Block 0738, lot 020
950 Franklin St
- City’s use
- Multi-Family Residential
- Built
- 1931
- Stories
- 7
- Units
- 54
- Rooms
- 24 bedrooms, 54 bathrooms
- Building
- 50,480 sq ft
- Lot
- 8,250 sq ft
- Zoning
- RM4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
50 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2024 | Completed final sign-off May 2026 | 950 Franklin St | Halyard Inc | upgrade fire alarm systems to current codes, nfpa 72 (2022), to comply with sffc 1103.7.6.1 to provide low frequency sounders in sleeping areas.Details
upgrade fire alarm systems to current codes, nfpa 72 (2022), to comply with sffc 1103.7.6.1 to provide low frequency sounders in sleeping areas. | $111,754 |
| Feb 23, 2023 | Expired or cancelled cancelled Jan 2026 | 995 Ellis St | to comply with accessible business entrance program per ord 51-16. ref abe 201812173068. install new power door operator per da-05.Details
to comply with accessible business entrance program per ord 51-16. ref abe 201812173068. install new power door operator per da-05. | $5,000 | |
| Feb 23, 2023 | Expired or cancelled cancelled Jan 2026 | 985 Ellis St | to comply with accessible business entrance program per ord 51-16. ref abe 202301066024. install new power door operator per da-05.Details
to comply with accessible business entrance program per ord 51-16. ref abe 202301066024. install new power door operator per da-05. | $5,000 | |
| Dec 20, 2022 | Never finaled issued Mar 2023, no final | 985 Ellis St | add addresses 985 ellis st to apn 0738/020 per sanborn map.Details
add addresses 985 ellis st to apn 0738/020 per sanborn map. | ||
| Sep 15, 2022 | Completed final sign-off Nov 2022 | 950 Franklin St | Hon's Construction Inc. | unit #47: remove and replace kitchen countertopsDetails
unit #47: remove and replace kitchen countertops | $5,500 |
| Apr 13, 2022 | Never finaled filed Apr 2022, never issued | 995 Ellis St | conversion of an existing lcu space to one adu unit at the ground floor of a residential mixed-use building per the local adu program. add loft and interior spiral stairs within the ground floor unit.Details
conversion of an existing lcu space to one adu unit at the ground floor of a residential mixed-use building per the local adu program. add loft and interior spiral stairs within the ground floor unit. | $120,000 | |
| Apr 8, 2022 | Expired or cancelled cancelled Jan 2026 | 950 Franklin St | Boss Construction Inc. | #38: 1) revision to pa#202201276824. 2)rehabilitate extg kitchen. 3)rehabilitate extg bathroom.Details
#38: 1) revision to pa#202201276824. 2)rehabilitate extg kitchen. 3)rehabilitate extg bathroom. | |
| Jan 27, 2022 | Completed final sign-off Jun 2022 | 950 Franklin St | Boss Construction Inc. | unit 38: convert existing kitchen and dining room to study. relocate kitchen. rehab existing bathroom. install washer/dryer.Details
unit 38: convert existing kitchen and dining room to study. relocate kitchen. rehab existing bathroom. install washer/dryer. | $32,000 |
| Feb 24, 2021 | Completed final sign-off Feb 2022 | 950 Franklin St | Boss Construction Inc. | unit #54: convert existing kitchen to bedroom. relocate kitchen. rehabilitate bathroom. install washer/dryer.Details
unit #54: convert existing kitchen to bedroom. relocate kitchen. rehabilitate bathroom. install washer/dryer. | $42,000 |
| Dec 18, 2020 | Completed final sign-off Jan 2022 | 950 Franklin St | Boss Construction Inc. | unit 71 - 7th flr. convert (e) kitchen to bedroom to create second bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer and dryer. must comply with 2019 sffc sec 1103.7.6.1. fire alarm under separate permit.Details
unit 71 - 7th flr. convert (e) kitchen to bedroom to create second bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer and dryer. must comply with 2019 sffc sec 1103.7.6.1. fire alarm under separate permit. | $40,000 |
| Dec 15, 2020 | Completed final sign-off Sep 2021 | 950 Franklin St | Boss Construction Inc. | #64: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer and dryer.Details
#64: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer and dryer. | $40,000 |
| Feb 18, 2020 | Never finaled issued Feb 2020, no final | 950 Franklin St | Axa Construction | add washer/dryer (ventless) into existing closet.Details
add washer/dryer (ventless) into existing closet. | $3,000 |
| Aug 26, 2019 | Expired or cancelled cancelled Jan 2026 | 995 Ellis St | to erect non-electrical wall sign(gkp market organic indian food & deli)Details
to erect non-electrical wall sign(gkp market organic indian food & deli) | $500 | |
| Jul 10, 2019 | Completed final sign-off Oct 2019 | 950 Franklin St | Axa Construction | unit #36: 1) convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer.Details
unit #36: 1) convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. | $42,000 |
| Nov 6, 2018 | Completed final sign-off Feb 2019 | 950 Franklin St | Euro Plumbing Inc, General Contractor | unit 58 - convert kitchen & dining to bedroom; relocate kitchen; rehabilitate existing bathroom and install washer/dryerDetails
unit 58 - convert kitchen & dining to bedroom; relocate kitchen; rehabilitate existing bathroom and install washer/dryer | $40,000 |
| Jul 11, 2018 | Never finaled issued Jul 2018, no final | 950 Franklin St | street spaceDetails
street space | ||
| Jun 12, 2018 | Never finaled issued Jun 2018, no final | 950 Franklin St | street spaceDetails
street space | ||
| Dec 28, 2017 | Never finaled issued Jan 2018, no final | 950 Franklin St | Euro Plumbing Inc, General Contractor | #32 -1) convert dining room to bedroom. 2)rehabilitate extg kitchen. 3)rehabilitate extg bathroom. 4)install washer an dryer.Details
#32 -1) convert dining room to bedroom. 2)rehabilitate extg kitchen. 3)rehabilitate extg bathroom. 4)install washer an dryer. | $29,000 |
| Nov 9, 2017 | Completed final sign-off Mar 2018 | 950 Franklin St | units #21 and 22: kitchen and bathroom remodel. upgrade electrical subpanel and plumbing fixtures. replace shower valve, replace kitchen cabinets. all work in kind replacement.Details
units #21 and 22: kitchen and bathroom remodel. upgrade electrical subpanel and plumbing fixtures. replace shower valve, replace kitchen cabinets. all work in kind replacement. | $20,000 | |
| Aug 9, 2017 | Completed final sign-off Aug 2017 | 950 Franklin St | Fault Line Plumbing Inc | work in unit #78 only: to comply with notice of violation #201759941. penetrate unterior wall to connect new radiator to (e) central heating system. patch. resolving notice of violation concerning lack of heat source in unit.Details
work in unit #78 only: to comply with notice of violation #201759941. penetrate unterior wall to connect new radiator to (e) central heating system. patch. resolving notice of violation concerning lack of heat source in unit. | $11,000 |
| Nov 2, 2016 | Completed final sign-off May 2017 | 950 Franklin St | Palmera Construction Co | 5th floor unit #53 - remodel (e) kitchen, (e) bathroom. convert (e) dining room to a bedroom. add washer/dryerDetails
5th floor unit #53 - remodel (e) kitchen, (e) bathroom. convert (e) dining room to a bedroom. add washer/dryer | $28,000 |
| Apr 26, 2016 | Never finaled issued Apr 2016, no final | 950 Franklin St | street spaceDetails
street space | ||
| Mar 21, 2016 | Completed final sign-off Aug 2016 | 950 Franklin St | Sandbank Construction, Inc | #78- remodel unit #78 (studio), remodel existing bathroom, relocate & remodel existing kitchen, convert existing dining into study room (not for sleeping), add washer and dryer. unit to remain a studioDetails
#78- remodel unit #78 (studio), remodel existing bathroom, relocate & remodel existing kitchen, convert existing dining into study room (not for sleeping), add washer and dryer. unit to remain a studio | $27,000 |
| Nov 24, 2015 | Never finaled issued Nov 2015, no final | 950 Franklin St | street spaceDetails
street space | ||
| Nov 18, 2015 | Never finaled issued Nov 2015, no final | 950 Franklin St | street spaceDetails
street space | ||
| Jul 31, 2015 | Completed final sign-off Mar 2016 | 950 Franklin St | Sandbank Construction, Inc | 1) remodel unit #44 at the 4th floor. 2)add washer and dryer. 3)relocate kitchen. 4)remodel extg bathroom.Details
1) remodel unit #44 at the 4th floor. 2)add washer and dryer. 3)relocate kitchen. 4)remodel extg bathroom. | $35,000 |
| Jul 15, 2015 | Completed final sign-off Jan 2016 | 950 Franklin St | Sandbank Construction, Inc | unit 31 - rev. to 201503261999 - interior alterations to unit 31 on 3rd fl. relocate kitchen, remodel bathroom, add washer/dryerDetails
unit 31 - rev. to 201503261999 - interior alterations to unit 31 on 3rd fl. relocate kitchen, remodel bathroom, add washer/dryer | |
| Jun 29, 2015 | Never finaled issued Jun 2015, no final | 950 Franklin St | B-Side Inc. | unit 61: replacment of kitchen cabinet, no electrical or plumbing. none structural. top cabinets only.Details
unit 61: replacment of kitchen cabinet, no electrical or plumbing. none structural. top cabinets only. | $1,500 |
| Jun 1, 2015 | Completed final sign-off Jan 2016 | 950 Franklin St | Sandbank Construction, Inc | unit #24 remodel at 2nd floor - additoin of new washer & dryer.Details
unit #24 remodel at 2nd floor - additoin of new washer & dryer. | $8,000 |
| Mar 27, 2015 | Never finaled issued Mar 2015, no final | 950 Franklin St | street spaceDetails
street space | ||
| Mar 26, 2015 | Completed final sign-off Jan 2016 | 950 Franklin St | Sandbank Construction, Inc | unit 31: remodel of kitchen and bathroom and add a washer and dryer.Details
unit 31: remodel of kitchen and bathroom and add a washer and dryer. | $30,000 |
| Mar 24, 2015 | Never finaled issued Mar 2015, no final | 950 Franklin St | street space permitDetails
street space permit | ||
| Oct 15, 2014 | Completed final sign-off Feb 2015 | 950 Franklin St | Sandbank Construction, Inc | remodel unit 62. remove e non bearing walls, relocate kitchen fixtures, cabinets. remodel bath in kind. add washer dryerDetails
remodel unit 62. remove e non bearing walls, relocate kitchen fixtures, cabinets. remodel bath in kind. add washer dryer | $10,000 |
| Oct 15, 2014 | Completed final sign-off Feb 2015 | 950 Franklin St | Sandbank Construction, Inc | remodel unit 42. remove non bearing walls. relocate kitchen fixutres and cabinets. remodel bath in kind. add washer and dryerDetails
remodel unit 42. remove non bearing walls. relocate kitchen fixutres and cabinets. remodel bath in kind. add washer and dryer | $10,000 |
| Oct 1, 2014 | Completed final sign-off Apr 2015 | 950 Franklin St | Sandbank Construction, Inc | unit 76 - remdol remove non-bearing wall; add den & closet, relocate of kitchen fixtures & cabinets; remodel bathroomDetails
unit 76 - remdol remove non-bearing wall; add den & closet, relocate of kitchen fixtures & cabinets; remodel bathroom | $10,000 |
| Jul 23, 2014 | Completed final sign-off Apr 2015 | 950 Franklin St | Sandbank Construction, Inc | all work done in unit # 73. remove & add interior non-bearing walls. remodel kithcen & bath. new bedroom. new bath, add washer/dryer. new lighting to modified spaces.Details
all work done in unit # 73. remove & add interior non-bearing walls. remodel kithcen & bath. new bedroom. new bath, add washer/dryer. new lighting to modified spaces. | $50,000 |
| Jul 21, 2014 | Completed final sign-off Nov 2014 | 950 Franklin St | Construction Depot Inc | #25 - bathroom remodel - to comply with cec150(k) 10Details
#25 - bathroom remodel - to comply with cec150(k) 10 | $20,000 |
| Jul 2, 2014 | Completed final sign-off Dec 2014 | 950 Franklin St | Sandbank Construction, Inc | all work in unit #65 - remove /add interior non-bearing walls. remodel bath, relcoate kitchen, new bedroom, add washer/dryer. new lighting to remodeled areas.Details
all work in unit #65 - remove /add interior non-bearing walls. remodel bath, relcoate kitchen, new bedroom, add washer/dryer. new lighting to remodeled areas. | $35,000 |
| Jun 24, 2014 | Completed final sign-off Nov 2014 | 950 Franklin St | Construction Depot Inc | unit #2:kitchen remodel. bath remodel. convert shower into w/d closet. no change on walls.Details
unit #2:kitchen remodel. bath remodel. convert shower into w/d closet. no change on walls. | $20,000 |
| May 30, 2014 | Expired or cancelled cancelled Oct 2014 | 950 Franklin St | Malagic Construction | #65: new tile tub surround, tile floor, new sink and toilet, partial bathroom remodel in 9 bathDetails
#65: new tile tub surround, tile floor, new sink and toilet, partial bathroom remodel in 9 bath | $3,000 |
| Jul 8, 2013 | Never finaled issued Aug 2013, no final | 950 Franklin St | Pre Wire Electrical, D S Management Inc Dba Metrocon Builders | all work in unit 67. remove add interior walls, move kitchen to existing closet. remodel e bath. convert dining to new bedroom, new lighting plan for modified spaces. new washer dryerDetails
all work in unit 67. remove add interior walls, move kitchen to existing closet. remodel e bath. convert dining to new bedroom, new lighting plan for modified spaces. new washer dryer | $48,000 |
| May 15, 2013 | Never finaled issued May 2013, no final | 950 Franklin St | street spaceDetails
street space | ||
| May 3, 2013 | Completed final sign-off Nov 2013 | 950 Franklin St | Schoepp Construction Inc | all work in unit #37:move kitchen to extg closet. remodel bath, remove/add interior walls, convert extg dinning to new bedroom. new lighting plan for modified spaces, new washer and dryer.Details
all work in unit #37:move kitchen to extg closet. remodel bath, remove/add interior walls, convert extg dinning to new bedroom. new lighting plan for modified spaces, new washer and dryer. | $35,000 |
| May 3, 2013 | Completed final sign-off Nov 2013 | 950 Franklin St | Schoepp Construction Inc | unit #43-move kitchen to (e) closet, remove/add interior walls. convert (e) dining room to new bedroom. new lighting plan for modified spaceDetails
unit #43-move kitchen to (e) closet, remove/add interior walls. convert (e) dining room to new bedroom. new lighting plan for modified space | $12,000 |
| May 3, 2013 | Completed final sign-off Nov 2013 | 950 Franklin St | Schoepp Construction Inc | unit #54-move kitchen to (e) closet, remove/add interior walls. convert (e) dining & living rooms to new bedroom. new lighting plan for modified spaceDetails
unit #54-move kitchen to (e) closet, remove/add interior walls. convert (e) dining & living rooms to new bedroom. new lighting plan for modified space | $12,000 |
| Nov 6, 2012 | Never finaled issued Nov 2012, no final | 950 Franklin St | Schoepp Construction Inc | unit 43 remodel apt. bathroom/kitchen, toilet, sink, vanity (bath) cabinets, countertops, sink (kitchen). no lighting changeDetails
unit 43 remodel apt. bathroom/kitchen, toilet, sink, vanity (bath) cabinets, countertops, sink (kitchen). no lighting change | $10,000 |
| Nov 6, 2012 | Never finaled issued Nov 2012, no final | 950 Franklin St | Schoepp Construction Inc | unit 56: remodel apt. bathroom/kitchen, toilet, tub, vanity, cabinets, countertops, sink. no lightingDetails
unit 56: remodel apt. bathroom/kitchen, toilet, tub, vanity, cabinets, countertops, sink. no lighting | $10,000 |
| Jun 27, 2012 | Expired or cancelled expired Jul 2013 | 950 Franklin St | Eagle Ridge Construction And Roofing | unit #57 & 63-interior alterations to reconfigure bathroom, kitchen, dining room. replace fixtures, finishes at bathrooms & kitchens. add wash /dryer.Details
unit #57 & 63-interior alterations to reconfigure bathroom, kitchen, dining room. replace fixtures, finishes at bathrooms & kitchens. add wash /dryer. | $30,000 |
| Mar 7, 2011 | Never finaled issued Mar 2011, no final | 950 Franklin St | Grace Roofing & Construction | reroofingDetails
reroofing | $55,000 |
| Aug 4, 2010 | Expired or cancelled expired Mar 2013 | 950 Franklin St | Mashal Builders & Contractors Inc | unit #25 - kitchen & bathroom remodeling, paint the apartment. no structural work or window changing. no partition wall relocation.Details
unit #25 - kitchen & bathroom remodeling, paint the apartment. no structural work or window changing. no partition wall relocation. | $18,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.