C & H Home Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Apr 2026
- Last 24 months
- 3 permits filed
22 permits since 2000: 17 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 175 days from filing to permit and 479 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2024 | Completed final sign-off May 2026 | 135 26th Av | 3 story horizontal addition. 1st fl: add family, office, powder room, 1 bedroom & 1 bath. 2nd fl: remodel kitchen & powder room. reconfigure stairs. add roof deck at the rear. 3rd fl: remodel baths. add roof deck at rear. replace stucco in kind @ front & windows with aluminum cludwood.Details
3 story horizontal addition. 1st fl: add family, office, powder room, 1 bedroom & 1 bath. 2nd fl: remodel kitchen & powder room. reconfigure stairs. add roof deck at the rear. 3rd fl: remodel baths. add roof deck at rear. replace stucco in kind @ front & windows with aluminum cludwood. | $450,000 |
| Oct 14, 2022 | Completed final sign-off Mar 2024 | 3725 Scott St | 1st fl: add 2 bedrooms, 2 full bath, family room, playroom and laundry. 2nd fl: remodel kitchen, bathroom, add full bath. add ext spiral stairs and roof deck. repl front windows in-kind. repair stucco at front.infill at rear.Details
1st fl: add 2 bedrooms, 2 full bath, family room, playroom and laundry. 2nd fl: remodel kitchen, bathroom, add full bath. add ext spiral stairs and roof deck. repl front windows in-kind. repair stucco at front.infill at rear. | $175,000 |
| Jan 16, 2020 | Completed final sign-off Dec 2021 | 2571 22nd Av | 1st fl - create (n) deck & add staircase to backyard; relocate kitchen, add 1 office, 1 powder room. 2nd fl - remodel (e) full bathroom add (1) 4 fixture bathroom. basement: infill (e) structure @ rear & create interior stair to 1st fl. add mech room, 3 bedrooms, 3-fixture bath & (1) entertainmentDetails
1st fl - create (n) deck & add staircase to backyard; relocate kitchen, add 1 office, 1 powder room. 2nd fl - remodel (e) full bathroom add (1) 4 fixture bathroom. basement: infill (e) structure @ rear & create interior stair to 1st fl. add mech room, 3 bedrooms, 3-fixture bath & (1) entertainment | $100,000 |