Block 4074, lot 020
753 Vermont St
- City’s use
- Single Family Residential
- Built
- 1904
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,908 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 8, 2023 | Completed final sign-off Nov 2023 | 753 Vermont St | O'sullivan & Son Construction Inc | revision to pa 2023-0526-8691 "to remove car charger from scope of work"Details
revision to pa 2023-0526-8691 "to remove car charger from scope of work" | |
| May 26, 2023 | Completed final sign-off Nov 2023 | 753 Vermont St | O'sullivan & Son Construction Inc | 1/f: ugrade electrical in living room & bedroom 3, remove fireplace, patch floor/walls in-kind; 2/f: add new bathroom, remodel (e) bathroom; garage: install new car chargerDetails
1/f: ugrade electrical in living room & bedroom 3, remove fireplace, patch floor/walls in-kind; 2/f: add new bathroom, remodel (e) bathroom; garage: install new car charger | $40,000 |
| Mar 17, 2021 | Completed final sign-off May 2021 | 753 Vermont St | Jemico Llc Dba Renewal By Andersen Of Sf | replacing 9 each in kind street visible windows, with wood. energies insert into existing frame. u-factor <.30Details
replacing 9 each in kind street visible windows, with wood. energies insert into existing frame. u-factor <.30 | $21,603 |
| Jun 22, 2018 | Never finaled issued Jun 2018, no final | 753 Vermont St | street space permit & sidewalk permitDetails
street space permit & sidewalk permit | ||
| Oct 26, 2011 | Completed final sign-off Mar 2012 | 753 Vermont St | Dohrmann Construction Inc. | revision to app#201012176901 for the following changes: 1) interior remodeling at 2nd floor to expand bath 1 and reconfigure the adjacent bedroom 1 walkin closet, 2) removal of the fireplace/heater from bedroom 1 and to change door #6 to the room,3) change the door and window configuration at theDetails
revision to app#201012176901 for the following changes: 1) interior remodeling at 2nd floor to expand bath 1 and reconfigure the adjacent bedroom 1 walkin closet, 2) removal of the fireplace/heater from bedroom 1 and to change door #6 to the room,3) change the door and window configuration at the | |
| Sep 29, 2011 | Never finaled issued Sep 2011, no final | 753 Vermont St | street spaceDetails
street space | ||
| Dec 17, 2010 | Completed final sign-off Mar 2012 | 753 Vermont St | Dohrmann Construction Inc. | rear addition with one and two story portions and replacement bath. interior remodeling at existing second floor rear bedroom, five new skylights at existing roof. total increase in habitable space =324 sqft. excavation and new patio and retaining walls at rear yard.Details
rear addition with one and two story portions and replacement bath. interior remodeling at existing second floor rear bedroom, five new skylights at existing roof. total increase in habitable space =324 sqft. excavation and new patio and retaining walls at rear yard. | $85,000 |
| Sep 6, 2007 | Completed final sign-off Sep 2007 | 753 Vermont St | High Quality Roofing Co. | reroofing.Details
reroofing. | $3,200 |
| Aug 28, 2006 | Completed final sign-off Oct 2006 | 753 Vermont St | Bergquist Builders | rev. to 2006/08/08/8918: add pony wall, new wall, dbl (e) floor joists. show (e) bream in kitchenDetails
rev. to 2006/08/08/8918: add pony wall, new wall, dbl (e) floor joists. show (e) bream in kitchen | |
| Aug 8, 2006 | Completed final sign-off Oct 2006 | 753 Vermont St | Bergquist Builders | comply complaint 200671895. revision to app #200607247443 (no drawings) (originals) add pocket door opening. reinforce floor joists and posts.Details
comply complaint 200671895. revision to app #200607247443 (no drawings) (originals) add pocket door opening. reinforce floor joists and posts. | $3,000 |
| Jul 24, 2006 | Completed final sign-off Oct 2006 | 753 Vermont St | Bergquist Builders | kitchen remodel, cabinets, flooring, drywall, counters, appliances. correction notice 200671274. replace existing tub, vanity, toilet, same locationDetails
kitchen remodel, cabinets, flooring, drywall, counters, appliances. correction notice 200671274. replace existing tub, vanity, toilet, same location | $23,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bergquist Builders (3), Dohrmann Construction Inc. (2), O'sullivan & Son Construction Inc (2), High Quality Roofing Co., Jemico Llc Dba Renewal By Andersen Of Sf
- Architects
- Jeffrey B E Logan, Steven Whitney
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.