Back to kitchen remodel contractors
Ava Jamshidnejad
- Based in
- Walnut Creek
- On San Francisco permits
- Sep 2023 to Jun 2026
- Last 24 months
- 12 permits filed
13 permits since 2000: 2 completed, 11 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 1 completed, 3 in progress. Typically 43 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 24, 2026 | In progress issued Apr 2026 | 36 Sussex St | extend 1st floor kitchen below existing 2nd floor overhang. remodel existing kitchen. repair siding at north wall.Details
extend 1st floor kitchen below existing 2nd floor overhang. remodel existing kitchen. repair siding at north wall. | $35,000 |
| Jan 4, 2026 | In progress issued Jul 2026 | 321 Rutledge St | garage level: voluntary foundation replacement, new retaining walls, shoring, excavate rear crawl space, total excavation of 22 cubic yards; 1/f kitchen renovation, (n) bathroom; 2/f bathroom renovation. alteration of rear existing porch roof.Details
garage level: voluntary foundation replacement, new retaining walls, shoring, excavate rear crawl space, total excavation of 22 cubic yards; 1/f kitchen renovation, (n) bathroom; 2/f bathroom renovation. alteration of rear existing porch roof. | $10,000 |
| Jun 23, 2025 | In progress issued Jul 2025 | 127 Ellert St | kitchen and bathroom remodel, addition of half bathroom, relocate laundry to garage, replace windows in front, replace flooring and repaint interior. demo of deck and reconstruction as shown on plans.Details
kitchen and bathroom remodel, addition of half bathroom, relocate laundry to garage, replace windows in front, replace flooring and repaint interior. demo of deck and reconstruction as shown on plans. | $50,000 |
| Nov 20, 2024 | Completed final sign-off Apr 2025 | 2627 Chestnut St | 2nd fl - kitchen and laundry remodelDetails
2nd fl - kitchen and laundry remodel | $24,000 |