Bill Lau
- Listed as
- architect, authorized agent-others, designer, engineer
- Based in
- San Francisco
- On San Francisco permits
- Mar 2003 to Apr 2026
142 permits since 2000 (engineer on 121 permits, architect on 15 permits, authorized agent-others on 3 permits, designer on 3 permits): 98 completed, 7 in progress, 15 never finaled, 22 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 142.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 30, 2026 | In progress issued May 2026 | 922 Lawton St | He & Kuang Inc | remodel/ rearrange living, dining, kitchen, bedroom, bathroom & family. add two full baths. convert storage to a bedroom, add kitchenette with 2 burner stove, no oven. remove bearing wall, add flat skylight. replace all windows/door. install new water heaater & heat pump. upgrade electrical &Details
remodel/ rearrange living, dining, kitchen, bedroom, bathroom & family. add two full baths. convert storage to a bedroom, add kitchenette with 2 burner stove, no oven. remove bearing wall, add flat skylight. replace all windows/door. install new water heaater & heat pump. upgrade electrical & | $200,000 |
| Apr 28, 2026 | In progress issued Apr 2026 | 145 Garcia Av | Ray Lui Construction Inc | add a bedroom, enclose balcony, add skylights, interior remodel on the 2nd fl. legalize bedroom and playroom on the 1st fl, remodel 1st fl, add 2 bathroom and laundy on 1st fl. infill one window on the 1st floor. replace all windows/doors. replace water heater and furnace. upgrade plumb/elec.Details
add a bedroom, enclose balcony, add skylights, interior remodel on the 2nd fl. legalize bedroom and playroom on the 1st fl, remodel 1st fl, add 2 bathroom and laundy on 1st fl. infill one window on the 1st floor. replace all windows/doors. replace water heater and furnace. upgrade plumb/elec. | $250,000 |
| Nov 10, 2025 | In progress issued Nov 2025 | 761 Pine St | Cbs Construction Inc. | relocate kitchen, add bathrooms, add lights & outlets, convert dining room to bedroom w/bathrooms in each unit (761. 763 & 765 pine st).Details
relocate kitchen, add bathrooms, add lights & outlets, convert dining room to bedroom w/bathrooms in each unit (761. 763 & 765 pine st). | $250,000 |
| Nov 10, 2025 | In progress issued Nov 2025 | 1722 Ortega St | He & Kuang Inc | remodel kitchen & bath, add a new full bath, remove walls, replace 3 skylights and a window on 2nd floor; remodel bath, add kitchenette (2 burner) no oven & laundry on 1st floor; add lights & outletsDetails
remodel kitchen & bath, add a new full bath, remove walls, replace 3 skylights and a window on 2nd floor; remodel bath, add kitchenette (2 burner) no oven & laundry on 1st floor; add lights & outlets | $150,000 |
| Sep 5, 2025 | Completed final sign-off Jun 2026 | 2122 42nd Av | S And L Remodeling And Design Inc | remodel bath, add full bath, infill lightwell, add flat skylights on 2nd fl. add 2 bedroom, a bath, laundry & media w/ kitchenette (2) burner stove, hood & sink. replace window, add sliding door on 1st fl. replace garage door. relocate water heater & furnace. remove interior stairs.Details
remodel bath, add full bath, infill lightwell, add flat skylights on 2nd fl. add 2 bedroom, a bath, laundry & media w/ kitchenette (2) burner stove, hood & sink. replace window, add sliding door on 1st fl. replace garage door. relocate water heater & furnace. remove interior stairs. | $170,000 |
| Aug 8, 2025 | Completed final sign-off Aug 2026 | 2363 34th Av | L R T Construction | remodel/rearrange living, dining, kitchen, bedroom, bath, stairs, infill lightwell, add a full bath,bedroom, remove walls, add flat skylights 2nd fl. add 2 bedroom, 1 bath, media and kitchenette w 2 burner stove (no oven) hood and sink on 1st fl. replace window and door, add deck at rear less thanDetails
remodel/rearrange living, dining, kitchen, bedroom, bath, stairs, infill lightwell, add a full bath,bedroom, remove walls, add flat skylights 2nd fl. add 2 bedroom, 1 bath, media and kitchenette w 2 burner stove (no oven) hood and sink on 1st fl. replace window and door, add deck at rear less than | $200,000 |
| Jul 28, 2025 | In progress issued Jul 2025 | 2752 Buchanan St | Brighter Legacy Builders Inc. | remodel a bedroom & relocate a bath; add a bedroom, bath, media w/kitchenette w/2 burner stove & sink; replace garage door on 1st floor. remodel/rearrange living dining kitchen bedrooms & bath; add bath & laundry; infill central patio; remove walls; add flat skylights on 2nd fl. remodel/rearrangeDetails
remodel a bedroom & relocate a bath; add a bedroom, bath, media w/kitchenette w/2 burner stove & sink; replace garage door on 1st floor. remodel/rearrange living dining kitchen bedrooms & bath; add bath & laundry; infill central patio; remove walls; add flat skylights on 2nd fl. remodel/rearrange | $300,000 |
| Jun 18, 2025 | In progress issued Jun 2025 | 735 16th Av | Z Construction Company Inc | revision to pa #202401304936. change window to sliding door at a window of north side, add retaining wall and deck less than 30" ht abv grade at rear on 1st floor. no shed in yard. change layout in bathroom on 2nd floor.Details
revision to pa #202401304936. change window to sliding door at a window of north side, add retaining wall and deck less than 30" ht abv grade at rear on 1st floor. no shed in yard. change layout in bathroom on 2nd floor. | $5,000 |
| Feb 4, 2025 | Completed final sign-off May 2025 | 2 Santa Rita Av | S And L Remodeling And Design Inc | 3rd/fl:relocate wall,remodel bath & closets. remove wall,remodel kitchen,replace door and window at rear, close window on side, replace tiles and fixtures in powder room on the 2nd/fl. add counter and sinks,to remove partition wall in laundry rm 1st/flDetails
3rd/fl:relocate wall,remodel bath & closets. remove wall,remodel kitchen,replace door and window at rear, close window on side, replace tiles and fixtures in powder room on the 2nd/fl. add counter and sinks,to remove partition wall in laundry rm 1st/fl | $98,000 |
| Aug 15, 2024 | Completed final sign-off Nov 2024 | 1839 Laguna St | Brighter Legacy Builders Inc. | relocate/enlarge openings to living room; remove partition wall, replace bathroom & closet doors on 2/f. replce& relocate closet doors, laundry door; relocate partitions wall on 3/f.Details
relocate/enlarge openings to living room; remove partition wall, replace bathroom & closet doors on 2/f. replce& relocate closet doors, laundry door; relocate partitions wall on 3/f. | $15,000 |
| Aug 15, 2024 | Completed final sign-off Sep 2024 | 3464 17th St | Ray Lui Construction Inc | rev 202304115480: add/relocate skylights.relocate water heater to garage.no need fire rated door & wall in laundry room change to double vanities, switch toilet & vanity in unit 3464 on 4/f. remove partition walls, relocate side door, close window,add closet under stairs on 1/f.Details
rev 202304115480: add/relocate skylights.relocate water heater to garage.no need fire rated door & wall in laundry room change to double vanities, switch toilet & vanity in unit 3464 on 4/f. remove partition walls, relocate side door, close window,add closet under stairs on 1/f. | |
| Aug 15, 2024 | Completed final sign-off Sep 2024 | 3462 17th St | Ray Lui Construction Inc | rev 202304115485: switch toilet & vanity, change to double vanites,relocate water heater to ground floor, no need fire-rated door & wall in laundry room. change pocket doors to hinged doors.Details
rev 202304115485: switch toilet & vanity, change to double vanites,relocate water heater to ground floor, no need fire-rated door & wall in laundry room. change pocket doors to hinged doors. | |
| Jul 17, 2024 | Completed final sign-off Feb 2026 | 1354 29th Av | Zhou's International Inc. | remodel/rearrange kitchen,bath,rooms.stairs,infill lightwell;add a full bath;add flat skylights.add 2 beds,2 baths,media on 1/f.add deck & doors at rear.replace wdws w/ alum wood-clad in-kind at front;wdws & doors at rear;garage dr,wh &furn;elec & plumb upgrades.replace roof.Details
remodel/rearrange kitchen,bath,rooms.stairs,infill lightwell;add a full bath;add flat skylights.add 2 beds,2 baths,media on 1/f.add deck & doors at rear.replace wdws w/ alum wood-clad in-kind at front;wdws & doors at rear;garage dr,wh &furn;elec & plumb upgrades.replace roof. | $160,000 |
| Jun 26, 2024 | Expired or cancelled withdrawn Jul 2025 | 2315 17th Av | comply w/nov 202033561 remodel/rearrange living, dining, kitche, bedrooms, bath & stairs; add a full bath & bedrm; remove walls; add flat skylights on 2nd fl; add study, media, family & 2 bath; add bar sink on 1st fl; replace window/door @ rear; replace water heater, furnace. upgrade electrical &Details
comply w/nov 202033561 remodel/rearrange living, dining, kitche, bedrooms, bath & stairs; add a full bath & bedrm; remove walls; add flat skylights on 2nd fl; add study, media, family & 2 bath; add bar sink on 1st fl; replace window/door @ rear; replace water heater, furnace. upgrade electrical & | $250,000 | |
| Jan 30, 2024 | In progress issued Apr 2024 | 735 16th Av | Z Construction Company Inc | relocate kitchen & stairs; remodel bath, living & dining; add a full bath & 1/2 bath.add skylights on 2/f.remove stairs;legalize beds,full bth & family; infill lightwell & add full bath on 1/f. replace w/ wood doors,alum wood-clad wdws at front; replace roof; add shedd less than 8' ht & <100sf.Details
relocate kitchen & stairs; remodel bath, living & dining; add a full bath & 1/2 bath.add skylights on 2/f.remove stairs;legalize beds,full bth & family; infill lightwell & add full bath on 1/f. replace w/ wood doors,alum wood-clad wdws at front; replace roof; add shedd less than 8' ht & <100sf. | $250,000 |
| Nov 21, 2023 | Expired or cancelled cancelled Mar 2024 | 722 Masonic Av | Brighter Legacy Builders Inc. | revise approved pa# 202309136474. change bathroom layout. remove sink on island on 2nd floor. replace foundation in garage.Details
revise approved pa# 202309136474. change bathroom layout. remove sink on island on 2nd floor. replace foundation in garage. | $15,000 |
| Nov 21, 2023 | Completed final sign-off Jul 2025 | 326 10th Av | He & Kuang Inc | comply novv 202287556. remodel rearrange livinig, dining, kitchen,bedroo, bath, stairs,full bath, office. remove walls, infill lightwells, remove sundroom,add deck, stairs 2nd fl. remodel 2 bedroom, bath, playrm.add kitchenette w2 burner stove,no oven,hood,sink. add full bath 1st fl. replace windowsDetails
comply novv 202287556. remodel rearrange livinig, dining, kitchen,bedroo, bath, stairs,full bath, office. remove walls, infill lightwells, remove sundroom,add deck, stairs 2nd fl. remodel 2 bedroom, bath, playrm.add kitchenette w2 burner stove,no oven,hood,sink. add full bath 1st fl. replace windows | $120,000 |
| Sep 27, 2023 | Completed final sign-off Dec 2023 | 2614 25th Av | add a deck at rear on 2nd floor. replace 2 windows to sliding doors at rear.Details
add a deck at rear on 2nd floor. replace 2 windows to sliding doors at rear. | $20,000 | |
| Jul 17, 2023 | Completed final sign-off Oct 2024 | 839 Garfield St | 2nd/fl: remodel/rearrange living, dining, kitchen, bath, add a full bath, remove walls & stairs, in-fill lightwell, add skylight. 1st fl: add 2 bedrooms, 2 bathrooms, media, kitchenette with 2 burners, hood, sinks., no oven. repair/replace front stucco as needed. update electric and plumbingDetails
2nd/fl: remodel/rearrange living, dining, kitchen, bath, add a full bath, remove walls & stairs, in-fill lightwell, add skylight. 1st fl: add 2 bedrooms, 2 bathrooms, media, kitchenette with 2 burners, hood, sinks., no oven. repair/replace front stucco as needed. update electric and plumbing | $120,000 | |
| Jun 23, 2023 | Never finaled issued Jun 2023, no final | 2034 44th Av | remodel bath. remove fireplace & wall. replace skylight. add deck & stair ar rear. change to french door to deck on 2nd fl. add full bath & media. convert (e) bedroom to family with kitchenette. relocate front door on 1st fl. replace water heater, furnace. upgrade electrical & plumbing system.Details
remodel bath. remove fireplace & wall. replace skylight. add deck & stair ar rear. change to french door to deck on 2nd fl. add full bath & media. convert (e) bedroom to family with kitchenette. relocate front door on 1st fl. replace water heater, furnace. upgrade electrical & plumbing system. | $120,000 | |
| May 26, 2023 | Completed final sign-off Jan 2024 | 145 Farragut Av | I Z M C Construction Inc | add deck & stairs at rear on 2/f. add 2 bedrooms, 2 full bathrooms & media room with kitchenette on 1/f. upgrade electrical & plumbing system.Details
add deck & stairs at rear on 2/f. add 2 bedrooms, 2 full bathrooms & media room with kitchenette on 1/f. upgrade electrical & plumbing system. | $100,000 |
| Apr 11, 2023 | Completed final sign-off Sep 2024 | 3462 17th St | Ray Lui Construction Inc | remodel/rearrange rooms, bath & kitchen; add 2 full bath & laundry, add lights; replace water heater & furnace; update electrical & plumbing sys on 3rd fl.Details
remodel/rearrange rooms, bath & kitchen; add 2 full bath & laundry, add lights; replace water heater & furnace; update electrical & plumbing sys on 3rd fl. | $100,000 |
| Feb 15, 2023 | Completed final sign-off Dec 2023 | 2195 40th Av | Fogarty James A | 2/f: remodel/rearrange living, dining, bedrooms, and bath. add a full bath, removed walls and add flat skylights. 1/f: add 2 bedrooms, a full bath. replace/add new windows/doors with aluminum clad wood windows/doors. repair siding, replace waster heater and furnance. upgrade electrical/plumbing.Details
2/f: remodel/rearrange living, dining, bedrooms, and bath. add a full bath, removed walls and add flat skylights. 1/f: add 2 bedrooms, a full bath. replace/add new windows/doors with aluminum clad wood windows/doors. repair siding, replace waster heater and furnance. upgrade electrical/plumbing. | $100,000 |
| Dec 16, 2022 | Completed final sign-off Sep 2023 | 235 Rutledge St | Edri Construction Inc *See Notes* | add a bedroom, a full bathroom & kitcheneete, relocate entry doors, add windows & doors at reat on 1st floor, replace water heater, hvac, upgrade electrical & plumbing systems.Details
add a bedroom, a full bathroom & kitcheneete, relocate entry doors, add windows & doors at reat on 1st floor, replace water heater, hvac, upgrade electrical & plumbing systems. | $100,000 |
| Oct 21, 2022 | Completed final sign-off Jun 2023 | 3731 Kirkham St | legalize 2 bedrooms and a bath, add 2 bathrooms on 1st floor. convert dining to bedroom on 2nd floor, relocate water heater and furnace upgrade electrical and plumbing system.Details
legalize 2 bedrooms and a bath, add 2 bathrooms on 1st floor. convert dining to bedroom on 2nd floor, relocate water heater and furnace upgrade electrical and plumbing system. | $100,000 | |
| Sep 6, 2022 | Completed final sign-off Sep 2022 | 1431 15th Av | Zhou's International Inc. | rev to pa 202104158579. reduce scope - eliminate proposed foundation work along south property line at rear.Details
rev to pa 202104158579. reduce scope - eliminate proposed foundation work along south property line at rear. | |
| Sep 6, 2022 | Completed final sign-off Apr 2023 | 2267 45th Av | Zhou's International Inc. | replace windows and dooor at rear, add a deck & stiars at rear on 2/f. rearrange rooms including a full bathroom, family, kitchenette 2 burner stove, no oven. enclose below sunroom to be a bedroom.replace/relocate entry door on 1/f. replace water heater, funace, upgrade electrical & plumbing system.Details
replace windows and dooor at rear, add a deck & stiars at rear on 2/f. rearrange rooms including a full bathroom, family, kitchenette 2 burner stove, no oven. enclose below sunroom to be a bedroom.replace/relocate entry door on 1/f. replace water heater, funace, upgrade electrical & plumbing system. | $100,000 |
| Jun 28, 2022 | Completed final sign-off Oct 2024 | 67 Inverness Dr | Yes General Construction Builder Llc | remodel/relocate kitchen/bath, stairs, add full bath and bedroom. infill lightwell & patio. convert door to aluminum clad wood window at front on 2nd fl. remodel/relocate bath & bedroom. add bedroom & media. add kitchenette with 2 burner stove, no oven. add hood, sink & fridge on 1st fl.Details
remodel/relocate kitchen/bath, stairs, add full bath and bedroom. infill lightwell & patio. convert door to aluminum clad wood window at front on 2nd fl. remodel/relocate bath & bedroom. add bedroom & media. add kitchenette with 2 burner stove, no oven. add hood, sink & fridge on 1st fl. | $150,000 |
| May 17, 2022 | Completed final sign-off Apr 2023 | 1651 Burrows St | Edri Construction Inc *See Notes* | remodel kitchen & bath. remove walls. replace with aluminum clad wood windows in kitchen on 2nd fl. remodel bath on 1st fl.Details
remodel kitchen & bath. remove walls. replace with aluminum clad wood windows in kitchen on 2nd fl. remodel bath on 1st fl. | $60,000 |
| Mar 31, 2022 | Completed final sign-off Feb 2023 | 151 Venus St | Rockland Construction Group Inc | remodel/relocate kitchen and bath, add full bath, relocate stairs enclose patio, remove walls, add a deck and stair at rear on 2nd floor. add 2 bedroom, a full bath, media and kitchenette on 1st floor. replace w/ aluminum windows and entry door at front. replace vinyl doors at rear. replace water heDetails
remodel/relocate kitchen and bath, add full bath, relocate stairs enclose patio, remove walls, add a deck and stair at rear on 2nd floor. add 2 bedroom, a full bath, media and kitchenette on 1st floor. replace w/ aluminum windows and entry door at front. replace vinyl doors at rear. replace water he | $200,000 |
| Dec 20, 2021 | Completed final sign-off Jun 2022 | 15 Hemway Tr | Zhou's International Inc. | remodel kitchen and bath add a bath on 3rd fl. infill lightwell on 2nd & 3rd fl.Details
remodel kitchen and bath add a bath on 3rd fl. infill lightwell on 2nd & 3rd fl. | $45,000 |
| Dec 2, 2021 | Expired or cancelled cancelled Jan 2026 | 1454 48th Av | all work @ rear building only. lower unit: add 2 bathrooms, add 1 study rm,1 media room, 1 laumdry & 1 family room. uppper unit: add 1 bathroom & 1 bedroom.Details
all work @ rear building only. lower unit: add 2 bathrooms, add 1 study rm,1 media room, 1 laumdry & 1 family room. uppper unit: add 1 bathroom & 1 bedroom. | $100,000 | |
| Nov 12, 2021 | Completed final sign-off Jun 2022 | 323 16th Av | rev to pa202010237205 to enclose below sunroom& add sink and counter, enlarge kitchen counter & add french door to sunroom. replace tub with shower & replace closets by wardroves, replace with hard board siding at rear.Details
rev to pa202010237205 to enclose below sunroom& add sink and counter, enlarge kitchen counter & add french door to sunroom. replace tub with shower & replace closets by wardroves, replace with hard board siding at rear. | $30,000 | |
| Oct 28, 2021 | Completed final sign-off Dec 2023 | 2114 26th Av | infill central patio, remodel/relocate kitchen& bath, add new bath & den on 2/f. add study and office, media & kitchenette , a full bathoom on 1/f. replce water heater/furnace, upgrade electrical & plumbing. replace roof.Details
infill central patio, remodel/relocate kitchen& bath, add new bath & den on 2/f. add study and office, media & kitchenette , a full bathoom on 1/f. replce water heater/furnace, upgrade electrical & plumbing. replace roof. | $140,000 | |
| Sep 15, 2021 | Completed final sign-off Apr 2022 | 718 Pine St | add a bathroom on 4th floor. add french door at living room. add a bathroom on 2nd floor.Details
add a bathroom on 4th floor. add french door at living room. add a bathroom on 2nd floor. | $15,000 | |
| Sep 7, 2021 | Completed final sign-off Mar 2023 | 1211 39th Av | Tam And Sons Inc | comply w/complaint #202179616 rearange rooms, stairs remodel kitchen & bath, add bath on 2nd & 3rd fl. add bedroom a full bathroom & study on 1st fl. relocate/replace door w/ aluminum and wood windows/door at front, replace windows/door w/vinyl at rear update plumbing and electricalDetails
comply w/complaint #202179616 rearange rooms, stairs remodel kitchen & bath, add bath on 2nd & 3rd fl. add bedroom a full bathroom & study on 1st fl. relocate/replace door w/ aluminum and wood windows/door at front, replace windows/door w/vinyl at rear update plumbing and electrical | $180,000 |
| Aug 30, 2021 | Never finaled issued Oct 2021, no final | 2626 Griffith St | revision to site permit 201601046276 to revise ab-005 to document rear yard exit as 18'9"Details
revision to site permit 201601046276 to revise ab-005 to document rear yard exit as 18'9" | ||
| Apr 15, 2021 | Completed final sign-off Sep 2022 | 1431 15th Av | Zhou's International Inc. | remod/replace kitchen & bath, stairway & infill lightwell, remove wall, add fullbath, desk at rearat 2nd fl, add two bedrm & media, infill below sunrm, replace/relocate garagedoor, entrace door at 1st fl, replace alumium clad wood window at fron & vinyl at rear, replace waer & furnace, replace roof.Details
remod/replace kitchen & bath, stairway & infill lightwell, remove wall, add fullbath, desk at rearat 2nd fl, add two bedrm & media, infill below sunrm, replace/relocate garagedoor, entrace door at 1st fl, replace alumium clad wood window at fron & vinyl at rear, replace waer & furnace, replace roof. | $120,000 |
| Mar 22, 2021 | Completed final sign-off Nov 2021 | 40 Homewood Ct | rearrange bedrooms, relocate/remodel kitchen & bathrooms, relocate stairs. add a bedroom, office, family & full bath on 1st fl. replace front & side windows with aluminum clad wood windows. replace garage door & roof. upgrade electrical & plumbing.Details
rearrange bedrooms, relocate/remodel kitchen & bathrooms, relocate stairs. add a bedroom, office, family & full bath on 1st fl. replace front & side windows with aluminum clad wood windows. replace garage door & roof. upgrade electrical & plumbing. | $200,000 | |
| Mar 22, 2021 | Completed final sign-off Aug 2021 | 2921 Judah St | C & K Housing Const Co *Ck Id* | add a family room & a full bath on 1st fl. add vinyl window & door at rear. relocate/replace water heater, furnace & entry door. upgrade electrical & plumbing system.Details
add a family room & a full bath on 1st fl. add vinyl window & door at rear. relocate/replace water heater, furnace & entry door. upgrade electrical & plumbing system. | $50,000 |
| Oct 23, 2020 | Completed final sign-off Jun 2022 | 323 16th Av | He & Kuang Inc | remodel (e) bathrooms & add a full bathroom on 3/f. on 2/f: remodel kitchen, add a 1/2 bath, remove wall, replace stairs to 1/f. remove non-permitted structural and stairs & convert back to original at rear. add storage on1/f. replace windows/door at rear. door at front. relcate water heater/furnaceDetails
remodel (e) bathrooms & add a full bathroom on 3/f. on 2/f: remodel kitchen, add a 1/2 bath, remove wall, replace stairs to 1/f. remove non-permitted structural and stairs & convert back to original at rear. add storage on1/f. replace windows/door at rear. door at front. relcate water heater/furnace | $95,000 |
| Sep 23, 2020 | Completed final sign-off May 2023 | 1348 Douglass St | Tsl Construction & Consultant Inc, Pilot Construction Management Inc | remodel kitchen, relocate bathroom, add 1/2 bathroom.replace stairs & skylights, remove walls, rearrange rooms. add deck on 2/f. add 3 bedrooms, 2 full bathrs, family, relocate garage door on 1/f. replace windows with alum-clad wood. replace stucco & room. replace wather heater, furnace. upgrade e&pDetails
remodel kitchen, relocate bathroom, add 1/2 bathroom.replace stairs & skylights, remove walls, rearrange rooms. add deck on 2/f. add 3 bedrooms, 2 full bathrs, family, relocate garage door on 1/f. replace windows with alum-clad wood. replace stucco & room. replace wather heater, furnace. upgrade e&p | $150,000 |
| Aug 15, 2020 | Completed final sign-off May 2022 | 221 Ashbury St | Brighter Legacy Builders Inc. | rev to pa202002114059: reduce scope of work. remodel kitchen and bathroom, add a new bathroom and relocate washer/dryer in unit 221.delete partition, cancel relocate bath and remodel extg instead and cancel windows.Details
rev to pa202002114059: reduce scope of work. remodel kitchen and bathroom, add a new bathroom and relocate washer/dryer in unit 221.delete partition, cancel relocate bath and remodel extg instead and cancel windows. | |
| Feb 11, 2020 | Completed final sign-off Sep 2020 | 821 Broderick St | relocate kitchen, remodel bath, add a full bath, replace windows (2) @ rear in unit #6.Details
relocate kitchen, remodel bath, add a full bath, replace windows (2) @ rear in unit #6. | $48,000 | |
| Jan 31, 2020 | Completed final sign-off Sep 2020 | 55 Arco Wy | remodel kitchen & remove wall & fireplace, remodel bath, add (n) bath, enclose lightwell, add skylight on 2nd fl; add family, bedroom, storage & 2 full baths on 1st fl; replace water heater, furnace, upgrade electrical & plumbing systemDetails
remodel kitchen & remove wall & fireplace, remodel bath, add (n) bath, enclose lightwell, add skylight on 2nd fl; add family, bedroom, storage & 2 full baths on 1st fl; replace water heater, furnace, upgrade electrical & plumbing system | $98,000 | |
| Jan 31, 2020 | Completed final sign-off Oct 2020 | 2538 21st Av | Hong's General Construction Inc | remodel/relocate kitchen & bath, add a full bath & bedroom, relocate/replace stairs. infill lightwell, add a deck & stair @ rear on 2nd floor. add two bedrooms, 2 full bath, media & laundry, replace garage door on 1st floor. replace aluminum clad wood windows @ front. replace water heater/furnace.Details
remodel/relocate kitchen & bath, add a full bath & bedroom, relocate/replace stairs. infill lightwell, add a deck & stair @ rear on 2nd floor. add two bedrooms, 2 full bath, media & laundry, replace garage door on 1st floor. replace aluminum clad wood windows @ front. replace water heater/furnace. | $150,000 |
| Dec 30, 2019 | Completed final sign-off May 2023 | 1855 23rd Av | Ray Lui Construction Inc | adu per ord 95-17 including living, litchen, 2 full bath& 2 bedrm, replace roof, front door at 1st fl, remodel/relocate kitchen, bath, add full bath & bedrm, remove stairs, infill patio & lightwell, add new lightwell, deck & stairs at rear, replace door to window at 2nd fl, replace w/ aluminum cladDetails
adu per ord 95-17 including living, litchen, 2 full bath& 2 bedrm, replace roof, front door at 1st fl, remodel/relocate kitchen, bath, add full bath & bedrm, remove stairs, infill patio & lightwell, add new lightwell, deck & stairs at rear, replace door to window at 2nd fl, replace w/ aluminum clad | $150,000 |
| Oct 30, 2019 | Expired or cancelled withdrawn Mar 2021 | 579 Naples St | convert 1st floor arear to new 2nd unit. including 2 bedrooms kitchen/dining and media. ordiance 95-17.Details
convert 1st floor arear to new 2nd unit. including 2 bedrooms kitchen/dining and media. ordiance 95-17. | $5,000 | |
| Oct 28, 2019 | Expired or cancelled cancelled May 2023 | 1774 27th Av | legalize 2nd unit including living, kitchen, 2bedrm, 2 fullbath &study on 1st fl per ord 43-14, remodel/relocate kitchen & bath, add a full bath @ lightwell, relocate stairs, add a deck @ rear on 2nd fl, replace water heate, upgrade elect & plumbDetails
legalize 2nd unit including living, kitchen, 2bedrm, 2 fullbath &study on 1st fl per ord 43-14, remodel/relocate kitchen & bath, add a full bath @ lightwell, relocate stairs, add a deck @ rear on 2nd fl, replace water heate, upgrade elect & plumb | $120,000 | |
| Jul 1, 2019 | Expired or cancelled cancelled Jan 2026 | 1287 33rd Av | 1) add 1 unit at ground floor include living/kitchen/bed area and one full bath. (unit #2). 2)remodel extg 2nd floor rear partition in (unit 1) 3)remodel extg 3rd floor master bath (unit 1)Details
1) add 1 unit at ground floor include living/kitchen/bed area and one full bath. (unit #2). 2)remodel extg 2nd floor rear partition in (unit 1) 3)remodel extg 3rd floor master bath (unit 1) | $20,000 | |
| Jun 24, 2019 | Completed final sign-off Jun 2020 | 62 Otsego Av | relocate kitchen & stairs, remodel bath, add a full bath; skylight, deck & stairs on 2nd floor; add 2 bedrooms, 2 full bath, media, side door on 1st fl; replace w/aluminum clad windows @ front, vinyl at arear. replace water heater/furnace, upgrade electrical & plumbingDetails
relocate kitchen & stairs, remodel bath, add a full bath; skylight, deck & stairs on 2nd floor; add 2 bedrooms, 2 full bath, media, side door on 1st fl; replace w/aluminum clad windows @ front, vinyl at arear. replace water heater/furnace, upgrade electrical & plumbing | $120,000 | |
| Jun 14, 2019 | Never finaled filed Jun 2019, never issued | 454 Ralston St | additional dwelling unit on 2nd flr per ordinance 95-17, new separation wall on 1st fl. new kitchen on second floor. ref pa# 2014-0127-7177, 2018-0515-9200 & 2018-1113-5667.Details
additional dwelling unit on 2nd flr per ordinance 95-17, new separation wall on 1st fl. new kitchen on second floor. ref pa# 2014-0127-7177, 2018-0515-9200 & 2018-1113-5667. | $8,000 | |
| Jun 3, 2019 | Completed final sign-off May 2021 | 2243 31st Av | Yes General Construction Builder Llc | legalize bedroom & family room, add a full bath, replace foundation at 1st flr. replace rear windows w/ vinyl windows. replace water heater, furnace, upgrade electrical & plumbing system.Details
legalize bedroom & family room, add a full bath, replace foundation at 1st flr. replace rear windows w/ vinyl windows. replace water heater, furnace, upgrade electrical & plumbing system. | $50,000 |
| May 24, 2019 | Completed final sign-off Oct 2021 | 647 35th Av | M&T Construction Inc | legalize 1st flr area as additional unit #3 per ord# 43-14, including kitchen, living, bathroom & 2 bedrooms. add water heater, furnace & washer/dryer.Details
legalize 1st flr area as additional unit #3 per ord# 43-14, including kitchen, living, bathroom & 2 bedrooms. add water heater, furnace & washer/dryer. | $50,000 |
| Mar 13, 2019 | Completed final sign-off Jan 2020 | 180 Parker Av | He & Kuang Inc | remodel/relocate kitchen, add a full bath, re-arrange rooms on 2nd fl; add rooms & a full bath on 1st fl. relocate water heater and furnaceDetails
remodel/relocate kitchen, add a full bath, re-arrange rooms on 2nd fl; add rooms & a full bath on 1st fl. relocate water heater and furnace | $5,800 |
| Feb 5, 2019 | Completed final sign-off Jan 2021 | 866 39th Av | Zhou's International Inc. | remodel/relocate (e) kitchen, bathrm & stairs, add a full bathrm. enclose (e) lightwell; add skylights on 2/f. add 2 bedrms, media room, full bathroom. relocate dervice door, add deck on 1/f. replace alum clad wood win on front. replace garage door. replace vinyl windows/door at rear. replace roof.Details
remodel/relocate (e) kitchen, bathrm & stairs, add a full bathrm. enclose (e) lightwell; add skylights on 2/f. add 2 bedrms, media room, full bathroom. relocate dervice door, add deck on 1/f. replace alum clad wood win on front. replace garage door. replace vinyl windows/door at rear. replace roof. | $100,000 |
| Dec 4, 2018 | Never finaled filed Dec 2018, never issued | 1277 30th Av | comply w/ complaint/nov 201883921 & 201883921 per ord# 43-14. legalize rooms, bathrooms & kitchen on 1st flr as 2nd unit.Details
comply w/ complaint/nov 201883921 & 201883921 per ord# 43-14. legalize rooms, bathrooms & kitchen on 1st flr as 2nd unit. | $80,000 | |
| Nov 15, 2018 | Completed final sign-off Sep 2019 | 11 San Jacinto Wy | Ka Keung Chan Dba K K Construction | remodel 2 bathrooms and a (n) bathroom at upper floorDetails
remodel 2 bathrooms and a (n) bathroom at upper floor | $40,000 |
| Apr 19, 2018 | Completed final sign-off Mar 2019 | 2115 Noriega St | He & Kuang Inc | infill lightwell, add skylight on 2nd floor. remove interior stairs. add bedroom, family & full bath on 1st floor. replace with vinyl windows at rear. replace water heater, furnace. upgrade electrical & plumbing systemDetails
infill lightwell, add skylight on 2nd floor. remove interior stairs. add bedroom, family & full bath on 1st floor. replace with vinyl windows at rear. replace water heater, furnace. upgrade electrical & plumbing system | $70,000 |
| Dec 28, 2017 | Completed final sign-off Jul 2019 | 2345 Divisadero St | Zhou's International Inc. | revision to pa #201709279695 - rearrange bath on 3rd floor. add interior stairs, 2 bedrooms, 2 full baths, a family room on 1st floor. infill partial lightwell. relocate water heaters, furnaces, wash/dryer. replace foundation.Details
revision to pa #201709279695 - rearrange bath on 3rd floor. add interior stairs, 2 bedrooms, 2 full baths, a family room on 1st floor. infill partial lightwell. relocate water heaters, furnaces, wash/dryer. replace foundation. | $100,000 |
| Dec 15, 2017 | Completed final sign-off Jul 2020 | 2463 19th Av | Yao Star Construction | legalize 1st fl as 2nd unit including 3 beds,3 full baths,kitchen, dining and living.remodel kitchen and bath, add 2 full bath, relocate stairs, remove walls & add flat skylights on 2nd fl. enlarge garage door. replace w/aluminum clad wood windows at front & side,vinyl winddows at rear.Details
legalize 1st fl as 2nd unit including 3 beds,3 full baths,kitchen, dining and living.remodel kitchen and bath, add 2 full bath, relocate stairs, remove walls & add flat skylights on 2nd fl. enlarge garage door. replace w/aluminum clad wood windows at front & side,vinyl winddows at rear. | $120,000 |
| Nov 21, 2017 | Completed final sign-off Mar 2021 | 1287 33rd Av | Z Construction Company Inc | ground flr horizontal addition. add family rm & bath @ grnd flr. add toilet rm @ 2nd flr. add full bath @ 3rd flr. remodel (e) 2nd & 3rd flrs. (n) rear deck and stair.Details
ground flr horizontal addition. add family rm & bath @ grnd flr. add toilet rm @ 2nd flr. add full bath @ 3rd flr. remodel (e) 2nd & 3rd flrs. (n) rear deck and stair. | $70,000 |
| Sep 27, 2017 | Completed final sign-off Jul 2019 | 2345 Divisadero St | remodel kitchen & 1/2 bath on 2/f, add 2 bathroom, remodel a bath walk-in closet on 3/f, add a full bath, remodel (e) bath on 4/f, replace doors & windows at rear, add lights, outlets, relocater water heater/furnace, upgrade electrical/plumbing, add skylignt, not visable from streetDetails
remodel kitchen & 1/2 bath on 2/f, add 2 bathroom, remodel a bath walk-in closet on 3/f, add a full bath, remodel (e) bath on 4/f, replace doors & windows at rear, add lights, outlets, relocater water heater/furnace, upgrade electrical/plumbing, add skylignt, not visable from street | $160,000 | |
| Jul 31, 2017 | Completed final sign-off Feb 2018 | 2115 16th Av | Rockland Construction Group Inc | remodel/relocate kitchen & bath, add a full bath, convert dining to bedroom, remove interior stairs, replace main stairs, add skylight on 2/f, add family/study/2 full bath, entry doors on 1/fl, replace with aluminum clad wood windows in kind @ front, vinyl window @ rear, replace water heater,furnaceDetails
remodel/relocate kitchen & bath, add a full bath, convert dining to bedroom, remove interior stairs, replace main stairs, add skylight on 2/f, add family/study/2 full bath, entry doors on 1/fl, replace with aluminum clad wood windows in kind @ front, vinyl window @ rear, replace water heater,furnace | $98,000 |
| Jul 11, 2017 | Completed final sign-off Jan 2018 | 1963 43rd Av | add bedroom, family rm, laundry, full bath, infill area below bedroom 1st fl. remodel front entry, relocate water heater, furnace. upgrade elec, plumbing systemDetails
add bedroom, family rm, laundry, full bath, infill area below bedroom 1st fl. remodel front entry, relocate water heater, furnace. upgrade elec, plumbing system | $70,000 | |
| Jun 27, 2017 | Completed final sign-off Jun 2018 | 1474 34th Av | He & Kuang Inc | infill central patio, add a full bath & bedroom, relocate stairs, remodel ktichen/bath, remove walls, add deck on 2nd floor. add 2 bedrooms, 2 full baths, 2 storages, add entry door on 1st floor. replace front window with aluminum clad wood windows, all other window/door with vinyl. replace roof.Details
infill central patio, add a full bath & bedroom, relocate stairs, remodel ktichen/bath, remove walls, add deck on 2nd floor. add 2 bedrooms, 2 full baths, 2 storages, add entry door on 1st floor. replace front window with aluminum clad wood windows, all other window/door with vinyl. replace roof. | $110,000 |
| Jun 19, 2017 | Completed final sign-off Jun 2018 | 1628 Cayuga Av | Kelvin Construction | convert kitchen to bedroom, relodate kitchen and add 2 full bath on 2nd fl. infill below bedroom, add 2 bedrooms, 2 full bath, storage, laundry, add a door at front of ground floor. add deck & stairs at rear. replace windows at rear. upgrade electrical, plumbing system. relocate water heater/furnaceDetails
convert kitchen to bedroom, relodate kitchen and add 2 full bath on 2nd fl. infill below bedroom, add 2 bedrooms, 2 full bath, storage, laundry, add a door at front of ground floor. add deck & stairs at rear. replace windows at rear. upgrade electrical, plumbing system. relocate water heater/furnace | $12,000 |
| Jun 19, 2017 | Completed final sign-off May 2018 | 2010 23rd Av | Zhou's International Inc. | remodel kitchen & bath, add full bath, replace stairs, infill patio, add lightwell on 2nd fl. add bath & deck at penthouse. convert rms to bedrms, add media & storage, relocate full bath on garage & 1st fl. replace front windows w/aluminum clad wood windows. other windows w/vinyl. replace plumbing,Details
remodel kitchen & bath, add full bath, replace stairs, infill patio, add lightwell on 2nd fl. add bath & deck at penthouse. convert rms to bedrms, add media & storage, relocate full bath on garage & 1st fl. replace front windows w/aluminum clad wood windows. other windows w/vinyl. replace plumbing, | $90,000 |
| Jun 7, 2017 | Completed final sign-off Sep 2019 | 840 Monterey Bl | comply with nov #201780911, 200876639, 200875573.legalize 2nd unit incl kitchen,living rm,dining,3bdrms,3bath,family,laundry on 1/fl.remove stairs.remodel kitchen/bath.add a new full bath,remove bearing wall on 2/flr.replace front windows w/alum clad, others w/vinyl windows.upgrade elec/plumb.Details
comply with nov #201780911, 200876639, 200875573.legalize 2nd unit incl kitchen,living rm,dining,3bdrms,3bath,family,laundry on 1/fl.remove stairs.remodel kitchen/bath.add a new full bath,remove bearing wall on 2/flr.replace front windows w/alum clad, others w/vinyl windows.upgrade elec/plumb. | $150,000 | |
| Jun 7, 2017 | Completed final sign-off Aug 2018 | 1939 18th Av | Soon Yu Construction | add a bedroom, family rm, laundry & full bath. remove interior stairs & convert it to closet. remodel (e) bath & kitchen on 2ns flr. replace front window w/alum clad wood windows. replace other window w/vinyl. relocate water heater/furn. remove rear stairs.Details
add a bedroom, family rm, laundry & full bath. remove interior stairs & convert it to closet. remodel (e) bath & kitchen on 2ns flr. replace front window w/alum clad wood windows. replace other window w/vinyl. relocate water heater/furn. remove rear stairs. | $108,000 |
| May 26, 2017 | Expired or cancelled expired Jul 2023 | 647 Masonic Av | Hungto Co Incorporation | add unit per ord #162-16. add unit on 1st fl, add (2) bedrooms, (1) bathroom, (1) living room, (1) kitchen.Details
add unit per ord #162-16. add unit on 1st fl, add (2) bedrooms, (1) bathroom, (1) living room, (1) kitchen. | $40,000 |
| May 2, 2017 | Expired or cancelled withdrawn Mar 2023 | 556 Ellington Av | erect a 3 story type v construction single family dwelling.Details
erect a 3 story type v construction single family dwelling. | $300,000 | |
| Mar 15, 2017 | Never finaled filed Mar 2017, never issued | 570 25th Av | horizontal addition at the rear of the existing building, add 3 bathroom, 2 master bed rooms, addition dwelling unit on 1st floor.Details
horizontal addition at the rear of the existing building, add 3 bathroom, 2 master bed rooms, addition dwelling unit on 1st floor. | $50,000 | |
| Mar 7, 2017 | Never finaled issued Oct 2019, no final | 13 Surrey St | Ecowave Inc | interior remodel unit b. relocation 1 each existing bathroom, remodel kitchen, new sheetrock for entire unit. no exterior work. no building expansion.Details
interior remodel unit b. relocation 1 each existing bathroom, remodel kitchen, new sheetrock for entire unit. no exterior work. no building expansion. | $20,000 |
| Feb 24, 2017 | Expired or cancelled withdrawn Mar 2022 | 130 Midcrest Wy | horizontal addition 3 story @ rear including 3 new bedrooms, 4 new bathrooms, family, living & dining. add deck & stair @ rear.Details
horizontal addition 3 story @ rear including 3 new bedrooms, 4 new bathrooms, family, living & dining. add deck & stair @ rear. | $180,000 | |
| Feb 10, 2017 | Expired or cancelled cancelled Jun 2025 | 439 Duboce Av | change of use on 1st floor. from laundry shop to residential unit. add 3 bedrooms, 3 bathrooms, 1 kitchen and 1 living room. sprinklers to nfpa-13r on separate addendum.Details
change of use on 1st floor. from laundry shop to residential unit. add 3 bedrooms, 3 bathrooms, 1 kitchen and 1 living room. sprinklers to nfpa-13r on separate addendum. | $30,000 | |
| Feb 2, 2017 | Completed final sign-off Dec 2017 | 456 Princeton St | Zhen G Yu | infill area below bedroom, add bedroom, family, storage, office & two full baths on 1st floor. add deck & stairs at rear. replace windows/doors. relocate water heater & furnace.Details
infill area below bedroom, add bedroom, family, storage, office & two full baths on 1st floor. add deck & stairs at rear. replace windows/doors. relocate water heater & furnace. | $65,000 |
| Feb 2, 2017 | Completed final sign-off May 2017 | 27 Sylvan Dr | Evergreen Construction Company | remodel kitchen, replace fixtures in bathrooms, remove stairs & partition wall on 2nd floor. add 2 bedrooms, 2 full bathrooms, 2 storage, remove partition wall, add entry door on 1st floor. relocate water heater, furnace, upgrade electrical & plumbing system.Details
remodel kitchen, replace fixtures in bathrooms, remove stairs & partition wall on 2nd floor. add 2 bedrooms, 2 full bathrooms, 2 storage, remove partition wall, add entry door on 1st floor. relocate water heater, furnace, upgrade electrical & plumbing system. | $70,000 |
| Dec 29, 2016 | Completed final sign-off Jun 2021 | 1235 Bay St | K L W Construction Inc | add one unit #14 on ground floor and remodel one unit #13 on ground floor. ref app#201608114818 for mandatory soft story per ordinance no. 66-13. fire alarm system & notification device as need to comply w/ ordinance. add unit per ordinance nos. 162-16, 95-17 & 162-17.Details
add one unit #14 on ground floor and remodel one unit #13 on ground floor. ref app#201608114818 for mandatory soft story per ordinance no. 66-13. fire alarm system & notification device as need to comply w/ ordinance. add unit per ordinance nos. 162-16, 95-17 & 162-17. | $26,000 |
| Nov 8, 2016 | Completed final sign-off Jun 2018 | 2727 34th Av | Peter G Low | legalize rooms on 1st flr as 2nd unit including 3 bdrms, 2 bath, kitchen, dining & living. add windows @ side, relocate water heater, furnace. replace foundation. unit legalization ordinance 43-14.Details
legalize rooms on 1st flr as 2nd unit including 3 bdrms, 2 bath, kitchen, dining & living. add windows @ side, relocate water heater, furnace. replace foundation. unit legalization ordinance 43-14. | $120,000 |
| Sep 13, 2016 | Expired or cancelled expired Feb 2018 | 944 Greenwich St | K L W Construction Inc | soft story retrofit per sfbc chapter 34b engineering criteria....Details
soft story retrofit per sfbc chapter 34b engineering criteria.... | $20,000 |
| Aug 11, 2016 | Never finaled issued Aug 2016, no final | 114 Brighton Av | remove 2 staircases & add a new staircase, rearrange rooms, remodel kitchen, relocate bathrooms & add a new bathroom, remove walls on 2/f, relocate bathroom, add a new bathroom, rearrange rooms on 1/f, replace/relocate windows at rear.Details
remove 2 staircases & add a new staircase, rearrange rooms, remodel kitchen, relocate bathrooms & add a new bathroom, remove walls on 2/f, relocate bathroom, add a new bathroom, rearrange rooms on 1/f, replace/relocate windows at rear. | $200,000 | |
| Aug 11, 2016 | Completed final sign-off Jul 2019 | 2563 30th Av | add a bedroom, family, storage, laundry & 2 full bathrooms on ground floor, relocate water heater & furnace, replace foundation, open a door at front.Details
add a bedroom, family, storage, laundry & 2 full bathrooms on ground floor, relocate water heater & furnace, replace foundation, open a door at front. | $80,000 | |
| Jul 19, 2016 | Completed final sign-off Jan 2017 | 141 Trumbull St | add 2 bedrooms, full bath, den,. laundry, stairs on gr fl. remove stairs on 2nd fl, replace windows at rear relocate water heater and furnaceDetails
add 2 bedrooms, full bath, den,. laundry, stairs on gr fl. remove stairs on 2nd fl, replace windows at rear relocate water heater and furnace | $50,000 | |
| Jul 13, 2016 | Expired or cancelled cancelled Jan 2026 | 1862 19th Av | add 1 bedroom, computer room & photography studio & 3 bathrooms on ground floor. voluntary seismic reinforcement.Details
add 1 bedroom, computer room & photography studio & 3 bathrooms on ground floor. voluntary seismic reinforcement. | $50,000 | |
| Jun 17, 2016 | Never finaled issued Dec 2016, no final | 236 Sadowa St | unit legalization ord 43-14. legalized in law unit at ground floor. remove 2' high soil at front yard. replace (e) front stair by (n) stair in same shape & width.Details
unit legalization ord 43-14. legalized in law unit at ground floor. remove 2' high soil at front yard. replace (e) front stair by (n) stair in same shape & width. | $56,000 | |
| Apr 29, 2016 | Completed final sign-off Jul 2016 | 1000 Stockton St | Frank Lau Construction Co | t.i. retail store, install sinks, water heater and handicap restroom. install tiles and floor transaction to a coved base, replace front door, add lights per plan.Details
t.i. retail store, install sinks, water heater and handicap restroom. install tiles and floor transaction to a coved base, replace front door, add lights per plan. | $20,000 |
| Jan 22, 2016 | Completed final sign-off May 2016 | 2071 03rd St | Western Construction & Co Inc. | t.i. - sandwich store/coffee shop. install sinks & ada counter, provide floor transaction to a coved base, install ramp & platform at front door, legalize two offices. n/a ordinance #155-13Details
t.i. - sandwich store/coffee shop. install sinks & ada counter, provide floor transaction to a coved base, install ramp & platform at front door, legalize two offices. n/a ordinance #155-13 | $8,000 |
| Jan 4, 2016 | Never finaled issued Mar 2019, no final | 2626 Griffith St | Xieli Con-N-Dev Inc | to erect 3 stories, no basement, single family dwelling.Details
to erect 3 stories, no basement, single family dwelling. | $350,000 |
| Nov 30, 2015 | Completed final sign-off Jul 2016 | 1817 21st Av | Z Y Building Inc | relocate kitchen, convert kitchen to study room, remodel (e) bath, add (n) bath & deck on 2nd floor. re-arrange bedroom, family room, convert bedroom to storage remodel (e) bath, add (n) bath & storage on 1st floor. replace windows/doors of rear.Details
relocate kitchen, convert kitchen to study room, remodel (e) bath, add (n) bath & deck on 2nd floor. re-arrange bedroom, family room, convert bedroom to storage remodel (e) bath, add (n) bath & storage on 1st floor. replace windows/doors of rear. | $80,000 |
| Nov 24, 2015 | Completed final sign-off Aug 2016 | 430 Staples Av | Z Construction Company Inc | convert ground floor to a bedroom with half bath, replace existing foundation by new footings, voluntary add shear wall & holdown.Details
convert ground floor to a bedroom with half bath, replace existing foundation by new footings, voluntary add shear wall & holdown. | $120,000 |
| Nov 2, 2015 | Completed final sign-off Feb 2016 | 2333 17th Av | Will P K Ng Construction Inc. | remodel exercise room, add 1/2 bath and study room on ground floor.Details
remodel exercise room, add 1/2 bath and study room on ground floor. | $20,000 |
| Jul 27, 2015 | Expired or cancelled withdrawn May 2017 | 372 07th Av | change use of (e) garage to (n) retail space. provide 1 street car parking by infilled (e) curb cut.Details
change use of (e) garage to (n) retail space. provide 1 street car parking by infilled (e) curb cut. | $8,000 | |
| Jul 20, 2015 | Completed final sign-off Sep 2017 | 1232 06th Av | K L W Construction Inc | soft story seismic retrofitDetails
soft story seismic retrofit | $20,000 |
| Jul 20, 2015 | Completed final sign-off Nov 2015 | 383 Lombard St | Terence Mcmahon Construction | #404 - remodel (e) kitchen & replace (e) header beam & widen the (e) kitchen entrance.Details
#404 - remodel (e) kitchen & replace (e) header beam & widen the (e) kitchen entrance. | $10,000 |
| May 27, 2015 | Never finaled issued Jun 2015, no final | 549 Flood Av | Green Construction Builder Corp | 1) ground floor: convert extg family rm to study and extg playroom to family rm. add a full bath, half bath and walk in closet and laundry room. 2) remove extg int. stair and add a nw stair. 3) enlarge one extg bedrom on 2nd fl. revision to app#201503181172.Details
1) ground floor: convert extg family rm to study and extg playroom to family rm. add a full bath, half bath and walk in closet and laundry room. 2) remove extg int. stair and add a nw stair. 3) enlarge one extg bedrom on 2nd fl. revision to app#201503181172. | $15,000 |
| Apr 23, 2015 | Completed final sign-off Sep 2015 | 2347 19th Av | Z Construction Company Inc | convert e home theater to master bedroom, playroom exercise room and 2 new bath at gr fl. divided e family room to music and family room at 2nd fl, add new door at front of garageDetails
convert e home theater to master bedroom, playroom exercise room and 2 new bath at gr fl. divided e family room to music and family room at 2nd fl, add new door at front of garage | $55,000 |
| Mar 18, 2015 | Completed final sign-off Nov 2015 | 549 Flood Av | Green Construction Builder Corp | convert (e) playroom to study room, legalize (e) family room, add a full bath, a half bath & walk in closet on ground floor. add storage rm, washer , dryer & relocated w. h. & furnace on ground flr. infill (e) second flr lightwell to make a deck & remove the stair.Details
convert (e) playroom to study room, legalize (e) family room, add a full bath, a half bath & walk in closet on ground floor. add storage rm, washer , dryer & relocated w. h. & furnace on ground flr. infill (e) second flr lightwell to make a deck & remove the stair. | $40,000 |
| Jan 12, 2015 | Completed final sign-off Jun 2019 | 239 14th Av | C R Construction Co Inc, Gvn Construction Inc. | vertical & horizontal addition. convert ground flr living space to a new unit including three bedroom, two bathrooms, living room & kitchen. convert (e) family room & (e) bedroom area to two bedrooms, a full bath, & roof deck on the second flr. convert (e) sunsroom to a bedroom, add a new bedroom onDetails
vertical & horizontal addition. convert ground flr living space to a new unit including three bedroom, two bathrooms, living room & kitchen. convert (e) family room & (e) bedroom area to two bedrooms, a full bath, & roof deck on the second flr. convert (e) sunsroom to a bedroom, add a new bedroom on | $200,000 |
| Nov 18, 2014 | Completed final sign-off Nov 2015 | 576 15th Av | Associated Trucking Inc | replace extg unsound footingDetails
replace extg unsound footing | $6,000 |