Carlos Renan Dominguez
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- Dominguez Associates
- Based in
- Pacifica
- On San Francisco permits
- Dec 2002 to Aug 2026
139 permits since 2000 (engineer on 77 permits, architect on 56 permits, authorized agent-others on 4 permits, attorney on 1 permit, designer on 1 permit): 85 completed, 18 in progress, 22 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 139.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 2035 Laguna St | priority ab-0004: construct a horizontal addition at all levels for an elevator within the required rear yard.Details
priority ab-0004: construct a horizontal addition at all levels for an elevator within the required rear yard. | $90,000 | |
| Jun 16, 2026 | In progress filed Jun 2026, not yet issued | 1128 Irving St | convert and remodel (e) 2 commercial units into 2 dwelling units. no change to the building.Details
convert and remodel (e) 2 commercial units into 2 dwelling units. no change to the building. | $450,000 | |
| Feb 6, 2026 | In progress issued Jun 2026 | 435 10th Av | alteration of the front facade to replace (e) siding & windows; replace (e) front stairDetails
alteration of the front facade to replace (e) siding & windows; replace (e) front stair | $50,000 | |
| Jan 21, 2026 | In progress filed Jan 2026, not yet issued | 520 Oak Park Dr | remodel (e) kitchen, dining & living room. raise floor at living room. propose floating steps at living room. new wall hung toilet at (e) powder room. new electric fire place at (e) living room. remove portion of wall and replace with new steel beam.Details
remodel (e) kitchen, dining & living room. raise floor at living room. propose floating steps at living room. new wall hung toilet at (e) powder room. new electric fire place at (e) living room. remove portion of wall and replace with new steel beam. | $80,000 | |
| Oct 27, 2025 | In progress filed Oct 2025, not yet issued | 741 30th Av | building a: replace (e) ada ramp & railings, concrete deck and deck. building b: repair (e) ada ramp & railings as needed. building c: replace (e) ada ramp & railingsDetails
building a: replace (e) ada ramp & railings, concrete deck and deck. building b: repair (e) ada ramp & railings as needed. building c: replace (e) ada ramp & railings | $180,000 | |
| Jul 17, 2025 | In progress filed Jul 2025, not yet issued | 2035 Laguna St | remodel (e) master bathroom and add grab bars, add radiant heating floor at (e) master bathroomDetails
remodel (e) master bathroom and add grab bars, add radiant heating floor at (e) master bathroom | $20,000 | |
| Jul 3, 2025 | In progress issued Jul 2026 | 520 Oak Park Dr | site permit- create a new entrance to existing suite by adding the existing porch area. change tiles, floor, toilet and sink at existing suite bathroom. add radiant heating floor @ suiteDetails
site permit- create a new entrance to existing suite by adding the existing porch area. change tiles, floor, toilet and sink at existing suite bathroom. add radiant heating floor @ suite | $70,000 | |
| May 19, 2025 | Expired or cancelled withdrawn Jan 2026 | 2168 Market St | change the layout at 2 existing barsDetails
change the layout at 2 existing bars | $30,000 | |
| Mar 26, 2025 | In progress issued May 2025 | 520 Oak Park Dr | remodel existing master bathroom @ 3rd fl; add radiant heating floorDetails
remodel existing master bathroom @ 3rd fl; add radiant heating floor | $25,000 | |
| Mar 3, 2025 | In progress issued Jan 2026 | 266 21st Av | alter site - revision to site permit#202108267165 s. layout changed at studio# 4 and studio# 5, also new lightwell for 1 bedroom unit# 3 and studio# 5. fire alarm shall be on separate permit & comply with cfc 903 & sf fire code 1103.7.6.1. sprinklers to comply with nfpa 13 & on a separate permit.Details
alter site - revision to site permit#202108267165 s. layout changed at studio# 4 and studio# 5, also new lightwell for 1 bedroom unit# 3 and studio# 5. fire alarm shall be on separate permit & comply with cfc 903 & sf fire code 1103.7.6.1. sprinklers to comply with nfpa 13 & on a separate permit. | $150,000 | |
| Feb 10, 2025 | In progress issued Mar 2025 | 2090 23rd Av | T & T Construction | 1st/f: new family rm, new bedroom, new bath & hallway. 2nd/f: remodel e) bathrooms to 1 ensuite bath & 1 common bath. fill in e) non shared lightwell, & 2 new skylights. add new interier stair to connect both levelsDetails
1st/f: new family rm, new bedroom, new bath & hallway. 2nd/f: remodel e) bathrooms to 1 ensuite bath & 1 common bath. fill in e) non shared lightwell, & 2 new skylights. add new interier stair to connect both levels | $180,000 |
| Jan 31, 2025 | Completed final sign-off Jan 2026 | 520 Oak Park Dr | change windows, change exterior siding, remove existing chimney at living room, change deck shingles for tempered glassDetails
change windows, change exterior siding, remove existing chimney at living room, change deck shingles for tempered glass | $40,000 | |
| Jan 16, 2025 | In progress issued Nov 2025 | 562 28th Av | Romkon Inc | rev to pa 201705055838. admin correction on unit count (6du + 2adu) and construction type (3a). horizontal addition to expand living and dining area of the rear units @ 2nd to 4th flr. add balcony to the rear units @ 2nd to 4th flr. horizontal addition to add master bedroom at the rear unit at 4/f.Details
rev to pa 201705055838. admin correction on unit count (6du + 2adu) and construction type (3a). horizontal addition to expand living and dining area of the rear units @ 2nd to 4th flr. add balcony to the rear units @ 2nd to 4th flr. horizontal addition to add master bedroom at the rear unit at 4/f. | $75,000 |
| Nov 18, 2024 | Completed final sign-off Jul 2025 | 1200 Sloat Bl | Great Ocean Construction Inc. | interior remodel of kitchen and bathrooms, add a bathroom, replace front stair and landing, new fence, roofing, add skylightsDetails
interior remodel of kitchen and bathrooms, add a bathroom, replace front stair and landing, new fence, roofing, add skylights | $150,000 |
| Sep 25, 2024 | Completed final sign-off Jul 2025 | 475 18th Av | H & Bo Construction Inc. | rev 202307061618- to remove side windows and change the size of rear window in the sunroom, extend laundry room and add a laundry sink and adding a electric fireplace on the 2nd and 3rd floor units.Details
rev 202307061618- to remove side windows and change the size of rear window in the sunroom, extend laundry room and add a laundry sink and adding a electric fireplace on the 2nd and 3rd floor units. | |
| Sep 25, 2024 | Completed final sign-off Sep 2025 | 475 18th Av | H & Bo Construction Inc. | revision to adu 202304246350- to remove notes fire sprinkler on the site plan. fire sprinkler not required for this project and revised adu floor plan. proposed occupancy changed from r-2 to r-3.Details
revision to adu 202304246350- to remove notes fire sprinkler on the site plan. fire sprinkler not required for this project and revised adu floor plan. proposed occupancy changed from r-2 to r-3. | |
| Jul 1, 2024 | Completed final sign-off Feb 2025 | 331 Paris St | Bay Pros Construction Inc | revision to 202011239559, new foundation on existing bedroom to be legalize under pa#202011239559 (revision)Details
revision to 202011239559, new foundation on existing bedroom to be legalize under pa#202011239559 (revision) | |
| Jan 19, 2024 | In progress issued Jan 2024 | 568 28th Av | Romkon Inc | permit for permeation grouting of soils along the existing foundationDetails
permit for permeation grouting of soils along the existing foundation | $10,000 |
| Jan 19, 2024 | In progress issued Jan 2024 | 562 28th Av | Romkon Inc | permit for permeation grouting of soils along the existing foundation. ref pa 201705055838Details
permit for permeation grouting of soils along the existing foundation. ref pa 201705055838 | $10,000 |
| Nov 21, 2023 | In progress issued Jan 2024 | 562 28th Av | Romkon Inc | revision to bpa#201705055838, revision of property line details. provide detail at stair footing.Details
revision to bpa#201705055838, revision of property line details. provide detail at stair footing. | $2,000 |
| Nov 6, 2023 | In progress filed Nov 2023, not yet issued | 517 45th Av | add a new nook @ master bedroom,new spiral stairs to a new roof deck,new fire escapre egress.Details
add a new nook @ master bedroom,new spiral stairs to a new roof deck,new fire escapre egress. | $50,000 | |
| Oct 16, 2023 | In progress issued Feb 2025 | 3372 22nd St | to convert (e) commercial to residential, to provide a new residential unit at 3372 22nd street with a new deck area. work includes additional foundation and framing elements of 1st story and new, near-grade deck at rear of building, dmj 10/17/2023;Details
to convert (e) commercial to residential, to provide a new residential unit at 3372 22nd street with a new deck area. work includes additional foundation and framing elements of 1st story and new, near-grade deck at rear of building, dmj 10/17/2023; | $200,000 | |
| Sep 28, 2023 | Never finaled issued Oct 2023, no final | 725 Geary St | to comply with accessible business entrance program per ordinance 51-16. to request for technicial infeasibility. new ada entrance and list cannot be done due to lack of space and existing bearing wall. abe201912029053.Details
to comply with accessible business entrance program per ordinance 51-16. to request for technicial infeasibility. new ada entrance and list cannot be done due to lack of space and existing bearing wall. abe201912029053. | ||
| Sep 6, 2023 | Completed final sign-off Feb 2024 | 614 28th Av | Daniel Kelly Construction | install a roof hatch & access from the sunroom on the 3rd fl for solar panel maintenanceDetails
install a roof hatch & access from the sunroom on the 3rd fl for solar panel maintenance | $3,000 |
| Jul 6, 2023 | Completed final sign-off Sep 2025 | 475 18th Av | H & Bo Construction Inc. | interior remodel of existing two units on this permit (475-477 18th ave). adu under separate permit app #202304246350. ***no structural work under this permit***Details
interior remodel of existing two units on this permit (475-477 18th ave). adu under separate permit app #202304246350. ***no structural work under this permit*** | $300,000 |
| Jun 6, 2023 | Never finaled issued Aug 2023, no final | 765 Minna St | Olive Remodeling | revision to 202002285763. revise 2nd fl residentail unit from a 1 bedroom to a 2 bedrooms unit. provide emergency escape and rescue window access via stair in the rear to access the roof to the public way per pre-appDetails
revision to 202002285763. revise 2nd fl residentail unit from a 1 bedroom to a 2 bedrooms unit. provide emergency escape and rescue window access via stair in the rear to access the roof to the public way per pre-app | $10,000 |
| May 11, 2023 | Never finaled issued Aug 2023, no final | 5163 Mission St | Gilheany Construction | accessible business entrance progrm per ordinance 51-16, abe 201911047772, ada entrance door, push buttons and ramp, relocate door & reslope ramp 1":12"Details
accessible business entrance progrm per ordinance 51-16, abe 201911047772, ada entrance door, push buttons and ramp, relocate door & reslope ramp 1":12" | $20,000 |
| May 3, 2023 | Completed final sign-off Nov 2023 | 1986 45th Av | Lombardi Property Development | legalize unpermitted bedroom to family room, remove walk-in closet, legalize unpermitted bathroom, replace (e) window to sliding door/same widthDetails
legalize unpermitted bedroom to family room, remove walk-in closet, legalize unpermitted bathroom, replace (e) window to sliding door/same width | $30,000 |
| Apr 24, 2023 | Completed final sign-off Sep 2025 | 475 18th Av | H & Bo Construction Inc. | add a 2 bedrooms adu on the ground floor. and interior remodel of the exsiting two units under a separate permit.Details
add a 2 bedrooms adu on the ground floor. and interior remodel of the exsiting two units under a separate permit. | $200,000 |
| Apr 6, 2023 | Never finaled filed Apr 2023, never issued | 2355 25th Av | add a 2 bedrooms adu on the ground floor within the building envelope.Details
add a 2 bedrooms adu on the ground floor within the building envelope. | $100,000 | |
| Mar 31, 2023 | Completed final sign-off Aug 2025 | 2381 Chestnut St | commercial: mandatory soft story retrofit per sfebc 505e.Details
commercial: mandatory soft story retrofit per sfebc 505e. | $50,000 | |
| Mar 31, 2023 | Completed final sign-off Aug 2025 | 3250 Divisadero St | residential: mandtory soft story retrofit per sfebc 505e.Details
residential: mandtory soft story retrofit per sfebc 505e. | $50,000 | |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 403 Monterey Bl | John Paul O'brien Construction | response to complaint about common area stairs, 201634843, rebuild stairs in-kind and update railing to 42"h.Details
response to complaint about common area stairs, 201634843, rebuild stairs in-kind and update railing to 42"h. | $30,000 |
| Dec 5, 2022 | Completed final sign-off Jul 2023 | 1319 03rd Av | Behan Construction | interior remodel-change counter and cabinets of (e) kitchen. add (n) powder rm @ 1st level, add (n) bathrm @ 2nd level. remodel (e) bathrm @ 2nd level. widen opening between (e) kitchen & dining rm.Details
interior remodel-change counter and cabinets of (e) kitchen. add (n) powder rm @ 1st level, add (n) bathrm @ 2nd level. remodel (e) bathrm @ 2nd level. widen opening between (e) kitchen & dining rm. | $60,000 |
| Dec 2, 2022 | Never finaled issued Jan 2023, no final | 678 40th Av | interior remodel to create new famil/office and a full bathroom on the ground floor and to retain one parking space.Details
interior remodel to create new famil/office and a full bathroom on the ground floor and to retain one parking space. | $30,000 | |
| Oct 19, 2022 | Completed final sign-off Oct 2024 | 843 41st Av | T & T Construction | revision to bpa#202205043541. change approved (1) bedroom to (2) bedrooms on ground floor w/in building envelope; change 1/2 bathroom to a full bathroom on 2nd fl; remove skylightDetails
revision to bpa#202205043541. change approved (1) bedroom to (2) bedrooms on ground floor w/in building envelope; change 1/2 bathroom to a full bathroom on 2nd fl; remove skylight | |
| Jul 12, 2022 | Completed final sign-off Feb 2024 | 75 Clifford Tr | change rear windows at basement, 1st and 2nd floorsDetails
change rear windows at basement, 1st and 2nd floors | $15,000 | |
| May 19, 2022 | Completed final sign-off Aug 2023 | 82 Idora Av | Twin Pinnacles Construction | add deck on the 1st floor(street level)& stair down to the rear yard.addition of an office on basement level & new patio in the rear yard. no alteration on the front facade.Details
add deck on the 1st floor(street level)& stair down to the rear yard.addition of an office on basement level & new patio in the rear yard. no alteration on the front facade. | $60,000 |
| May 4, 2022 | Completed final sign-off Oct 2024 | 843 41st Av | T & T Construction | replace (e) pantry into a half bathroom and fill-in non-sharing light well on 2/f. 2/f: remodel kithcn, bathroom. remodel interior stair (2nd to 1st flr). 1/f: remodel (for new bedroom, office, bathroom, laundry room and mudroom). replace or repair front stair in kind.Details
replace (e) pantry into a half bathroom and fill-in non-sharing light well on 2/f. 2/f: remodel kithcn, bathroom. remodel interior stair (2nd to 1st flr). 1/f: remodel (for new bedroom, office, bathroom, laundry room and mudroom). replace or repair front stair in kind. | $200,000 |
| May 2, 2022 | Completed final sign-off Aug 2023 | 82 Idora Av | Twin Pinnacles Construction | 2/f: interior remodel for the interior stair to connect the 1/f (street level) for a new laundry room, mudroom, a half bath, a primary bedroom, suite, and a sunroom. basement level: partially excavate approx. 18" for a new bathroom and storage closet.Details
2/f: interior remodel for the interior stair to connect the 1/f (street level) for a new laundry room, mudroom, a half bath, a primary bedroom, suite, and a sunroom. basement level: partially excavate approx. 18" for a new bathroom and storage closet. | $250,000 |
| Mar 16, 2022 | Expired or cancelled cancelled Jan 2026 | 882 25th Av | on the 1st floor to add 100 sqft from the garage area to add a bathroom and remodel (e) habitable space.Details
on the 1st floor to add 100 sqft from the garage area to add a bathroom and remodel (e) habitable space. | $100,000 | |
| Mar 16, 2022 | Expired or cancelled withdrawn May 2024 | 124 Forest Side Av | 1/f: remodel (e) habitable spaces, new family room, and new interior stair to connect to the 2/f. 2/f: remove interior walls to provide new kitchen. 3/f: remodel (e) bathroom, new laundry closet and add ensuite bathroom in front bedroom.Details
1/f: remodel (e) habitable spaces, new family room, and new interior stair to connect to the 2/f. 2/f: remove interior walls to provide new kitchen. 3/f: remodel (e) bathroom, new laundry closet and add ensuite bathroom in front bedroom. | $450,000 | |
| Mar 10, 2022 | Completed final sign-off Oct 2022 | 407 Monterey Bl | John Paul O'brien Construction | unit #407: repair fire damage to interior including 2 bedrooms, 1 kitchen & 1 bathroom. replace 10 (e) windows in-kind with aluminum clad casement windows.Details
unit #407: repair fire damage to interior including 2 bedrooms, 1 kitchen & 1 bathroom. replace 10 (e) windows in-kind with aluminum clad casement windows. | $100,000 |
| Feb 23, 2022 | Completed final sign-off Apr 2025 | 331 Paris St | E & A Builders | demolish illegal shed in rear yardDetails
demolish illegal shed in rear yard | $3,500 |
| Dec 16, 2021 | Completed final sign-off Apr 2022 | 770 46th Av | Fay Construction & Restoration Inc | structural revision to pa202002245201.Details
structural revision to pa202002245201. | $8,000 |
| Nov 16, 2021 | Expired or cancelled cancelled Jul 2026 | 2652 California St | horizontal & vertical addition for (n) 2nd dwelling unit. remodel (e) unit w/ (n) stair to (n) deck at (e) roof. (n) passenger elevator. (n) concrete sidewalk. front facade improvements. (n) mep systems. (n) rear yard landscaping, retaining walls & paving.Details
horizontal & vertical addition for (n) 2nd dwelling unit. remodel (e) unit w/ (n) stair to (n) deck at (e) roof. (n) passenger elevator. (n) concrete sidewalk. front facade improvements. (n) mep systems. (n) rear yard landscaping, retaining walls & paving. | $2,835,800 | |
| Nov 10, 2021 | Never finaled issued Nov 2021, no final | 555 Geary St | Drink And Company Inc Dba The Bar Builde | to remove exterior wood siding over original existing windows; to remove suspended ceiling in dining room. to change logo copy on existing exterior sign.Details
to remove exterior wood siding over original existing windows; to remove suspended ceiling in dining room. to change logo copy on existing exterior sign. | $2,500 |
| Sep 29, 2021 | Completed final sign-off Nov 2022 | 1865 24th Av | Brendan Waters Construction Inc | 1st fl - create 1 bedrm, family rm, full bathrm, laundry closet, storage & retain garage for 1 car parking. a new deck off the 1st fl. new interior stair connecting both floors on the 2nd fl. remodel kitchen, add bathrm, infill (e) non-share light wellDetails
1st fl - create 1 bedrm, family rm, full bathrm, laundry closet, storage & retain garage for 1 car parking. a new deck off the 1st fl. new interior stair connecting both floors on the 2nd fl. remodel kitchen, add bathrm, infill (e) non-share light well | $300,000 |
| Jun 9, 2021 | Completed final sign-off Oct 2021 | 1932 16th Av | Millard Tong Const Co Inc | new cappng to exiting foundation at under the (e) exterior stairs and front corner of the house. replacing (e) 4" concrete slab at exterior corridor. replace in-kind (6) existing windows at front - visible from st.Details
new cappng to exiting foundation at under the (e) exterior stairs and front corner of the house. replacing (e) 4" concrete slab at exterior corridor. replace in-kind (6) existing windows at front - visible from st. | $12,000 |
| Apr 8, 2021 | Completed final sign-off Aug 2022 | 312 Foerster St | Bay Laurel Construction Inc | revise pa 202011249624 to change rear window and door size. no change to front.Details
revise pa 202011249624 to change rear window and door size. no change to front. | |
| Mar 3, 2021 | Expired or cancelled cancelled Oct 2023 | 2650 26th Av | Sasso Construction Inc. | add new roof deck to extg single family and replace extg roofingDetails
add new roof deck to extg single family and replace extg roofing | $15,000 |
| Feb 23, 2021 | Never finaled filed Feb 2021, never issued | 1908 Buchanan St | excavate appox 2' on the 1st flr to create livable spaces and an one car garage. remove one (e) street tree with (n) curb cut for a driveway. side yard extensions on the 2nd and 3rd flr. and interior remodel. (n) rear yard deck off the 2nd flr.Details
excavate appox 2' on the 1st flr to create livable spaces and an one car garage. remove one (e) street tree with (n) curb cut for a driveway. side yard extensions on the 2nd and 3rd flr. and interior remodel. (n) rear yard deck off the 2nd flr. | $500,000 | |
| Jan 29, 2021 | Completed final sign-off Apr 2022 | 471 40th Av | Bao Hengda Inc | rev pa201912189868-on 2/f side exention of 39sf to be filled in (e) nonshared lightwell for a new kitchen,remodel (e) bathroom and add a full bathroo, add 3 skylights. no work in the front.Details
rev pa201912189868-on 2/f side exention of 39sf to be filled in (e) nonshared lightwell for a new kitchen,remodel (e) bathroom and add a full bathroo, add 3 skylights. no work in the front. | $100,000 |
| Dec 8, 2020 | Completed final sign-off Jul 2022 | 1225 31st Av | Custom Concepts | voluntary seismic upgrade. add 2 bedroom, 2 baths, and laundry downstairs. remodel kitchen abd bath upstairs. replace plumbing & electrical. repair front stairs in kind.Details
voluntary seismic upgrade. add 2 bedroom, 2 baths, and laundry downstairs. remodel kitchen abd bath upstairs. replace plumbing & electrical. repair front stairs in kind. | $250,000 |
| Dec 1, 2020 | Completed final sign-off Jul 2021 | 4180 Mission St | John O'rourke | ada rampDetails
ada ramp | $8,000 |
| Nov 24, 2020 | Completed final sign-off Jan 2026 | 1478 32nd Av | Pivot Pools Construction And Design Inc | interior remodel on 1st floor: create master bedroom, great room, & remodel (e) interior stair. remodel bedroom on 2nd floor. no work or change in the front.Details
interior remodel on 1st floor: create master bedroom, great room, & remodel (e) interior stair. remodel bedroom on 2nd floor. no work or change in the front. | $100,000 |
| Nov 24, 2020 | Completed final sign-off Aug 2022 | 312 Foerster St | Bay Laurel Construction Inc | interior remodel on 1st floor: create office, half bath, family room, laundry & storage room. new interior stair connecting both floors. no work or change in the front.Details
interior remodel on 1st floor: create office, half bath, family room, laundry & storage room. new interior stair connecting both floors. no work or change in the front. | $100,000 |
| Sep 17, 2020 | Never finaled filed Sep 2020, never issued | 928 Guerrero St | convert existing garage into additional dwelling unit perDetails
convert existing garage into additional dwelling unit per | $50,000 | |
| Sep 16, 2020 | Never finaled issued Aug 2023, no final | 3055 22nd Av | Mountain Top Construction Llc | new second fl addition. extend bedroom on second floor over (e) first floor.Details
new second fl addition. extend bedroom on second floor over (e) first floor. | $50,000 |
| Jun 10, 2020 | Completed final sign-off Jul 2022 | 1225 31st Av | remove all of the plaster in all of the rooms except for the kitchen walls. plaster is 3/4" and will be replaced with 5/8" type "x" sheetrock.Details
remove all of the plaster in all of the rooms except for the kitchen walls. plaster is 3/4" and will be replaced with 5/8" type "x" sheetrock. | $5,000 | |
| Jun 8, 2020 | Expired or cancelled cancelled Nov 2024 | 1225 31st Av | Custom Concepts | to erect a type 5b, one story rear detached 2 bedroom 652 sf adu unit with one basement per ord 95-17 & 116-19. front sfh to remain.Details
to erect a type 5b, one story rear detached 2 bedroom 652 sf adu unit with one basement per ord 95-17 & 116-19. front sfh to remain. | $100,000 |
| Feb 14, 2020 | Never finaled issued Feb 2020, no final | 701 Prague St | new electrical panel install ceiling lights and outlets, minor bathroom remodel x 2, kitchen cabinet upgrade, retrofit/seismic upgrade (optional) heating (ducting relocate) repair stairs in backyardDetails
new electrical panel install ceiling lights and outlets, minor bathroom remodel x 2, kitchen cabinet upgrade, retrofit/seismic upgrade (optional) heating (ducting relocate) repair stairs in backyard | $70,000 | |
| Dec 5, 2019 | Completed final sign-off Apr 2021 | 143 Collins St | Chavarria Construction Inc | residential remodel kitchen & bathroom, plumbing & electrical upgrades, new roof. minor framing for closets, alcove & roof enclosure, partial seismic upgrade. new deck, enclose light well. new front entrance.Details
residential remodel kitchen & bathroom, plumbing & electrical upgrades, new roof. minor framing for closets, alcove & roof enclosure, partial seismic upgrade. new deck, enclose light well. new front entrance. | $180,000 |
| Nov 18, 2019 | Never finaled filed Nov 2019, never issued | 793 San Jose Av | change of use from office to child care facility. two childrent's restrooms; open (n) door to backyard;add low fence between deck & back yard; replace in-kind (e) fence facing 30th st;remove (e) two burners @ (e) kitchen. no food provided from (n) day care.Details
change of use from office to child care facility. two childrent's restrooms; open (n) door to backyard;add low fence between deck & back yard; replace in-kind (e) fence facing 30th st;remove (e) two burners @ (e) kitchen. no food provided from (n) day care. | $40,000 | |
| Nov 13, 2019 | Completed final sign-off Jun 2021 | 2226 22nd Av | Kleytman Construction Company Inc | reduce extg garage/laundry area & convert into media room and office. add new bathroom & laundry room at ground floor. convert extg family room into bedroom. replace extg windows and add new door at rear. relocate stairs. enclose 2 exstg lighwells. add nw bathroom & closet @ 2nd fl.Details
reduce extg garage/laundry area & convert into media room and office. add new bathroom & laundry room at ground floor. convert extg family room into bedroom. replace extg windows and add new door at rear. relocate stairs. enclose 2 exstg lighwells. add nw bathroom & closet @ 2nd fl. | $180,000 |
| Sep 20, 2019 | In progress issued May 2024 | 725 Geary St | code compliance or violations 201798811 create hallwy that will open up the rear fire escape for all tennants//this shall be a rated hallwayDetails
code compliance or violations 201798811 create hallwy that will open up the rear fire escape for all tennants//this shall be a rated hallway | $25,000 | |
| Sep 20, 2019 | Completed final sign-off Aug 2020 | 1856 Pacific Av | Romkon Inc | changing winding stairs to striaght stairs for access to roofDetails
changing winding stairs to striaght stairs for access to roof | |
| Aug 14, 2019 | Never finaled issued Aug 2019, no final | 3607 Market St | remove two wall @ second floor, add new wall, foundation, and window towards to the side of the house (not visible from the street)Details
remove two wall @ second floor, add new wall, foundation, and window towards to the side of the house (not visible from the street) | $5,000 | |
| Aug 7, 2019 | Completed final sign-off Jan 2021 | 890 Union St | Green Point Construction Inc | (n) rear retaining wall on west most side is 7.38feet hight and slopes to east to 7.06ft hight. after construction, retaining wall on west most will remail 7.38 feet hight and slope east to 7.06feet high.Details
(n) rear retaining wall on west most side is 7.38feet hight and slopes to east to 7.06ft hight. after construction, retaining wall on west most will remail 7.38 feet hight and slope east to 7.06feet high. | $30,000 |
| Jul 30, 2019 | Completed final sign-off Nov 2020 | 1641 Lake St | Seth Bernstein, Javier Magana Construction Services | kitchen remodel with bigger wall openings: remove (e) closet to make kitchen larger; relocate door opening for laundry.Details
kitchen remodel with bigger wall openings: remove (e) closet to make kitchen larger; relocate door opening for laundry. | $12,000 |
| May 7, 2019 | Completed final sign-off Sep 2023 | 1566 29th Av | T & T Construction | rear horizontal addition for a new bathroom & bedroom, side extension to fill in existing non-share lightwell to expand kitchen.Details
rear horizontal addition for a new bathroom & bedroom, side extension to fill in existing non-share lightwell to expand kitchen. | $150,000 |
| Feb 14, 2019 | Completed final sign-off Jun 2021 | 2155 39th Av | T & T Construction | ground floor: bathroom remodel & rear addition to create a storage room. 2nd floor: rear horizontal addition to create (n) family room & remodel (e) bedroom & deck.Details
ground floor: bathroom remodel & rear addition to create a storage room. 2nd floor: rear horizontal addition to create (n) family room & remodel (e) bedroom & deck. | $100,000 |
| Jan 30, 2019 | Completed final sign-off Jan 2020 | 360 Somerset St | convert (e) workshop/storage & portion of garage into habitable space, add 2 (n) bathroom & remodel an (e) bathroom, remodel (e) kitchen, bedroom #1, and closet, rebuild a large deck at rear, replace (e) rear windowsDetails
convert (e) workshop/storage & portion of garage into habitable space, add 2 (n) bathroom & remodel an (e) bathroom, remodel (e) kitchen, bedroom #1, and closet, rebuild a large deck at rear, replace (e) rear windows | $120,000 | |
| Jan 15, 2019 | Completed final sign-off May 2019 | 379 Nevada St | Behan Construction | add additional 1 bedrooms & 1 bathrooms at staraoage area in garage area with 2 additional closets in hallway.Details
add additional 1 bedrooms & 1 bathrooms at staraoage area in garage area with 2 additional closets in hallway. | $80,000 |
| Dec 18, 2018 | Completed final sign-off Mar 2019 | 4076 19th St | Dave Mason Building | remove staircase. add new staircase add closet under stairs no new windowsDetails
remove staircase. add new staircase add closet under stairs no new windows | $10,000 |
| Oct 16, 2018 | Completed final sign-off Aug 2020 | 1856 Pacific Av | Romkon Inc | administrative permit (no work to document) the soft story work, compply with soft story nov 201402021, withdraw soft story pa# 201612064256, seismic work under 201003299153; soft story retrofit/sfebc chapter 4d: 2016 cebc appendix a4Details
administrative permit (no work to document) the soft story work, compply with soft story nov 201402021, withdraw soft story pa# 201612064256, seismic work under 201003299153; soft story retrofit/sfebc chapter 4d: 2016 cebc appendix a4 | |
| Oct 10, 2018 | Completed final sign-off Jan 2023 | 68 Diamond St | Cbs Construction Inc. | adding (3) adu to 1st floor per ordinance #162-16Details
adding (3) adu to 1st floor per ordinance #162-16 | $50,000 |
| Sep 21, 2018 | Completed final sign-off Apr 2019 | 999 Green St | Cbs Construction Inc. | apt 2403: remodel kitchen. remove 2 closets, remove non-structural walls. maher n/a.Details
apt 2403: remodel kitchen. remove 2 closets, remove non-structural walls. maher n/a. | $30,000 |
| Sep 5, 2018 | Never finaled issued Mar 2019, no final | 91 Central Av | Cbs Construction Inc. | add two 1 bedroom adu's on 1st fl. per ordiance #162-16Details
add two 1 bedroom adu's on 1st fl. per ordiance #162-16 | $168,000 |
| Aug 3, 2018 | In progress issued Feb 2025 | 401 Parker Av | legalization of dwelling unit at basement per ordinance 43-14. this permit is excludes the expansion work proposed under site permit #2018-0710-4172.Details
legalization of dwelling unit at basement per ordinance 43-14. this permit is excludes the expansion work proposed under site permit #2018-0710-4172. | $95,000 | |
| Mar 28, 2018 | Expired or cancelled expired Dec 2025 | 1077 Post St | add cannabis retail to (e) medical cannabis dispensary per planning code sec 190. ref pa #2008-1124-7269.Details
add cannabis retail to (e) medical cannabis dispensary per planning code sec 190. ref pa #2008-1124-7269. | ||
| Jan 12, 2018 | Never finaled issued Jul 2019, no final | 1856 Pacific Av | Romkon Inc | per adu unit ordinance# 162-16, convert ground floor and basement level spaces to 5 adus. structural work covered by separate permit.Details
per adu unit ordinance# 162-16, convert ground floor and basement level spaces to 5 adus. structural work covered by separate permit. | $250,000 |
| Nov 15, 2017 | Completed final sign-off Mar 2019 | 4132 23rd St | supplement to pa #201506249735 - to obtain a shoring permit.Details
supplement to pa #201506249735 - to obtain a shoring permit. | $1,000 | |
| Oct 19, 2017 | Completed final sign-off Jun 2019 | 1126 Taylor St | Cbs Construction Inc. | add 2 bedrooms & one bathroom @ ground floor . add new stairway connect to unit #2. n/a maher ordinanceDetails
add 2 bedrooms & one bathroom @ ground floor . add new stairway connect to unit #2. n/a maher ordinance | $28,000 |
| Oct 2, 2017 | Completed final sign-off May 2018 | 734 Clayton St | Behan Construction | add habitable space at garage area. to remodel (e) kitchen, (e) family rm & (e) dining rm. to change sunroom to (n) deck. remodel (e) bathroom & add bedroom #4 at second fl.Details
add habitable space at garage area. to remodel (e) kitchen, (e) family rm & (e) dining rm. to change sunroom to (n) deck. remodel (e) bathroom & add bedroom #4 at second fl. | $160,000 |
| Sep 14, 2017 | Completed final sign-off Apr 2019 | 2966 Clay St | Dave Mason Building | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $50,000 |
| Sep 13, 2017 | Completed final sign-off Dec 2021 | 970 Chestnut St | Custom Concepts, Achill Beg Construction Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $70,000 |
| Sep 13, 2017 | Completed final sign-off Jul 2019 | 785 San Jose Av | Cbs Construction Inc. | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $50,000 |
| Sep 13, 2017 | Completed final sign-off Aug 2021 | 849 Noe St | Ehj Construction,Inc. | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $50,000 |
| Sep 13, 2017 | Completed final sign-off Oct 2018 | 471 23rd Av | Dave Mason Building | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $50,000 |
| Sep 8, 2017 | Completed final sign-off Feb 2018 | 95 26th Av | Behan Construction | unit a - to switch existing dining and kitchen areas; lower existing chimney and change it to gas; to change tile at 2 existing bathrooms; no exterior work to be doneDetails
unit a - to switch existing dining and kitchen areas; lower existing chimney and change it to gas; to change tile at 2 existing bathrooms; no exterior work to be done | $20,000 |
| Jul 20, 2017 | Completed final sign-off Aug 2022 | 142 Cortland Av | Cbs Construction Inc. | (n) 2-story addition. (3)(n) bedrooms, (2) baths, (1)(n) laundry room. add garage.Details
(n) 2-story addition. (3)(n) bedrooms, (2) baths, (1)(n) laundry room. add garage. | $186,000 |
| Mar 3, 2017 | Completed final sign-off May 2018 | 430 34th Av | Dave Mason Building | soft story retrofit per sfebc chapter 4d, 2012 iebc appendix a-4. to comply nov#201642371Details
soft story retrofit per sfebc chapter 4d, 2012 iebc appendix a-4. to comply nov#201642371 | $50,000 |
| Feb 24, 2017 | Never finaled issued Nov 2018, no final | 16 Putnam St | Behan Construction | vertical addition.add 1 mstr bedroom & bath@attic area.raised roof.remodel (e)bath 1/fl.add frt window at bsmt.Details
vertical addition.add 1 mstr bedroom & bath@attic area.raised roof.remodel (e)bath 1/fl.add frt window at bsmt. | $50,000 |
| Dec 16, 2016 | Completed final sign-off Jul 2019 | 141 Santa Marina St | Cbs Construction Inc. | rear bldg. add unit per ordinance no. 162-16.Details
rear bldg. add unit per ordinance no. 162-16. | $130,000 |
| Dec 16, 2016 | Completed final sign-off Dec 2017 | 142 Cortland Av | Cbs Construction Inc. | legalize (e) rear unit at ground floor per ordinance no. 43-14Details
legalize (e) rear unit at ground floor per ordinance no. 43-14 | $15,000 |
| Sep 29, 2016 | Completed final sign-off Sep 2017 | 33 Retiro Wy | Behan Construction | upgrade existing stairs to the garage with new stairs dimensions. change bathroom tiles, change counter @ kitchen. bolt existing foundation, no exterior work to be done.Details
upgrade existing stairs to the garage with new stairs dimensions. change bathroom tiles, change counter @ kitchen. bolt existing foundation, no exterior work to be done. | $40,000 |
| Jan 14, 2016 | Completed final sign-off Aug 2017 | 1126 Taylor St | Aguirre & Sons Inc | soft story retrofit per 2012 iebc appendix a-4Details
soft story retrofit per 2012 iebc appendix a-4 | $31,000 |
| Jan 14, 2016 | Expired or cancelled withdrawn Jan 2018 | 1126 Taylor St | add 2 bedrooms & one bathroom @ ground floor . add new stairway connect to unit #2. new steel beam.Details
add 2 bedrooms & one bathroom @ ground floor . add new stairway connect to unit #2. new steel beam. | $18,000 | |
| Nov 10, 2015 | Completed final sign-off Mar 2017 | 16 Putnam St | Behan Construction | at (e) basement to add gym area and small computer room with half bath and storage, new stairs at existing laundry area and move laundry to (e) pantry. no exterior work to be done.Details