include a bedroom, remodel and expand the existing bathroom, and two closets. work at the existing areas of the 1st and 2nd floor to provide new structural posts and shear walls required for new 3rd floor addition. | $55,000 |
| Jun 24, 2021 | Completed final sign-off Jul 2023 | 2720 Lyon St | The Toboni Group, G Family Incorporated | comply to nov202172831 & 202172219; provide as-built conditions,rev to pa 201406118149, 201406118149, 201709117616, 201908300281, 201912200106, 202001313229 & 202002144497. to address bid requirement of as built conditionsDetails
comply to nov202172831 & 202172219; provide as-built conditions,rev to pa 201406118149, 201406118149, 201709117616, 201908300281, 201912200106, 202001313229 & 202002144497. to address bid requirement of as built conditions | |
| May 25, 2021 | Completed final sign-off May 2022 | 7 Downey St | Hammerhouse Construction | at rear yard: remove (e) fence & cmu retaining wall on the northside of rear yard & replace w/ (n) wood fence and concrete retaining wall. construction to be done in conjunction w/ work at downey st under pa# 202011138907.Details
at rear yard: remove (e) fence & cmu retaining wall on the northside of rear yard & replace w/ (n) wood fence and concrete retaining wall. construction to be done in conjunction w/ work at downey st under pa# 202011138907. | |
| May 13, 2021 | Completed final sign-off Jul 2024 | 17 Scott St | Hammerhouse Construction | 1:new horizontal addition of 130sf at the 2nd fl.,add new bathroom with a skylight. 2:interior remodel at 1st fl. remodel existing dining room to add a powder room,remodel existing kitchen.3:add new window and door at kitchen and sun room.4:remodel existing 2nd fl hall bathroom and add skylight. 5:Details
1:new horizontal addition of 130sf at the 2nd fl.,add new bathroom with a skylight. 2:interior remodel at 1st fl. remodel existing dining room to add a powder room,remodel existing kitchen.3:add new window and door at kitchen and sun room.4:remodel existing 2nd fl hall bathroom and add skylight. 5: | $65,000 |
| Mar 15, 2021 | Expired or cancelled expired Jan 2025 | 84 Hernandez Av | Lynch Construction Inc | new rear deck off of 1st fl. repair/replace (e) clay tile roofing & flat roof. (n) skylight; 1st fl (n) windows on south wall. remodel (e) bath. remodel (e) laundry room into a steam room; 2nd fl replace (e) door at rear with (n) french door. replace 2 rear windows; 3rd fl (n) laundry closet.Details
new rear deck off of 1st fl. repair/replace (e) clay tile roofing & flat roof. (n) skylight; 1st fl (n) windows on south wall. remodel (e) bath. remodel (e) laundry room into a steam room; 2nd fl replace (e) door at rear with (n) french door. replace 2 rear windows; 3rd fl (n) laundry closet. | $45,000 |
| Feb 5, 2021 | Completed final sign-off Jun 2024 | 555 Teresita Bl | remove (e) sunroom enclosure and concrete slab on rear facade. provide a new glass enclosure of the same size and shape, and a new concrete slab. provide new electrical and lighting.Details
remove (e) sunroom enclosure and concrete slab on rear facade. provide a new glass enclosure of the same size and shape, and a new concrete slab. provide new electrical and lighting. | $25,000 | |
| Jan 21, 2021 | Completed final sign-off Jul 2023 | 555 Teresita Bl | Britton Builders Incorporated | 1 of 3 bathroom remodel on 2nd fl. remove & replace (e) finishes & fixtures. (e) locations to remain. replace (e) wood french door at 2nd fl bedroom. front porch remove (e) posts, slab on grade, retaining walls & railing. (n) post, foundation, steps & metal railing.Details
1 of 3 bathroom remodel on 2nd fl. remove & replace (e) finishes & fixtures. (e) locations to remain. replace (e) wood french door at 2nd fl bedroom. front porch remove (e) posts, slab on grade, retaining walls & railing. (n) post, foundation, steps & metal railing. | $35,000 |
| Jan 19, 2021 | Completed final sign-off Sep 2021 | 235 Romain St | Hubert Penny | remove (e) kitchen & bathroom including interior walls in this area. provide new kitchen & bathroom.Details
remove (e) kitchen & bathroom including interior walls in this area. provide new kitchen & bathroom. | $70,000 |
| Nov 20, 2020 | Completed final sign-off Feb 2025 | 142 Westwood Dr | O'shea Co. Home Grown Construction | interior remodel at 1st floor: remodel into a living room, powder room, and laundry room. new adu at 1st floor within existing building envelope. new gas fireplace appliance unit 2nd floor living room.Details
interior remodel at 1st floor: remodel into a living room, powder room, and laundry room. new adu at 1st floor within existing building envelope. new gas fireplace appliance unit 2nd floor living room. | $175,000 |
| Nov 13, 2020 | Completed final sign-off Apr 2022 | 220 San Leandro Wy | Custom Construction Enterprises | basement: (n) living room, bedroom, full bath, powder, laundry & media room. (n) interior stairs to connect 1st fl to basement. add (n) shower to 1st fl bathroom. (n) window openings on north & south facade. widen garage. replace windows at front with wood.Details
basement: (n) living room, bedroom, full bath, powder, laundry & media room. (n) interior stairs to connect 1st fl to basement. add (n) shower to 1st fl bathroom. (n) window openings on north & south facade. widen garage. replace windows at front with wood. | $175,000 |
| Nov 13, 2020 | Completed final sign-off Apr 2022 | 5 Downey St | Hammerhouse Construction | 1st fl remodel guest bath & (n) wet bar in den. 2nd fl remodel powder room. remove wall between dining & family room. 3rd fl remodel 2 baths. rear yard relocate stairs from 1st fl deck to grade. (n) pergola, firepit, fencing on 3 sides, deck surface. front facade work.Details
1st fl remodel guest bath & (n) wet bar in den. 2nd fl remodel powder room. remove wall between dining & family room. 3rd fl remodel 2 baths. rear yard relocate stairs from 1st fl deck to grade. (n) pergola, firepit, fencing on 3 sides, deck surface. front facade work. | $62,000 |
| Oct 14, 2020 | Expired or cancelled expired Apr 2024 | 2800 Green St | All Bay Construction Inc | rear yard- add new roof deck surface above (e) 1st flr bathrm roof w/ guardrail. add (n) exterior spiral stair from (e) 1st flr deck to (n) roof deck at 2nd flr. remove (e) window at 2nd flr living rm & replace w/ (n) doorDetails
rear yard- add new roof deck surface above (e) 1st flr bathrm roof w/ guardrail. add (n) exterior spiral stair from (e) 1st flr deck to (n) roof deck at 2nd flr. remove (e) window at 2nd flr living rm & replace w/ (n) door | $12,000 |
| Oct 13, 2020 | Never finaled issued Sep 2021, no final | 122 Tiffany Av | Britton Builders Incorporated | revision to pa #201607011423, 201908169052, 20190427852: add mech room @ 1/f. move exterior stair east for door. move stair on front facade to align w/stair adjacent to mech room. revise exterior stair layout at south stair adjacent to #140a & 140b.Details
revision to pa #201607011423, 201908169052, 20190427852: add mech room @ 1/f. move exterior stair east for door. move stair on front facade to align w/stair adjacent to mech room. revise exterior stair layout at south stair adjacent to #140a & 140b. | |
| Oct 7, 2020 | Completed final sign-off Mar 2022 | 1654 25th Av | Rinaldi Construction | remodel 1/f previously approved under pa #201106279023 & #201808167561. new concrete slab & new foundations (east/south wall). remove (e) bathroom, relocate new bathroom. remodel (e) bedroom, window, living room & door, new music room, laundry/storage room. new furnace & water heater garageDetails
remodel 1/f previously approved under pa #201106279023 & #201808167561. new concrete slab & new foundations (east/south wall). remove (e) bathroom, relocate new bathroom. remodel (e) bedroom, window, living room & door, new music room, laundry/storage room. new furnace & water heater garage | $45,000 |
| Oct 7, 2020 | Completed final sign-off Mar 2024 | 90 West Clay St | Hammerhouse Construction, Pan Pacific Construction | 1/f: remodel (e) hallway, powder room, and convert (e) mechanical room into a laundry room. provide two new fau units (furnaces). remodel (e) media room. 2/f: remodel interior for new pantry & powder room. 4/f: at rear deck, remove metal railing, add new low solidwall with glass railDetails
1/f: remodel (e) hallway, powder room, and convert (e) mechanical room into a laundry room. provide two new fau units (furnaces). remodel (e) media room. 2/f: remodel interior for new pantry & powder room. 4/f: at rear deck, remove metal railing, add new low solidwall with glass rail | $75,000 |
| Sep 2, 2020 | Expired or cancelled cancelled Jan 2026 | 154 Downey St | foundation replacementDetails
foundation replacement | $20,000 | |
| May 19, 2020 | Completed final sign-off Nov 2020 | 348 Hazelwood Av | Gil Construction & Assoc Inc. | 2nd flr-remodel (e) kitchen and mudroom w/ (n) cabinetry, appliances & finishes. remove wall btwn dining & kitchen and add (n) wall. (n) openings at living rm north wall. 3rd flr-hall bathrm: (n) fixture locations & finishes. (n) master bath & closet in north flr area of (e) master bedroomDetails
2nd flr-remodel (e) kitchen and mudroom w/ (n) cabinetry, appliances & finishes. remove wall btwn dining & kitchen and add (n) wall. (n) openings at living rm north wall. 3rd flr-hall bathrm: (n) fixture locations & finishes. (n) master bath & closet in north flr area of (e) master bedroom | $38,500 |
| Feb 14, 2020 | Completed final sign-off Jul 2023 | 2720 Lyon St | The Toboni Group | temporary planter boxes, relocate light. 36" tall counter above spiral stair enclosure to match apprvd kitchen sink counter with 6" backsplash around both. increase height of wall from backsplash to elevator enclosure from 36" to 42" w gate at same heightDetails
temporary planter boxes, relocate light. 36" tall counter above spiral stair enclosure to match apprvd kitchen sink counter with 6" backsplash around both. increase height of wall from backsplash to elevator enclosure from 36" to 42" w gate at same height | $2,000 |
| Jan 31, 2020 | Completed final sign-off Jul 2023 | 2720 Lyon St | G Family Incorporated | revision to pa #2019-1220-0106: provide baseplate for temporary shade umbrella. no attachment to building.Details
revision to pa #2019-1220-0106: provide baseplate for temporary shade umbrella. no attachment to building. | |
| Jan 23, 2020 | Completed final sign-off Dec 2020 | 162 Funston Av | Jfieco | interior remoedl at 2nd fl dining room and living room to create a new inteiror opening by removing & replacing an existing shearwall; install a new gas appliance fireplace unit in the living room.Details
interior remoedl at 2nd fl dining room and living room to create a new inteiror opening by removing & replacing an existing shearwall; install a new gas appliance fireplace unit in the living room. | $8,000 |
| Dec 23, 2019 | Completed final sign-off Dec 2020 | 162 Funston Av | Jfieco | 3rd flr interior remodel. add a shoer to (e) half bath. add a closet to (e) bedroom. (n) recessed lightiing in bedrooms.Details
3rd flr interior remodel. add a shoer to (e) half bath. add a closet to (e) bedroom. (n) recessed lightiing in bedrooms. | $17,000 |
| Dec 20, 2019 | Completed final sign-off Jul 2023 | 2720 Lyon St | revision to pa# 2017-0611-8149 & 2019-0830-0281. relocate bbq grill @ roof deck. provide two new base supports for temporary shade umbrellas on the roof.Details
revision to pa# 2017-0611-8149 & 2019-0830-0281. relocate bbq grill @ roof deck. provide two new base supports for temporary shade umbrellas on the roof. | $500 | |
| Dec 12, 2019 | Completed final sign-off Oct 2024 | 61 Parker Av | Custom Construction Enterprises | new 3 story rear yard addition & interior remodel.1st fl: new bedroom, 2 baths, laundry room, living room, mud room, new interior stairs. 2nd fl: new kitchen, powder room, dining room, roar porch & stairs. 3rd fl: remodel (e) master bedroom, new master bathroom, hall bathroom, new office. 2 bedroomsDetails
new 3 story rear yard addition & interior remodel.1st fl: new bedroom, 2 baths, laundry room, living room, mud room, new interior stairs. 2nd fl: new kitchen, powder room, dining room, roar porch & stairs. 3rd fl: remodel (e) master bedroom, new master bathroom, hall bathroom, new office. 2 bedrooms | $650,000 |
| Nov 27, 2019 | Completed final sign-off Sep 2024 | 146 Jordan Av | to comply with nov #201986291 dated 9/23/2019, construction of a (n) detached garage structure that will replace the original garage structure that was demolished, alteration to (e) gate, replacing (e) deck & stairs, side & rear fences, modifying portion of the grade in the rear yard.Details
to comply with nov #201986291 dated 9/23/2019, construction of a (n) detached garage structure that will replace the original garage structure that was demolished, alteration to (e) gate, replacing (e) deck & stairs, side & rear fences, modifying portion of the grade in the rear yard. | $35,000 | |
| Oct 3, 2019 | Completed final sign-off May 2021 | 191 Devonshire Wy | Hammerhouse Construction | revision to pa 2018-1220-8900 - revise scope of work for furnace units. relocate and provide a new furnace unit in the attic space. provide a new ceiling access hatch at the 2nd fl hallway ceilingDetails
revision to pa 2018-1220-8900 - revise scope of work for furnace units. relocate and provide a new furnace unit in the attic space. provide a new ceiling access hatch at the 2nd fl hallway ceiling | $1,000 |
| Sep 11, 2019 | Completed final sign-off Jul 2020 | 246 Dellbrook Av | interior remodel of the (e) kitchen on the 2nd flr. remove the non load bearing wall interior wall btwn kit & din rmDetails
interior remodel of the (e) kitchen on the 2nd flr. remove the non load bearing wall interior wall btwn kit & din rm | $24,000 | |
| Aug 30, 2019 | Completed final sign-off Jul 2023 | 2720 Lyon St | G Family Incorporated | rev to pa# 201908017632; add glass railing at (e) parapet/south property line wall vicinity skylight, add (2) elec light at roof deck 3ft from property line 8ft in elevationDetails
rev to pa# 201908017632; add glass railing at (e) parapet/south property line wall vicinity skylight, add (2) elec light at roof deck 3ft from property line 8ft in elevation | $1,000 |
| Aug 16, 2019 | Never finaled issued Mar 2020, no final | 122 Tiffany Av | Britton Builders Incorporated | add new dwelling unit on the ground floor per ordinance 162-16.Details
add new dwelling unit on the ground floor per ordinance 162-16. | $90,000 |
| Aug 1, 2019 | Completed final sign-off Jul 2023 | 2720 Lyon St | G Family Incorporated | rev to 201406118149s1 reloc roof deck fp, add gas lanterns on north facade of ele. reduce opening ht at ele door at roof deck, add panel profile to stucco finish at ne&w facade of ele, add gas heater at roof deck on ne ele. add ele lights at e side of roof deck. show kit range hood to vent at east..Details
rev to 201406118149s1 reloc roof deck fp, add gas lanterns on north facade of ele. reduce opening ht at ele door at roof deck, add panel profile to stucco finish at ne&w facade of ele, add gas heater at roof deck on ne ele. add ele lights at e side of roof deck. show kit range hood to vent at east.. | |
| Jun 27, 2019 | Completed final sign-off Nov 2020 | 132 Sickles Av | move garbage room door and partition wall to enlarge garbage room and create e3asier access for recology and tennants. add a new min 50 cfm fan and duct from garbage room to lightwell and terminating at roof of building.Details
move garbage room door and partition wall to enlarge garbage room and create e3asier access for recology and tennants. add a new min 50 cfm fan and duct from garbage room to lightwell and terminating at roof of building. | $2,000 | |
| Apr 12, 2019 | Completed final sign-off May 2022 | 122 Tiffany Av | front facade remodel: remove - (e) stucco, trim, wood windows & doors, (e) 4 sets of ext concrete stairs. add new - wood siding (or refurbish (e) underneath stucco if poss.) new wood windows w/alum cladding, new doors & ext wood stairs & railingsDetails
front facade remodel: remove - (e) stucco, trim, wood windows & doors, (e) 4 sets of ext concrete stairs. add new - wood siding (or refurbish (e) underneath stucco if poss.) new wood windows w/alum cladding, new doors & ext wood stairs & railings | $90,000 | |
| Jan 30, 2019 | Completed final sign-off May 2021 | 191 Devonshire Wy | 1st fl. sun room replace (e) glass enclosure (previously permitted # 9321721) with a new glass enclosure demo of (e) glass enclosure, previously permited pa# 20181228900. replace in-kind.Details
1st fl. sun room replace (e) glass enclosure (previously permitted # 9321721) with a new glass enclosure demo of (e) glass enclosure, previously permited pa# 20181228900. replace in-kind. | $12,000 | |
| Dec 20, 2018 | Completed final sign-off May 2021 | 191 Devonshire Wy | Hammerhouse Construction | at 1st f; add new office. bdrm bath wthin existing floor area. 2nd fl remodel e kitchen, remove non bearing wall between kitchen and dining rm. 1st fl replace e glass enclosure on a separate permitDetails
at 1st f; add new office. bdrm bath wthin existing floor area. 2nd fl remodel e kitchen, remove non bearing wall between kitchen and dining rm. 1st fl replace e glass enclosure on a separate permit | $95,000 |
| Sep 20, 2018 | Completed final sign-off Sep 2019 | 734 Haight St | Joseph P Walsh Dba Walsh Construction Co | bathroom remodel: replace bathtub, new shower, replace toilet, new sink location..Details
bathroom remodel: replace bathtub, new shower, replace toilet, new sink location.. | $20,000 |
| Sep 7, 2018 | Completed final sign-off Nov 2019 | 2462 16th Av | Hammerhouse Construction | interior remodel of existing kitchen, bathroom & powder room; remove existing wood burning fireplace, add electric floor heat to bathroom & powder roomDetails
interior remodel of existing kitchen, bathroom & powder room; remove existing wood burning fireplace, add electric floor heat to bathroom & powder room | $85,000 |
| May 25, 2018 | Completed final sign-off Jan 2021 | 1250 Eucalyptus Dr | Klz Builder Corporation, Kl Construction Group | excavate below (e) west side of home to create nw living space (living rm, bedrm & bathrm); add (n) laundry rm adjacent to garage, (n) interior stairs from 1st to (n) basement floor level; replace (e) heating w/new hydronic in floor system. remove (e) masonry fireplace, replace w/gas fireplaceDetails
excavate below (e) west side of home to create nw living space (living rm, bedrm & bathrm); add (n) laundry rm adjacent to garage, (n) interior stairs from 1st to (n) basement floor level; replace (e) heating w/new hydronic in floor system. remove (e) masonry fireplace, replace w/gas fireplace | $150,000 |
| Apr 25, 2018 | Completed final sign-off Sep 2019 | 2487 35th Av | Hammerhouse Construction | addition of powder room & new widow facing into existing lightwell, remodel existing bathroom incl window replacement, remodel existing kitchen incl replacement of windows that open to interior court.Details
addition of powder room & new widow facing into existing lightwell, remodel existing bathroom incl window replacement, remodel existing kitchen incl replacement of windows that open to interior court. | $50,000 |
| Dec 7, 2017 | Completed final sign-off Apr 2019 | 131 Harold Av | Golden State Marble & Granite Inc. | infill existing lightwell at 1st/2nd fl north side of building. remodel 1st fl to include family rm,powder rm, bedroom, closet, laundry rm. new interior stair connectiong 1st and 2nd fl. removel 2nd fl to include kitchen, dining room, hall bath. new stairs at rear from 1st fl toDetails
infill existing lightwell at 1st/2nd fl north side of building. remodel 1st fl to include family rm,powder rm, bedroom, closet, laundry rm. new interior stair connectiong 1st and 2nd fl. removel 2nd fl to include kitchen, dining room, hall bath. new stairs at rear from 1st fl to | $160,000 |
| Sep 26, 2017 | Completed final sign-off Mar 2020 | 2816 Clement St | Alpha Construction & Engineering Inc. | revision to pa #2012-0319-6288; revise front facade: material from cement board siding to stucco/plaster, revise size of window & door trim; revise roof termination at side property lines; revise garage door style, remove brackets below bay window, revise trim detail at entry gate.Details
revision to pa #2012-0319-6288; revise front facade: material from cement board siding to stucco/plaster, revise size of window & door trim; revise roof termination at side property lines; revise garage door style, remove brackets below bay window, revise trim detail at entry gate. | |
| Sep 20, 2017 | Never finaled issued Oct 2017, no final | 373 South Van Ness Av | Rinaldi Construction | provide a rated path of egress along (e) tradesman alley (north side) from proposed 3 unit bldg @ rear of property (under seperate pa#201604296193). scope to include a new 10' wall along property line, remodel "e" bldg north wall to be 1 hr. rated, new gate at front. n/a maherDetails
provide a rated path of egress along (e) tradesman alley (north side) from proposed 3 unit bldg @ rear of property (under seperate pa#201604296193). scope to include a new 10' wall along property line, remodel "e" bldg north wall to be 1 hr. rated, new gate at front. n/a maher | $10,000 |
| Sep 11, 2017 | Completed final sign-off Jul 2023 | 2720 Lyon St | The Toboni Group, G Family Incorporated | interior remodel of 3 floor levels. work include (n) kitchen, (3) full bathrooms, (1) powder room, (n) interior stairsDetails
interior remodel of 3 floor levels. work include (n) kitchen, (3) full bathrooms, (1) powder room, (n) interior stairs | $300,000 |
| Sep 7, 2017 | Never finaled issued Sep 2017, no final | 1450 Post St | #308- interior remodel of unit # 308. relocate the extg kitchen, replace extg bathtub with a washer/dryer, new layout to non load bearing walls at closets and new kitchen area. sprinkler, alarm deferred.Details
#308- interior remodel of unit # 308. relocate the extg kitchen, replace extg bathtub with a washer/dryer, new layout to non load bearing walls at closets and new kitchen area. sprinkler, alarm deferred. | $60,000 |