Galen Tom
- License
- C31900
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect, authorized agent-others, designer
- Firm
- Galen Tom, Architect
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Oct 2026
14 permits since 2000 (architect on 12 permits, authorized agent-others on 1 permit, designer on 1 permit): 10 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Vt Construction And Remodeling (4), Zhang's Building Co (3), Reliable Construction Inc (2), Samco Construction Inc
- Engineers
- Michael Hom (2)
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 7
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 28, 2026 | In progress filed Oct 2026, not yet issued | 1310 Alabama St | Vt Construction And Remodeling | comply nov 202657246.remodel (e) & add (n)bedroom,bath & adu(ca).voluntary seismic upgrade of soft-story per ab-094.replace(e) exterior deck & stairs & front side yard entrance gate and replace in-kind. door being replaced and metal gate added.2/f: r/r (e) bath, kitchen, walls.remodel bath. reconfigDetails
comply nov 202657246.remodel (e) & add (n)bedroom,bath & adu(ca).voluntary seismic upgrade of soft-story per ab-094.replace(e) exterior deck & stairs & front side yard entrance gate and replace in-kind. door being replaced and metal gate added.2/f: r/r (e) bath, kitchen, walls.remodel bath. reconfig | $300,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 400 Goettingen St | add new uppper and lower deck with stairs to rear yard. demo (e) 2/f bedroom wdw and replace with vinyl sliding gass door to provide access to upper rear yard deck. contractor to install exterior deck lighting per owner requirement.Details
add new uppper and lower deck with stairs to rear yard. demo (e) 2/f bedroom wdw and replace with vinyl sliding gass door to provide access to upper rear yard deck. contractor to install exterior deck lighting per owner requirement. | $25,000 | |
| Jun 16, 2026 | Expired or cancelled cancelled Jul 2026 | 1310 Alabama St | remodel & add(n) bedroom,bath & accessory dwelling unit (adu)to existing two-story sfh with voluntary seismic upgrade of soft-story per ab-094.upgrade all mech,electrical & plum systems to comply with current codes.replace(e) exterior deck & stairs & front side yard entrance gate & fence with newDetails
remodel & add(n) bedroom,bath & accessory dwelling unit (adu)to existing two-story sfh with voluntary seismic upgrade of soft-story per ab-094.upgrade all mech,electrical & plum systems to comply with current codes.replace(e) exterior deck & stairs & front side yard entrance gate & fence with new | $300,000 | |
| Oct 19, 2021 | Never finaled issued Jan 2023, no final | 180 Granada Av | Vt Construction And Remodeling | this project shall refer to permit app#201907297192 & 201907297193 to revise and add the following items: 1)add new deck at rear yard with fire-rated exterior walls at property lines. 2) add new sliding glass door & window at master bedroom. 3)add nw hand sink in laundry room.Details
this project shall refer to permit app#201907297192 & 201907297193 to revise and add the following items: 1)add new deck at rear yard with fire-rated exterior walls at property lines. 2) add new sliding glass door & window at master bedroom. 3)add nw hand sink in laundry room. | $10,000 |
| Jan 4, 2021 | Completed final sign-off Nov 2021 | 1815 Union St | Reliable Construction Inc | rev to pa 202003126948 & pa 202003126947. mod business entry to comply w/ accessible business entry program req equivalent facilitation & tech infeas per ordinance 51-16. use of alternate design due to (e) site conditions. install handrails, extensions at ramps on int side only. hardware to pull typDetails
rev to pa 202003126948 & pa 202003126947. mod business entry to comply w/ accessible business entry program req equivalent facilitation & tech infeas per ordinance 51-16. use of alternate design due to (e) site conditions. install handrails, extensions at ramps on int side only. hardware to pull typ | $1,000 |
| Dec 8, 2020 | Completed final sign-off Nov 2021 | 1809 Union St | Reliable Construction Inc | rev to pa 202003126948 & pa 202003126947. modif the primary business entrance of 1809 union street to comply with the requirements of the accessible business entrance program requesting equivalent facilitation & technical infeasibilty per ordinance 51-16 & information sheets da-04 & da-05 andDetails
rev to pa 202003126948 & pa 202003126947. modif the primary business entrance of 1809 union street to comply with the requirements of the accessible business entrance program requesting equivalent facilitation & technical infeasibilty per ordinance 51-16 & information sheets da-04 & da-05 and | $1,000 |
| Mar 12, 2020 | Completed final sign-off Nov 2021 | 1809 Union St | to comply with abe ord 51-16 modify primary business entrance 1809 union st.Details
to comply with abe ord 51-16 modify primary business entrance 1809 union st. | $5,000 | |
| Mar 12, 2020 | Completed final sign-off Nov 2021 | 1815 Union St | to comply with abe ord 51-16 modify primary business entrance 1815 union st.Details
to comply with abe ord 51-16 modify primary business entrance 1815 union st. | $5,000 | |
| Sep 26, 2019 | Completed final sign-off Mar 2023 | 419 16th Av | Samco Construction Inc | revision pa# 201901220865; to create separate dwelling unit on ground fl. 1st fl. add (n) kitchen, laundry, master bath replace sliding glass door at bedroom with energy egress window, crete (n) entry vestibule & entry door, 2nd fl. remove (e) stair to ground fl. fill in floor for (n) stockDetails
revision pa# 201901220865; to create separate dwelling unit on ground fl. 1st fl. add (n) kitchen, laundry, master bath replace sliding glass door at bedroom with energy egress window, crete (n) entry vestibule & entry door, 2nd fl. remove (e) stair to ground fl. fill in floor for (n) stock | $20,000 |
| Jul 29, 2019 | Completed final sign-off Dec 2023 | 180 Granada Av | Vt Construction And Remodeling | addition of dwelling unit per ordinance 95-17.Details
addition of dwelling unit per ordinance 95-17. | $150,000 |
| Jul 29, 2019 | Completed final sign-off Dec 2023 | 180 Granada Av | Vt Construction And Remodeling | horizontal addition at rear yard. 1st flr: remodel garage & add (n) bathroom. 2nd flr: remodel kitchen & convert (e) bedroom into dining rm, add (n) famiy rm, deck,& laundry. update mep.Details
horizontal addition at rear yard. 1st flr: remodel garage & add (n) bathroom. 2nd flr: remodel kitchen & convert (e) bedroom into dining rm, add (n) famiy rm, deck,& laundry. update mep. | $200,000 |
| Aug 15, 2017 | Completed final sign-off Sep 2018 | 772 28th Av | Zhang's Building Co | the project shall be the remodel and reconfiguration of the upper level unit from 2 bed, 1 bath to 3 bed, 2 baths. the kitchen and living/dining shall be relocated to the rear of the house. addlaundry and master bathroom. upgrade all mechanical, electrical, and plumbing systems. replace front windowDetails
the project shall be the remodel and reconfiguration of the upper level unit from 2 bed, 1 bath to 3 bed, 2 baths. the kitchen and living/dining shall be relocated to the rear of the house. addlaundry and master bathroom. upgrade all mechanical, electrical, and plumbing systems. replace front window | $75,000 |
| Oct 3, 2016 | Completed final sign-off Oct 2017 | 181 Morningside Dr | Zhang's Building Co | remodel kitchen, breakfast & laundry. remodel (e) baths and create (n) walk in closet at master bedroom add new bedroom and new bath at (e) family room on ground floor level with new sliding glass door access to rear yard. upgrade mepDetails
remodel kitchen, breakfast & laundry. remodel (e) baths and create (n) walk in closet at master bedroom add new bedroom and new bath at (e) family room on ground floor level with new sliding glass door access to rear yard. upgrade mep | $87,000 |
| May 25, 2016 | Completed final sign-off Jan 2017 | 523 07th Av | Zhang's Building Co | alterations on 2nd floor incl addition of new laundry rm & rear yard deck & stair. (e0 living rm shall recome a (n) bedroom, (e) dining room shall become a (n) living rm & (e) sunroom shal become a (n) breakfast room; (e) kitchen & bath on 2nd floor shall be demolished & replacedDetails
alterations on 2nd floor incl addition of new laundry rm & rear yard deck & stair. (e0 living rm shall recome a (n) bedroom, (e) dining room shall become a (n) living rm & (e) sunroom shal become a (n) breakfast room; (e) kitchen & bath on 2nd floor shall be demolished & replaced | $10,000 |