C & H Home Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Apr 2026
- Last 24 months
- 3 permits filed
22 permits since 2000: 17 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2026 | Completed final sign-off Apr 2026 | 135 26th Av | revision to 202403268596 and 202405222735 to document field condition and final layout. 1st fl: relocate wetbar and bedroom closet, add electric fireplace, add outdoor sink. 2nd fl reconfigure kitchen, remove laundry. 3rd fl, reconfigure 2 baths, new laundryDetails
revision to 202403268596 and 202405222735 to document field condition and final layout. 1st fl: relocate wetbar and bedroom closet, add electric fireplace, add outdoor sink. 2nd fl reconfigure kitchen, remove laundry. 3rd fl, reconfigure 2 baths, new laundry | $1,000 |
| Jan 23, 2026 | Completed final sign-off Aug 2026 | 359 31st Av | 2/f: remove walls between dining/living and kitchen. 3/f: remodel (e) kitchen and remove walls between dining/living and kitchen.Details
2/f: remove walls between dining/living and kitchen. 3/f: remodel (e) kitchen and remove walls between dining/living and kitchen. | $70,000 |
| Jul 25, 2025 | Completed final sign-off Jun 2026 | 1763 28th Av | remodel (e) kitchen. convert 1 bathroom to 1 full bath & powder room. all work on 2/f.Details
remodel (e) kitchen. convert 1 bathroom to 1 full bath & powder room. all work on 2/f. | $60,000 |
| Sep 12, 2024 | Completed final sign-off Jul 2025 | 178 Cayuga Av | 1st floor: 1)relocate washer/dryer, furnace and water heater. 2)add a bedroom, mudroom, gymroom and 2 bathroom. 2nd floor: 1)relocate enlarge kitchen by infilling light well. 2)add a bedroom and powder. 3)add deck at rear.Details
1st floor: 1)relocate washer/dryer, furnace and water heater. 2)add a bedroom, mudroom, gymroom and 2 bathroom. 2nd floor: 1)relocate enlarge kitchen by infilling light well. 2)add a bedroom and powder. 3)add deck at rear. | $40,000 |
| Jul 30, 2024 | Completed final sign-off May 2026 | 135 26th Av | 3 story horizontal addition. 1st fl: add family, office, powder room, 1 bedroom & 1 bath. 2nd fl: remodel kitchen & powder room. reconfigure stairs. add roof deck at the rear. 3rd fl: remodel baths. add roof deck at rear. replace stucco in kind @ front & windows with aluminum cludwood.Details
3 story horizontal addition. 1st fl: add family, office, powder room, 1 bedroom & 1 bath. 2nd fl: remodel kitchen & powder room. reconfigure stairs. add roof deck at the rear. 3rd fl: remodel baths. add roof deck at rear. replace stucco in kind @ front & windows with aluminum cludwood. | $450,000 |
| Dec 19, 2023 | Completed final sign-off Dec 2024 | 1683 11th Av | revision to pa# 202309126401, add new foundation at interior side of existing foundation at south & west exterior walls, existing foundation to remain.Details
revision to pa# 202309126401, add new foundation at interior side of existing foundation at south & west exterior walls, existing foundation to remain. | $5,000 |
| Sep 12, 2023 | Completed final sign-off Dec 2024 | 1683 11th Av | remodel (e) 1st fl family room, playrooms, bathroom (areas previously permitted under pa# 764523 + 9421301) to a bedroom, family room, & bathroom. new window + door in (e) openings at 1st fl on the rear facade.Details
remodel (e) 1st fl family room, playrooms, bathroom (areas previously permitted under pa# 764523 + 9421301) to a bedroom, family room, & bathroom. new window + door in (e) openings at 1st fl on the rear facade. | $135,000 |
| Jul 25, 2023 | Completed final sign-off Dec 2024 | 174 Cayuga Av | infill e lightwell on 2nd fl. reconfigure e bath, e kitchen living room at 2nd fl. convert e dining rm into new bedroom at 2nd fl. propose new media room, office, bath, relocate laundry and mech equip at 1st fl. replace windows at 1st flDetails
infill e lightwell on 2nd fl. reconfigure e bath, e kitchen living room at 2nd fl. convert e dining rm into new bedroom at 2nd fl. propose new media room, office, bath, relocate laundry and mech equip at 1st fl. replace windows at 1st fl | $120,000 |
| Apr 14, 2023 | Completed final sign-off Apr 2023 | 520 Miramar Av | revision to permit 202112084026. 1/f: change bedroom to office. relocate laundry room and wet bar. new windows on left side and rear. 2/f: reconfigure master bath and new windows on sides.Details
revision to permit 202112084026. 1/f: change bedroom to office. relocate laundry room and wet bar. new windows on left side and rear. 2/f: reconfigure master bath and new windows on sides. | |
| Oct 14, 2022 | Completed final sign-off Mar 2024 | 3725 Scott St | 1st fl: add 2 bedrooms, 2 full bath, family room, playroom and laundry. 2nd fl: remodel kitchen, bathroom, add full bath. add ext spiral stairs and roof deck. repl front windows in-kind. repair stucco at front.infill at rear.Details
1st fl: add 2 bedrooms, 2 full bath, family room, playroom and laundry. 2nd fl: remodel kitchen, bathroom, add full bath. add ext spiral stairs and roof deck. repl front windows in-kind. repair stucco at front.infill at rear. | $175,000 |
| Dec 8, 2021 | Completed final sign-off Apr 2023 | 520 Miramar Av | 1st/fl: add 2 bedrooms, 1 full bath, 1 family room, laundry and wetbar. new patio at rear. 2nd/fl: total remodel. new windows in-kind at front with woodDetails
1st/fl: add 2 bedrooms, 1 full bath, 1 family room, laundry and wetbar. new patio at rear. 2nd/fl: total remodel. new windows in-kind at front with wood | $140,000 |
| Jan 16, 2020 | Completed final sign-off Dec 2021 | 2571 22nd Av | 1st fl - create (n) deck & add staircase to backyard; relocate kitchen, add 1 office, 1 powder room. 2nd fl - remodel (e) full bathroom add (1) 4 fixture bathroom. basement: infill (e) structure @ rear & create interior stair to 1st fl. add mech room, 3 bedrooms, 3-fixture bath & (1) entertainmentDetails
1st fl - create (n) deck & add staircase to backyard; relocate kitchen, add 1 office, 1 powder room. 2nd fl - remodel (e) full bathroom add (1) 4 fixture bathroom. basement: infill (e) structure @ rear & create interior stair to 1st fl. add mech room, 3 bedrooms, 3-fixture bath & (1) entertainment | $100,000 |
| May 22, 2019 | Completed final sign-off Mar 2020 | 215 14th Av | add bathroom at both units, move door opening, restore wall to original layout, add 2 skylights maher not reqDetails
add bathroom at both units, move door opening, restore wall to original layout, add 2 skylights maher not req | $50,000 |
| Feb 7, 2019 | Completed final sign-off Nov 2019 | 31 Bridgeview Dr | foundation repair along southeast property lineDetails
foundation repair along southeast property line | $30,000 |
| Jul 19, 2017 | Never finaled issued Aug 2017, no final | 306 Victoria St | 1st floor- interior remodel including new bedrooms, new bathrooms & laundry room per plan .Details
1st floor- interior remodel including new bedrooms, new bathrooms & laundry room per plan . | $45,000 |
| Jun 26, 2017 | Expired or cancelled withdrawn Aug 2017 | 151 Chicago Wy | main fl: kitchen remodel and add (1) full bath per plan.Details
main fl: kitchen remodel and add (1) full bath per plan. | $20,000 |
| Apr 19, 2017 | Completed final sign-off Jul 2017 | 595 03rd Av | unit 1: remodel (1) bathroom, replace bathtub, tile, fixtures, lightsDetails
unit 1: remodel (1) bathroom, replace bathtub, tile, fixtures, lights | $5,000 |
| Oct 4, 2016 | Never finaled issued Jul 2019, no final | 2122 22nd St | legalization of dwelling unit installed without permit. unit legalization ord 43-14. remove shower stall keep half bath rm at entry levelDetails
legalization of dwelling unit installed without permit. unit legalization ord 43-14. remove shower stall keep half bath rm at entry level | $20,000 |
| Nov 10, 2015 | Completed final sign-off Feb 2016 | 414 Lakeview Av | relocate family room to bedroom, bedroom to family room at 1st floor by approved permit #201508073670Details
relocate family room to bedroom, bedroom to family room at 1st floor by approved permit #201508073670 | |
| Aug 27, 2015 | Never finaled issued Sep 2015, no final | 930 Huron Av | revision to app#201410148746 perr plan to eliminate the extg hallway and doorway relocated.Details
revision to app#201410148746 perr plan to eliminate the extg hallway and doorway relocated. | |
| Aug 27, 2015 | Completed final sign-off Feb 2016 | 682 Madrid St | revision to app#201303252975. add 2 hallway in extg garage area- sheet a-1rDetails
revision to app#201303252975. add 2 hallway in extg garage area- sheet a-1r | $2,000 |
| Aug 7, 2015 | Never finaled issued Aug 2015, no final | 414 Lakeview Av | interior remodel per plan, 1/f- add (n) bedroom and bath, 2/f- add (n) bathroom and remodel kitchen & bath.Details
interior remodel per plan, 1/f- add (n) bedroom and bath, 2/f- add (n) bathroom and remodel kitchen & bath. | $42,000 |