Block 0851, lot 013
300 Buchanan St
- City’s use
- Multi-Family Residential
- Built
- 1931
- Stories
- 7
- Units
- 60
- Rooms
- 61 bedrooms, 60 bathrooms
- Building
- 65,241 sq ft
- Lot
- 10,484 sq ft
- Zoning
- RM2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
73 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 11, 2025 | Completed final sign-off Apr 2025 | 300 Buchanan St | G T M Works Llc Dba Greentree Maint | unit #602: in kind kitchen remodel.Details
unit #602: in kind kitchen remodel. | $25,000 |
| Jun 28, 2023 | Completed final sign-off Nov 2023 | 300 Buchanan St | Rain Defense | remove the existing 3 windows. install the new dual panel, wood windows to rough opening. visible from street. like for like replacement. same sizes , same locations. u-factor = 0.30.Details
remove the existing 3 windows. install the new dual panel, wood windows to rough opening. visible from street. like for like replacement. same sizes , same locations. u-factor = 0.30. | $7,900 |
| Nov 16, 2022 | In progress issued Feb 2024 | 300 Buchanan St | Doherty Restoration, Inc. | relocate (e) laundry to basement floor, reconfigure (e) trash room, remove (4) off street parking spots in ground floor garage. non-visible changes to exterior. coordinate with 2022-0310-9641Details
relocate (e) laundry to basement floor, reconfigure (e) trash room, remove (4) off street parking spots in ground floor garage. non-visible changes to exterior. coordinate with 2022-0310-9641 | $20,000 |
| Mar 10, 2022 | Never finaled filed Mar 2022, never issued | 300 Buchanan St | Doherty Restoration, Inc. | addition of 9 adu units at the ground floor under the local adu program.Details
addition of 9 adu units at the ground floor under the local adu program. | $1,000,000 |
| Feb 14, 2022 | Completed final sign-off Oct 2022 | 300 Buchanan St | Brighter Bay Builders Inc, Axel8 Construction | apt 510. convert (e) kitchen to bedroom. relocate kitchen, rehab (e) bathroom, install washer/dryer.Details
apt 510. convert (e) kitchen to bedroom. relocate kitchen, rehab (e) bathroom, install washer/dryer. | $28,000 |
| Nov 8, 2021 | Completed final sign-off Sep 2022 | 300 Buchanan St | Brighter Bay Builders Inc, Axel8 Construction | unit 207 convert e kitchen to bedroom, relocate kitchen, rehab e bath, install washer dryerDetails
unit 207 convert e kitchen to bedroom, relocate kitchen, rehab e bath, install washer dryer | $32,000 |
| Oct 22, 2021 | Completed final sign-off Nov 2021 | 300 Buchanan St | Blu Sky Restoration Contractors Llc | unit 108: remove and install cabinets in (1) kitchenDetails
unit 108: remove and install cabinets in (1) kitchen | $5,000 |
| Aug 24, 2021 | Completed final sign-off Feb 2022 | 300 Buchanan St | Axel8 Construction | #306: 1) convert extg kitchen to bedroom. 2)relocate main entry. 3)relocate kitchen. 4) rehabilitate extg bathroom. 5)install washer and dryerDetails
#306: 1) convert extg kitchen to bedroom. 2)relocate main entry. 3)relocate kitchen. 4) rehabilitate extg bathroom. 5)install washer and dryer | $40,000 |
| Jul 28, 2021 | Completed final sign-off Jun 2022 | 300 Buchanan St | Axel8 Construction | unit. 406. convert existing closet to bedroom.Details
unit. 406. convert existing closet to bedroom. | $10,000 |
| Jul 2, 2021 | Completed final sign-off Jan 2022 | 300 Buchanan St | Axel8 Construction | unit 502 - convert existing kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer & dryerDetails
unit 502 - convert existing kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer & dryer | $40,000 |
| Jun 16, 2021 | Completed final sign-off Dec 2021 | 300 Buchanan St | Axel8 Construction | unit 206: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer and dryer.Details
unit 206: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer and dryer. | $40,000 |
| May 14, 2020 | Expired or cancelled withdrawn Jun 2020 | 300 Buchanan St | unit 305: convert (e) kitchen into bedroom, relocate kitchen, rehabilitate (e) bathroomDetails
unit 305: convert (e) kitchen into bedroom, relocate kitchen, rehabilitate (e) bathroom | $35,000 | |
| Jan 17, 2020 | Completed final sign-off Nov 2021 | 300 Buchanan St | Axel8 Construction | #407 on 5th fl: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom, install washer & dryer. maher naDetails
#407 on 5th fl: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom, install washer & dryer. maher na | $40,000 |
| Oct 28, 2019 | Never finaled issued Oct 2019, no final | 300 Buchanan St | street spaceDetails
street space | ||
| Oct 23, 2019 | Never finaled issued Jan 2020, no final | 300 Buchanan St | street spaceDetails
street space | ||
| Oct 22, 2019 | Never finaled issued Oct 2019, no final | 300 Buchanan St | street spaceDetails
street space | ||
| Sep 27, 2019 | Never finaled issued Oct 2019, no final | 300 Buchanan St | Axel8 Construction | unit 202 - convert (e) closet to kitchen; convert (e) kitchen to bedroom; relocate kitchen; rehabilitate existing bathroom & install washer/dryer. 3rd floor,Details
unit 202 - convert (e) closet to kitchen; convert (e) kitchen to bedroom; relocate kitchen; rehabilitate existing bathroom & install washer/dryer. 3rd floor, | $40,000 |
| Sep 27, 2019 | Never finaled issued Oct 2019, no final | 300 Buchanan St | Axel8 Construction | unit 401 - convert (e) kitchen to bedroom; relocate kitchen; rehabilitate existing bathroom & install washer/dryerDetails
unit 401 - convert (e) kitchen to bedroom; relocate kitchen; rehabilitate existing bathroom & install washer/dryer | $42,000 |
| Apr 2, 2019 | Completed final sign-off Jul 2019 | 300 Buchanan St | Doherty Restoration, Inc. | convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e0 bedroom, install w/dDetails
convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e0 bedroom, install w/d | $40,000 |
| Mar 14, 2019 | Completed final sign-off Jul 2020 | 300 Buchanan St | Hue & Cry Security System | as built in ref to permit #201807174774. reliabled device addresses to coordinate with panel programingDetails
as built in ref to permit #201807174774. reliabled device addresses to coordinate with panel programing | |
| Nov 9, 2018 | Completed final sign-off Mar 2019 | 300 Buchanan St | Hon's Construction Inc. | unit #105: 1) convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer.Details
unit #105: 1) convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. | $38,000 |
| Jul 26, 2018 | Never finaled issued Aug 2018, no final | 300 Buchanan St | Palmera Construction Co | unit #605:rehabilitate existing kitchen, rehabilitate existing bathroom, install washer & dryerDetails
unit #605:rehabilitate existing kitchen, rehabilitate existing bathroom, install washer & dryer | $32,000 |
| Jul 17, 2018 | Completed final sign-off Mar 2021 | 300 Buchanan St | Hue & Cry Security System | installation of new fa system w/full wireless interior notification in all sleeping areas. smoke & pulls in common areas. bldg is partially sprinklered. monitored by cell communicator. **maher n/a**Details
installation of new fa system w/full wireless interior notification in all sleeping areas. smoke & pulls in common areas. bldg is partially sprinklered. monitored by cell communicator. **maher n/a** | $72,325 |
| Jul 12, 2018 | Completed final sign-off Sep 2018 | 300 Buchanan St | B-Side Inc. | garage walls on ceiling putting fire protection coulking. maher naDetails
garage walls on ceiling putting fire protection coulking. maher na | $2,000 |
| Apr 27, 2018 | Completed final sign-off Oct 2018 | 300 Buchanan St | Euro Plumbing Inc, General Contractor | #507: rehabiliate existing kitchen, rehabilitate existing bathroom, install washer & dryer. maher naDetails
#507: rehabiliate existing kitchen, rehabilitate existing bathroom, install washer & dryer. maher na | $30,000 |
| Feb 14, 2018 | Completed final sign-off Jul 2018 | 300 Buchanan St | Euro Plumbing Inc, General Contractor | unit #406: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer.Details
unit #406: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. | $28,000 |
| Dec 12, 2017 | Completed final sign-off Apr 2018 | 300 Buchanan St | Euro Plumbing Inc, General Contractor | ste. #205: remodel kitchen and bathroom. updating electrical subpanel and plumbing. maher n/aDetails
ste. #205: remodel kitchen and bathroom. updating electrical subpanel and plumbing. maher n/a | $20,000 |
| Nov 20, 2017 | Completed final sign-off Dec 2017 | 300 Buchanan St | B-Side Inc. | comply with nov 201796321(item 3) - repair holes in garage ceiling. repair in kind; n/a maherDetails
comply with nov 201796321(item 3) - repair holes in garage ceiling. repair in kind; n/a maher | $1,000 |
| Nov 7, 2017 | Expired or cancelled cancelled Jan 2026 | 300 Buchanan St | unit #205: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)convert closet into a sleeping nook. 4) install washer and dryer. n/a for maherDetails
unit #205: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)convert closet into a sleeping nook. 4) install washer and dryer. n/a for maher | $28,000 | |
| Aug 17, 2017 | Never finaled issued Aug 2017, no final | 300 Buchanan St | Hon's Construction Inc. | unit#401 remodel kitchen & bathroom like and kind, paint & refinish floors. n/a for maher.Details
unit#401 remodel kitchen & bathroom like and kind, paint & refinish floors. n/a for maher. | $34,000 |
| Feb 8, 2017 | Never finaled issued Feb 2017, no final | 300 Buchanan St | D F K Y Construction Inc | #208- revision to pa#201610261207, reconfigure kitchen & closets. n/a ordinance #155-13Details
#208- revision to pa#201610261207, reconfigure kitchen & closets. n/a ordinance #155-13 | |
| Dec 15, 2016 | Completed final sign-off Jul 2017 | 300 Buchanan St | Hon's Construction Inc. | remodel unit 107 on 2nd fl. convert e kitchen into bdrm, relocate kitchen, remodel e bath, add washer\dryer. no exterior workDetails
remodel unit 107 on 2nd fl. convert e kitchen into bdrm, relocate kitchen, remodel e bath, add washer\dryer. no exterior work | $38,000 |
| Dec 15, 2016 | Completed final sign-off Aug 2017 | 300 Buchanan St | Hon's Construction Inc. | remodel unit 404 on the 5th fl- remodel e kitchen, remodel e bathroom, convert e closet into bedroom, add 2nd bathroom, add washer dryerDetails
remodel unit 404 on the 5th fl- remodel e kitchen, remodel e bathroom, convert e closet into bedroom, add 2nd bathroom, add washer dryer | $39,000 |
| Nov 14, 2016 | Never finaled issued Nov 2016, no final | 300 Buchanan St | street spaceDetails
street space | ||
| Oct 26, 2016 | Completed final sign-off Jul 2017 | 300 Buchanan St | Hon's Construction Inc. | unit 305, 4th floor - remodel (e) kitchen & bathroom. convert (e) kitchen to bedroom. add washer & dryerDetails
unit 305, 4th floor - remodel (e) kitchen & bathroom. convert (e) kitchen to bedroom. add washer & dryer | $30,000 |
| Oct 26, 2016 | Completed final sign-off Mar 2017 | 300 Buchanan St | K F L Construction Inc. | unit 310, 4th floor - relocate (e) kitchen, remodel (e) bathroom, convert (e) kitchen to bedroom, add washer & dryerDetails
unit 310, 4th floor - relocate (e) kitchen, remodel (e) bathroom, convert (e) kitchen to bedroom, add washer & dryer | $38,000 |
| Oct 26, 2016 | Completed final sign-off Apr 2017 | 300 Buchanan St | D F K Y Construction Inc | unit 208, 3rd floor - remodel (e) kitchen & bathroom. convert (e) closet to a den. add washer and dryer. maher naDetails
unit 208, 3rd floor - remodel (e) kitchen & bathroom. convert (e) closet to a den. add washer and dryer. maher na | $38,000 |
| Aug 31, 2016 | Completed final sign-off Feb 2017 | 300 Buchanan St | D F K Y Construction Inc | unit #102; 2/f: remodel (e) bathroom & kitchen. add washer & dryer. n/a ordinance #155-13Details
unit #102; 2/f: remodel (e) bathroom & kitchen. add washer & dryer. n/a ordinance #155-13 | $38,000 |
| Aug 19, 2016 | Completed final sign-off Mar 2017 | 300 Buchanan St | D F K Y Construction Inc | remodel unit 609, 7th floor - remodel (e) bathroom and kitche. add washer and dryerDetails
remodel unit 609, 7th floor - remodel (e) bathroom and kitche. add washer and dryer | $25,000 |
| Aug 1, 2016 | Never finaled issued Aug 2016, no final | 300 Buchanan St | street spaceDetails
street space | ||
| Jul 12, 2016 | Completed final sign-off Dec 2016 | 300 Buchanan St | 3rd flr, unit# 210: remodel (e) bedroom. relocate (e) kitchen. convert (e) kitchen / dining room to bedroom. add washer & dryer maher naDetails
3rd flr, unit# 210: remodel (e) bedroom. relocate (e) kitchen. convert (e) kitchen / dining room to bedroom. add washer & dryer maher na | $40,000 | |
| Jul 12, 2016 | Completed final sign-off Dec 2016 | 300 Buchanan St | D F K Y Construction Inc | 3rd flr, unit# 201: remodel (e) bedroom. relocate (e) kitchen. convert (e) kitchen to bedroom. add washer & dryer maher naDetails
3rd flr, unit# 201: remodel (e) bedroom. relocate (e) kitchen. convert (e) kitchen to bedroom. add washer & dryer maher na | $40,000 |
| Jul 12, 2016 | Completed final sign-off Dec 2016 | 300 Buchanan St | D F K Y Construction Inc | revision to 2015-1117-2818. revise floor plan unit 106. n/a maher ord 155f-13Details
revision to 2015-1117-2818. revise floor plan unit 106. n/a maher ord 155f-13 | |
| Jul 12, 2016 | Completed final sign-off Dec 2016 | 300 Buchanan St | D F K Y Construction Inc | 2nd flr, unit#101: remodel (e) bathroom. relocate (e) kitchen. convert (e) kitchen to bedroom. add washer & dryer maher naDetails
2nd flr, unit#101: remodel (e) bathroom. relocate (e) kitchen. convert (e) kitchen to bedroom. add washer & dryer maher na | $40,000 |
| Jun 17, 2016 | Expired or cancelled cancelled Jan 2026 | 300 Buchanan St | revision to pa 2015-0417-4002 - remove roof deck from scope of workDetails
revision to pa 2015-0417-4002 - remove roof deck from scope of work | ||
| Apr 22, 2016 | Completed final sign-off Sep 2016 | 300 Buchanan St | Sure, Inc. | remodel unit 308 at 4th fl, remodel existing bath, remodel existing kitchen, add washer dryer. n/a ordinance #155-13Details
remodel unit 308 at 4th fl, remodel existing bath, remodel existing kitchen, add washer dryer. n/a ordinance #155-13 | $25,000 |
| Apr 5, 2016 | Never finaled issued Apr 2016, no final | 300 Buchanan St | street spaceDetails
street space | ||
| Feb 5, 2016 | Expired or cancelled cancelled Aug 2016 | 300 Buchanan St | Malagic Construction | to comply with complaint # 201471841, replace old kitchen countertop with new , new bathtub tile,surround, tile floor, no structural work, no walls moved or removed, added or infilled. all (e) layout to remain unchanged, in unit 210 & 101Details
to comply with complaint # 201471841, replace old kitchen countertop with new , new bathtub tile,surround, tile floor, no structural work, no walls moved or removed, added or infilled. all (e) layout to remain unchanged, in unit 210 & 101 | $15,000 |
| Jan 5, 2016 | Completed final sign-off May 2016 | 300 Buchanan St | Sure, Inc. | unit #409: remodel at the 4th floor. remodel extg kitchen. remodel extg bathroom. add den and washer and dryer. n/a maher ord. 155-13Details
unit #409: remodel at the 4th floor. remodel extg kitchen. remodel extg bathroom. add den and washer and dryer. n/a maher ord. 155-13 | $25,000 |
| Nov 17, 2015 | Completed final sign-off Dec 2016 | 300 Buchanan St | Sure, Inc. | unit 106, remodel existing bathroom & kitchen. add bedroom. add washer/dryer. maher naDetails
unit 106, remodel existing bathroom & kitchen. add bedroom. add washer/dryer. maher na | $18,000 |
| Nov 17, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | Sure, Inc. | unit 508, remodel existing bathroom. 2nd bathroom & den. relocate & remodel (e) kitchen. add washer/dryer. maher naDetails
unit 508, remodel existing bathroom. 2nd bathroom & den. relocate & remodel (e) kitchen. add washer/dryer. maher na | $30,000 |
| Oct 5, 2015 | Never finaled issued Oct 2015, no final | 300 Buchanan St | street spaceDetails
street space | ||
| Oct 5, 2015 | Never finaled issued Oct 2015, no final | 300 Buchanan St | street spaceDetails
street space | ||
| Apr 21, 2015 | Never finaled issued Jun 2015, no final | 300 Buchanan St | C&M Development & Construction Inc | unit # 402: convert unit from 1 studio unit to 1 bedroom unit, remodel kitchen & bathroom. remove non-load bearing wallsDetails
unit # 402: convert unit from 1 studio unit to 1 bedroom unit, remodel kitchen & bathroom. remove non-load bearing walls | $20,000 |
| Apr 17, 2015 | Completed final sign-off Oct 2016 | 300 Buchanan St | C&M Development & Construction Inc | unit# 109 & adjacent roof. remove & add interior walls. remodel kitchen & bath. add new bath. convert (e) closet & hallway closet into (n) home office. add w/d. convert (e) roof to roof deck. new lighting to modified spaces. maher - not req'dDetails
unit# 109 & adjacent roof. remove & add interior walls. remodel kitchen & bath. add new bath. convert (e) closet & hallway closet into (n) home office. add w/d. convert (e) roof to roof deck. new lighting to modified spaces. maher - not req'd | $70,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | C&M Development & Construction Inc | unt #608 - convert from 1 bedroom, 1 bath unit to 2 bedrooms, 2 baths unit. remodel kitchen, remove & relocate non-load bearing wall. n/a maher ordinanceDetails
unt #608 - convert from 1 bedroom, 1 bath unit to 2 bedrooms, 2 baths unit. remodel kitchen, remove & relocate non-load bearing wall. n/a maher ordinance | $20,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | C&M Development & Construction Inc | unt #204 - convert from 1 bedroom apartment to two bedrooms, two baths unit, remodel kitchen, remove non-load bearing wall. n/a maher ordinanceDetails
unt #204 - convert from 1 bedroom apartment to two bedrooms, two baths unit, remodel kitchen, remove non-load bearing wall. n/a maher ordinance | $30,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | C&M Development & Construction Inc | unt #403 - convert from 1 bedroom,1 bath unit to 2 bedrooms, 2 bathrooms unit. remodel kitchen, remove non-load bearing wall. n/a maher ordinanceDetails
unt #403 - convert from 1 bedroom,1 bath unit to 2 bedrooms, 2 bathrooms unit. remodel kitchen, remove non-load bearing wall. n/a maher ordinance | $38,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | C&M Development & Construction Inc | unt #607 - convert from 1 studio unit to 1 bedroom unit. remodel kitchen & bathroom, remove relocate non-load bearing wall. n/a maher ordinanceDetails
unt #607 - convert from 1 studio unit to 1 bedroom unit. remodel kitchen & bathroom, remove relocate non-load bearing wall. n/a maher ordinance | $20,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | C&M Development & Construction Inc | unt #604 - convert from 1 bedroom, 1 bath unit to 2 bedrooms, 2 baths unit, remodel kitchen, remove non-load bearing wall. n/a maher ordinanceDetails
unt #604 - convert from 1 bedroom, 1 bath unit to 2 bedrooms, 2 baths unit, remodel kitchen, remove non-load bearing wall. n/a maher ordinance | $30,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | C&M Development & Construction Inc | unt #307 - convert from studio to 1 bedroom apartment, remodel kitchen & bathroom, remov enon-load bearing wall. n/a maher ordinanceDetails
unt #307 - convert from studio to 1 bedroom apartment, remodel kitchen & bathroom, remov enon-load bearing wall. n/a maher ordinance | $20,000 |
| Feb 11, 2015 | Completed final sign-off Feb 2015 | 300 Buchanan St | Sandbank Construction, Inc | pour concrete 24 sq ft to replace existing inside garage.Details
pour concrete 24 sq ft to replace existing inside garage. | $600 |
| Dec 18, 2014 | Completed final sign-off Feb 2015 | 300 Buchanan St | Empnc Inc. Dba Empire Community Painting | two(2) stucco cracks on front of building, remove under six(6) sq. ft. of stucco to repair, for documentation purposes for waterproofing. compliance with maher ordinance no 155-13 not required.Details
two(2) stucco cracks on front of building, remove under six(6) sq. ft. of stucco to repair, for documentation purposes for waterproofing. compliance with maher ordinance no 155-13 not required. | $5,000 |
| May 30, 2014 | Never finaled issued May 2014, no final | 300 Buchanan St | Eagle Ridge Construction And Roofing | to comply w/ nov#201076027 paragraphs #3,4,5,6&7. 3-locate source of water damage. 4-repair damage ceilings. 5-repair damaged walls. 6-repair floor covering. 7-remove or cover damaged paint. all replaced ceiling elements to maintain fire separation requirements.Details
to comply w/ nov#201076027 paragraphs #3,4,5,6&7. 3-locate source of water damage. 4-repair damage ceilings. 5-repair damaged walls. 6-repair floor covering. 7-remove or cover damaged paint. all replaced ceiling elements to maintain fire separation requirements. | $4,000 |
| Mar 10, 2014 | Expired or cancelled cancelled Jan 2026 | 300 Buchanan St | revision to previous pa 2013-1210-3816. all work done unit #504. modifications to (n) bath, kitchen area and bedroom next to the entrance.Details
revision to previous pa 2013-1210-3816. all work done unit #504. modifications to (n) bath, kitchen area and bedroom next to the entrance. | ||
| Dec 10, 2013 | Completed final sign-off Apr 2014 | 300 Buchanan St | B-Side Inc. | unit #504 and 505: remove and add interior walls. remodel bath & kitchen. add new bathroom. add washer and dryer. new lighting to modified spaces. compliance with ordinance 155-13 not required.Details
unit #504 and 505: remove and add interior walls. remodel bath & kitchen. add new bathroom. add washer and dryer. new lighting to modified spaces. compliance with ordinance 155-13 not required. | $40,000 |
| Dec 10, 2013 | Completed final sign-off May 2014 | 300 Buchanan St | B-Side Inc. | unit #405:remove and add interior walls. remodel bath. relocate kitchen to extg closet. convert kitchen/dining into new bedroom. add washer and dryer. new lighting to modification spaces.Details
unit #405:remove and add interior walls. remodel bath. relocate kitchen to extg closet. convert kitchen/dining into new bedroom. add washer and dryer. new lighting to modification spaces. | $35,000 |
| Oct 18, 2010 | Never finaled issued Oct 2010, no final | 300 Buchanan St | D3 Construction | to comply w/his nov #201038218, dated 3/30/10 item 6,7,8.Details
to comply w/his nov #201038218, dated 3/30/10 item 6,7,8. | $1,500 |
| Jun 21, 2002 | Completed final sign-off Oct 2002 | 300 Buchanan St | On-Site Maintenance | remove existing & install new kitchen cabinets. install new sink, faucet water lines drain/retrap. rDetails
remove existing & install new kitchen cabinets. install new sink, faucet water lines drain/retrap. r | $5,000 |
| Apr 22, 2002 | Expired or cancelled expired Aug 2002 | 300 Buchanan St | On-Site Maintenance | replace expired permit 952483 2001/11/02/2419 for finalDetails
replace expired permit 952483 2001/11/02/2419 for final | $2,000 |
| Mar 18, 2002 | Expired or cancelled expired Jul 2002 | 300 Buchanan St | Pacific Automatic Sprinkler | fire sprinkler work only,connect to (e)fire sprinkler system to install 3 fire sprinklers(new garagDetails
fire sprinkler work only,connect to (e)fire sprinkler system to install 3 fire sprinklers(new garag | $1,450 |
| Mar 5, 2002 | Completed final sign-off Mar 2002 | 300 Buchanan St | On-Site Maintenance | bld&create garbage room as req by nov 200118421.&install 2 1 hr doors,gfci,new light fix. ,motion seDetails
bld&create garbage room as req by nov 200118421.&install 2 1 hr doors,gfci,new light fix. ,motion se | $11,000 |
| Nov 2, 2001 | Expired or cancelled expired Mar 2002 | 300 Buchanan St | On-Site Maintenance | new kitchen outlets and faucets new sheet rock and bathroomDetails
new kitchen outlets and faucets new sheet rock and bathroom | $2,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.