Mark Reilly
- Listed as
- architect, pmt consultant/expediter
- Firm
- Mark Reilly Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jul 2010 to Aug 2024
23 permits since 2000 (architect on 22 permits, pmt consultant/expediter on 1 permit): 20 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 1, 2024 | Expired or cancelled expired Jan 2026 | 3676 17th St | Harmony Design & Development Inc | revision to pa # 2022-1206-7705 remove & replace siding at rear & side btwn grid g & h. replace dry rotted posts at grid h1 + h4; reframe 2nd fl wall on grid 1 btwn grid g & h. adjust preapproved deck supports; shift preapproved 1st & 2nd fl stairs 12" east; remove siding at lightwell.Details
revision to pa # 2022-1206-7705 remove & replace siding at rear & side btwn grid g & h. replace dry rotted posts at grid h1 + h4; reframe 2nd fl wall on grid 1 btwn grid g & h. adjust preapproved deck supports; shift preapproved 1st & 2nd fl stairs 12" east; remove siding at lightwell. | $10,000 |
| Sep 8, 2023 | Never finaled filed Sep 2023, never issued | 121 Hancock St | remove section of gabled roof at rear of third floor to create three dormers per 2a3 for upper unit within buildable areaDetails
remove section of gabled roof at rear of third floor to create three dormers per 2a3 for upper unit within buildable area | $275,000 | |
| Dec 6, 2022 | Completed final sign-off Jan 2026 | 3676 17th St | Harmony Design & Development Inc | partially excavate lower level to create (n) principal suite and laundry in (e) 1st flr storage area and connect to 2nd flr unit w/(n) stair . renovate 2nd flr kitchen and living and 3rd flr bedroom and 2nd bathrooms (n) windows balcony and spiral stair at rear of structure.Details
partially excavate lower level to create (n) principal suite and laundry in (e) 1st flr storage area and connect to 2nd flr unit w/(n) stair . renovate 2nd flr kitchen and living and 3rd flr bedroom and 2nd bathrooms (n) windows balcony and spiral stair at rear of structure. | $325,000 |
| Apr 13, 2022 | Completed final sign-off Jul 2022 | 105 Fairmount St | unit #105: kitchen remodel of unit 105 in a 2 unit buildingDetails
unit #105: kitchen remodel of unit 105 in a 2 unit building | $45,600 | |
| Feb 15, 2022 | Completed final sign-off Dec 2025 | 25 Bennington St | C H Burnham Inc | remove 1-story rear addition & replace w/ 3-story addition. excavate @ rear garage to create 1st fl living space. relocate (e) 2nd fl kitchen & bathroom, add 2 dommers, 2 bedrooms, 1 bath, skylight, & balcony @ 3rd fl. build ((n) interior stair. add spiral stair & patio @ rearDetails
remove 1-story rear addition & replace w/ 3-story addition. excavate @ rear garage to create 1st fl living space. relocate (e) 2nd fl kitchen & bathroom, add 2 dommers, 2 bedrooms, 1 bath, skylight, & balcony @ 3rd fl. build ((n) interior stair. add spiral stair & patio @ rear | $550,000 |
| Oct 15, 2021 | Completed final sign-off May 2023 | 117 Newman St | Hakewill Construction Co. Inc. | revision of addendum to previously approved permit #201905029503 s1: add a closet to bedroom 2 and change the location of permeable paving from the driveway to the side walkway in the front yard setback.Details
revision of addendum to previously approved permit #201905029503 s1: add a closet to bedroom 2 and change the location of permeable paving from the driveway to the side walkway in the front yard setback. | $5,000 |
| Mar 18, 2021 | Completed final sign-off Nov 2022 | 162 Parker Av | Custom 6 Builders | add a studio unit within (e) 1st floor. renovate (e) 2nd fl kitchen, bathroom & bedrooms & add a bathroom, laundry closet & spiral stair to backyard.Details
add a studio unit within (e) 1st floor. renovate (e) 2nd fl kitchen, bathroom & bedrooms & add a bathroom, laundry closet & spiral stair to backyard. | $235,000 |
| Feb 26, 2020 | Completed final sign-off May 2021 | 21 Bennington St | B R J Construction | remodel (e) kitchen, 2 bathrooms & deck within (e) buidling envelopeDetails
remodel (e) kitchen, 2 bathrooms & deck within (e) buidling envelope | $265,000 |
| Oct 1, 2019 | Completed final sign-off Mar 2021 | 130 Newman St | Devlin/Mcnally Construction | revision to 201807023461 s1 repair drurot in (e) 3rd flr attic storage and add new dormer per the reqs of the sf dormer ordDetails
revision to 201807023461 s1 repair drurot in (e) 3rd flr attic storage and add new dormer per the reqs of the sf dormer ord | $18,000 |
| May 2, 2019 | Completed final sign-off May 2023 | 117 Newman St | Hakewill Construction Co. Inc. | replace (e) exterior entry stair, driveway & garage door. restore street facade. add (n) 3rd story bedroom, office, bath & stair. add (2) skylightsDetails
replace (e) exterior entry stair, driveway & garage door. restore street facade. add (n) 3rd story bedroom, office, bath & stair. add (2) skylights | $356,000 |
| Oct 17, 2018 | Completed final sign-off May 2019 | 799 Athens St | O'shea Co. Home Grown Construction | remodel (e) kitchen & bath, open wall btwn kitchen and diningDetails
remodel (e) kitchen & bath, open wall btwn kitchen and dining | $64,000 |
| Jul 2, 2018 | Completed final sign-off Mar 2021 | 130 Newman St | Devlin/Mcnally Construction | renovate (e) attic, adding (n) stair, master bath & skylights. build (n) first flr guest suite & laundry inside garage & under (e) dining room & deck. renovate (e) second flr dining room & deck.Details
renovate (e) attic, adding (n) stair, master bath & skylights. build (n) first flr guest suite & laundry inside garage & under (e) dining room & deck. renovate (e) second flr dining room & deck. | $435,000 |
| Jan 14, 2016 | Completed final sign-off May 2018 | 249 17th Av | horizontal addition bldg 1 story addition at rear of (e)structure w/patio on top. add 1st fl guest, bed, bath, study & laundry. enclose (e) 2nd flr rear porch. renovate 2nd flr kitchen. add (n) interior stair from 1st to 2nd flr. replace garage door. remove (e) ext rear stair from 1st to 2nd flDetails
horizontal addition bldg 1 story addition at rear of (e)structure w/patio on top. add 1st fl guest, bed, bath, study & laundry. enclose (e) 2nd flr rear porch. renovate 2nd flr kitchen. add (n) interior stair from 1st to 2nd flr. replace garage door. remove (e) ext rear stair from 1st to 2nd fl | $250,000 | |
| May 12, 2015 | Completed final sign-off Oct 2017 | 3855 17th St | William Gregory Clause | replace (e) brick foundation, convert 1st fl storage into room & deck. add 3rd fl master suite & (n) internal stair to connect all floors. (n) sliding doors @ back of house, (3) (n) skylights.Details
replace (e) brick foundation, convert 1st fl storage into room & deck. add 3rd fl master suite & (n) internal stair to connect all floors. (n) sliding doors @ back of house, (3) (n) skylights. | $460,000 |
| Feb 12, 2015 | Completed final sign-off Dec 2018 | 70 Beaumont Av | Kalix Inc Dbalara Construction | renovate 2nd floor kitchen, dining, living, powder rm and add deck, add 3rd floor master suite, 2 bedrooms, 2 full baths and stairDetails
renovate 2nd floor kitchen, dining, living, powder rm and add deck, add 3rd floor master suite, 2 bedrooms, 2 full baths and stair | $285,000 |
| Oct 8, 2014 | Completed final sign-off Apr 2017 | 555 29th St | Ak Brady Construction | convert(e) basement into (n)laundry,guest bath,playrm,&mstr bath.add(n)mstr bedrm under (e)family rm.add(n)guest bedrm in bsmt level w/ deck above.add(n)internal stair to bsmt.renovate powder rm on 1st fl. modify entry.Details
convert(e) basement into (n)laundry,guest bath,playrm,&mstr bath.add(n)mstr bedrm under (e)family rm.add(n)guest bedrm in bsmt level w/ deck above.add(n)internal stair to bsmt.renovate powder rm on 1st fl. modify entry. | $215,000 |
| Sep 9, 2013 | Completed final sign-off Dec 2014 | 527 Alvarado St | Lee & Company Contractors Inc | replace existing kitchen/dining room windows & doors. add 4'-6" addition at lower level. create two bedrooms, two bathrooms & playroom in place of former master bedroom, add 11'-0" deck, stair to yard & spiral stair to main level.Details
replace existing kitchen/dining room windows & doors. add 4'-6" addition at lower level. create two bedrooms, two bathrooms & playroom in place of former master bedroom, add 11'-0" deck, stair to yard & spiral stair to main level. | $85,000 |
| Jul 19, 2013 | Completed final sign-off Nov 2013 | 1370 Florida St | Glenn James Perrin | renovate kitchen & pantry, replace 2 windows, not visable from streetDetails
renovate kitchen & pantry, replace 2 windows, not visable from street | $42,000 |
| Jul 11, 2012 | Completed final sign-off Feb 2013 | 309 Waller St | Lee & Company Contractors Inc | remove stucco and restore facade. replace rotted second floor windows with matching aluminum clad wood double hung windows.Details
remove stucco and restore facade. replace rotted second floor windows with matching aluminum clad wood double hung windows. | $55,000 |
| Apr 23, 2012 | Completed final sign-off Aug 2012 | 527 Alvarado St | Lee & Company Contractors Inc | remodel extg master bathroom: replace and relocate tub, toilet & sinks. install new lights and fan within the extg space.Details
remodel extg master bathroom: replace and relocate tub, toilet & sinks. install new lights and fan within the extg space. | $15,000 |
| Aug 30, 2011 | Completed final sign-off Jan 2012 | 32 Atalaya Tr | unit #32 atalaya-new master bathroom in (e) closet, renovate (e) ground floor storage to create a new playroom.Details
unit #32 atalaya-new master bathroom in (e) closet, renovate (e) ground floor storage to create a new playroom. | $38,500 | |
| Aug 5, 2011 | Completed final sign-off Jul 2012 | 311 Waller St | Lee & Company Contractors Inc | renovate (e) kitchen & bath; add four dormers to attic & build new mezzanine above reconfigured living dining room. new doors and windows at rear of unit, create new roof deck above (e) kitchen and add new balcony off kitchenDetails
renovate (e) kitchen & bath; add four dormers to attic & build new mezzanine above reconfigured living dining room. new doors and windows at rear of unit, create new roof deck above (e) kitchen and add new balcony off kitchen | $110,000 |
| Jul 20, 2010 | Expired or cancelled expired Feb 2011 | 278 Topaz Wy | H O S Construction | interior renovation of ktichen - two bathrooms & one power room. add lights, replace (e) hot water heater & furnace. repair (e) fireplace, install (n) master bedroom gas fireplace & laundry sink. replace flooring, (n) trim throughout.Details
interior renovation of ktichen - two bathrooms & one power room. add lights, replace (e) hot water heater & furnace. repair (e) fireplace, install (n) master bedroom gas fireplace & laundry sink. replace flooring, (n) trim throughout. | $78,000 |