Block 0159, lot 008
916 Pacific Ave
- City’s use
- Multi-Family Residential
- Built
- 1917
- Stories
- 3
- Units
- 26
- Rooms
- 24 bathrooms
- Building
- 17,021 sq ft
- Lot
- 6,298 sq ft
- Zoning
- RC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 27, 2025 | Completed final sign-off Mar 2025 | 916 Pacific Av | G T M Works Llc Dba Greentree Maint | to comply with #7 of nov 202431434. install missing wood guardrail on section of stairs leading to roof on the interior stairs. new section will be painted. not visible from st.Details
to comply with #7 of nov 202431434. install missing wood guardrail on section of stairs leading to roof on the interior stairs. new section will be painted. not visible from st. | $292 |
| Nov 30, 2022 | Completed final sign-off May 2023 | 916 Pacific Av | B-Side Inc. | unit 2: rehabilitate (e) kitchen and bathroom. install washer and dryer.Details
unit 2: rehabilitate (e) kitchen and bathroom. install washer and dryer. | $24,000 |
| May 6, 2022 | Completed final sign-off Nov 2022 | 916 Pacific Av | unit 23: rehab (e) ktctchen & bath. install washer & dryer.Details
unit 23: rehab (e) ktctchen & bath. install washer & dryer. | $40,000 | |
| Mar 11, 2022 | Completed final sign-off Aug 2022 | 916 Pacific Av | B-Side Inc. | apt 5: add non-load bearing partitions. rehab (e) kitchen & bathroom rehabilitation. install washer/dryer.Details
apt 5: add non-load bearing partitions. rehab (e) kitchen & bathroom rehabilitation. install washer/dryer. | $40,000 |
| Dec 8, 2021 | Completed final sign-off Apr 2022 | 916 Pacific Av | B-Side Inc. | #21: rehabilitate (e) kitchen, (e) bathroom, install washer/dryerDetails
#21: rehabilitate (e) kitchen, (e) bathroom, install washer/dryer | $36,000 |
| Jul 28, 2021 | Never finaled issued Jul 2021, no final | 916 Pacific Av | B-Side Inc. | unit 7. replace bath tub, same location, replace washer & dryer. same location. upgrade line. dryer shall comply with cmc 504.4 and 502.2.1Details
unit 7. replace bath tub, same location, replace washer & dryer. same location. upgrade line. dryer shall comply with cmc 504.4 and 502.2.1 | $25,000 |
| Apr 16, 2021 | Completed final sign-off Apr 2021 | 916 Pacific Av | Brighter Bay Builders Inc | # 19: no new wall and no extg wall relocation. plaster fell during demo of kitchen/bath replacing it with new drywall at living room and bedroom approx 550 sq ft. new sheetrock shall be 5/8" typex gypsum board. revision to app#202010297761Details
# 19: no new wall and no extg wall relocation. plaster fell during demo of kitchen/bath replacing it with new drywall at living room and bedroom approx 550 sq ft. new sheetrock shall be 5/8" typex gypsum board. revision to app#202010297761 | $7,000 |
| Oct 29, 2020 | Completed final sign-off Apr 2021 | 916 Pacific Av | Brighter Bay Builders Inc | 0unit 19: rehabilitate existing bathroom & kitchen. install washer & dryer.Details
0unit 19: rehabilitate existing bathroom & kitchen. install washer & dryer. | $35,000 |
| Sep 2, 2020 | Completed final sign-off Jun 2021 | 916 Pacific Av | Au Electric Corporation/Aec Alarms | upgrade the extg fire alarm system to comply with sffc 1103.7.6.1 and nfpa 72Details
upgrade the extg fire alarm system to comply with sffc 1103.7.6.1 and nfpa 72 | $45,000 |
| May 1, 2019 | Completed final sign-off Mar 2021 | 916 Pacific Av | Wickman Development And Construction | seismic stregthening in accordance with iebc appx a4. target story is ground flr. new wood shear walls, new moment frame, new grade beam commercial - iDetails
seismic stregthening in accordance with iebc appx a4. target story is ground flr. new wood shear walls, new moment frame, new grade beam commercial - i | $82,800 |
| May 1, 2019 | Completed final sign-off Mar 2021 | 916 Pacific Av | Wickman Development And Construction | seismic stregthening in accordance with iebc appx a4. target story is ground flr. new wood shear walls, new moment frame, new grade beam residential - 201905019446Details
seismic stregthening in accordance with iebc appx a4. target story is ground flr. new wood shear walls, new moment frame, new grade beam residential - 201905019446 | $7,200 |
| Apr 8, 2019 | Expired or cancelled cancelled Jan 2026 | 916 Pacific Av | accessible building entrance program in compliance w/ mandate 51-16. power door operator, lower fllor, change door hardware, sidewalk work. abe 202309078544.Details
accessible building entrance program in compliance w/ mandate 51-16. power door operator, lower fllor, change door hardware, sidewalk work. abe 202309078544. | $28,000 | |
| Jun 20, 2018 | Completed final sign-off Nov 2018 | 916 Pacific Av | B-Side Inc. | unit #25: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. n/a for maherDetails
unit #25: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. n/a for maher | $30,000 |
| Apr 4, 2018 | Completed final sign-off Aug 2018 | 916 Pacific Av | Holland Brooks Builders Inc | renovate unit #8 like for like kitchen & bathroom replacement. add washer & dryer & install new reqire throughout unit. no new walls. maher naDetails
renovate unit #8 like for like kitchen & bathroom replacement. add washer & dryer & install new reqire throughout unit. no new walls. maher na | $28,000 |
| Feb 12, 2018 | Expired or cancelled cancelled Jan 2026 | 916 Pacific Av | unit #15: 1) rehabilitate extg kitchen. 2) install washer and dryer.Details
unit #15: 1) rehabilitate extg kitchen. 2) install washer and dryer. | $19,000 | |
| Oct 13, 2017 | Completed final sign-off Dec 2017 | 916 Pacific Av | Palmera Construction Co | #16 - full apt remodel; kitchen , bathroom ; no walls will be removed or addedDetails
#16 - full apt remodel; kitchen , bathroom ; no walls will be removed or added | $20,000 |
| Aug 29, 2017 | Completed final sign-off Jan 2018 | 916 Pacific Av | Rain Defense | reroofing.Details
reroofing. | $54,000 |
| Feb 17, 2017 | Completed final sign-off May 2017 | 916 Pacific Av | Palmera Construction Co | remodeling (e) unit 9 - kitchen and bathroom; no walls will be added or moved; add washer/dryer in (e) hall closet. add sub panel. all lights shall be high efficacy. min one on vacancy sensorDetails
remodeling (e) unit 9 - kitchen and bathroom; no walls will be added or moved; add washer/dryer in (e) hall closet. add sub panel. all lights shall be high efficacy. min one on vacancy sensor | $15,000 |
| Feb 17, 2017 | Never finaled issued Feb 2017, no final | 916 Pacific Av | Palmera Construction Co | remodeling (e) unit 17 - kitchen and bathroom; no walls will be added or moved; add washer/dryer in (e) hall closet. add sub panel. all lights shall be high efficacy. min one on vacancy sensorDetails
remodeling (e) unit 17 - kitchen and bathroom; no walls will be added or moved; add washer/dryer in (e) hall closet. add sub panel. all lights shall be high efficacy. min one on vacancy sensor | $15,000 |
| Feb 6, 2017 | Completed final sign-off Apr 2017 | 916 Pacific Av | Markoff Structural Pest Control | markoff structural termite report # 16660, item #1, 2, 3, 4, 5, 6, 7; all repairs will not affect egress. substructure. n/a maherDetails
markoff structural termite report # 16660, item #1, 2, 3, 4, 5, 6, 7; all repairs will not affect egress. substructure. n/a maher | $60,000 |
| Jan 12, 2010 | Completed final sign-off Feb 2010 | 916 Pacific Av | Sierra Construction | comply w/his nov #200921701 & 200923749 dated 9/25/09 & 10/12/09, restore as it legal use as a commercial space use, remove ekitchen cabinets & counter and return to open area.Details
comply w/his nov #200921701 & 200923749 dated 9/25/09 & 10/12/09, restore as it legal use as a commercial space use, remove ekitchen cabinets & counter and return to open area. | $1,000 |
| Jan 28, 2000 | Completed final sign-off Aug 2016 | 916 Pacific Av | Polichio And Horne Inc | install foundation bolts at four foot centers min embedment 7"Details
install foundation bolts at four foot centers min embedment 7" |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- B-Side Inc. (5), Palmera Construction Co (3), Brighter Bay Builders Inc (2), Wickman Development And Construction (2), Au Electric Corporation/Aec Alarms, G T M Works Llc Dba Greentree Maint, Holland Brooks Builders Inc, Markoff Structural Pest Control, Polichio And Horne Inc, Rain Defense, Sierra Construction
- Engineers
- Joe Kon (2), Joe Win Kon (2), Nathan Williams
- Authorized agents
- Alina Karelina (2)
- Designers
- Joe Kon
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.