Block 0336, lot 015
555 Eddy St
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 4
- Units
- 39
- Rooms
- 38 bathrooms
- Building
- 21,735 sq ft
- Lot
- 9,452 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 8, 2023 | Completed final sign-off May 2024 | 555 Eddy St | B B J Electric, Inc | install new facu and equipment to meet 1103.7.6.1 install new lf sounders inside every dwelling unit.Details
install new facu and equipment to meet 1103.7.6.1 install new lf sounders inside every dwelling unit. | $56,803 |
| Feb 10, 2017 | Completed final sign-off Jun 2017 | 555 Eddy St | Hon's Construction Inc. | unit #4: remodel kitchen and bathroom, like in kind. paint unit and install new vinyl flooring. existing flooring to remain. no structural work.Details
unit #4: remodel kitchen and bathroom, like in kind. paint unit and install new vinyl flooring. existing flooring to remain. no structural work. | $18,000 |
| Aug 14, 2015 | Never finaled issued Aug 2015, no final | 555 Eddy St | Boss Construction Inc. | kitchen and bath remodel. upgrade electrical in unit 33. no walls to be removed or altered.Details
kitchen and bath remodel. upgrade electrical in unit 33. no walls to be removed or altered. | $10,000 |
| Jun 25, 2015 | Completed final sign-off Jun 2016 | 555 Eddy St | Rain Defense | waterproofing (2) balcony decks with urethene coating. n/a maher ord. # 155-13Details
waterproofing (2) balcony decks with urethene coating. n/a maher ord. # 155-13 | $6,000 |
| May 11, 2015 | Completed final sign-off Aug 2015 | 555 Eddy St | unit #6: remodel kitcheb and remove partial partition wall per plan.Details
unit #6: remodel kitcheb and remove partial partition wall per plan. | $6,000 | |
| Apr 10, 2015 | Completed final sign-off Jun 2015 | 555 Eddy St | Palmera Construction Co | kitchen and bathroom remodel in unit #32 3rd floor extg hood and lighting to remain. no walls to be moved/ no structural work. all fire rated assemblies to be maintained.Details
kitchen and bathroom remodel in unit #32 3rd floor extg hood and lighting to remain. no walls to be moved/ no structural work. all fire rated assemblies to be maintained. | $16,000 |
| Dec 23, 2014 | Expired or cancelled cancelled Jan 2026 | 555 Eddy St | #32 - remodel kitchen, plumbing & electrical by separate permit.Details
#32 - remodel kitchen, plumbing & electrical by separate permit. | $10,000 | |
| Aug 29, 2014 | Never finaled issued Jan 2015, no final | 555 Eddy St | Palmera Construction Co | all work done in unit#24. remove/add interior non-bearing walls. remodel kitchen & bath. add washer/dryer. new lighting to modified spaces.Details
all work done in unit#24. remove/add interior non-bearing walls. remodel kitchen & bath. add washer/dryer. new lighting to modified spaces. | $35,000 |
| Jun 17, 2014 | Completed final sign-off Jul 2014 | 555 Eddy St | Rain Defense | reroofingDetails
reroofing | $68,000 |
| Jun 3, 2014 | Completed final sign-off Jan 2015 | 555 Eddy St | Palmera Construction Co | unit #9 - remodel (e) studio, demo (e) bearing interior wall, remodel kitchen & bath, lighitng to remodelled areas. new post & beam.Details
unit #9 - remodel (e) studio, demo (e) bearing interior wall, remodel kitchen & bath, lighitng to remodelled areas. new post & beam. | $30,000 |
| Apr 9, 2014 | Completed final sign-off Jan 2015 | 555 Eddy St | Palmera Construction Co | unit #36: remove and add interior walls. remodel kitchen and bath. new lighting to modified spaces.Details
unit #36: remove and add interior walls. remodel kitchen and bath. new lighting to modified spaces. | $25,000 |
| Apr 9, 2014 | Completed final sign-off Oct 2014 | 555 Eddy St | Kwan Wo Ironworks Inc | unit #8: remove and add interior walls. remodel kitchen and bath.add washer and dryer. in-fill vent shaft window in hallway. new lighting to modified spaces.Details
unit #8: remove and add interior walls. remodel kitchen and bath.add washer and dryer. in-fill vent shaft window in hallway. new lighting to modified spaces. | $35,000 |
| Mar 11, 2014 | Completed final sign-off Jul 2014 | 555 Eddy St | Kwan Wo Ironworks Inc | #3- replace existing plumbing fixtures & electrical fixtures with new, replace cabinet cabinet with new, replace tiles in bathroom, replace hardwood floor, paint.Details
#3- replace existing plumbing fixtures & electrical fixtures with new, replace cabinet cabinet with new, replace tiles in bathroom, replace hardwood floor, paint. | $10,000 |
| Nov 13, 2013 | Completed final sign-off Dec 2013 | 555 Eddy St | Schoepp Construction Inc | unit #19 all work done in unit #19, remove/add interior walls, remodel kitchen and bath, new lighting to modified spaces.Details
unit #19 all work done in unit #19, remove/add interior walls, remodel kitchen and bath, new lighting to modified spaces. | $30,000 |
| Feb 13, 2012 | Never finaled issued Feb 2012, no final | 555 Eddy St | street spaceDetails
street space | ||
| Dec 9, 2011 | Never finaled issued Dec 2011, no final | 555 Eddy St | street space permit.Details
street space permit. | ||
| Mar 15, 2007 | Never finaled issued Mar 2007, no final | 555 Eddy St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Feb 18, 2000 | Expired or cancelled cancelled Feb 2000 | 555 Eddy St | install wrought gate w/door closer & inter-com systemDetails
install wrought gate w/door closer & inter-com system | $1,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Palmera Construction Co (4), Kwan Wo Ironworks Inc (2), Rain Defense (2), B B J Electric, Inc, Boss Construction Inc., Hon's Construction Inc., Schoepp Construction Inc
- Architects
- Daniel Barringer (2)
- Engineers
- Daniel Barringer (3), Jefferson Chen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.