Block 0868, lot 036
311 Waller St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 4
- Units
- 3
- Rooms
- 4 bathrooms
- Building
- 3,060 sq ft
- Lot
- 1,875 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 4, 2022 | Expired or cancelled cancelled Jan 2026 | 311 Waller St | Tesla Energy Operations | install energy storage system @ 40.5 kwh (3). (3) power walls batteries in garage. n 200a load center. batteries locate on interior wall.Details
install energy storage system @ 40.5 kwh (3). (3) power walls batteries in garage. n 200a load center. batteries locate on interior wall. | $26,800 |
| Dec 4, 2012 | Never finaled issued Dec 2012, no final | 307 Waller St | street space permitDetails
street space permit | ||
| Jul 11, 2012 | Completed final sign-off Feb 2013 | 309 Waller St | Lee & Company Contractors Inc | remove stucco and restore facade. replace rotted second floor windows with matching aluminum clad wood double hung windows.Details
remove stucco and restore facade. replace rotted second floor windows with matching aluminum clad wood double hung windows. | $55,000 |
| Jan 5, 2012 | Completed final sign-off Jul 2012 | 311 Waller St | Lee & Company Contractors Inc | revision 201108051827. kitchen cabinet layourt change. mezzanine level west wall changes including adding gas fire place. add 2 fire rated windows to west wall, not visible from street. rework kitche electrical due to cabinet reworkingDetails
revision 201108051827. kitchen cabinet layourt change. mezzanine level west wall changes including adding gas fire place. add 2 fire rated windows to west wall, not visible from street. rework kitche electrical due to cabinet reworking | $5,000 |
| Aug 5, 2011 | Completed final sign-off Jul 2012 | 311 Waller St | Lee & Company Contractors Inc | renovate (e) kitchen & bath; add four dormers to attic & build new mezzanine above reconfigured living dining room. new doors and windows at rear of unit, create new roof deck above (e) kitchen and add new balcony off kitchenDetails
renovate (e) kitchen & bath; add four dormers to attic & build new mezzanine above reconfigured living dining room. new doors and windows at rear of unit, create new roof deck above (e) kitchen and add new balcony off kitchen | $110,000 |
| Feb 17, 2010 | Completed final sign-off May 2010 | 307 Waller St | Hubert Penny | new bathroom on 3rd floor unit. replace (e) 7 windows with wood windowswork on 3rd floor.Details
new bathroom on 3rd floor unit. replace (e) 7 windows with wood windowswork on 3rd floor. | $17,500 |
| Dec 2, 2008 | Completed final sign-off Dec 2008 | 307 Waller St | Hubert Penny | provide handrail throughout rear stairs. to be place on top of existing handrail. nov# 200878998. 34 - 38" above tread. item# 1 only. on nov.Details
provide handrail throughout rear stairs. to be place on top of existing handrail. nov# 200878998. 34 - 38" above tread. item# 1 only. on nov. | $100 |
| Jul 12, 2006 | Completed final sign-off May 2007 | 307 Waller St | Shaun Gelling Construction | general work to be brought up to code, including electrical/plumbing. 3r-4432.Details
general work to be brought up to code, including electrical/plumbing. 3r-4432. | $2,100 |
| Jul 14, 2005 | Completed final sign-off Jul 2005 | 307 Waller St | verify correct unit count and correct 3-r report to show a 3 unit building on 3 floors of occupancy.Details
verify correct unit count and correct 3-r report to show a 3 unit building on 3 floors of occupancy. | ||
| Jun 13, 2003 | Never finaled issued Jun 2003, no final | 307 Waller St | address assignmentDetails
address assignment | ||
| Apr 24, 2000 | Expired or cancelled expired Aug 2000 | 311 Waller St | Details
|
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Lee & Company Contractors Inc (3), Hubert Penny (2), Shaun Gelling Construction, Tesla Energy Operations
- Architects
- Mark Reilly (2)
- Engineers
- Don David
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.