C & H Home Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Apr 2026
- Last 24 months
- 3 permits filed
22 permits since 2000: 17 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 198 days from filing to permit and 308 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2024 | Completed final sign-off Jul 2025 | 178 Cayuga Av | 1st floor: 1)relocate washer/dryer, furnace and water heater. 2)add a bedroom, mudroom, gymroom and 2 bathroom. 2nd floor: 1)relocate enlarge kitchen by infilling light well. 2)add a bedroom and powder. 3)add deck at rear.Details
1st floor: 1)relocate washer/dryer, furnace and water heater. 2)add a bedroom, mudroom, gymroom and 2 bathroom. 2nd floor: 1)relocate enlarge kitchen by infilling light well. 2)add a bedroom and powder. 3)add deck at rear. | $40,000 |
| Jan 16, 2020 | Completed final sign-off Dec 2021 | 2571 22nd Av | 1st fl - create (n) deck & add staircase to backyard; relocate kitchen, add 1 office, 1 powder room. 2nd fl - remodel (e) full bathroom add (1) 4 fixture bathroom. basement: infill (e) structure @ rear & create interior stair to 1st fl. add mech room, 3 bedrooms, 3-fixture bath & (1) entertainmentDetails
1st fl - create (n) deck & add staircase to backyard; relocate kitchen, add 1 office, 1 powder room. 2nd fl - remodel (e) full bathroom add (1) 4 fixture bathroom. basement: infill (e) structure @ rear & create interior stair to 1st fl. add mech room, 3 bedrooms, 3-fixture bath & (1) entertainment | $100,000 |