Jeff Logan
- Listed as
- architect, authorized agent-others
- Firm
- Lapnog Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jan 2015 to Jun 2026
26 permits since 2000 (architect on 25 permits, authorized agent-others on 1 permit): 21 completed, 2 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 5, 2026 | In progress issued Jun 2026 | 2578 Great Hy | revision to permit#202611240327, revise upper sloped roof framing from post & beam to 2x10 joists w/ gwb ceiling & 3rd spayed insulation, revise 3rd floor framing to increase size of floor opening for the stair. no change to height or area of building, no change to front & rear elevations.Details
revision to permit#202611240327, revise upper sloped roof framing from post & beam to 2x10 joists w/ gwb ceiling & 3rd spayed insulation, revise 3rd floor framing to increase size of floor opening for the stair. no change to height or area of building, no change to front & rear elevations. | ||
| Dec 11, 2025 | In progress issued Feb 2026 | 2578 Great Hy | remodel of (e) 3 story single family residence. horizontal addition on 3 levels in rear. add one bedroom local program adu on 1st floor. vertical extension with new siding & windows throughout.Details
remodel of (e) 3 story single family residence. horizontal addition on 3 levels in rear. add one bedroom local program adu on 1st floor. vertical extension with new siding & windows throughout. | $450,000 | |
| Oct 15, 2024 | Expired or cancelled withdrawn Jan 2025 | 4248 25th St | replace existing exterior egress stair and landings, in-kindDetails
replace existing exterior egress stair and landings, in-kind | $50,000 | |
| Oct 3, 2024 | Completed final sign-off Jun 2025 | 1455 Eucalyptus Dr | A L Martin Construction | (n) deck from kitchen to rear yard. interior remodel: remodel (e) ktchen & bathroom w/ new fixtures & finishes. replace (e) windows, none face street. new bathroom & replace internal stair. convert space behind garageDetails
(n) deck from kitchen to rear yard. interior remodel: remodel (e) ktchen & bathroom w/ new fixtures & finishes. replace (e) windows, none face street. new bathroom & replace internal stair. convert space behind garage | $200,000 |
| Jun 26, 2024 | Completed final sign-off Jun 2025 | 617 Castro St | Aurora Builders | interior remodel. e kitchen , new appliances, fixtures, finishes.e 1/2 bath converted into new laundry, e office converted int new bath. replace 2 e windows in light courtsDetails
interior remodel. e kitchen , new appliances, fixtures, finishes.e 1/2 bath converted into new laundry, e office converted int new bath. replace 2 e windows in light courts | $100,000 |
| Jun 22, 2023 | Completed final sign-off Jun 2024 | 851 Wisconsin St | horizontal addition on 2 levels in rear, new deck in rear, interior remodel, add 2 bedrooms and media room, and relocate bath on 1fl. relocate interior stairs 2f. remodel and relocate bath rm. new exterior windows and entrance at gradeDetails
horizontal addition on 2 levels in rear, new deck in rear, interior remodel, add 2 bedrooms and media room, and relocate bath on 1fl. relocate interior stairs 2f. remodel and relocate bath rm. new exterior windows and entrance at grade | $350,000 | |
| May 26, 2023 | Completed final sign-off Nov 2023 | 753 Vermont St | O'sullivan & Son Construction Inc | 1/f: ugrade electrical in living room & bedroom 3, remove fireplace, patch floor/walls in-kind; 2/f: add new bathroom, remodel (e) bathroom; garage: install new car chargerDetails
1/f: ugrade electrical in living room & bedroom 3, remove fireplace, patch floor/walls in-kind; 2/f: add new bathroom, remodel (e) bathroom; garage: install new car charger | $40,000 |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 851 Wisconsin St | demo of (e) shed in rear yard in respond to complaint nov 202029551.Details
demo of (e) shed in rear yard in respond to complaint nov 202029551. | $1,000 | |
| Jan 10, 2023 | Completed final sign-off Mar 2023 | 851 Wisconsin St | comply w/ complaint #201653633, #202296035: demo of existing deck.Details
comply w/ complaint #201653633, #202296035: demo of existing deck. | $3,500 | |
| Dec 21, 2022 | Completed final sign-off Apr 2024 | 5 Starview Wy | A L Martin Construction | remove existing metal cladding, repair existing plaster, replace w/ synthetic wood cladding & plaster, replace existing vinyl & aluminum windows in e opening front visible, street windows remain. new deck at 2/f in rear yard.Details
remove existing metal cladding, repair existing plaster, replace w/ synthetic wood cladding & plaster, replace existing vinyl & aluminum windows in e opening front visible, street windows remain. new deck at 2/f in rear yard. | $180,000 |
| Jun 10, 2022 | Completed final sign-off Dec 2022 | 997 Dolores St | A L Martin Construction | kitchen remodel- remove partition, new cabinets, flooring. replace 4 windows in-kind not visible from street. relocate elec subpanel. add new hvac, condensor on roof, 3 mini split in bedrooms.Details
kitchen remodel- remove partition, new cabinets, flooring. replace 4 windows in-kind not visible from street. relocate elec subpanel. add new hvac, condensor on roof, 3 mini split in bedrooms. | $75,000 |
| Dec 28, 2021 | Completed final sign-off Jan 2023 | 283 29th Av | A L Martin Construction | remodel: repair and replace wood siding on west and south elevations. replace door and windows on west and south elevations in kind. replace existing deck in rear yard in kind. new partial concrete retaining wall.Details
remodel: repair and replace wood siding on west and south elevations. replace door and windows on west and south elevations in kind. replace existing deck in rear yard in kind. new partial concrete retaining wall. | $100,000 |
| Jan 29, 2021 | Completed final sign-off Jan 2022 | 51 Van Buren St | A L Martin Construction | replace (e) two-tier deck, stair, and foundation with new deck, stair, and concrete piers. replace (e) siding, patio doors and windows on rear elevation with (mimimum .40 u-factor) new siding, waterproofing, patio doors, and windows. replace (e) rear fence with new rear fenceDetails
replace (e) two-tier deck, stair, and foundation with new deck, stair, and concrete piers. replace (e) siding, patio doors and windows on rear elevation with (mimimum .40 u-factor) new siding, waterproofing, patio doors, and windows. replace (e) rear fence with new rear fence | $80,000 |
| Jun 9, 2020 | Expired or cancelled withdrawn Feb 2023 | 851 Wisconsin St | to comply with nov 202029551: demo rear single wood (type v) shed.Details
to comply with nov 202029551: demo rear single wood (type v) shed. | $700 | |
| Dec 16, 2019 | Completed final sign-off Apr 2021 | 104 Robinhood Dr | remodel s.f.d.: replace extg kitchen and bathroom finishes/fixtures on main level. replace extg bathroom fixtures on lower level 1. replace all remaining extg alum windows, not visible from street. convert unwarranted bathroom & family room on lower level 2. repair extg deck on main leve in kind.Details
remodel s.f.d.: replace extg kitchen and bathroom finishes/fixtures on main level. replace extg bathroom fixtures on lower level 1. replace all remaining extg alum windows, not visible from street. convert unwarranted bathroom & family room on lower level 2. repair extg deck on main leve in kind. | $225,000 | |
| Nov 20, 2019 | Completed final sign-off Jun 2020 | 88 Chilton Av | N C P General Contracting Inc | remodel (e) kitchen on 2nd fl. replace (3) exterior windows in-kind, kitchen, dining & stair. window replacement "in like-kind", same size & location. also, existing rated/non-rated windows may be replaced with same.Details
remodel (e) kitchen on 2nd fl. replace (3) exterior windows in-kind, kitchen, dining & stair. window replacement "in like-kind", same size & location. also, existing rated/non-rated windows may be replaced with same. | $75,000 |
| Apr 5, 2019 | Never finaled issued Apr 2019, no final | 1248 Treat Av | A L Martin Construction | revision to 201810092535 replace front entry stair in-kindDetails
revision to 201810092535 replace front entry stair in-kind | $12,000 |
| Oct 9, 2018 | Completed final sign-off Feb 2020 | 1248 Treat Av | new half bath on 1st fl. facade restoration remove e alum siding and restor or replace orig wood siding. remove e alum windows and replace with custom wood dbl hung in kindDetails
new half bath on 1st fl. facade restoration remove e alum siding and restor or replace orig wood siding. remove e alum windows and replace with custom wood dbl hung in kind | $35,000 | |
| Nov 9, 2017 | Completed final sign-off Jul 2018 | 2032 14th Av | Mrcc | remodel (e) garage: addition of new office in existing envelope. relocate furnace & laundry.Details
remodel (e) garage: addition of new office in existing envelope. relocate furnace & laundry. | $35,000 |
| Jul 6, 2017 | Completed final sign-off Dec 2017 | 248 San Carlos St | A L Martin Construction | demo (e) fireplace, re-arrange interior partitions for (n) master bedroom closet, add light to (n) closet.Details
demo (e) fireplace, re-arrange interior partitions for (n) master bedroom closet, add light to (n) closet. | $8,000 |
| Mar 23, 2017 | Completed final sign-off May 2018 | 141 Devonshire Wy | replace e kitchen and bath finishes on 2nd lvel, new mster bath, entry foyer, 1/2 bath 1st level, family rm, bdrm existing. remove e internal stair, add new internal stair. replace e vinyl windows with alum throughout, in kind on front. stuctural upgrades to include new beams for vaulted ceiling,Details
replace e kitchen and bath finishes on 2nd lvel, new mster bath, entry foyer, 1/2 bath 1st level, family rm, bdrm existing. remove e internal stair, add new internal stair. replace e vinyl windows with alum throughout, in kind on front. stuctural upgrades to include new beams for vaulted ceiling, | $175,000 | |
| Jan 31, 2017 | Completed final sign-off Oct 2018 | 248 San Carlos St | A L Martin Construction | remodel (e) half bath into full bath @ 2nd floor. replace window, not visible from street.Details
remodel (e) half bath into full bath @ 2nd floor. replace window, not visible from street. | $35,000 |
| May 17, 2016 | Completed final sign-off Jun 2017 | 786 27th St | enlarge (e) bathroom & replace fixtures & finishes. create 1-hour fire separation between garage & habitable space.Details
enlarge (e) bathroom & replace fixtures & finishes. create 1-hour fire separation between garage & habitable space. | $21,000 | |
| May 17, 2016 | Completed final sign-off Jun 2017 | 786 27th St | legalize (e) dwelling unit per ord 43-14.Details
legalize (e) dwelling unit per ord 43-14. | $20,000 | |
| Apr 7, 2016 | Completed final sign-off Feb 2017 | 139 Marietta Dr | A L Martin Construction | new deck in rear yard at basement level with stair to rear yard.Details
new deck in rear yard at basement level with stair to rear yard. | $20,000 |
| Jan 29, 2015 | Completed final sign-off Apr 2015 | 997 Dolores St | A L Martin Construction | remodel of (2) half-baths into (2) full bathrooms within the same footprint. upgrade electrical, (2) new showers, (2) new wall hung toilets & (2) new sinks. replace (2) windows in-kind & add (2) new ceiling fans ducted to exterior wall. work in this unit only.Details
remodel of (2) half-baths into (2) full bathrooms within the same footprint. upgrade electrical, (2) new showers, (2) new wall hung toilets & (2) new sinks. replace (2) windows in-kind & add (2) new ceiling fans ducted to exterior wall. work in this unit only. | $20,000 |