Michael Ford
- Listed as
- architect
- On San Francisco permits
- Nov 2024 to Mar 2026
6 permits since 2000 (architect on 6 permits): 3 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 9, 2026 | In progress filed Mar 2026, not yet issued | 722 19th Av | demo (e) type-vb 1 story detached garage.Details
demo (e) type-vb 1 story detached garage. | $5,000 | |
| Mar 9, 2026 | In progress filed Mar 2026, not yet issued | 722 19th Av | partial demo (e) sfd at rear lot. remodel int of (e) rear bldg, excavate lower finish floor, replace siding and windows. construct new 3-story addition w/stair penthouse to roof deck. (n) nfpa 13r systemDetails
partial demo (e) sfd at rear lot. remodel int of (e) rear bldg, excavate lower finish floor, replace siding and windows. construct new 3-story addition w/stair penthouse to roof deck. (n) nfpa 13r system | $500,000 | |
| Mar 9, 2026 | In progress filed Mar 2026, not yet issued | 722 19th Av | construction of new 2-story detached residential dwelling unit - garage with 1 bedroom apartment above.Details
construction of new 2-story detached residential dwelling unit - garage with 1 bedroom apartment above. | $80,000 | |
| Mar 27, 2025 | Completed final sign-off May 2026 | 765 34th Av | Sequoia Build Group Inc | revision to 202411155160: lowering ground fl slab, replace additional foundation, revising landscape design at rear. no interior changeDetails
revision to 202411155160: lowering ground fl slab, replace additional foundation, revising landscape design at rear. no interior change | $50,000 |
| Dec 4, 2024 | Completed final sign-off Nov 2025 | 174 Springfield Dr | Hardtke Construction | (n) deck and patio at rear. convert 2 (e) window into 2 doors at rear of propertyDetails
(n) deck and patio at rear. convert 2 (e) window into 2 doors at rear of property | $25,000 |
| Nov 15, 2024 | Completed final sign-off May 2026 | 765 34th Av | Dliu Construction | complete upper level interior remodel. (n) conditioned space at lower level. infill conditioned space under xtg upper level. provide access btwn upper & lower levels. replace rear siding w/ stucco. new on grade concrete patio at rear.Details
complete upper level interior remodel. (n) conditioned space at lower level. infill conditioned space under xtg upper level. provide access btwn upper & lower levels. replace rear siding w/ stucco. new on grade concrete patio at rear. | $200,000 |