Michael Hom
- Listed as
- architect, attorney, authorized agent-others, designer, engineer, lessee, pmt consultant/expediter
- Firm
- Hom & Pisano Engineering Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Oct 2026
725 permits since 2000 (engineer on 684 permits, architect on 24 permits, authorized agent-others on 10 permits, pmt consultant/expediter on 3 permits, designer on 2 permits, attorney on 1 permit, lessee on 1 permit): 488 completed, 90 in progress, 67 never finaled, 80 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 725.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 1601 Diamond St | Nk Construction & Real Estate Developmen | remodel of existing lower, main and upper levels of 3 story residence with lower level addition and horizontal addition at front and rear. improvments include interior remodel. exterior facelift, doors, windows added, new rear deck, and foundation replacment.Details
remodel of existing lower, main and upper levels of 3 story residence with lower level addition and horizontal addition at front and rear. improvments include interior remodel. exterior facelift, doors, windows added, new rear deck, and foundation replacment. | $450,000 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 646 Duncan St | interior renovations on 1st floor. horizontal addition & interior renovation on 2nd floor, including new rear deck, vertical addition to include new 3rd floor & decks. ab-112Details
interior renovations on 1st floor. horizontal addition & interior renovation on 2nd floor, including new rear deck, vertical addition to include new 3rd floor & decks. ab-112 | $200,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1125 Revere Av | corrections for nov #: 202659151 - document field conditions and legalize 2nd floor. administrative change of use for first floor from u to f-1.Details
corrections for nov #: 202659151 - document field conditions and legalize 2nd floor. administrative change of use for first floor from u to f-1. | $50,000 | |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 601 Moraga St | Blair Burke General Contractors Inc | rev to pa# 2025-1218-2169: replace (e) fence at west property line, add a pergola and outdoor shower all under 8'high floor elevation changes at carriage house and garage.Details
rev to pa# 2025-1218-2169: replace (e) fence at west property line, add a pergola and outdoor shower all under 8'high floor elevation changes at carriage house and garage. | $16,000 |
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 471 30th St | ground floor remodel & full seismic retrofit. add two accessory dwelling units(adu)to existing 5 unit bldg for a total of 7 dweling units. legaize existing ground floor unit behind garage & convert to studio accessory dwelling unit. convert existing garage to new studio adu.Details
ground floor remodel & full seismic retrofit. add two accessory dwelling units(adu)to existing 5 unit bldg for a total of 7 dweling units. legaize existing ground floor unit behind garage & convert to studio accessory dwelling unit. convert existing garage to new studio adu. | $230,000 | |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 341 Avila St | expansion at (e) 3rd floor. vertical expansion 3'-5", horizontal addition at rear yard 1'-5". replace interior stair. renovate kitchen. renovate 3 full bathrooms, add 1 full bathroom & 1 half bath. project is subject to ab112 all-electric ordinance.Details
expansion at (e) 3rd floor. vertical expansion 3'-5", horizontal addition at rear yard 1'-5". replace interior stair. renovate kitchen. renovate 3 full bathrooms, add 1 full bathroom & 1 half bath. project is subject to ab112 all-electric ordinance. | $744,000 | |
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 431 Jersey St | a 361 office addition to the rear of the existing main house, including an office space, a bathroom, and closet. not subject to ab-112.Details
a 361 office addition to the rear of the existing main house, including an office space, a bathroom, and closet. not subject to ab-112. | $594,665 | |
| Sep 20, 2026 | In progress filed Sep 2026, not yet issued | 4150 Cesar Chavez St | correct nov# 2026-50762. at unit #6 on 4th floor; 1)new roof deck, private to unit #6. 2) replace exterior door. items #2,4, and 5 removed from scope. 8/27/26Details
correct nov# 2026-50762. at unit #6 on 4th floor; 1)new roof deck, private to unit #6. 2) replace exterior door. items #2,4, and 5 removed from scope. 8/27/26 | $25,000 | |
| Sep 16, 2026 | In progress issued Sep 2026 | 400 Goettingen St | add new uppper and lower deck with stairs to rear yard. demo (e) 2/f bedroom wdw and replace with vinyl sliding gass door to provide access to upper rear yard deck. contractor to install exterior deck lighting per owner requirement.Details
add new uppper and lower deck with stairs to rear yard. demo (e) 2/f bedroom wdw and replace with vinyl sliding gass door to provide access to upper rear yard deck. contractor to install exterior deck lighting per owner requirement. | $25,000 | |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 1124 Treat Av | convert rear portion of garage to state adu; excavate for 8'-0" ceiling height.voluntary foundation replacement; nfpa 13r sprinklers under separate permit.replace existing rear yard decks & property line wall & remove existing deck enclosure.remodel 3rd floor kitchen. adu subject to ab112.Details
convert rear portion of garage to state adu; excavate for 8'-0" ceiling height.voluntary foundation replacement; nfpa 13r sprinklers under separate permit.replace existing rear yard decks & property line wall & remove existing deck enclosure.remodel 3rd floor kitchen. adu subject to ab112. | $337,028 | |
| Aug 18, 2026 | In progress issued Aug 2026 | 70 Zircon Pl | San Francisco Design Build | remodel existing single family residence with 2 levels over basement. exterior changes include replacing 1 existing rear facing window and 1 existing rear facing door. remodel kitchen, remodel wet bar in-kind. new lighting throughout remodeled areasDetails
remodel existing single family residence with 2 levels over basement. exterior changes include replacing 1 existing rear facing window and 1 existing rear facing door. remodel kitchen, remodel wet bar in-kind. new lighting throughout remodeled areas | $57,000 |
| Aug 6, 2026 | In progress issued Sep 2026 | 1716 Broadway | Sage Construction Services | building exterior: replace some (e) windows, re roof and paint, add new guardrails. level 1: expand existing habitable space, remodel an existing bathroom and add a kitchenette (2-burner), laundry closet and deck. level 2/3: remodel existing kitchens and bathrooms, add laundry closetDetails
building exterior: replace some (e) windows, re roof and paint, add new guardrails. level 1: expand existing habitable space, remodel an existing bathroom and add a kitchenette (2-burner), laundry closet and deck. level 2/3: remodel existing kitchens and bathrooms, add laundry closet | $475,000 |
| Jul 29, 2026 | In progress issued Aug 2026 | 1867 25th Av | Persepollis Construction Inc | revision to pa # 202604290298 - remove rotten existing light well and rebuild rotten back deck in kind. change the layout in the bathroom that is already approved and is in scope of work and add a skylight on top of the shower.Details
revision to pa # 202604290298 - remove rotten existing light well and rebuild rotten back deck in kind. change the layout in the bathroom that is already approved and is in scope of work and add a skylight on top of the shower. | $10,000 |
| Jul 21, 2026 | In progress filed Jul 2026, not yet issued | 62 Baker St | horizontal and vert addition, garage addition, and interior remodel to (e) two unit building. scope includes removal of (udu) at basement level per planning code sec 317(c)(7)(b).reference planning approval letter for planning record 2025-005568prj. comply with nov 202316786, 202316812, 202312987.Details
horizontal and vert addition, garage addition, and interior remodel to (e) two unit building. scope includes removal of (udu) at basement level per planning code sec 317(c)(7)(b).reference planning approval letter for planning record 2025-005568prj. comply with nov 202316786, 202316812, 202312987. | $275,000 | |
| Jul 20, 2026 | In progress issued Aug 2026 | 381 San Leandro Wy | San Francisco Design Build | remodel to (e) single family residence. exterior changes including 1 rear door replacement, remodel kitchen. mep system systems will be upgraded as required per code. new lighting throught remodeled areas.Details
remodel to (e) single family residence. exterior changes including 1 rear door replacement, remodel kitchen. mep system systems will be upgraded as required per code. new lighting throught remodeled areas. | $45,000 |
| Jul 15, 2026 | In progress issued Jul 2026 | 2431 Ulloa St | Landis Halton Construction | interior kitchen and bathroom remodel, enlarge opening between kitchen and living room, add new half bath. no expansion of building envelope or work visible from the street.Details
interior kitchen and bathroom remodel, enlarge opening between kitchen and living room, add new half bath. no expansion of building envelope or work visible from the street. | $100,000 |
| Jul 6, 2026 | In progress issued Jul 2026 | 1819 08th Av | Precision General Contruction | 2nd flr - kitchen remodel + (n) window. (n) half bath. remove (e) deck+stairs; build (n) deck + stairs. replace kitchen roof w/ (n) pitched roof. 3rd fl - (n) laundry closet. new skylight. replace bedrm..Details
2nd flr - kitchen remodel + (n) window. (n) half bath. remove (e) deck+stairs; build (n) deck + stairs. replace kitchen roof w/ (n) pitched roof. 3rd fl - (n) laundry closet. new skylight. replace bedrm.. | $100,000 |
| Jun 30, 2026 | In progress issued Aug 2026 | 5600 Fulton St | Kag Designs And Construction Llc | 1.convert 237 sqft uncond. to habitable space @1st flr main unit. 2. remodel guest suite @1st flr main unit, 3. remove main unit int. service stair & expand /remodel kitchen 4.relocate kitchenette, add main bedroom, bath & closet @ 2nd unit, 5.remove serv entry door & provide selective window work @Details
1.convert 237 sqft uncond. to habitable space @1st flr main unit. 2. remodel guest suite @1st flr main unit, 3. remove main unit int. service stair & expand /remodel kitchen 4.relocate kitchenette, add main bedroom, bath & closet @ 2nd unit, 5.remove serv entry door & provide selective window work @ | $250,000 |
| Jun 26, 2026 | In progress filed Jun 2026, not yet issued | 1951 09th Av | interior remodel of first and second floor w/ 3'-0" horizontal addition at rear at second floor only.Details
interior remodel of first and second floor w/ 3'-0" horizontal addition at rear at second floor only. | $371,027 | |
| Jun 16, 2026 | In progress filed Jun 2026, not yet issued | 1128 Irving St | convert and remodel (e) 2 commercial units into 2 dwelling units. no change to the building.Details
convert and remodel (e) 2 commercial units into 2 dwelling units. no change to the building. | $450,000 | |
| Jun 16, 2026 | Expired or cancelled cancelled Jul 2026 | 1310 Alabama St | remodel & add(n) bedroom,bath & accessory dwelling unit (adu)to existing two-story sfh with voluntary seismic upgrade of soft-story per ab-094.upgrade all mech,electrical & plum systems to comply with current codes.replace(e) exterior deck & stairs & front side yard entrance gate & fence with newDetails
remodel & add(n) bedroom,bath & accessory dwelling unit (adu)to existing two-story sfh with voluntary seismic upgrade of soft-story per ab-094.upgrade all mech,electrical & plum systems to comply with current codes.replace(e) exterior deck & stairs & front side yard entrance gate & fence with new | $300,000 | |
| Jun 9, 2026 | In progress issued Jun 2026 | 442 44th Av | Velero Inc | revision 202512182113 creating l shaped concrete wall to attach to (e) footings on part of the west side wall in the garage. all shoring included. revise roof beam size.Details
revision 202512182113 creating l shaped concrete wall to attach to (e) footings on part of the west side wall in the garage. all shoring included. revise roof beam size. | $5,000 |
| May 28, 2026 | In progress filed May 2026, not yet issued | 7 Kronquist Ct | replace (e) rear deck at levels 2 & 3 with new. rear siding replacement and windows and doors at rear yard.Details
replace (e) rear deck at levels 2 & 3 with new. rear siding replacement and windows and doors at rear yard. | $35,000 | |
| May 26, 2026 | Completed final sign-off Aug 2026 | 833 Cole St | Bonilla Construction | mandatory seismic retrofit per sfebc chapter 4d to comply with nov #201719661.Details
mandatory seismic retrofit per sfebc chapter 4d to comply with nov #201719661. | $10,000 |
| May 15, 2026 | In progress issued May 2026 | 620 02nd Av | Damar Construction And Remodeling Inc | revision to permit 2025 1203 0805, interior revision on 2nd floor, relocating the (e) powder room and removing framed opening between living room and family room.Details
revision to permit 2025 1203 0805, interior revision on 2nd floor, relocating the (e) powder room and removing framed opening between living room and family room. | |
| May 11, 2026 | In progress issued Sep 2026 | 1424 Underwood Av | Reliable Construction Inc | erect 2-story, type 5b, detached adu at rear, with 3-bedrooms, 2-baths, kitchen, living room and office nook.Details
erect 2-story, type 5b, detached adu at rear, with 3-bedrooms, 2-baths, kitchen, living room and office nook. | $200,000 |
| May 7, 2026 | In progress filed May 2026, not yet issued | 426 Valley St | Nk Construction & Real Estate Developmen | convert part of garage & storage into conditioned space w/ new bedroom/bath/laundry & media rm; horizontal addition @ rear yard & side setback; new interior stairs; excavate grade;new heat pump & water heater;new rear deck;kitchen remodel;replace stairs @front setback;new half-bath;vertical additionDetails
convert part of garage & storage into conditioned space w/ new bedroom/bath/laundry & media rm; horizontal addition @ rear yard & side setback; new interior stairs; excavate grade;new heat pump & water heater;new rear deck;kitchen remodel;replace stairs @front setback;new half-bath;vertical addition | $400,000 |
| May 7, 2026 | In progress filed May 2026, not yet issued | 172 Landers St | Proano Construction | interior remodel to both units of an existing duplex . remodel existing kitchens, bedrooms, bathrooms, laundry, & dining. new rear horizontal addition to both units. new rear deck and exterior stairs. all new windows. new skylights. new front entry steps & gate.Details
interior remodel to both units of an existing duplex . remodel existing kitchens, bedrooms, bathrooms, laundry, & dining. new rear horizontal addition to both units. new rear deck and exterior stairs. all new windows. new skylights. new front entry steps & gate. | $650,000 |
| May 6, 2026 | In progress filed May 2026, not yet issued | 295 Sanchez St | Finbarr Collins Construction Inc. | replace glass deck railing with solid walls.Details
replace glass deck railing with solid walls. | $15,000 |
| Apr 30, 2026 | In progress issued May 2026 | 922 Lawton St | He & Kuang Inc | remodel/ rearrange living, dining, kitchen, bedroom, bathroom & family. add two full baths. convert storage to a bedroom, add kitchenette with 2 burner stove, no oven. remove bearing wall, add flat skylight. replace all windows/door. install new water heaater & heat pump. upgrade electrical &Details
remodel/ rearrange living, dining, kitchen, bedroom, bathroom & family. add two full baths. convert storage to a bedroom, add kitchenette with 2 burner stove, no oven. remove bearing wall, add flat skylight. replace all windows/door. install new water heaater & heat pump. upgrade electrical & | $200,000 |
| Apr 29, 2026 | In progress issued May 2026 | 1870 44th Av | Sf Town Builders Inc | convert 319 sf of storage area on first fl. to living space with a bedroom, bath and laundry reconfigure (e) garage. add deck and stairs at rear of house. replace (e) windows at front. replace drive way paversDetails
convert 319 sf of storage area on first fl. to living space with a bedroom, bath and laundry reconfigure (e) garage. add deck and stairs at rear of house. replace (e) windows at front. replace drive way pavers | $85,000 |
| Apr 29, 2026 | In progress issued May 2026 | 1867 25th Av | Persepollis Construction Inc | replace the existing one bed/ one bath habitable space with two bed two bath on 1st story . replace and relocate the existing sliding door with new energy efficient sliding door. remove existing patio swing door with new sliding door. reduce the size of garage on 1st floor. refinish the existingDetails
replace the existing one bed/ one bath habitable space with two bed two bath on 1st story . replace and relocate the existing sliding door with new energy efficient sliding door. remove existing patio swing door with new sliding door. reduce the size of garage on 1st floor. refinish the existing | $150,000 |
| Apr 3, 2026 | In progress issued Apr 2026 | 62 Santa Ysabel Av | remove (2) closets to remodel the existing kitchen, the full bathroomm on the second floor will be remodel"in-kind". a small 12 sq ft pop out at the rear of the second floor will be removed. (1) door and (2) windows will be replaced on the rear wall. (2) new skylights will be added.Details
remove (2) closets to remodel the existing kitchen, the full bathroomm on the second floor will be remodel"in-kind". a small 12 sq ft pop out at the rear of the second floor will be removed. (1) door and (2) windows will be replaced on the rear wall. (2) new skylights will be added. | $115,000 | |
| Apr 1, 2026 | In progress issued Jun 2026 | 535 Oak Park Dr | Norwood Construction | (n) 9 sq ft front facade bay window. replace stucco at front and side facade w/ (n) siding. interior renovation at 2/f. kitchen, bedrooms, and bathrooms. (n) finishes on (e) ext stair structure. (n) 2/f windows and skylights. (n) lighting and mech supply ducting at 2/f. (e) gas furnace to remain.Details
(n) 9 sq ft front facade bay window. replace stucco at front and side facade w/ (n) siding. interior renovation at 2/f. kitchen, bedrooms, and bathrooms. (n) finishes on (e) ext stair structure. (n) 2/f windows and skylights. (n) lighting and mech supply ducting at 2/f. (e) gas furnace to remain. | $140,000 |
| Mar 15, 2026 | In progress issued Aug 2026 | 293 Jersey St | Kieran O'carroll Construction | 2-story horizontal addition at the rear and side. kitchen remodel and new powder room on 2/f. new bedroom and remodeled bathrooms on 3/f. removed powder and enclosed laundry on 1/f. new front door and openings.Details
2-story horizontal addition at the rear and side. kitchen remodel and new powder room on 2/f. new bedroom and remodeled bathrooms on 3/f. removed powder and enclosed laundry on 1/f. new front door and openings. | $600,000 |
| Mar 13, 2026 | In progress filed Mar 2026, not yet issued | 1439 Oak St | Thomas Le Construction Inc | alter-site.1st fl:new 1439-b oak st with new laundry & storage. 2nd fl: renovation of (e) 1439-a oak st. renovation fo (e) 1439 oak st into new unit. 3rd fl: renovate (e) 1441 oak st into new 1441-a oak st & new 1441 oak st. 4th fl: all-new structural, mep work as required. ref 2021-002010 variance.Details
alter-site.1st fl:new 1439-b oak st with new laundry & storage. 2nd fl: renovation of (e) 1439-a oak st. renovation fo (e) 1439 oak st into new unit. 3rd fl: renovate (e) 1441 oak st into new 1441-a oak st & new 1441 oak st. 4th fl: all-new structural, mep work as required. ref 2021-002010 variance. | $527,124 |
| Mar 11, 2026 | Completed final sign-off Apr 2026 | 113 Valley St | K 2 Builders Inc | rev to pa 2024-0320-8226: add 24" cantilever metal balcony at 3rd fl. m.b. ref pa# 2020-0831-3026Details
rev to pa 2024-0320-8226: add 24" cantilever metal balcony at 3rd fl. m.b. ref pa# 2020-0831-3026 | $15,000 |
| Feb 26, 2026 | In progress filed Feb 2026, not yet issued | 201 Onondaga Av | mandatory seismic retrofit per ab-107: application of engineering criteria in sfbc chapter 4:d.Details
mandatory seismic retrofit per ab-107: application of engineering criteria in sfbc chapter 4:d. | $25,000 | |
| Feb 26, 2026 | In progress filed Feb 2026, not yet issued | 201 Onondaga Av | per ca govt code 66323: turn part of (e) garage into 1 new accessory dwelling unit.Details
per ca govt code 66323: turn part of (e) garage into 1 new accessory dwelling unit. | $125,000 | |
| Jan 19, 2026 | In progress issued Apr 2026 | 774 35th Av | Home Pride Construction Inc | addition & remodel to (e) home: adding 489sf rear and front yard, all w/in (e) setback requirements, no change in overall height.Details
addition & remodel to (e) home: adding 489sf rear and front yard, all w/in (e) setback requirements, no change in overall height. | $500,000 |
| Jan 7, 2026 | In progress issued Jul 2026 | 1021 Cole St | Straightedge Construction | partial remodel with attached single car garage. partial demolition of (e) lower floor slab & construction of 355 sf of unconditioned space to habitable area. addition of 4 roof dormers & a skylight. remodel (e) rear deck & new 72 sf deck @ 4th floor level.Details
partial remodel with attached single car garage. partial demolition of (e) lower floor slab & construction of 355 sf of unconditioned space to habitable area. addition of 4 roof dormers & a skylight. remodel (e) rear deck & new 72 sf deck @ 4th floor level. | $500,000 |
| Jan 1, 2026 | In progress issued May 2026 | 81 Manchester St | Cma Development Inc | level 1:adu convertion per state prgm include: partition for separate entrance from garage.level 2: replace siding @ street & backyard facade & replace window @ street facade in kind.removal (e) fireplace. (n) en-suite bathrm & closet in master bedrm.reconfiguration of existing bathroom and laundryDetails
level 1:adu convertion per state prgm include: partition for separate entrance from garage.level 2: replace siding @ street & backyard facade & replace window @ street facade in kind.removal (e) fireplace. (n) en-suite bathrm & closet in master bedrm.reconfiguration of existing bathroom and laundry | $180,000 |
| Dec 31, 2025 | In progress issued Aug 2026 | 271 Montana St | Adib Construction & Engineering Svcs | convert ground floor to state adu with 1-bedroom, 1-full bathroom and kitchen. new rear sliding door on 2/f.Details
convert ground floor to state adu with 1-bedroom, 1-full bathroom and kitchen. new rear sliding door on 2/f. | $60,000 |
| Dec 30, 2025 | In progress issued Feb 2026 | 467 38th Av | Zhou's International Inc. | remodel bedroom & bath.add 2 full bath on top floor.remodel living,dining,kitchen & 1/2 bath.add deck & stairs on mid floor.remodel bathroom,family, w/ kitchenette,remove wall,w/ 2 burners,stove.add bed on 1/f.replace wdws w/ alumn at front,wdws/doors at rear.replace w/h & furn.upgrade meps. roof.Details
remodel bedroom & bath.add 2 full bath on top floor.remodel living,dining,kitchen & 1/2 bath.add deck & stairs on mid floor.remodel bathroom,family, w/ kitchenette,remove wall,w/ 2 burners,stove.add bed on 1/f.replace wdws w/ alumn at front,wdws/doors at rear.replace w/h & furn.upgrade meps. roof. | $250,000 |
| Dec 24, 2025 | In progress issued Jan 2026 | 476 Lansdale Av | Prosper Construction Dev Inc. | shared wood fence and gate with neighbor at 472 lansdale. sharing plans 202512121711Details
shared wood fence and gate with neighbor at 472 lansdale. sharing plans 202512121711 | $500 |
| Dec 22, 2025 | In progress issued Jan 2026 | 2430 28th Av | B&H Builder Inc | 1st fl - reconfigure 1st fo to created 2 bedrooms w/new bathrooms; 2nd fl - existing ktichen, bathroom and add new bathroom for bedroom #1; rebuild (e) interior stair to comply with new code req; replace front windows in-kind w/aluminu clad wood. upgrade elec 100 amp meter to 200 ampDetails
1st fl - reconfigure 1st fo to created 2 bedrooms w/new bathrooms; 2nd fl - existing ktichen, bathroom and add new bathroom for bedroom #1; rebuild (e) interior stair to comply with new code req; replace front windows in-kind w/aluminu clad wood. upgrade elec 100 amp meter to 200 amp | $122,000 |
| Dec 22, 2025 | In progress issued Jul 2026 | 341 Park St | Munoz Villa Construction, Connor Daly Corporation | rear and side addition, a notch in the building side for a lightwell, a rear yeard deck at the ground level with a retractable awning and enclosed rain barrels, wideniing the existing garage door and west driveway, and interior remodeling with new windows and exterior doors and skylights.Details
rear and side addition, a notch in the building side for a lightwell, a rear yeard deck at the ground level with a retractable awning and enclosed rain barrels, wideniing the existing garage door and west driveway, and interior remodeling with new windows and exterior doors and skylights. | $600,000 |
| Dec 17, 2025 | Expired or cancelled cancelled Jan 2026 | 646 Duncan St | interior renovations on 1st floor. horizontal addition & interior renovations on 2nd floor including new rear deck. vertical addition to include new 3rd floor & decks.Details
interior renovations on 1st floor. horizontal addition & interior renovations on 2nd floor including new rear deck. vertical addition to include new 3rd floor & decks. | $850,000 | |
| Dec 13, 2025 | In progress filed Dec 2025, not yet issued | 249 Peru Av | Steadfast Bay Construction | remove rear portion of the building, excavate crawl space and grade at rear yard to create new basement, new interior stairs connecting 1st floor with basement; horizontal addition at rear yard for 1st floor and basement, relocate kitchen and bathroom in first floor; new window and exterior doors.Details
remove rear portion of the building, excavate crawl space and grade at rear yard to create new basement, new interior stairs connecting 1st floor with basement; horizontal addition at rear yard for 1st floor and basement, relocate kitchen and bathroom in first floor; new window and exterior doors. | $250,000 |
| Dec 12, 2025 | In progress issued Jan 2026 | 472 Lansdale Av | Prosper Construction Dev Inc. | provide corrective action to nov 202544191. install 2 new windows. replace damaged tubular steel post under (e) beam. remove unpermitted wood enclosure under front overhang. new shared wood gate with the neighbor at the side of houseDetails
provide corrective action to nov 202544191. install 2 new windows. replace damaged tubular steel post under (e) beam. remove unpermitted wood enclosure under front overhang. new shared wood gate with the neighbor at the side of house | $6,500 |
| Dec 3, 2025 | In progress issued Jan 2026 | 620 02nd Av | Damar Construction And Remodeling Inc | interior revision & remodel to permit#202011249635: 1st fl-add office niche, revised stair plan; 2nd fl-kitchen, pantry, powder room remodel, 3rd fl-(n) bathroom. remodel will result in 3 bedrooms, 3.5 bathrooms. exterior remodel:(n) garage door, (n) front & rear stair, (n) rear deck.Details
interior revision & remodel to permit#202011249635: 1st fl-add office niche, revised stair plan; 2nd fl-kitchen, pantry, powder room remodel, 3rd fl-(n) bathroom. remodel will result in 3 bedrooms, 3.5 bathrooms. exterior remodel:(n) garage door, (n) front & rear stair, (n) rear deck. | |
| Dec 1, 2025 | In progress issued Mar 2026 | 57 Carmelita St | Olmec Builders Inc | lower slab at ground level for new garage and additional dwelling, storage and mechanical space. install front yard garage ramp and planters. remodel main level (level 1) new kitchen and garden room. remove (e) garden room. remodel upper level (level 2) new primary bath.Details
lower slab at ground level for new garage and additional dwelling, storage and mechanical space. install front yard garage ramp and planters. remodel main level (level 1) new kitchen and garden room. remove (e) garden room. remodel upper level (level 2) new primary bath. | $545,379 |
| Nov 18, 2025 | Completed final sign-off Jul 2026 | 2087 44th Av | Pederson Construction Inc | interior remodel of single family dwelling to include new kitchen w relocated equipment, new expandded opening between kitchen and living rm, new skylight @ kitchen, new electrical and plumbing, sep permit.no change to building envelope.Details
interior remodel of single family dwelling to include new kitchen w relocated equipment, new expandded opening between kitchen and living rm, new skylight @ kitchen, new electrical and plumbing, sep permit.no change to building envelope. | $32,365 |
| Oct 30, 2025 | In progress issued Nov 2025 | 520 College Av | Adib Construction & Engineering Svcs | revision to 202312273171. repair, rebuild deteriorated front stair in kind, raise ceiling in living rm. replace e slab on 1st fl. replace foundtaion at north side,widen garage door from 8' to 9', new 36sf skylightDetails
revision to 202312273171. repair, rebuild deteriorated front stair in kind, raise ceiling in living rm. replace e slab on 1st fl. replace foundtaion at north side,widen garage door from 8' to 9', new 36sf skylight | |
| Oct 15, 2025 | In progress issued Jan 2026 | 1874 Great Hy | Art Of Construction Inc | enclose 120 sf below an e) floor above the rear of the bldg. new addition will included a full bath & study. e) wood stair at rear will be reconfigured. all windows & exterior doors will be replaced, all exterior siding will be replacedDetails
enclose 120 sf below an e) floor above the rear of the bldg. new addition will included a full bath & study. e) wood stair at rear will be reconfigured. all windows & exterior doors will be replaced, all exterior siding will be replaced | $363,000 |
| Oct 10, 2025 | In progress issued Mar 2026 | 227 Congo St | A2z Remodeling Inc. | construct new sunroom addition in rear yardDetails
construct new sunroom addition in rear yard | $125,000 |
| Oct 9, 2025 | In progress issued Mar 2026 | 1470 De Haro St | T T General Construction | expand level 1 to create new conditioned space at level 1, and enlarge level 2 bathroomDetails
expand level 1 to create new conditioned space at level 1, and enlarge level 2 bathroom | $55,000 |
| Sep 26, 2025 | Completed final sign-off Oct 2026 | 59 Clipper St | Clayton Timbrell & Co | landscape retaining wall replacement at rear yard. shared scope with 202507171007.Details
landscape retaining wall replacement at rear yard. shared scope with 202507171007. | $6,250 |
| Sep 11, 2025 | Expired or cancelled withdrawn Apr 2026 | 7 Kronquist Ct | replace rear deck at 3 levels. replace siding, windows and doors at rear yard. replace two windows in kind at front facade.Details
replace rear deck at 3 levels. replace siding, windows and doors at rear yard. replace two windows in kind at front facade. | $38,000 | |
| Sep 5, 2025 | In progress issued Mar 2026 | 750 Presidio Av | Precision General Contruction | per california government code 65852.2, turn part of garage and storage area into 3 new adus, new laundry room, reduced storage area w/ new toilet room.Details
per california government code 65852.2, turn part of garage and storage area into 3 new adus, new laundry room, reduced storage area w/ new toilet room. | $350,000 |
| Sep 4, 2025 | Completed final sign-off Nov 2025 | 765 34th Av | Dliu Construction, Sonoma Build Group Inc | front stair replacement like to likeDetails
front stair replacement like to like | $5,000 |
| Aug 28, 2025 | In progress issued Aug 2025 | 332 Gambier St | Tako Studios Llc. | revision to 202505297487 to add scope and reconfigure space: remodel 3 bedrooms, 1 bath in back. add 1 bath and replace 3 windows and siding on north side only. remodel front of home into 3 bedrooms and move 1 bath. move kitchen and relocate main entry to side. add 2 windows.Details
revision to 202505297487 to add scope and reconfigure space: remodel 3 bedrooms, 1 bath in back. add 1 bath and replace 3 windows and siding on north side only. remodel front of home into 3 bedrooms and move 1 bath. move kitchen and relocate main entry to side. add 2 windows. | $27,500 |
| Aug 6, 2025 | In progress filed Aug 2025, not yet issued | 451 Anderson St | horizontal addition at back of house at 1st & 2nd floor & remodel interior stairway. add new skylights in (e) living area & (e) bedroom.Details
horizontal addition at back of house at 1st & 2nd floor & remodel interior stairway. add new skylights in (e) living area & (e) bedroom. | $350,000 | |
| Jul 13, 2025 | In progress issued Feb 2026 | 614 Elizabeth St | Cameron Builders Sf | revision to pa# 202408269419, 1/f- new driveway and new garage door. 4/f- upgrades include a new bathroom, new bedroom, new playroom and a new stair from level 3 to 4. and new penthouse to allow for code min headroom at stair. new forced air heating throughout to replace radiant.Details
revision to pa# 202408269419, 1/f- new driveway and new garage door. 4/f- upgrades include a new bathroom, new bedroom, new playroom and a new stair from level 3 to 4. and new penthouse to allow for code min headroom at stair. new forced air heating throughout to replace radiant. | $155,100 |
| Jul 12, 2025 | In progress issued Nov 2025 | 256 Sweeny St | Bayview Renovation & Development, Inc. | (n) 2-story horizontal addition at rear yard: add a 2 bedrooms, 2 bathrooms state program adu with family room, kitchen and deck. on the 2nd level remodel 2 bedrooms and 1 bathroom,add garage, staircase and deck. no exterior work visible from street.Details
(n) 2-story horizontal addition at rear yard: add a 2 bedrooms, 2 bathrooms state program adu with family room, kitchen and deck. on the 2nd level remodel 2 bedrooms and 1 bathroom,add garage, staircase and deck. no exterior work visible from street. | $150,000 |
| Jul 11, 2025 | In progress issued Jul 2025 | 190 Ripley St | Peter Etges Gc | revision to pa # 2024-0517-2333 reduction in scope. remove cove ceiling on 2nd fl living room from scopeDetails
revision to pa # 2024-0517-2333 reduction in scope. remove cove ceiling on 2nd fl living room from scope | |
| Jun 27, 2025 | In progress issued Jan 2026 | 871 Cayuga Av | Frederic Grasset Design-Build | ground floor remodel and minor 1 story horizontal addition at rear yard ground floor. (n) bedroom, family room, bathroom, laundry, mud room, and storage. no excavation or work visible from street.Details
ground floor remodel and minor 1 story horizontal addition at rear yard ground floor. (n) bedroom, family room, bathroom, laundry, mud room, and storage. no excavation or work visible from street. | $170,487 |
| Jun 26, 2025 | In progress issued Dec 2025 | 2122 34th Av | Alder Construction | kitchen remodel w (n) appliances. bathroom remodel w(n) fixtures; replace (e) courtyard window; enclose (e) lightwell. minor modifications to interior wallsDetails
kitchen remodel w (n) appliances. bathroom remodel w(n) fixtures; replace (e) courtyard window; enclose (e) lightwell. minor modifications to interior walls | $102,515 |
| Jun 24, 2025 | Completed final sign-off Mar 2026 | 220 Danvers St | new 456 sq ft deck to the (e) lower roof. new roof deck will be accessed by a new set of interior stairs at 2nd fl. one new window and one new door will be added to the north elevationDetails
new 456 sq ft deck to the (e) lower roof. new roof deck will be accessed by a new set of interior stairs at 2nd fl. one new window and one new door will be added to the north elevation | $165,000 | |
| Jun 4, 2025 | Completed final sign-off Aug 2025 | 466 Liberty St | Lyne Construction | at front setback, replace landscaping retaining wall and wd fence along the east property line. (approx 12 ft long)Details
at front setback, replace landscaping retaining wall and wd fence along the east property line. (approx 12 ft long) | $10,000 |
| Jun 3, 2025 | In progress issued Sep 2025 | 1099 Holloway Av | Reliable Construction Inc | addition to (e) sfr in rear yard, new bedroom, closet, bathroom over crawl space. minor remodel to (e) bedrooms. new exterior doors, windows and deck. see "project scope" on cover page for complete descriptions for this permit.Details
addition to (e) sfr in rear yard, new bedroom, closet, bathroom over crawl space. minor remodel to (e) bedrooms. new exterior doors, windows and deck. see "project scope" on cover page for complete descriptions for this permit. | $120,000 |
| May 17, 2025 | In progress issued Aug 2025 | 2040 Gough St | demo and replace rear portion of building (15ft x 8ft; 3-stories); remove rear int stairs; remodel kitchen nd 1/f toilet room add 2 new baths in 3/f,remodel (e) bath; add 2 new baths on 4/f; add laudry. new windows rear elev.Details
demo and replace rear portion of building (15ft x 8ft; 3-stories); remove rear int stairs; remodel kitchen nd 1/f toilet room add 2 new baths in 3/f,remodel (e) bath; add 2 new baths on 4/f; add laudry. new windows rear elev. | $25,000 | |
| Apr 21, 2025 | Completed final sign-off Nov 2025 | 4440 20th St | main house rear ext. stairs reconfiguration; stair from 2nd fl to the ground fl to be taken out. infill (e) door to the stairs to create new window. extend deck landing on ground floor; new fire wall along property line @ rear stairs w/new footing; add skylights @ bathroom & above interior stairs.Details
main house rear ext. stairs reconfiguration; stair from 2nd fl to the ground fl to be taken out. infill (e) door to the stairs to create new window. extend deck landing on ground floor; new fire wall along property line @ rear stairs w/new footing; add skylights @ bathroom & above interior stairs. | $10,000 | |
| Apr 7, 2025 | In progress issued Apr 2025 | 50 Jules Av | ground floor remodel entry and add 1 bedroom, 1 bath, walk in closet, office, laundry, exterior deck. no expansion of building envelope or exterior work. visible from street. exterior deck 250 sf.Details
ground floor remodel entry and add 1 bedroom, 1 bath, walk in closet, office, laundry, exterior deck. no expansion of building envelope or exterior work. visible from street. exterior deck 250 sf. | $120,000 | |
| Mar 26, 2025 | Completed final sign-off Jun 2026 | 1912 09th Av | North Bay Construction | alter site to pa #202309066000: partial removal (e) flat roof, select interior walls & single glazed windows. (n) partial flat roof w/ buildable envelope (no increase height), (n) interior remodel 2/f: (n) primary bath, remodel (e) kitchen, (n) windows front facade, kitchen, living & primary bath.Details
alter site to pa #202309066000: partial removal (e) flat roof, select interior walls & single glazed windows. (n) partial flat roof w/ buildable envelope (no increase height), (n) interior remodel 2/f: (n) primary bath, remodel (e) kitchen, (n) windows front facade, kitchen, living & primary bath. | |
| Mar 11, 2025 | Completed final sign-off Jul 2025 | 2763 Filbert St | Stonebridge Construction Inc | revision to pa 202501249076 revision to structural drawings based on existing conditionsDetails
revision to pa 202501249076 revision to structural drawings based on existing conditions | |
| Mar 7, 2025 | In progress issued Mar 2025 | 1550 Diamond St | Roly Construction | revision to pa #2025-0110-8136 remove unpermitted roof over deck at rear yard. replace windows at 2nd & 3rd fl. replace interior stair run from 2nd to 3rd fl. at 3rd fl, renovate one bath, add new full bath.Details
revision to pa #2025-0110-8136 remove unpermitted roof over deck at rear yard. replace windows at 2nd & 3rd fl. replace interior stair run from 2nd to 3rd fl. at 3rd fl, renovate one bath, add new full bath. | $36,000 |
| Mar 7, 2025 | Completed final sign-off Feb 2026 | 5326 California St | Alder Construction | revision to pa 202405202506; add laundry & remove closet at 1st fl; add (n) header @ (e) opening on 2nd floor; change wood header to steel @ kitchen door & windows. reframe (e) exterior wall @ 3rd fl bathDetails
revision to pa 202405202506; add laundry & remove closet at 1st fl; add (n) header @ (e) opening on 2nd floor; change wood header to steel @ kitchen door & windows. reframe (e) exterior wall @ 3rd fl bath | $15,000 |
| Feb 18, 2025 | Completed final sign-off Jul 2025 | 1731 43rd Av | Sf Town Builders Inc | remodel e backyard, add new pergolas, new fenceDetails
remodel e backyard, add new pergolas, new fence | $50,000 |
| Feb 7, 2025 | Completed final sign-off Oct 2025 | 1013 Castro St | Proano Construction | replace (e) rotten & warped treads & risers for (e) exterior entry stairs. add concrete-lined storage under stairs. no interior work, no increase to bldg footprint.Details
replace (e) rotten & warped treads & risers for (e) exterior entry stairs. add concrete-lined storage under stairs. no interior work, no increase to bldg footprint. | $15,000 |
| Jan 17, 2025 | In progress issued May 2025 | 244 16th Av | Amber - Tru Construction Inc. | revision to permit# 202009305567.reduce scope & cost of work.renovation and rear expansion the size of approved expansion on the 1/f is reduced.approved expansion on 2/f & attic/top level is eliminated existing attic level to remain/has a 7'-0" ceiling and therefore non-habitable. no f/s installed.Details
revision to permit# 202009305567.reduce scope & cost of work.renovation and rear expansion the size of approved expansion on the 1/f is reduced.approved expansion on 2/f & attic/top level is eliminated existing attic level to remain/has a 7'-0" ceiling and therefore non-habitable. no f/s installed. | |
| Dec 23, 2024 | In progress issued Feb 2025 | 138 Parker Av | Cej Construction Llc | 3/f: remodel 2 bathrooms, combine 2 bedrooms into single bedroom, turn unoccupied roof into roof dek, add roof overhang, new sliding door and windwo, at roof, add 4 (n) skylights, new roof parapet along north property lineDetails
3/f: remodel 2 bathrooms, combine 2 bedrooms into single bedroom, turn unoccupied roof into roof dek, add roof overhang, new sliding door and windwo, at roof, add 4 (n) skylights, new roof parapet along north property line | $70,000 |
| Dec 20, 2024 | In progress filed Dec 2024, not yet issued | 251 Faxon Av | new retaining wall and steps w/in front setbackDetails
new retaining wall and steps w/in front setback | $15,000 | |
| Dec 20, 2024 | In progress issued Jul 2025 | 610 Fillmore St | Sonoma Build Group Inc | barrier removal to install (n) ada elevator to provide accessibility. upgrade 1 (e) common use bathing facility at level 2, provide accessible entrance to the building. elevator will be deffered submittal.Details
barrier removal to install (n) ada elevator to provide accessibility. upgrade 1 (e) common use bathing facility at level 2, provide accessible entrance to the building. elevator will be deffered submittal. | $60,000 |
| Dec 17, 2024 | Completed final sign-off Nov 2025 | 344 Holladay Av | Consolid Inc | voluntary repair + reinfoce of existing poor framing conditions. replace deteriorated foundation under front wall. new voluntary seismic retrofit of ground floor. work not adjacent to public right of way.Details
voluntary repair + reinfoce of existing poor framing conditions. replace deteriorated foundation under front wall. new voluntary seismic retrofit of ground floor. work not adjacent to public right of way. | $40,000 |
| Dec 6, 2024 | Completed final sign-off Jul 2025 | 540 Victoria St | R & D Construction Co Inc | revision to 202408269432. replace foundation and slab per plan. remodel gr fl bath and laundry, replace stairs upper flr layout to accomodate, replace window at dining room. extend rear patio. convert (e) media room to (n) bedroomDetails
revision to 202408269432. replace foundation and slab per plan. remodel gr fl bath and laundry, replace stairs upper flr layout to accomodate, replace window at dining room. extend rear patio. convert (e) media room to (n) bedroom | $160,000 |
| Dec 3, 2024 | In progress issued Dec 2024 | 741 Arguello Bl | Rozen Home Builders Inc | revision to pa# 202410092671: kitchen remodel- remove (e) interior wall between dining and kitchen. no exterior work visible from the street; bathroom remodel in-kind.Details
revision to pa# 202410092671: kitchen remodel- remove (e) interior wall between dining and kitchen. no exterior work visible from the street; bathroom remodel in-kind. | $50,000 |
| Nov 25, 2024 | Completed final sign-off Nov 2025 | 566 Vermont St | 7 Hills Construction | add powder room at level 1, legalize bathrooms and kitchen on level 1 and 2. legalize rear deck. replace nine front windows (report number cc8672)Details
add powder room at level 1, legalize bathrooms and kitchen on level 1 and 2. legalize rear deck. replace nine front windows (report number cc8672) | $75,000 |
| Nov 18, 2024 | Completed final sign-off Jul 2025 | 1200 Sloat Bl | Great Ocean Construction Inc. | interior remodel of kitchen and bathrooms, add a bathroom, replace front stair and landing, new fence, roofing, add skylightsDetails
interior remodel of kitchen and bathrooms, add a bathroom, replace front stair and landing, new fence, roofing, add skylights | $150,000 |
| Nov 15, 2024 | Completed final sign-off May 2026 | 765 34th Av | Dliu Construction | complete upper level interior remodel. (n) conditioned space at lower level. infill conditioned space under xtg upper level. provide access btwn upper & lower levels. replace rear siding w/ stucco. new on grade concrete patio at rear.Details
complete upper level interior remodel. (n) conditioned space at lower level. infill conditioned space under xtg upper level. provide access btwn upper & lower levels. replace rear siding w/ stucco. new on grade concrete patio at rear. | $200,000 |
| Nov 1, 2024 | In progress issued Nov 2024 | 62 Santa Ysabel Av | remove (e) exterior wood stairs. new deck & stairs protected by fire rated wall at property line at the rear of the buildingDetails
remove (e) exterior wood stairs. new deck & stairs protected by fire rated wall at property line at the rear of the building | $10,500 | |
| Oct 4, 2024 | In progress issued Apr 2025 | 614 Elizabeth St | Cameron Builders Sf | convert 1st fl storage to new foundations, bathroom, bedroom, & family room. 2nd fl- relocate kitchen & bath. revise interior partitions & structural upgrades. 3rd fl- relocate bath. add new bath. revise interior partitions & structural upgrades. new windows at rear. new radiant heating throughtout.Details
convert 1st fl storage to new foundations, bathroom, bedroom, & family room. 2nd fl- relocate kitchen & bath. revise interior partitions & structural upgrades. 3rd fl- relocate bath. add new bath. revise interior partitions & structural upgrades. new windows at rear. new radiant heating throughtout. | $921,596 |
| Oct 3, 2024 | Completed final sign-off Jun 2025 | 1455 Eucalyptus Dr | A L Martin Construction | (n) deck from kitchen to rear yard. interior remodel: remodel (e) ktchen & bathroom w/ new fixtures & finishes. replace (e) windows, none face street. new bathroom & replace internal stair. convert space behind garageDetails
(n) deck from kitchen to rear yard. interior remodel: remodel (e) ktchen & bathroom w/ new fixtures & finishes. replace (e) windows, none face street. new bathroom & replace internal stair. convert space behind garage | $200,000 |
| Sep 18, 2024 | Completed final sign-off Nov 2025 | 1533 Newhall St | Tinka Construction | interior: bathroom remodel & closet at 1st fl. exterior: replace primary bedroom window w/ bigger window. (n) conc patio at grade in rear yard; replace (e) decking with (n) decking; add sleepers at rear yard (e)patio; strengthening (e) deckDetails
interior: bathroom remodel & closet at 1st fl. exterior: replace primary bedroom window w/ bigger window. (n) conc patio at grade in rear yard; replace (e) decking with (n) decking; add sleepers at rear yard (e)patio; strengthening (e) deck | $75,000 |
| Sep 16, 2024 | Completed final sign-off Jan 2025 | 2929 Broderick St | Citidev Inc. | voluntary structural reinforcement/repair at rear stair with new concrete footing and plywood sheathing (no work on stairs)Details
voluntary structural reinforcement/repair at rear stair with new concrete footing and plywood sheathing (no work on stairs) | $22,000 |
| Sep 16, 2024 | In progress issued Sep 2024 | 120 Belvedere St | L E D Construction | rear deck repair, structural work only. new beam and footing at e deck. new header over e opening.Details
rear deck repair, structural work only. new beam and footing at e deck. new header over e opening. | $15,000 |
| Sep 13, 2024 | Completed final sign-off Feb 2026 | 2134 41st Av | Fog Horn Builders Inc | expansion of ground flr horizontally out 9'11 3/4" to east for additional 243 s.f. of interior space. addition of occupied roof deck above the addition at level 2 for 243 s.f. of roof deck. interior addition will add a bedrm, bathrm & tv rm. sq ft will be 442 included space converted from garage useDetails
expansion of ground flr horizontally out 9'11 3/4" to east for additional 243 s.f. of interior space. addition of occupied roof deck above the addition at level 2 for 243 s.f. of roof deck. interior addition will add a bedrm, bathrm & tv rm. sq ft will be 442 included space converted from garage use | $150,000 |
| Aug 30, 2024 | Completed final sign-off May 2025 | 914 Wisconsin St | revision to pa# 202404039210: to address nov# 202427666 - to replace ailing framing, sheathing, and stucco along south, west, and 2'-o of north wall. interior floor framing andr ceiling joists will be replaced at bedrooms.Details
revision to pa# 202404039210: to address nov# 202427666 - to replace ailing framing, sheathing, and stucco along south, west, and 2'-o of north wall. interior floor framing andr ceiling joists will be replaced at bedrooms. | $22,000 | |
| Aug 26, 2024 | Completed final sign-off Aug 2026 | 83 Los Palmos Dr | Three Brothers Construction | interior remodel: remodel (e) kitchen and bathrooms on 2/f, adding new bathroom to create new master bedroom at 1/f and relocate/ upgrade (e) furnace and water heater in basement. upgrade (e) electrical panel to 200 amps.Details
interior remodel: remodel (e) kitchen and bathrooms on 2/f, adding new bathroom to create new master bedroom at 1/f and relocate/ upgrade (e) furnace and water heater in basement. upgrade (e) electrical panel to 200 amps. | $120,000 |
| Aug 15, 2024 | Completed final sign-off Nov 2024 | 1839 Laguna St | Brighter Legacy Builders Inc. | relocate/enlarge openings to living room; remove partition wall, replace bathroom & closet doors on 2/f. replce& relocate closet doors, laundry door; relocate partitions wall on 3/f.Details
relocate/enlarge openings to living room; remove partition wall, replace bathroom & closet doors on 2/f. replce& relocate closet doors, laundry door; relocate partitions wall on 3/f. | $15,000 |