Back to kitchen remodel contractors
Palmera Construction Co
- Based in
- South San Francisco
- On San Francisco permits
- Aug 2008 to Jan 2019
- Last 24 months
- 0 permits filed
198 permits since 2000: 111 completed, 71 never finaled, 16 expired or cancelled.
Of the 71 never-finaled permits, 42 are 5 to 10 years old, 29 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
132 kitchen remodel permits: 65 completed, 58 never finaled, 9 expired or cancelled. Typically 21 days from filing to permit and 116 days from permit to final inspection.
Showing the 100 most recent of 132.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2019 | Never finaled issued Feb 2019, no final | 845 California St | unit 502 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer/dryerDetails
unit 502 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer/dryer | $38,000 |
| Jan 3, 2019 | Completed final sign-off Jun 2019 | 500 Stanyan St | rehabilitate existing kitchen. rehabilitate existing bathroom. install bedroom. install washer/dryer.Details
rehabilitate existing kitchen. rehabilitate existing bathroom. install bedroom. install washer/dryer. | $33,000 |
| Jan 3, 2019 | Completed final sign-off Nov 2019 | 655 Powell St | unit 206. convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install second bathroomDetails
unit 206. convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install second bathroom | $45,000 |
| Nov 1, 2018 | Never finaled issued Jan 2019, no final | 840 California St | unit#48: 1)rehabilitate extg kitchen and bathroom. install washer and dryerDetails
unit#48: 1)rehabilitate extg kitchen and bathroom. install washer and dryer | $30,000 |
| Nov 1, 2018 | Completed final sign-off Mar 2019 | 250 Fell St | unit# 69: 1)rehabilitate extg kitchen and bathroom. install washer and dryer. n/a for maherDetails
unit# 69: 1)rehabilitate extg kitchen and bathroom. install washer and dryer. n/a for maher | $28,000 |
| Oct 26, 2018 | Completed final sign-off Jun 2019 | 390 Liberty St | #2 -rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washeier/dryerDetails
#2 -rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washeier/dryer | $30,000 |
| Oct 26, 2018 | Completed final sign-off Mar 2019 | 390 Liberty St | #8 -convert existing living room to bedroom. rehabilitate existing kitchen. rehabilitate existing bathroo. install washer/dryer.Details
#8 -convert existing living room to bedroom. rehabilitate existing kitchen. rehabilitate existing bathroo. install washer/dryer. | $42,000 |
| Oct 12, 2018 | Completed final sign-off Mar 2019 | 99 Lupine Av | apt 503, convert dining room to bedroom; rehabilitate existing kitchen and bathroomDetails
apt 503, convert dining room to bedroom; rehabilitate existing kitchen and bathroom | $25,000 |
| Oct 12, 2018 | Never finaled issued Nov 2018, no final | 390 29th Av | unit #10 - rehabilitate existing kitchen and bathroom. install washer and dryerDetails
unit #10 - rehabilitate existing kitchen and bathroom. install washer and dryer | $30,000 |
| Oct 9, 2018 | Never finaled issued Nov 2018, no final | 634 Powell St | convert (e) living room to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryerDetails
convert (e) living room to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryer | $36,000 |
| Oct 3, 2018 | Completed final sign-off Apr 2019 | 655 Powell St | #603: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3) rehabilitate extg bathroom. 4)install 2nd bathroom, 5)install washer and dryer.Details
#603: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3) rehabilitate extg bathroom. 4)install 2nd bathroom, 5)install washer and dryer. | $45,000 |
| Oct 3, 2018 | Completed final sign-off May 2019 | 634 Powell St | #15: 1)rehabilitate extg kitchen. 2) rehabilitate extg bathroom. 3)install washer and dryer.Details
#15: 1)rehabilitate extg kitchen. 2) rehabilitate extg bathroom. 3)install washer and dryer. | $30,000 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 655 Powell St | unit 508: remodel existing kitchen 8x5 and bathroom 5x8. no walls to be moved or added. no change to layoutDetails
unit 508: remodel existing kitchen 8x5 and bathroom 5x8. no walls to be moved or added. no change to layout | $29,000 |
| Aug 16, 2018 | Completed final sign-off Jun 2020 | 1426 14th Av | 1/f: add 1 family rm, 1 den, 1 full bath, & laundry. 2/f: relocate kitchen, remodel bath & add 1 bath. 3/f: relocate kitchen, remodel bath, & add 1 office & 1 bath. partial infill of left lightwell against blank wall & new roof deck.Details
1/f: add 1 family rm, 1 den, 1 full bath, & laundry. 2/f: relocate kitchen, remodel bath & add 1 bath. 3/f: relocate kitchen, remodel bath, & add 1 office & 1 bath. partial infill of left lightwell against blank wall & new roof deck. | $90,000 |
| Aug 10, 2018 | Never finaled issued Sep 2018, no final | 601 Ofarrell St | rehabilitate existing kitchen and bathroom and install washer/dryerDetails
rehabilitate existing kitchen and bathroom and install washer/dryer | $30,000 |
| Aug 9, 2018 | Completed final sign-off Jan 2019 | 520 Scott St | unit #7 : 1)rehabilitate extg kitchen and extg bathroom. install washer and dryerDetails
unit #7 : 1)rehabilitate extg kitchen and extg bathroom. install washer and dryer | $30,000 |
| Aug 9, 2018 | Never finaled issued Sep 2018, no final | 601 Ofarrell St | unit 504 - comply with complaint 201855291. convert existing kitchen to bedroom; relocate kitchen, rehabilitate existing bathroom and install washer/dryerDetails
unit 504 - comply with complaint 201855291. convert existing kitchen to bedroom; relocate kitchen, rehabilitate existing bathroom and install washer/dryer | $40,000 |
| Aug 2, 2018 | Completed final sign-off Nov 2018 | 1819 Golden Gate Av | #17 - rehabilitate (e) kitchen and (e) bathroom. install w/d amher naDetails
#17 - rehabilitate (e) kitchen and (e) bathroom. install w/d amher na | $35,000 |
| Jul 31, 2018 | Completed final sign-off Jan 2019 | 655 Powell St | #702 -convert (e) dining to study. rehabilitate (e) kitchen. rehabilitate (e) bathroom. install w/dDetails
#702 -convert (e) dining to study. rehabilitate (e) kitchen. rehabilitate (e) bathroom. install w/d | $30,000 |
| Jul 31, 2018 | Never finaled issued Aug 2018, no final | 655 Powell St | #608 -convert (e) kitchen into bedroom relocate kitchen. rehabilitate (e) bathroom. install w/dDetails
#608 -convert (e) kitchen into bedroom relocate kitchen. rehabilitate (e) bathroom. install w/d | $38,000 |
| Jul 30, 2018 | Never finaled issued Aug 2018, no final | 1840 Clay St | #101 -convert (e) kitchen to office. relocate kitchen and living room. rehabilitate (e) bedroom. install w/d maher naDetails
#101 -convert (e) kitchen to office. relocate kitchen and living room. rehabilitate (e) bedroom. install w/d maher na | $40,000 |
| Jul 26, 2018 | Never finaled issued Aug 2018, no final | 300 Buchanan St | unit #605:rehabilitate existing kitchen, rehabilitate existing bathroom, install washer & dryerDetails
unit #605:rehabilitate existing kitchen, rehabilitate existing bathroom, install washer & dryer | $32,000 |
| Jul 9, 2018 | Never finaled issued Aug 2018, no final | 655 Powell St | 6th floor unit 602 - convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. inatall w/d. fire alarm system notification upgrade required under separate applicationDetails
6th floor unit 602 - convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. inatall w/d. fire alarm system notification upgrade required under separate application | $40,000 |
| Jun 28, 2018 | Never finaled issued Jul 2018, no final | 686 Post St | unit 63 - convert existing kitchen to bedroom, relocate existing kitchen, rehabilitate existing bathroom, install washer/dryerDetails
unit 63 - convert existing kitchen to bedroom, relocate existing kitchen, rehabilitate existing bathroom, install washer/dryer | $35,000 |
| Jun 25, 2018 | Completed final sign-off Nov 2018 | 655 Powell St | unit #404 convert (e) kitchen to bedroom. rehabilitate (e) bathroom & (e) kitchen. install w/d. no exterior work.Details
unit #404 convert (e) kitchen to bedroom. rehabilitate (e) bathroom & (e) kitchen. install w/d. no exterior work. | $38,000 |
| Jun 19, 2018 | Never finaled issued Jul 2018, no final | 655 Powell St | unit 704: rehabilitate existing kitchen & bathroom, install washier/dryerDetails
unit 704: rehabilitate existing kitchen & bathroom, install washier/dryer | $36,000 |
| May 29, 2018 | Never finaled issued Jun 2018, no final | 655 Powell St | unit 605 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer/dryerDetails
unit 605 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer/dryer | $36,000 |
| May 25, 2018 | Never finaled issued Jun 2018, no final | 3560 Divisadero St | unit #20: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. n/a for maherDetails
unit #20: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. n/a for maher | $42,000 |
| May 7, 2018 | Never finaled issued Jun 2018, no final | 655 Powell St | unit #506: 1)convert extg kitchen to bedroom. 2) relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer.Details
unit #506: 1)convert extg kitchen to bedroom. 2) relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. | $40,000 |
| May 3, 2018 | Never finaled issued Jun 2018, no final | 35 Lafayette St | unti #35 relocate living room & bedroom. rehabilitate (e) kitchen & bathroom. install w/dDetails
unti #35 relocate living room & bedroom. rehabilitate (e) kitchen & bathroom. install w/d | $25,000 |
| Apr 27, 2018 | Completed final sign-off Sep 2018 | 3560 Divisadero St | #25: install bedroom, rehabiliate existing kitchen, rehabilitate existing bathroom, install washer & dryer. maher naDetails
#25: install bedroom, rehabiliate existing kitchen, rehabilitate existing bathroom, install washer & dryer. maher na | $35,000 |
| Feb 15, 2018 | Never finaled issued Apr 2018, no final | 655 Powell St | unit #501: 1)rehabilitating extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer.Details
unit #501: 1)rehabilitating extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. | $29,000 |
| Feb 12, 2018 | Completed final sign-off Aug 2018 | 655 Powell St | unit #307: 1) rehabilitate extg kitchen. 2)rehabilitate extgf bathroom. 3) install washer and dryer. 4) create new study room.Details
unit #307: 1) rehabilitate extg kitchen. 2)rehabilitate extgf bathroom. 3) install washer and dryer. 4) create new study room. | $29,000 |
| Feb 7, 2018 | Never finaled issued Mar 2018, no final | 990 Geary St | unit #511: 1) rehabilitate extg kitchen and extg bathroom. n/a for maherDetails
unit #511: 1) rehabilitate extg kitchen and extg bathroom. n/a for maher | $25,000 |
| Jan 18, 2018 | Never finaled issued Feb 2018, no final | 655 Powell St | unit #502 - rehabilitate (e) kitchen & bathroom. install w/d maher naDetails
unit #502 - rehabilitate (e) kitchen & bathroom. install w/d maher na | $29,000 |
| Jan 10, 2018 | Never finaled issued Feb 2018, no final | 634 Powell St | unit #43: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer.Details
unit #43: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. | $30,000 |
| Jan 3, 2018 | Never finaled issued Jan 2018, no final | 1340 Lombard St | apt 301: convert e kitchen to bedroom, relocate kitchen, rehabilitate e bath, install washer and dryer maher not reqDetails
apt 301: convert e kitchen to bedroom, relocate kitchen, rehabilitate e bath, install washer and dryer maher not req | $39,000 |
| Dec 20, 2017 | Completed final sign-off Jun 2018 | 1025 Steiner St | unit #9: rehabilitate extg kitchen and extg bathroom. install washer and dryer.Details
unit #9: rehabilitate extg kitchen and extg bathroom. install washer and dryer. | $28,000 |
| Nov 28, 2017 | Never finaled issued Nov 2017, no final | 64 Cumberland St | replace five front windows to be hung windows replace one bathroom window and one above the stair case replace two kitchen windows and one in the master bedroom. replace one sliding door. all will be aluminum clad wood interior. u factor max. .3Details
replace five front windows to be hung windows replace one bathroom window and one above the stair case replace two kitchen windows and one in the master bedroom. replace one sliding door. all will be aluminum clad wood interior. u factor max. .3 | $7,000 |
| Nov 21, 2017 | Completed final sign-off Apr 2018 | 355 Fulton St | unit 307 - rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer & dryer. n/a maher ordinanceDetails
unit 307 - rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer & dryer. n/a maher ordinance | $28,000 |
| Nov 17, 2017 | Never finaled issued Dec 2017, no final | 1340 Lombard St | unit # 402: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. n/a for maherDetails
unit # 402: 1) rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. n/a for maher | $31,000 |
| Nov 6, 2017 | Never finaled issued Feb 2018, no final | 655 Powell St | untit #208: convert existing kitchen to den, relocate existing kitchen, rehabilitate existing bath, install washer and dryerDetails
untit #208: convert existing kitchen to den, relocate existing kitchen, rehabilitate existing bath, install washer and dryer | $25,000 |
| Nov 6, 2017 | Never finaled issued Feb 2018, no final | 655 Powell St | rehabilitate existing kitchen, rhabilitate existing bath, install washer and dryer, convert dining rm to sleeping nookDetails
rehabilitate existing kitchen, rhabilitate existing bath, install washer and dryer, convert dining rm to sleeping nook | $30,000 |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 655 Powell St | unit #301 - rehabilitate e kitchen, rehabilitate e. bath, install washer dryerDetails
unit #301 - rehabilitate e kitchen, rehabilitate e. bath, install washer dryer | $25,000 |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 655 Powell St | unit #401 - convert e kitchen to bedroom, relocate kitchen, rehabilitate bath, install washer/dryerDetails
unit #401 - convert e kitchen to bedroom, relocate kitchen, rehabilitate bath, install washer/dryer | $30,000 |
| Nov 1, 2017 | Never finaled issued Nov 2017, no final | 655 Powell St | unit #204 - convert e kitchen to bedroom, relocate e kitchen, rehabilitate e bath, install washer dryerDetails
unit #204 - convert e kitchen to bedroom, relocate e kitchen, rehabilitate e bath, install washer dryer | $18,000 |
| Oct 25, 2017 | Never finaled issued Dec 2017, no final | 39 Lafayette St | rehabilitate existing kitchen, bath, washer/dryer, install header at openingsDetails
rehabilitate existing kitchen, bath, washer/dryer, install header at openings | $30,000 |
| Oct 16, 2017 | Never finaled issued Oct 2017, no final | 140 Duboce Av | unit #301: convert e kitchen to bedroom, relocate kitchen, rehab existing bath, install washer dryerDetails
unit #301: convert e kitchen to bedroom, relocate kitchen, rehab existing bath, install washer dryer | $32,000 |
| Oct 13, 2017 | Completed final sign-off Dec 2017 | 916 Pacific Av | #16 - full apt remodel; kitchen , bathroom ; no walls will be removed or addedDetails
#16 - full apt remodel; kitchen , bathroom ; no walls will be removed or added | $20,000 |
| Oct 11, 2017 | Completed final sign-off Jul 2018 | 115 Belvedere St | remodel kitchen and bathroom. add no walls. no structural work to be done. replace 4 windows, 2 not visible from street. front windows to be wood. max u factor 0.32Details
remodel kitchen and bathroom. add no walls. no structural work to be done. replace 4 windows, 2 not visible from street. front windows to be wood. max u factor 0.32 | $19,000 |
| Aug 24, 2017 | Completed final sign-off Feb 2018 | 78 Buchanan St | unit 202: rehabilitate existing kitchen, existing bath, install washer and dryer; to comply with nov 201777702 dated 5/15/2017Details
unit 202: rehabilitate existing kitchen, existing bath, install washer and dryer; to comply with nov 201777702 dated 5/15/2017 | $28,000 |
| Aug 18, 2017 | Never finaled issued Oct 2017, no final | 3560 Divisadero St | unit #24: 1)convert extg closet to nook. 2) rehabilitate extg kitchen. 3) rehabilitate ext bathroom.4)install washer and dryer. n/a for maherDetails
unit #24: 1)convert extg closet to nook. 2) rehabilitate extg kitchen. 3) rehabilitate ext bathroom.4)install washer and dryer. n/a for maher | $32,000 |
| Aug 15, 2017 | Never finaled issued Sep 2017, no final | 1360 Lombard St | unit #603: rehabilitate (e) kitchen & bathroom, install washer & dryer. maher naDetails
unit #603: rehabilitate (e) kitchen & bathroom, install washer & dryer. maher na | $38,000 |
| Jul 21, 2017 | Completed final sign-off Mar 2019 | 990 Geary St | #504- convert e kitchen to bedroom, relocate kitchen, convewrt e living rm to bedroom, relocate living rm, rehab e bath, install washer dryer. n/a ordinance #155-13Details
#504- convert e kitchen to bedroom, relocate kitchen, convewrt e living rm to bedroom, relocate living rm, rehab e bath, install washer dryer. n/a ordinance #155-13 | $41,000 |
| Jun 29, 2017 | Completed final sign-off Apr 2018 | 2130 Mason St | 1st floor - proposes the removal of two walls & expansion of 78 sf (e) laundry to conditioned space @ kitchen, remodel bathroom, add bathroom, electrical upgrade.Details
1st floor - proposes the removal of two walls & expansion of 78 sf (e) laundry to conditioned space @ kitchen, remodel bathroom, add bathroom, electrical upgrade. | $60,000 |
| Jun 20, 2017 | Completed final sign-off Nov 2017 | 1360 Lombard St | unit 104 - rehabilitate existing kitchen, rehabilitate existing bathroom. install washer & dryer. n/a maherDetails
unit 104 - rehabilitate existing kitchen, rehabilitate existing bathroom. install washer & dryer. n/a maher | $26,000 |
| Jun 6, 2017 | Completed final sign-off Oct 2017 | 1360 Lombard St | unit 202 - rehabilitate existing kitchen, rehabilitate bathroom and install washer/dryer. n/a maherDetails
unit 202 - rehabilitate existing kitchen, rehabilitate bathroom and install washer/dryer. n/a maher | $30,000 |
| Jun 2, 2017 | Completed final sign-off Oct 2017 | 1360 Lombard St | unit #102: 1)rehabilitate exgt kitchen. 2) rehabilitate ext bathroom. 3)install washer and dryer.Details
unit #102: 1)rehabilitate exgt kitchen. 2) rehabilitate ext bathroom. 3)install washer and dryer. | $30,000 |
| Apr 27, 2017 | Never finaled issued Jun 2017, no final | 3560 Divisadero St | apt 26: convert existing kitchen to bedroom; relocate kitchen, rehabilitate existing bathroom, install washer/dryer. maher naDetails
apt 26: convert existing kitchen to bedroom; relocate kitchen, rehabilitate existing bathroom, install washer/dryer. maher na | $36,000 |
| Mar 1, 2017 | Never finaled issued Mar 2017, no final | 1405 Franklin St | unit 506, 5th floor - relocate existing kitchen, convert existing kitchen into bedroom, rehabilitate (e) bathroom, install washer/dryerDetails
unit 506, 5th floor - relocate existing kitchen, convert existing kitchen into bedroom, rehabilitate (e) bathroom, install washer/dryer | $35,000 |
| Feb 17, 2017 | Never finaled issued Feb 2017, no final | 916 Pacific Av | remodeling (e) unit 17 - kitchen and bathroom; no walls will be added or moved; add washer/dryer in (e) hall closet. add sub panel. all lights shall be high efficacy. min one on vacancy sensorDetails
remodeling (e) unit 17 - kitchen and bathroom; no walls will be added or moved; add washer/dryer in (e) hall closet. add sub panel. all lights shall be high efficacy. min one on vacancy sensor | $15,000 |
| Feb 17, 2017 | Completed final sign-off May 2017 | 916 Pacific Av | remodeling (e) unit 9 - kitchen and bathroom; no walls will be added or moved; add washer/dryer in (e) hall closet. add sub panel. all lights shall be high efficacy. min one on vacancy sensorDetails
remodeling (e) unit 9 - kitchen and bathroom; no walls will be added or moved; add washer/dryer in (e) hall closet. add sub panel. all lights shall be high efficacy. min one on vacancy sensor | $15,000 |
| Jan 13, 2017 | Never finaled issued Mar 2017, no final | 2023 Folsom St | remodel unit #5, 2nd floor - remodel existing kitchen and bathroom. add washer and dryerDetails
remodel unit #5, 2nd floor - remodel existing kitchen and bathroom. add washer and dryer | $26,000 |
| Jan 13, 2017 | Never finaled issued Feb 2017, no final | 1801 Gough St | apt 308, 3rd floor - convert (e) kitchen into den, relocate kitchen into dining room, remodel (e) bathroom. add washer & dryerDetails
apt 308, 3rd floor - convert (e) kitchen into den, relocate kitchen into dining room, remodel (e) bathroom. add washer & dryer | $34,000 |
| Dec 1, 2016 | Completed final sign-off Apr 2017 | 310 06th Av | unit #10, 3rd floor: remodel (e) kitchen & bathroom. add w/d. maher naDetails
unit #10, 3rd floor: remodel (e) kitchen & bathroom. add w/d. maher na | $28,000 |
| Dec 1, 2016 | Completed final sign-off Apr 2017 | 310 06th Av | unit #23, 4th floor: remodel (e) kitchen & bathroom. add w/d maher naDetails
unit #23, 4th floor: remodel (e) kitchen & bathroom. add w/d maher na | $30,000 |
| Nov 2, 2016 | Completed final sign-off May 2017 | 950 Franklin St | 5th floor unit #53 - remodel (e) kitchen, (e) bathroom. convert (e) dining room to a bedroom. add washer/dryerDetails
5th floor unit #53 - remodel (e) kitchen, (e) bathroom. convert (e) dining room to a bedroom. add washer/dryer | $28,000 |
| Nov 2, 2016 | Completed final sign-off Mar 2017 | 2023 Folsom St | 3rd floor unit #10 - convert (e) kitchen to study, relocate (e) kitchen to living room, remodel (e) bathroom. add washer/dryer. maher naDetails
3rd floor unit #10 - convert (e) kitchen to study, relocate (e) kitchen to living room, remodel (e) bathroom. add washer/dryer. maher na | $25,000 |
| Oct 11, 2016 | Completed final sign-off Mar 2017 | 1501 Haight St | remodel unit 10, 3rd floor - remodel (e) kitchen, remodel (e) bathroom, add washer & dryerDetails
remodel unit 10, 3rd floor - remodel (e) kitchen, remodel (e) bathroom, add washer & dryer | $30,000 |
| Sep 29, 2016 | Completed final sign-off Dec 2016 | 1140 Sutter St | interior remodel apt 410: non-structural alteration, relocate kitchen. remodel (e) bathroom. provide new bedroom. no egress window required 4th floor above gradeDetails
interior remodel apt 410: non-structural alteration, relocate kitchen. remodel (e) bathroom. provide new bedroom. no egress window required 4th floor above grade | $40,000 |
| Jun 28, 2016 | Never finaled issued Jul 2016, no final | 994 Guerrero St | unit 10, 3rd floor - remodel (e) bathroom, relocate kitchen within unit, convert (e) kitchen to den. add washer and dryer. maher naDetails
unit 10, 3rd floor - remodel (e) bathroom, relocate kitchen within unit, convert (e) kitchen to den. add washer and dryer. maher na | $35,000 |
| Jun 28, 2016 | Never finaled issued Jul 2016, no final | 994 Guerrero St | unit 5, 2nd floor - remodel (e) bathroom, relocate kitchen, convert (e) kitchen to den. add washer and dryer. maher naDetails
unit 5, 2nd floor - remodel (e) bathroom, relocate kitchen, convert (e) kitchen to den. add washer and dryer. maher na | $35,000 |
| Jun 28, 2016 | Never finaled issued Jul 2016, no final | 994 Guerrero St | unit 6, 3rd floor - remodel (e) bathroom, relocate kitchen, convert (e) kitchen to den. add washer and dryer. maher naDetails
unit 6, 3rd floor - remodel (e) bathroom, relocate kitchen, convert (e) kitchen to den. add washer and dryer. maher na | $35,000 |
| Jun 9, 2016 | Completed final sign-off Nov 2016 | 676 Geary St | 3rd flr, unit #308: remodel unit, existing bathroom, relocate existing kitchen, convert existing kitchen to bedroom, add washer & dryer. no exterior work. n/a ordinance #155-13Details
3rd flr, unit #308: remodel unit, existing bathroom, relocate existing kitchen, convert existing kitchen to bedroom, add washer & dryer. no exterior work. n/a ordinance #155-13 | $35,000 |
| Jun 6, 2016 | Completed final sign-off Sep 2016 | 95 Mccoppin St | kitchen remodel in-kind, no walls to be removed/movedDetails
kitchen remodel in-kind, no walls to be removed/moved | $10,280 |
| May 6, 2016 | Completed final sign-off Sep 2016 | 2619 Mission St | #33- remodel existing bathroom, remodel existing kitchen, add washer & dryer.Details
#33- remodel existing bathroom, remodel existing kitchen, add washer & dryer. | $25,000 |
| Mar 25, 2016 | Completed final sign-off Oct 2016 | 2600 Van Ness Av | 3rd flr, unit 206 - remodel unit, remodel (e) bathroom, relocate kitchen, convert (e) kitchen into bedroom. add washer and dryer.Details
3rd flr, unit 206 - remodel unit, remodel (e) bathroom, relocate kitchen, convert (e) kitchen into bedroom. add washer and dryer. | $30,000 |
| Mar 15, 2016 | Completed final sign-off Jan 2017 | 485 Dewey Bl | remodel extg kitchen and bathroom. replace window facing backyard. not visible from street. repair framing window. sheetrock repair.Details
remodel extg kitchen and bathroom. replace window facing backyard. not visible from street. repair framing window. sheetrock repair. | $25,000 |
| Mar 10, 2016 | Completed final sign-off Jun 2016 | 3440 20th St | unit #112 at 2nd floor. remodel extg bathroom, remodel extg kitchen. add washer and dryer. exhaust from range not visible from the street.Details
unit #112 at 2nd floor. remodel extg bathroom, remodel extg kitchen. add washer and dryer. exhaust from range not visible from the street. | $25,000 |
| Mar 1, 2016 | Completed final sign-off Jul 2016 | 645 Stockton St | remodel unit 602 @ 6th floor, remodel existing bathroom, convert exsting living into bedroom, remodel existng kitchen; add washer and dryer. maher naDetails
remodel unit 602 @ 6th floor, remodel existing bathroom, convert exsting living into bedroom, remodel existng kitchen; add washer and dryer. maher na | $25,000 |
| Feb 24, 2016 | Never finaled issued Mar 2016, no final | 990 Fulton St | #507 - relocate kitchen, remodel existing bathroom, convert (e) kitchen to bedroom, add washer & dryer.Details
#507 - relocate kitchen, remodel existing bathroom, convert (e) kitchen to bedroom, add washer & dryer. | $30,000 |
| Feb 19, 2016 | Never finaled issued Mar 2016, no final | 1030 Polk St | unit #305 remodel at 3rd floor. remodel extg bathroom . relocate and remodel extg kitchen. add washer and dryer. n/a for maherDetails
unit #305 remodel at 3rd floor. remodel extg bathroom . relocate and remodel extg kitchen. add washer and dryer. n/a for maher | $25,000 |
| Dec 28, 2015 | Completed final sign-off Apr 2016 | 2600 Van Ness Av | apt #301: remodel at 3rd floor. remodel extg bathroom, and add washer and dryer.relocate kitchen.Details
apt #301: remodel at 3rd floor. remodel extg bathroom, and add washer and dryer.relocate kitchen. | $30,000 |
| Dec 21, 2015 | Never finaled issued Mar 2016, no final | 990 Fulton St | remodel unit 501 at 6th fl. remodel existing bath. relocate existing kitchen. add bedroom and washer dryer. remove non-bearing walls.Details
remodel unit 501 at 6th fl. remodel existing bath. relocate existing kitchen. add bedroom and washer dryer. remove non-bearing walls. | $25,000 |
| Dec 9, 2015 | Completed final sign-off Oct 2016 | 1140 Sutter St | #504-interior remodel #504, non-structural alteration, relocate kitchen, remodel (e) bathroom, provide new bedroom, no egress window required 5/f above grade. n/a ordinance #155-13Details
#504-interior remodel #504, non-structural alteration, relocate kitchen, remodel (e) bathroom, provide new bedroom, no egress window required 5/f above grade. n/a ordinance #155-13 | $45,000 |
| Nov 3, 2015 | Completed final sign-off Nov 2016 | 686 Post St | remodel unit #1 at the first floor. remodel extg kitchen. add washer and dryer. n/a for maherDetails
remodel unit #1 at the first floor. remodel extg kitchen. add washer and dryer. n/a for maher | $15,000 |
| Oct 2, 2015 | Completed final sign-off Apr 2016 | 686 Post St | unit #23: remodel unit at 2nd floor: remodel (e) bathroom, relocate and remodel (e) kitchen, add washer & dryer. maher naDetails
unit #23: remodel unit at 2nd floor: remodel (e) bathroom, relocate and remodel (e) kitchen, add washer & dryer. maher na | $20,000 |
| Oct 2, 2015 | Completed final sign-off Apr 2016 | 686 Post St | unit #24: remodel unit at 2nd floor: remodel (e) bathroom, relocate and remodel (e) kitchen, add washer & dryer. convert studio to 1 bedroom apartment. maher naDetails
unit #24: remodel unit at 2nd floor: remodel (e) bathroom, relocate and remodel (e) kitchen, add washer & dryer. convert studio to 1 bedroom apartment. maher na | $20,000 |
| Sep 17, 2015 | Completed final sign-off Feb 2016 | 601 Ofarrell St | #208: 2nd flr. remodel unit - relocate kitchen, add washer and dryer. convert (e) dining to bedroom. maher naDetails
#208: 2nd flr. remodel unit - relocate kitchen, add washer and dryer. convert (e) dining to bedroom. maher na | $13,000 |
| Aug 31, 2015 | Completed final sign-off Dec 2015 | 2385 Folsom St | unit #105: 1)remodel the ground floor. 2) relocate extg kitchen. 3)relocate extg bathroom. 4)add one bathroom. 5) add one den. 6) add washer and dryer.Details
unit #105: 1)remodel the ground floor. 2) relocate extg kitchen. 3)relocate extg bathroom. 4)add one bathroom. 5) add one den. 6) add washer and dryer. | $45,000 |
| Jul 24, 2015 | Completed final sign-off Feb 2016 | 1036 Polk St | unit 405: remodel bathroom and kitchen. add washer and dryer. remove wall between kitchen and living room. maher n/a.Details
unit 405: remodel bathroom and kitchen. add washer and dryer. remove wall between kitchen and living room. maher n/a. | $25,000 |
| Jul 16, 2015 | Never finaled issued Jul 2015, no final | 755 Bush St | units 100 & 302: kitchen & bathroom remodeling. no walls to be altered.Details
units 100 & 302: kitchen & bathroom remodeling. no walls to be altered. | $36,000 |
| Jun 17, 2015 | Expired or cancelled expired Apr 2021 | 1035 Sutter St | comply with his complaint 201543121 dated 4/29/2015. remodel unit# 12 at 3rd fl. remodel e bath, remodel e kitchen, addition of dishwasher, addition of new washer and dryer. n/a ordinance #155-13Details
comply with his complaint 201543121 dated 4/29/2015. remodel unit# 12 at 3rd fl. remodel e bath, remodel e kitchen, addition of dishwasher, addition of new washer and dryer. n/a ordinance #155-13 | $45,000 |
| Apr 15, 2015 | Completed final sign-off Aug 2015 | 1754 Mission St | bathroom and kitchen remodel unit 1, unit 6. no change in wall and opening layout.Details
bathroom and kitchen remodel unit 1, unit 6. no change in wall and opening layout. | $36,000 |
| Apr 10, 2015 | Completed final sign-off Jun 2015 | 555 Eddy St | kitchen and bathroom remodel in unit #32 3rd floor extg hood and lighting to remain. no walls to be moved/ no structural work. all fire rated assemblies to be maintained.Details
kitchen and bathroom remodel in unit #32 3rd floor extg hood and lighting to remain. no walls to be moved/ no structural work. all fire rated assemblies to be maintained. | $16,000 |
| Apr 10, 2015 | Completed final sign-off Feb 2016 | 2132 Mason St | 2nd flr: add 1 bathroom, remodel 2nd bathroom. add 75 sf (e) porch to kitchen remodel, upgrade ele, remove 2 walls @ kitchen and add beams at 2nd floorDetails
2nd flr: add 1 bathroom, remodel 2nd bathroom. add 75 sf (e) porch to kitchen remodel, upgrade ele, remove 2 walls @ kitchen and add beams at 2nd floor | $40,000 |
| Mar 24, 2015 | Completed final sign-off Oct 2016 | 1140 Sutter St | work in unit #308: interior remodel , non-structural alteration, relocate kitchen, remodel (e) bathroom, provide new office; maher n/aDetails
work in unit #308: interior remodel , non-structural alteration, relocate kitchen, remodel (e) bathroom, provide new office; maher n/a | $25,000 |
| Mar 24, 2015 | Never finaled issued May 2015, no final | 1140 Sutter St | interior remodel apt #403: non-structural, alteration, relocate kitchen, remodel (e) bathroom, provide new bedroom, no egress window, required 4th flr above grade; maher n/aDetails
interior remodel apt #403: non-structural, alteration, relocate kitchen, remodel (e) bathroom, provide new bedroom, no egress window, required 4th flr above grade; maher n/a | $30,000 |
| Mar 4, 2015 | Expired or cancelled expired Apr 2021 | 1035 Sutter St | remodel unit 14: add wash & dryer. remodel kitchen maher - not req'dDetails
remodel unit 14: add wash & dryer. remodel kitchen maher - not req'd | $10,000 |
| Feb 4, 2015 | Completed final sign-off Jul 2015 | 737 Pine St | unit #54: convert studio to one bedroom apt. relocate kitchen and add laundry per plan. maher n/a.Details
unit #54: convert studio to one bedroom apt. relocate kitchen and add laundry per plan. maher n/a. | $20,000 |