B&H Builder Inc
- Based in
- South San Francisco
- On San Francisco permits
- Dec 2020 to Dec 2025
- Last 24 months
- 1 permit filed
5 permits since 2000: 3 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2025 | In progress issued Jan 2026 | 2430 28th Av | 1st fl - reconfigure 1st fo to created 2 bedrooms w/new bathrooms; 2nd fl - existing ktichen, bathroom and add new bathroom for bedroom #1; rebuild (e) interior stair to comply with new code req; replace front windows in-kind w/aluminu clad wood. upgrade elec 100 amp meter to 200 ampDetails
1st fl - reconfigure 1st fo to created 2 bedrooms w/new bathrooms; 2nd fl - existing ktichen, bathroom and add new bathroom for bedroom #1; rebuild (e) interior stair to comply with new code req; replace front windows in-kind w/aluminu clad wood. upgrade elec 100 amp meter to 200 amp | $122,000 |
| Jun 7, 2021 | Completed final sign-off Jun 2021 | 32 Cunningham Pl | replace (e) 3 window at same location and same opening with trim craddelwood materials. 1 bay window at the front of the houseDetails
replace (e) 3 window at same location and same opening with trim craddelwood materials. 1 bay window at the front of the house | $2,000 |
| Apr 30, 2021 | Never finaled issued May 2021, no final | 215 Precita Av | rev pa#202012030171: remove kitchen island and relocate kitchen sink and d/w on 1/f per plan. propse a bigger door from 24in and 30in at the laundry machine area on the 1/f per plan.Details
rev pa#202012030171: remove kitchen island and relocate kitchen sink and d/w on 1/f per plan. propse a bigger door from 24in and 30in at the laundry machine area on the 1/f per plan. | |
| Dec 10, 2020 | Completed final sign-off Oct 2021 | 820 Alabama St | units: 820/822a/822 alabama st:remodel kitchens & bathrooms in all units: like to like remodel for bathrooms, replace shower pan/tubs, new plumbing fixtures & new lighting.replace kitchen cabinets,countertops,new appliances and exhaust fans. no layout changes or walls modified.Details
units: 820/822a/822 alabama st:remodel kitchens & bathrooms in all units: like to like remodel for bathrooms, replace shower pan/tubs, new plumbing fixtures & new lighting.replace kitchen cabinets,countertops,new appliances and exhaust fans. no layout changes or walls modified. | $45,000 |
| Dec 3, 2020 | Completed final sign-off Apr 2022 | 215 Precita Av | remove (e) office on 2/f per plans.convert (e) closet to (n) laundry room on 2/f.expand (e) kitchen to create open design w/ (n) dining room.expand & relocate (e) ktichen & dining room to create open design on 3/f. replace rear windows with like for like wdws.Details
remove (e) office on 2/f per plans.convert (e) closet to (n) laundry room on 2/f.expand (e) kitchen to create open design w/ (n) dining room.expand & relocate (e) ktichen & dining room to create open design on 3/f. replace rear windows with like for like wdws. | $20,000 |