Back to kitchen remodel contractors
C & H Home Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Apr 2026
- Last 24 months
- 3 permits filed
22 permits since 2000: 17 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 8 completed, 1 never finaled, 1 expired or cancelled. Typically 21 days from filing to permit and 308 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2026 | Completed final sign-off Apr 2026 | 135 26th Av | revision to 202403268596 and 202405222735 to document field condition and final layout. 1st fl: relocate wetbar and bedroom closet, add electric fireplace, add outdoor sink. 2nd fl reconfigure kitchen, remove laundry. 3rd fl, reconfigure 2 baths, new laundryDetails
revision to 202403268596 and 202405222735 to document field condition and final layout. 1st fl: relocate wetbar and bedroom closet, add electric fireplace, add outdoor sink. 2nd fl reconfigure kitchen, remove laundry. 3rd fl, reconfigure 2 baths, new laundry | $1,000 |
| Jan 23, 2026 | Completed final sign-off Aug 2026 | 359 31st Av | 2/f: remove walls between dining/living and kitchen. 3/f: remodel (e) kitchen and remove walls between dining/living and kitchen.Details
2/f: remove walls between dining/living and kitchen. 3/f: remodel (e) kitchen and remove walls between dining/living and kitchen. | $70,000 |
| Jul 25, 2025 | Completed final sign-off Jun 2026 | 1763 28th Av | remodel (e) kitchen. convert 1 bathroom to 1 full bath & powder room. all work on 2/f.Details
remodel (e) kitchen. convert 1 bathroom to 1 full bath & powder room. all work on 2/f. | $60,000 |
| Sep 12, 2024 | Completed final sign-off Jul 2025 | 178 Cayuga Av | 1st floor: 1)relocate washer/dryer, furnace and water heater. 2)add a bedroom, mudroom, gymroom and 2 bathroom. 2nd floor: 1)relocate enlarge kitchen by infilling light well. 2)add a bedroom and powder. 3)add deck at rear.Details
1st floor: 1)relocate washer/dryer, furnace and water heater. 2)add a bedroom, mudroom, gymroom and 2 bathroom. 2nd floor: 1)relocate enlarge kitchen by infilling light well. 2)add a bedroom and powder. 3)add deck at rear. | $40,000 |
| Jul 30, 2024 | Completed final sign-off May 2026 | 135 26th Av | 3 story horizontal addition. 1st fl: add family, office, powder room, 1 bedroom & 1 bath. 2nd fl: remodel kitchen & powder room. reconfigure stairs. add roof deck at the rear. 3rd fl: remodel baths. add roof deck at rear. replace stucco in kind @ front & windows with aluminum cludwood.Details
3 story horizontal addition. 1st fl: add family, office, powder room, 1 bedroom & 1 bath. 2nd fl: remodel kitchen & powder room. reconfigure stairs. add roof deck at the rear. 3rd fl: remodel baths. add roof deck at rear. replace stucco in kind @ front & windows with aluminum cludwood. | $450,000 |
| Jul 25, 2023 | Completed final sign-off Dec 2024 | 174 Cayuga Av | infill e lightwell on 2nd fl. reconfigure e bath, e kitchen living room at 2nd fl. convert e dining rm into new bedroom at 2nd fl. propose new media room, office, bath, relocate laundry and mech equip at 1st fl. replace windows at 1st flDetails
infill e lightwell on 2nd fl. reconfigure e bath, e kitchen living room at 2nd fl. convert e dining rm into new bedroom at 2nd fl. propose new media room, office, bath, relocate laundry and mech equip at 1st fl. replace windows at 1st fl | $120,000 |
| Oct 14, 2022 | Completed final sign-off Mar 2024 | 3725 Scott St | 1st fl: add 2 bedrooms, 2 full bath, family room, playroom and laundry. 2nd fl: remodel kitchen, bathroom, add full bath. add ext spiral stairs and roof deck. repl front windows in-kind. repair stucco at front.infill at rear.Details
1st fl: add 2 bedrooms, 2 full bath, family room, playroom and laundry. 2nd fl: remodel kitchen, bathroom, add full bath. add ext spiral stairs and roof deck. repl front windows in-kind. repair stucco at front.infill at rear. | $175,000 |
| Jan 16, 2020 | Completed final sign-off Dec 2021 | 2571 22nd Av | 1st fl - create (n) deck & add staircase to backyard; relocate kitchen, add 1 office, 1 powder room. 2nd fl - remodel (e) full bathroom add (1) 4 fixture bathroom. basement: infill (e) structure @ rear & create interior stair to 1st fl. add mech room, 3 bedrooms, 3-fixture bath & (1) entertainmentDetails
1st fl - create (n) deck & add staircase to backyard; relocate kitchen, add 1 office, 1 powder room. 2nd fl - remodel (e) full bathroom add (1) 4 fixture bathroom. basement: infill (e) structure @ rear & create interior stair to 1st fl. add mech room, 3 bedrooms, 3-fixture bath & (1) entertainment | $100,000 |
| Jun 26, 2017 | Expired or cancelled withdrawn Aug 2017 | 151 Chicago Wy | main fl: kitchen remodel and add (1) full bath per plan.Details
main fl: kitchen remodel and add (1) full bath per plan. | $20,000 |
| Aug 7, 2015 | Never finaled issued Aug 2015, no final | 414 Lakeview Av | interior remodel per plan, 1/f- add (n) bedroom and bath, 2/f- add (n) bathroom and remodel kitchen & bath.Details
interior remodel per plan, 1/f- add (n) bedroom and bath, 2/f- add (n) bathroom and remodel kitchen & bath. | $42,000 |