Palmera Construction Co
- Based in
- South San Francisco
- On San Francisco permits
- Aug 2008 to Jan 2019
- Last 24 months
- 0 permits filed
198 permits since 2000: 111 completed, 71 never finaled, 16 expired or cancelled.
Of the 71 never-finaled permits, 42 are 5 to 10 years old, 29 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 285 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2018 | Completed final sign-off Nov 2019 | 1230 Monterey Bl | addition to pa #201806081434. demo existing plaster in hallway, bedrooms, staircase & dining room. install insulation. install 5/8" a type x gybd sheetrock, mud and sand.Details
addition to pa #201806081434. demo existing plaster in hallway, bedrooms, staircase & dining room. install insulation. install 5/8" a type x gybd sheetrock, mud and sand. | $20,000 |
| Nov 28, 2017 | Never finaled issued Nov 2017, no final | 64 Cumberland St | replace five front windows to be hung windows replace one bathroom window and one above the stair case replace two kitchen windows and one in the master bedroom. replace one sliding door. all will be aluminum clad wood interior. u factor max. .3Details
replace five front windows to be hung windows replace one bathroom window and one above the stair case replace two kitchen windows and one in the master bedroom. replace one sliding door. all will be aluminum clad wood interior. u factor max. .3 | $7,000 |
| Mar 16, 2016 | Completed final sign-off Apr 2016 | 531 Staples Av | at main floor new hallway to existing stairs. wall removal & replace door and close door opening at 1st floor. remove door between door & storage room. misc interior work.Details
at main floor new hallway to existing stairs. wall removal & replace door and close door opening at 1st floor. remove door between door & storage room. misc interior work. | $10,000 |
| Sep 18, 2013 | Completed final sign-off Oct 2013 | 730 Broadway | comply with nov 201313191 item #2 work not visible from the street, repair stairs less than 50%Details
comply with nov 201313191 item #2 work not visible from the street, repair stairs less than 50% | $1,200 |
| Mar 27, 2012 | Completed final sign-off Oct 2016 | 2529 Post St | demolish (e) dilapidated deck & stair. replace with new deck & stair.Details
demolish (e) dilapidated deck & stair. replace with new deck & stair. | $35,000 |