Andes Project Contractor Corp
- Based in
- San Rafael
- On San Francisco permits
- Jul 2023 to Jan 2026
- Last 24 months
- 15 permits filed
20 permits since 2000: 17 completed, 1 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 26, 2026 | Expired or cancelled cancelled Feb 2026 | 550 09th Av | replace in kind (7) windows, same opening, no modifications, same size, same operation, street facing. no structural alteration. max. u-factor=0.27.Details
replace in kind (7) windows, same opening, no modifications, same size, same operation, street facing. no structural alteration. max. u-factor=0.27. | $6,000 |
| Oct 31, 2025 | Completed final sign-off Feb 2026 | 201 Yerba Buena Av | replacing existing windows, same size, same location. 19 windows total, 4 street facing. all windows will be replaced in kind in existing openings. no structural alterations. 4 street facing wintows total. all windows will be replaced in kind in existing opeings.Details
replacing existing windows, same size, same location. 19 windows total, 4 street facing. all windows will be replaced in kind in existing openings. no structural alterations. 4 street facing wintows total. all windows will be replaced in kind in existing opeings. | $25,000 |
| Sep 9, 2025 | Completed final sign-off Oct 2025 | 4321 17th St | replace of 2 sliding windows in unit 2 and replacement of one exterior roof door on common areas, not visible from street.Details
replace of 2 sliding windows in unit 2 and replacement of one exterior roof door on common areas, not visible from street. | $10,000 |
| Aug 28, 2025 | Completed final sign-off Dec 2025 | 50 Walter St | work in both 50-50a walter street which is the same scope for both unit:in kind remodel of full bathroom(toilet, shower pan, double vanity) and half bathroom( toilet upgrade)Details
work in both 50-50a walter street which is the same scope for both unit:in kind remodel of full bathroom(toilet, shower pan, double vanity) and half bathroom( toilet upgrade) | $75,000 |
| Jul 10, 2025 | Completed final sign-off Dec 2025 | 4626 Fulton St | permit to repair and reinforce exterior stairs at rear leading from 3/f down to the backyard. less than 50% repair in kind.Details
permit to repair and reinforce exterior stairs at rear leading from 3/f down to the backyard. less than 50% repair in kind. | $8,000 |
| Jul 2, 2025 | Completed final sign-off Aug 2025 | 256 Willard North St | remodel kitchen, new cabinets and countertops.Details
remodel kitchen, new cabinets and countertops. | $25,000 |
| May 28, 2025 | Expired or cancelled cancelled Jul 2025 | 236 Willard North St | cabinets and countertop remodelation. installation of new cabinets and new countertop. everything else stays the same.Details
cabinets and countertop remodelation. installation of new cabinets and new countertop. everything else stays the same. | $18,000 |
| May 8, 2025 | Completed final sign-off Jan 2026 | 2454 16th Av | revision to 202502109987: remove and replace exterior stucco at 3rd fl front facade. remove ext wood siding at 3rd fl level on side and rear facades. replace w cement board siding, remove existing alum single glazed window on 3rd fl. front facade and replace w new fiberglass dbl glazed window,updateDetails
revision to 202502109987: remove and replace exterior stucco at 3rd fl front facade. remove ext wood siding at 3rd fl level on side and rear facades. replace w cement board siding, remove existing alum single glazed window on 3rd fl. front facade and replace w new fiberglass dbl glazed window,update | $5,000 |
| Mar 31, 2025 | In progress issued Mar 2025 | 4626 Fulton St | in kind repair of no more than 50% of rear wood stairs.Details
in kind repair of no more than 50% of rear wood stairs. | $1,500 |
| Mar 4, 2025 | Completed final sign-off Nov 2025 | 4626 Fulton St | remove & replace 5 double hung windows (in kind, in the same openings) on the front facade @ the 3rd fl unit; new windows shall be double hung windows, wood (n) aluminum exterior cladding with divided lights to match the existing divided light pattern of the existing windows. all windows to be replaDetails
remove & replace 5 double hung windows (in kind, in the same openings) on the front facade @ the 3rd fl unit; new windows shall be double hung windows, wood (n) aluminum exterior cladding with divided lights to match the existing divided light pattern of the existing windows. all windows to be repla | $2,500 |
| Feb 24, 2025 | Completed final sign-off Nov 2025 | 4626 Fulton St | rev to pa# 2024-1112-4750; replace wood siding to cement siding 550 sf in back of building.Details
rev to pa# 2024-1112-4750; replace wood siding to cement siding 550 sf in back of building. | $14,000 |
| Feb 11, 2025 | Completed final sign-off Mar 2025 | 2250 24th St | bathroom to be upgraded from tub to shower. upgrade of electrical trims.Details
bathroom to be upgraded from tub to shower. upgrade of electrical trims. | $12,000 |
| Feb 10, 2025 | Completed final sign-off Jan 2026 | 2454 16th Av | work @ 1st/f related to proprosed 2nd/f. 2nd/f: remodel e) kitchen, n) opening btw kitchen & dinning, n) opening btw dining/hallway, remodel hallway bath w/ new finishes, e) fixture locations to remain, remodel hallway water closet, relocate toilet, add sink, n) en-suite bath @ e)bedroom, n)windowsDetails
work @ 1st/f related to proprosed 2nd/f. 2nd/f: remodel e) kitchen, n) opening btw kitchen & dinning, n) opening btw dining/hallway, remodel hallway bath w/ new finishes, e) fixture locations to remain, remodel hallway water closet, relocate toilet, add sink, n) en-suite bath @ e)bedroom, n)windows | $160,000 |
| Nov 27, 2024 | Completed final sign-off Jan 2025 | 4528 Fulton St | bathroom remodel. bathtub conversion to shower. new tile work. new toilet, vanity, like for like.Details
bathroom remodel. bathtub conversion to shower. new tile work. new toilet, vanity, like for like. | $50,000 |
| Nov 12, 2024 | Completed final sign-off Nov 2025 | 4626 Fulton St | interior removel work at unit 4628.relocate kitchen to e living rm,remodel e kitchenvto be a n living rm,remodel e bath,replace e windows on rear facade.replace e exterior door at rear facade. int remodel unit 4626. new struc post related to vwork at 4628,patch/repair walls.2 n pad footings at garagDetails
interior removel work at unit 4628.relocate kitchen to e living rm,remodel e kitchenvto be a n living rm,remodel e bath,replace e windows on rear facade.replace e exterior door at rear facade. int remodel unit 4626. new struc post related to vwork at 4628,patch/repair walls.2 n pad footings at garag | $200,000 |
| Jul 16, 2024 | Completed final sign-off Oct 2024 | 838 Potrero Av | unit #a: bathroom remodel like for like. flooring about 700 sq ft. in kitchen and bathroom, replace kitchen backsplash only.Details
unit #a: bathroom remodel like for like. flooring about 700 sq ft. in kitchen and bathroom, replace kitchen backsplash only. | $35,000 |
| Jul 16, 2024 | Completed final sign-off Dec 2024 | 111 Chestnut St | bathroom remodel. like for like. new cabinets, vanity, and fixtures. kitchen remodel, like for like. new cabinets, countertops, new floors - about 100 sq ft.Details
bathroom remodel. like for like. new cabinets, vanity, and fixtures. kitchen remodel, like for like. new cabinets, countertops, new floors - about 100 sq ft. | $75,000 |
| Jul 20, 2023 | Completed final sign-off Nov 2023 | 1983 35th Av | 1st fl. relocate door and install at foyer 2nd fl. reconfigure & enlarge 1 bathroom 3rd fl. convert 1 bedroom into closet and comobine with the other bedroom to become master suite.Details
1st fl. relocate door and install at foyer 2nd fl. reconfigure & enlarge 1 bathroom 3rd fl. convert 1 bedroom into closet and comobine with the other bedroom to become master suite. | $25,000 |
| Jul 17, 2023 | Completed final sign-off Nov 2023 | 1983 35th Av | remove old siding and install back hardy siding 200 sqft. all work is non-structural only.Details
remove old siding and install back hardy siding 200 sqft. all work is non-structural only. | $8,000 |
| Jul 6, 2023 | Completed final sign-off Nov 2023 | 1983 35th Av | bathroom and kitchen remodel in kind. (2) street facing windows replacement aluminum clad incase windows. (4) rear facing window replacement in kind. remove balcony.Details
bathroom and kitchen remodel in kind. (2) street facing windows replacement aluminum clad incase windows. (4) rear facing window replacement in kind. remove balcony. | $30,000 |