Block 0948, lot 031
2720 Lyon St
- City’s use
- Single Family Residential
- Built
- 1922
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 2,870 sq ft
- Lot
- 2,425 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 17, 2023 | Completed final sign-off Oct 2023 | 2720 Lyon St | Pivot Pools Construction And Design Inc | demo (e) swimming pool plaster. demo (e) coping. demo (e) steps. apply pebble finish. install color led lights. install new poop coping. install new step ladder. build new steps.Details
demo (e) swimming pool plaster. demo (e) coping. demo (e) steps. apply pebble finish. install color led lights. install new poop coping. install new step ladder. build new steps. | $25,000 |
| Jun 24, 2021 | Completed final sign-off Jul 2023 | 2720 Lyon St | The Toboni Group, G Family Incorporated | comply to nov202172831 & 202172219; provide as-built conditions,rev to pa 201406118149, 201406118149, 201709117616, 201908300281, 201912200106, 202001313229 & 202002144497. to address bid requirement of as built conditionsDetails
comply to nov202172831 & 202172219; provide as-built conditions,rev to pa 201406118149, 201406118149, 201709117616, 201908300281, 201912200106, 202001313229 & 202002144497. to address bid requirement of as built conditions | |
| Jun 18, 2020 | Never finaled issued Jun 2020, no final | 2720 Lyon St | street spaceDetails
street space | ||
| Feb 14, 2020 | Completed final sign-off Jul 2023 | 2720 Lyon St | The Toboni Group | temporary planter boxes, relocate light. 36" tall counter above spiral stair enclosure to match apprvd kitchen sink counter with 6" backsplash around both. increase height of wall from backsplash to elevator enclosure from 36" to 42" w gate at same heightDetails
temporary planter boxes, relocate light. 36" tall counter above spiral stair enclosure to match apprvd kitchen sink counter with 6" backsplash around both. increase height of wall from backsplash to elevator enclosure from 36" to 42" w gate at same height | $2,000 |
| Jan 31, 2020 | Never finaled issued Jan 2020, no final | 2720 Lyon St | street spaceDetails
street space | ||
| Jan 31, 2020 | Completed final sign-off Jul 2023 | 2720 Lyon St | G Family Incorporated | revision to pa #2019-1220-0106: provide baseplate for temporary shade umbrella. no attachment to building.Details
revision to pa #2019-1220-0106: provide baseplate for temporary shade umbrella. no attachment to building. | |
| Dec 20, 2019 | Completed final sign-off Jul 2023 | 2720 Lyon St | revision to pa# 2017-0611-8149 & 2019-0830-0281. relocate bbq grill @ roof deck. provide two new base supports for temporary shade umbrellas on the roof.Details
revision to pa# 2017-0611-8149 & 2019-0830-0281. relocate bbq grill @ roof deck. provide two new base supports for temporary shade umbrellas on the roof. | $500 | |
| Sep 23, 2019 | Never finaled issued Sep 2019, no final | 2720 Lyon St | street spaceDetails
street space | ||
| Aug 30, 2019 | Completed final sign-off Jul 2023 | 2720 Lyon St | G Family Incorporated | rev to pa# 201908017632; add glass railing at (e) parapet/south property line wall vicinity skylight, add (2) elec light at roof deck 3ft from property line 8ft in elevationDetails
rev to pa# 201908017632; add glass railing at (e) parapet/south property line wall vicinity skylight, add (2) elec light at roof deck 3ft from property line 8ft in elevation | $1,000 |
| Aug 1, 2019 | Completed final sign-off Jul 2023 | 2720 Lyon St | G Family Incorporated | rev to 201406118149s1 reloc roof deck fp, add gas lanterns on north facade of ele. reduce opening ht at ele door at roof deck, add panel profile to stucco finish at ne&w facade of ele, add gas heater at roof deck on ne ele. add ele lights at e side of roof deck. show kit range hood to vent at east..Details
rev to 201406118149s1 reloc roof deck fp, add gas lanterns on north facade of ele. reduce opening ht at ele door at roof deck, add panel profile to stucco finish at ne&w facade of ele, add gas heater at roof deck on ne ele. add ele lights at e side of roof deck. show kit range hood to vent at east.. | |
| May 1, 2019 | Never finaled issued May 2019, no final | 2720 Lyon St | street spaceDetails
street space | ||
| Oct 15, 2018 | Never finaled issued Oct 2018, no final | 2720 Lyon St | street spaceDetails
street space | ||
| Sep 11, 2018 | Completed final sign-off Nov 2020 | 2720 Lyon St | Crime Watch Security Sys Llc, G Family Incorporated | installation of a new sprinkler monitoring system. ref pa 2017-0911-7616 and 2018-0430-7710 (sprinkler)Details
installation of a new sprinkler monitoring system. ref pa 2017-0911-7616 and 2018-0430-7710 (sprinkler) | $3,500 |
| Apr 30, 2018 | Completed final sign-off Nov 2020 | 2720 Lyon St | R Lowy Fire Protection Inc | fire sprinklers to nfpa 13r and 2" dedicated underground to the 3 story single family dwelling, ref pa 201709117616. 50 sprinklers, demand in garage is 78.6 gpm @ 43 psi with 68 psi safety, 3rd floor demand is 56 gpm requiring 89 psi, with 23 psi safety. connecting to east side of 6" cwm on lyon.Details
fire sprinklers to nfpa 13r and 2" dedicated underground to the 3 story single family dwelling, ref pa 201709117616. 50 sprinklers, demand in garage is 78.6 gpm @ 43 psi with 68 psi safety, 3rd floor demand is 56 gpm requiring 89 psi, with 23 psi safety. connecting to east side of 6" cwm on lyon. | $27,350 |
| Mar 8, 2018 | Never finaled issued Mar 2018, no final | 2720 Lyon St | street spaceDetails
street space | ||
| Sep 11, 2017 | Completed final sign-off Jul 2023 | 2720 Lyon St | The Toboni Group, G Family Incorporated | interior remodel of 3 floor levels. work include (n) kitchen, (3) full bathrooms, (1) powder room, (n) interior stairsDetails
interior remodel of 3 floor levels. work include (n) kitchen, (3) full bathrooms, (1) powder room, (n) interior stairs | $300,000 |
| Jun 11, 2014 | Completed final sign-off Jul 2023 | 2720 Lyon St | The Toboni Group, G Family Incorporated | widen (e) garage door. enlarge entry opening @ front facade. modify (e) rear facade window sizes & replace with windows & doors. add 42 sq. ft to ne corner of rear facade 1st floor. add a roof deck with spiral stair & elevator (stairs & elevator to be enclosed. infill north light well.Details
widen (e) garage door. enlarge entry opening @ front facade. modify (e) rear facade window sizes & replace with windows & doors. add 42 sq. ft to ne corner of rear facade 1st floor. add a roof deck with spiral stair & elevator (stairs & elevator to be enclosed. infill north light well. | $80,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- G Family Incorporated (7), The Toboni Group (4), Crime Watch Security Sys Llc, Pivot Pools Construction And Design Inc, R Lowy Fire Protection Inc
- Architects
- Jeff A. Eade (8)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.