Ava Jamshidnejad
- Based in
- Walnut Creek
- On San Francisco permits
- Sep 2023 to Jun 2026
- Last 24 months
- 12 permits filed
13 permits since 2000: 2 completed, 11 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Jul 2026 | 246 Bocana St | revision to permit 202504295406. new foundation at gridline 2 and b.Details
revision to permit 202504295406. new foundation at gridline 2 and b. | |
| Feb 24, 2026 | In progress issued Apr 2026 | 36 Sussex St | extend 1st floor kitchen below existing 2nd floor overhang. remodel existing kitchen. repair siding at north wall.Details
extend 1st floor kitchen below existing 2nd floor overhang. remodel existing kitchen. repair siding at north wall. | $35,000 |
| Jan 4, 2026 | In progress issued Jul 2026 | 321 Rutledge St | garage level: voluntary foundation replacement, new retaining walls, shoring, excavate rear crawl space, total excavation of 22 cubic yards; 1/f kitchen renovation, (n) bathroom; 2/f bathroom renovation. alteration of rear existing porch roof.Details
garage level: voluntary foundation replacement, new retaining walls, shoring, excavate rear crawl space, total excavation of 22 cubic yards; 1/f kitchen renovation, (n) bathroom; 2/f bathroom renovation. alteration of rear existing porch roof. | $10,000 |
| Oct 24, 2025 | In progress issued Jan 2026 | 1336 Shotwell St | revision to pa #2023-0911-345-s1 revise window u factor specification w title 24 onlyDetails
revision to pa #2023-0911-345-s1 revise window u factor specification w title 24 only | |
| Oct 9, 2025 | In progress issued Oct 2025 | 600 Texas St | revision to 202504144355 new footing grid line 4 (between grid line c and f), new footing grid line 1 (between grid line d and f)Details
revision to 202504144355 new footing grid line 4 (between grid line c and f), new footing grid line 1 (between grid line d and f) | |
| Jun 23, 2025 | In progress issued Jul 2025 | 127 Ellert St | kitchen and bathroom remodel, addition of half bathroom, relocate laundry to garage, replace windows in front, replace flooring and repaint interior. demo of deck and reconstruction as shown on plans.Details
kitchen and bathroom remodel, addition of half bathroom, relocate laundry to garage, replace windows in front, replace flooring and repaint interior. demo of deck and reconstruction as shown on plans. | $50,000 |
| Jun 20, 2025 | In progress issued Jul 2025 | 461 Gates St | revision to pa# 202503051616: replace (e) entry stair with new entry stair and rails in same location - updated details.Details
revision to pa# 202503051616: replace (e) entry stair with new entry stair and rails in same location - updated details. | $1,000 |
| May 16, 2025 | In progress issued Apr 2026 | 246 Bocana St | conversion of garage/storage to new habitable space 2. 2nd floor renovation 3. 3rd floor additionDetails
conversion of garage/storage to new habitable space 2. 2nd floor renovation 3. 3rd floor addition | $375,000 |
| May 2, 2025 | In progress issued Aug 2025 | 600 Texas St | excavation of approx 47 cu yd; remodel and horizontal expansion of 1st fl; remodel of 2nd fl (partial); removal of gas service, full electric 20181Details
excavation of approx 47 cu yd; remodel and horizontal expansion of 1st fl; remodel of 2nd fl (partial); removal of gas service, full electric 20181 | $185,000 |
| Mar 5, 2025 | In progress issued Mar 2025 | 461 Gates St | front stair replacement in kind. remove gas service, all electric in area of work. new insulation at roof. kithcen renovation.Details
front stair replacement in kind. remove gas service, all electric in area of work. new insulation at roof. kithcen renovation. | $20,000 |
| Mar 5, 2025 | Completed final sign-off Mar 2025 | 306 Precita Av | to comply with physical inspection report #cc-8430.Details
to comply with physical inspection report #cc-8430. | $1,000 |
| Nov 20, 2024 | Completed final sign-off Apr 2025 | 2627 Chestnut St | 2nd fl - kitchen and laundry remodelDetails
2nd fl - kitchen and laundry remodel | $24,000 |
| Sep 11, 2023 | In progress issued May 2025 | 1336 Shotwell St | conversion of 1/f to new studio adu. front facade renovation. remove (e) peaked roof for new flat roof and roof deck.Details
conversion of 1/f to new studio adu. front facade renovation. remove (e) peaked roof for new flat roof and roof deck. | $100,000 |