Artem Aleksandrovi Vusik I
- Listed as
- authorized agent-others, contractor
- Firm
- Boss Construction Inc.
- Based in
- North Highlands
- On San Francisco permits
- Feb 2015 to Aug 2025
150 permits since 2000 (contractor on 150 permits, authorized agent-others on 1 permit): 127 completed, 4 in progress, 14 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 150.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 4, 2025 | In progress issued Sep 2025 | 940 Baker St | Urban West Construction Inc, Boss Construction Inc. | unit 2 on 2/f: revision to permit 202503132199. existing rear balcony to be removed.Details
unit 2 on 2/f: revision to permit 202503132199. existing rear balcony to be removed. | $5,000 |
| Aug 4, 2025 | In progress issued Sep 2025 | 940 Baker St | Urban West Construction Inc, Boss Construction Inc. | unit 4 on 3/f: revision to permit 202503132200. existing rear balcony to be removed.Details
unit 4 on 3/f: revision to permit 202503132200. existing rear balcony to be removed. | $5,000 |
| Mar 28, 2025 | Completed final sign-off Aug 2025 | 1133 Dolores St | Boss Construction Inc. | repair existing iron beam at garage door entrance to maintain original structural integrity by applying sandblast to remove rust and apply protection paint. (in-kind)Details
repair existing iron beam at garage door entrance to maintain original structural integrity by applying sandblast to remove rust and apply protection paint. (in-kind) | $4,000 |
| Mar 13, 2025 | In progress issued Mar 2025 | 940 Baker St | Boss Construction Inc. | unit# 4 - existing rear wood balcony on 3rd floor to be replaced in kind due to dry rot.Details
unit# 4 - existing rear wood balcony on 3rd floor to be replaced in kind due to dry rot. | $5,000 |
| Mar 13, 2025 | In progress issued Mar 2025 | 940 Baker St | Boss Construction Inc. | unit# 2 - existing rear wood balcony on 2nd floor to be replaced in kind due to dry rot.Details
unit# 2 - existing rear wood balcony on 2nd floor to be replaced in kind due to dry rot. | $5,000 |
| Dec 13, 2024 | Completed final sign-off Sep 2025 | 2853 Union St | Boss Construction Inc. | kitchen and bath remodel, new washer and dryerDetails
kitchen and bath remodel, new washer and dryer | $20,000 |
| Nov 8, 2024 | Expired or cancelled withdrawn Sep 2025 | 940 Baker St | Boss Construction Inc. | unit #2: repair/replace all dry rot at balconies of #2 per sb721 report like for likeDetails
unit #2: repair/replace all dry rot at balconies of #2 per sb721 report like for like | $7,500 |
| Nov 8, 2024 | Expired or cancelled withdrawn Sep 2025 | 940 Baker St | Boss Construction Inc. | unit #4: repair/replace all dry rot at unit #4 balcony per sb721 report like for likeDetails
unit #4: repair/replace all dry rot at unit #4 balcony per sb721 report like for like | $7,500 |
| Jul 26, 2024 | Completed final sign-off Aug 2025 | 1133 Dolores St | Boss Construction Inc. | replace stucco facade at front of building. repair rotted shear panels & framing. replace 14 windows. u=.30maxDetails
replace stucco facade at front of building. repair rotted shear panels & framing. replace 14 windows. u=.30max | $65,000 |
| Mar 6, 2024 | Completed final sign-off Mar 2024 | 1127 Kearny St | Boss Construction Inc. | nov 202314556 complaint item #8, at the stairway to storage spaces, missing handrail, install new handrail/guardrail, and the entirety of the nov.Details
nov 202314556 complaint item #8, at the stairway to storage spaces, missing handrail, install new handrail/guardrail, and the entirety of the nov. | $300 |
| Jan 17, 2024 | Completed final sign-off May 2024 | 1964 Pacific Av | Boss Construction Inc. | unit 2: kitchen & bathroom remodel-add washer & dryer: modify unit lighting. modify two-side facing kitchen windows. infill one window. replace second window w/smaller vinyl.Details
unit 2: kitchen & bathroom remodel-add washer & dryer: modify unit lighting. modify two-side facing kitchen windows. infill one window. replace second window w/smaller vinyl. | $65,000 |
| Oct 14, 2022 | Completed final sign-off Jan 2023 | 239 Brannan St | Boss Construction Inc. | one bathroom remodel. convert master bath tub to shower, replace master bath fanDetails
one bathroom remodel. convert master bath tub to shower, replace master bath fan | $25,000 |
| May 12, 2022 | Completed final sign-off Sep 2022 | 1124 Fitzgerald Av | Boss Construction Inc. | interior remodel to provide 1 new bathroom and 1 new closet to rear of g/f of (e) 2-story, 2 bedroom single family home. convert (e) storage/office on g/f into legal bedroom.Details
interior remodel to provide 1 new bathroom and 1 new closet to rear of g/f of (e) 2-story, 2 bedroom single family home. convert (e) storage/office on g/f into legal bedroom. | $30,000 |
| May 4, 2022 | Completed final sign-off Oct 2022 | 1434 18th Av | Boss Construction Inc. | to comply with physical inspection report #ccc-8525.Details
to comply with physical inspection report #ccc-8525. | $3,000 |
| Apr 8, 2022 | Expired or cancelled cancelled Jan 2026 | 950 Franklin St | Boss Construction Inc. | #38: 1) revision to pa#202201276824. 2)rehabilitate extg kitchen. 3)rehabilitate extg bathroom.Details
#38: 1) revision to pa#202201276824. 2)rehabilitate extg kitchen. 3)rehabilitate extg bathroom. | |
| Apr 7, 2022 | Completed final sign-off Aug 2022 | 22 Vandewater St | Boss Construction Inc. | #308. rehab (e) kitchen. rehab (e) bathroom. install washer/dryer. no removal of struct. walls.Details
#308. rehab (e) kitchen. rehab (e) bathroom. install washer/dryer. no removal of struct. walls. | $18,000 |
| Mar 31, 2022 | Completed final sign-off Sep 2022 | 1660 Bay St | Boss Construction Inc. | unit #306: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer.Details
unit #306: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer & dryer. | $42,000 |
| Mar 24, 2022 | Completed final sign-off Jul 2022 | 4030 19th St | Boss Construction Inc. | #11. rehab existing kitchen, rehab existing bathroom. install washer/dryer. no removal of walls.Details
#11. rehab existing kitchen, rehab existing bathroom. install washer/dryer. no removal of walls. | $40,000 |
| Feb 28, 2022 | Completed final sign-off Jul 2022 | 1690 North Point St | Boss Construction Inc. | unit #204: convert (e) dining to bedroom. relocate kitchen. rehab (e) bathroom. install washer & dryer.Details
unit #204: convert (e) dining to bedroom. relocate kitchen. rehab (e) bathroom. install washer & dryer. | $28,000 |
| Jan 27, 2022 | Completed final sign-off Jun 2022 | 950 Franklin St | Boss Construction Inc. | unit 38: convert existing kitchen and dining room to study. relocate kitchen. rehab existing bathroom. install washer/dryer.Details
unit 38: convert existing kitchen and dining room to study. relocate kitchen. rehab existing bathroom. install washer/dryer. | $32,000 |
| Nov 8, 2021 | Completed final sign-off Jun 2022 | 630 Grand View Av | Boss Construction Inc. | unit 207: rehab (e) kitchen and (e) bathroom. install washer/ dryerDetails
unit 207: rehab (e) kitchen and (e) bathroom. install washer/ dryer | $28,000 |
| Oct 13, 2021 | Completed final sign-off Jul 2022 | 22 Vandewater St | Boss Construction Inc. | apt 307: rehab (e) kitchen & bathroom. install washer/dryer. no removal of structural walls.Details
apt 307: rehab (e) kitchen & bathroom. install washer/dryer. no removal of structural walls. | $28,000 |
| Sep 17, 2021 | Completed final sign-off May 2022 | 1434 18th Av | Boss Construction Inc. | each unit: renovate (e) kitchen (1) and bath (1). upgrade electrical in (e) unit 1434/1436 18th ave.Details
each unit: renovate (e) kitchen (1) and bath (1). upgrade electrical in (e) unit 1434/1436 18th ave. | $85,000 |
| Jul 26, 2021 | Expired or cancelled cancelled Jan 2026 | 22 Vandewater St | Boss Construction Inc. | unit 201: revision to bpa#202106041673 (kitchen & bath only-no plans); rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer/dryerDetails
unit 201: revision to bpa#202106041673 (kitchen & bath only-no plans); rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer/dryer | $10,000 |
| Jul 8, 2021 | Completed final sign-off Nov 2021 | 1599 Green St | Boss Construction Inc. | unit 204: rehabilitate e kitchen, bath, install washer dryerDetails
unit 204: rehabilitate e kitchen, bath, install washer dryer | $32,000 |
| Jul 7, 2021 | Completed final sign-off Jan 2022 | 630 Grand View Av | Boss Construction Inc. | unit 306: remodel (e) kitchen & bath like-for-like, new lighting, high efficacy & controls per cec 150.0(c)Details
unit 306: remodel (e) kitchen & bath like-for-like, new lighting, high efficacy & controls per cec 150.0(c) | $30,000 |
| Jun 4, 2021 | Completed final sign-off Feb 2022 | 4030 19th St | Boss Construction Inc. | #12; remodel existing kitchen, like for like. remodel existing bath (2) like for like. upgrade electrical subpanel.Details
#12; remodel existing kitchen, like for like. remodel existing bath (2) like for like. upgrade electrical subpanel. | $35,000 |
| Jun 4, 2021 | Completed final sign-off Oct 2021 | 22 Vandewater St | Boss Construction Inc. | #201: remodel existing kitchen and bath. like for like, relocate electrical subpanel.Details
#201: remodel existing kitchen and bath. like for like, relocate electrical subpanel. | $30,000 |
| Apr 20, 2021 | Completed final sign-off Nov 2021 | 1660 Bay St | Boss Construction Inc. | #206: 1)convert existing kitchen to study. 2)relocate kitchen. 3)rehabilitate extisting bathroom. 4)install washer and dryer.Details
#206: 1)convert existing kitchen to study. 2)relocate kitchen. 3)rehabilitate extisting bathroom. 4)install washer and dryer. | $40,000 |
| Apr 2, 2021 | Completed final sign-off Aug 2021 | 1 San Antonio Pl | Boss Construction Inc. | #1c - remodel existing kitchen & bath (2) in-kind. add washer/dryer in kitchen (self condensing electric) upgrade electrical. no lay out changeDetails
#1c - remodel existing kitchen & bath (2) in-kind. add washer/dryer in kitchen (self condensing electric) upgrade electrical. no lay out change | $35,000 |
| Mar 23, 2021 | Completed final sign-off Jul 2021 | 630 Grand View Av | Boss Construction Inc. | remodel existing (1) kitchen & (1) bath in unit #103 only. add self condensing ventless electr washer and dryer in existing closet. upgrade electrical, no wall changes, to demo.Details
remodel existing (1) kitchen & (1) bath in unit #103 only. add self condensing ventless electr washer and dryer in existing closet. upgrade electrical, no wall changes, to demo. | $35,000 |
| Mar 16, 2021 | Completed final sign-off Oct 2021 | 4030 19th St | Boss Construction Inc. | unit 7: remodel (e) kitchen and bath. add self condensing electric washer/dryer in (e) closet. upgrade electrical.Details
unit 7: remodel (e) kitchen and bath. add self condensing electric washer/dryer in (e) closet. upgrade electrical. | $30,000 |
| Feb 25, 2021 | Completed final sign-off May 2023 | 267 Green St | Boss Construction Inc. | unit #2: convert (e) kitchen to study, relocate kitchen, rehabilitate (e) bathroom, install waher & dryerDetails
unit #2: convert (e) kitchen to study, relocate kitchen, rehabilitate (e) bathroom, install waher & dryer | $42,000 |
| Feb 24, 2021 | Completed final sign-off Feb 2022 | 950 Franklin St | Boss Construction Inc. | unit #54: convert existing kitchen to bedroom. relocate kitchen. rehabilitate bathroom. install washer/dryer.Details
unit #54: convert existing kitchen to bedroom. relocate kitchen. rehabilitate bathroom. install washer/dryer. | $42,000 |
| Feb 23, 2021 | Completed final sign-off Jul 2021 | 1170 Sacramento St | Boss Construction Inc. | new dropped ceiling entire unit except entry way. ref pa# 201910114321.Details
new dropped ceiling entire unit except entry way. ref pa# 201910114321. | |
| Feb 4, 2021 | Completed final sign-off Aug 2021 | 22 Vandewater St | Boss Construction Inc. | unit 203: remodel existing kitchen and bath in kind. add laundry in bath (dryer to be self condensing) no wall change.Details
unit 203: remodel existing kitchen and bath in kind. add laundry in bath (dryer to be self condensing) no wall change. | $35,000 |
| Feb 2, 2021 | Completed final sign-off Jun 2023 | 271 Green St | Boss Construction Inc. | remodel existing kitchen and bathroom. add washer/ electric dryer in exisitng closet. upgrade electrical. dryer to be self condensing. no new exhaust plumbing. maintain 1-hour separation btw units at area of work.Details
remodel existing kitchen and bathroom. add washer/ electric dryer in exisitng closet. upgrade electrical. dryer to be self condensing. no new exhaust plumbing. maintain 1-hour separation btw units at area of work. | $35,000 |
| Jan 28, 2021 | Completed final sign-off Jun 2023 | 267 Green St | Boss Construction Inc. | unit #8: convert part of living room into bedroom. rehabilitate existing kitchen & bathroom. install washer & dryer.Details
unit #8: convert part of living room into bedroom. rehabilitate existing kitchen & bathroom. install washer & dryer. | $36,000 |
| Jan 14, 2021 | Completed final sign-off May 2021 | 630 Grand View Av | Boss Construction Inc. | #308: remodel existing kitchen & bath. add self condensing washer/dryer in existing closet. upgrade electrical.Details
#308: remodel existing kitchen & bath. add self condensing washer/dryer in existing closet. upgrade electrical. | $35,000 |
| Jan 14, 2021 | Completed final sign-off Mar 2021 | 1 San Antonio Pl | Boss Construction Inc. | #2a: remodel exisitng bath. replace bathtub & surround. replace pedestal sink & toilet in bath.Details
#2a: remodel exisitng bath. replace bathtub & surround. replace pedestal sink & toilet in bath. | $15,000 |
| Dec 18, 2020 | Completed final sign-off Jan 2022 | 950 Franklin St | Boss Construction Inc. | unit 71 - 7th flr. convert (e) kitchen to bedroom to create second bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer and dryer. must comply with 2019 sffc sec 1103.7.6.1. fire alarm under separate permit.Details
unit 71 - 7th flr. convert (e) kitchen to bedroom to create second bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer and dryer. must comply with 2019 sffc sec 1103.7.6.1. fire alarm under separate permit. | $40,000 |
| Dec 15, 2020 | Completed final sign-off Aug 2022 | 1660 Bay St | Boss Construction Inc. | #105: convert (e) kitchen to study. relocate kitchen. rehabilitate (e) bathroom. install 2nd bathroom. install washer & dryer.Details
#105: convert (e) kitchen to study. relocate kitchen. rehabilitate (e) bathroom. install 2nd bathroom. install washer & dryer. | $42,000 |
| Dec 15, 2020 | Completed final sign-off Sep 2021 | 950 Franklin St | Boss Construction Inc. | #64: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer and dryer.Details
#64: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer and dryer. | $40,000 |
| Dec 9, 2020 | Completed final sign-off Apr 2021 | 630 Grand View Av | Boss Construction Inc. | unit #108: remodel existing kitchen & bath. add self condensing washer/dryer in existing. upgrade electrical.Details
unit #108: remodel existing kitchen & bath. add self condensing washer/dryer in existing. upgrade electrical. | $35,000 |
| Dec 9, 2020 | Completed final sign-off Jun 2021 | 4030 19th St | Boss Construction Inc. | unit #14: remodel existing kitchen & 2 bath. add self condensing washer/dryer in existing. upgrade electrical sub-panel.Details
unit #14: remodel existing kitchen & 2 bath. add self condensing washer/dryer in existing. upgrade electrical sub-panel. | $35,000 |
| Dec 8, 2020 | Completed final sign-off Aug 2021 | 1660 Bay St | Boss Construction Inc. | (#108): rehabilitate existing kitchen. relocate bathroom. rehabilitate existing bathroom. install washer & dryer.Details
(#108): rehabilitate existing kitchen. relocate bathroom. rehabilitate existing bathroom. install washer & dryer. | $42,000 |
| Nov 17, 2020 | Completed final sign-off Apr 2021 | 630 Grand View Av | Boss Construction Inc. | unit 203: remodel e ktichen and bath add self condensing washer dryer in exiting closet upgrade electricalDetails
unit 203: remodel e ktichen and bath add self condensing washer dryer in exiting closet upgrade electrical | $35,000 |
| Nov 17, 2020 | Completed final sign-off Apr 2021 | 4030 19th St | Boss Construction Inc. | remodel e kitchen and bath(2) add self condensing washer dryer in existing closet. upgrade electricalDetails
remodel e kitchen and bath(2) add self condensing washer dryer in existing closet. upgrade electrical | $35,000 |
| Sep 22, 2020 | Completed final sign-off Feb 2021 | 1599 Green St | Boss Construction Inc. | unit 105. remodel exist kitchen & bath. add self condensing washer dryer in exist closet. update electricalDetails
unit 105. remodel exist kitchen & bath. add self condensing washer dryer in exist closet. update electrical | $30,000 |
| Sep 22, 2020 | Completed final sign-off Feb 2021 | 4030 19th St | Boss Construction Inc. | unit 15. remodel exist kitchen & bath. add self condensing washer dryer in exist closet. update electricalDetails
unit 15. remodel exist kitchen & bath. add self condensing washer dryer in exist closet. update electrical | $30,000 |
| Sep 4, 2020 | Completed final sign-off Mar 2021 | 642 Alvarado St | Boss Construction Inc. | unit #203: remodel existing kitchen & bath. like for like. add self condensing washer/dryer in existing closet. no wall change.Details
unit #203: remodel existing kitchen & bath. like for like. add self condensing washer/dryer in existing closet. no wall change. | $30,000 |
| Aug 14, 2020 | Completed final sign-off Jan 2021 | 22 Vandewater St | Boss Construction Inc. | unit# 304: remodel existing kitchen & bathroom in kind. add self condensing washer/dryer in existing closet. no structural work.Details
unit# 304: remodel existing kitchen & bathroom in kind. add self condensing washer/dryer in existing closet. no structural work. | $30,000 |
| Aug 14, 2020 | Completed final sign-off Nov 2020 | 22 Vandewater St | Boss Construction Inc. | unit# 205: remodel existing kitchen & bathroom in kind. add self condensing washer/dryer in existing closet. no structural work.Details
unit# 205: remodel existing kitchen & bathroom in kind. add self condensing washer/dryer in existing closet. no structural work. | $30,000 |
| Aug 14, 2020 | Completed final sign-off Nov 2020 | 22 Vandewater St | Boss Construction Inc. | unit# 208: remodel existing kitchen & bathroom in kind. add self condensing washer/dryer in existing closet. no structural work.Details
unit# 208: remodel existing kitchen & bathroom in kind. add self condensing washer/dryer in existing closet. no structural work. | $30,000 |
| Jul 2, 2020 | Completed final sign-off Sep 2020 | 642 Alvarado St | Boss Construction Inc. | unit # 109: remodel existing kitchen in kind. add self condensing washer dryer in existing closet no wall change.Details
unit # 109: remodel existing kitchen in kind. add self condensing washer dryer in existing closet no wall change. | $20,000 |
| Jun 30, 2020 | Completed final sign-off Oct 2020 | 22 Vandewater St | Boss Construction Inc. | unit #301: remodel (e) kitchen & bath like for like. add washer dryer in bathroom(self condensing).relocate sub panel out of closet. no wall change.Details
unit #301: remodel (e) kitchen & bath like for like. add washer dryer in bathroom(self condensing).relocate sub panel out of closet. no wall change. | $30,000 |
| Jun 30, 2020 | Completed final sign-off Oct 2020 | 22 Vandewater St | Boss Construction Inc. | unit #202: remodel(e) kitchen & bath like for like. add washer & dryer(self consending) in bathroom. relocate electrical panel out of closet. no wall change.Details
unit #202: remodel(e) kitchen & bath like for like. add washer & dryer(self consending) in bathroom. relocate electrical panel out of closet. no wall change. | $30,000 |
| Feb 25, 2020 | Completed final sign-off Oct 2020 | 969 Bush St | Boss Construction Inc. | apt #104: remodel existing kitchen & bath. add self condensing washer.dryer in existing closet. upgrade electrical.Details
apt #104: remodel existing kitchen & bath. add self condensing washer.dryer in existing closet. upgrade electrical. | $40,000 |
| Feb 25, 2020 | Completed final sign-off Sep 2020 | 1599 Green St | Boss Construction Inc. | apt #303: remodel existing kitchen & bath. add self condensing washer.dryer in existing closet (ventless). upgrade electrical subpanel.Details
apt #303: remodel existing kitchen & bath. add self condensing washer.dryer in existing closet (ventless). upgrade electrical subpanel. | $40,000 |
| Feb 25, 2020 | Completed final sign-off Sep 2020 | 925 Pierce St | Boss Construction Inc. | apt #12: add self condensing washer.dryer in existing closet. upgrade electrical subpanel.Details
apt #12: add self condensing washer.dryer in existing closet. upgrade electrical subpanel. | $10,000 |
| Feb 6, 2020 | Completed final sign-off Jul 2020 | 22 Vandewater St | Boss Construction Inc. | unit 303: remodel existing kitchen e bath like for like. add self condensing washer & dryer in bathrooom. no wall change. comply with cel 150.0 (k) 3 & 150.0 (k) 5Details
unit 303: remodel existing kitchen e bath like for like. add self condensing washer & dryer in bathrooom. no wall change. comply with cel 150.0 (k) 3 & 150.0 (k) 5 | $30,000 |
| Jan 10, 2020 | Completed final sign-off Mar 2020 | 737 Pine St | Boss Construction Inc. | apt 1a: upgrade electrical supbanel in unit to larger size. add self condensing washer/dryer in (e) kitchen.Details
apt 1a: upgrade electrical supbanel in unit to larger size. add self condensing washer/dryer in (e) kitchen. | $5,000 |
| Jan 10, 2020 | Completed final sign-off Aug 2020 | 969 Bush St | Boss Construction Inc. | apt 306: remodel (e) kitchen & bathroom, like for like and self condensing washer/dryer in(e) closet. no wall changes. upgrade electrical subpanel.Details
apt 306: remodel (e) kitchen & bathroom, like for like and self condensing washer/dryer in(e) closet. no wall changes. upgrade electrical subpanel. | $30,000 |
| Jan 10, 2020 | Completed final sign-off Mar 2020 | 22 Vandewater St | Boss Construction Inc. | apt 207: remodel (e) kitchen & bathroom. like for like. add washer/dryer/ ventless in bathroom. relocate electrical subpanel out of closet . no wall change.Details
apt 207: remodel (e) kitchen & bathroom. like for like. add washer/dryer/ ventless in bathroom. relocate electrical subpanel out of closet . no wall change. | $30,000 |
| Dec 6, 2019 | Completed final sign-off Mar 2020 | 630 Grand View Av | Boss Construction Inc. | unit 202: remodel e kitchen and bath, kitchen 8x10 bath 5x8 add washer dryer in e closet washer dryer to be ventlyess, self condensing relocate sub panel out of closet to unit hallwayDetails
unit 202: remodel e kitchen and bath, kitchen 8x10 bath 5x8 add washer dryer in e closet washer dryer to be ventlyess, self condensing relocate sub panel out of closet to unit hallway | $35,908 |
| Dec 4, 2019 | Completed final sign-off Sep 2020 | 969 Bush St | Boss Construction Inc. | convert e kitchen to study(not for sleeping), relocate kitchen, rehabilitate e bath, install washer and dryerDetails
convert e kitchen to study(not for sleeping), relocate kitchen, rehabilitate e bath, install washer and dryer | $40,000 |
| Oct 11, 2019 | Completed final sign-off Nov 2019 | 22 Vandewater St | Boss Construction Inc. | unit 103: add washer dryer outlet in existing bathroom. washer/dryer to be self condensing, ventless. upgrade electrical subpanelDetails
unit 103: add washer dryer outlet in existing bathroom. washer/dryer to be self condensing, ventless. upgrade electrical subpanel | $5,000 |
| Oct 11, 2019 | Completed final sign-off Jul 2021 | 1170 Sacramento St | Boss Construction Inc. | new interior non structural walls, new elec lights & outlets new plumbing, fixtures, new cabinets, new appliances, new tile & flooringDetails
new interior non structural walls, new elec lights & outlets new plumbing, fixtures, new cabinets, new appliances, new tile & flooring | $200,000 |
| Oct 11, 2019 | Completed final sign-off Dec 2019 | 642 Alvarado St | Boss Construction Inc. | unit 205: add washer dryer outlet in existing closet. washer/dryer to be self condensing, ventless.Details
unit 205: add washer dryer outlet in existing closet. washer/dryer to be self condensing, ventless. | $5,000 |
| Oct 2, 2019 | Completed final sign-off Jan 2020 | 969 Bush St | Boss Construction Inc. | unit 302 - remodel kitchen and bathroom. add washer/dryer in existing closet ventless unit, upgrade electrical panel. no wall changesDetails
unit 302 - remodel kitchen and bathroom. add washer/dryer in existing closet ventless unit, upgrade electrical panel. no wall changes | $25,000 |
| Sep 27, 2019 | Completed final sign-off Jan 2020 | 642 Alvarado St | Boss Construction Inc. | unit 105 - convert (e) kitchen to bedroom; relocate kitchen; rehabilitate (e) bathrom and install washer/dryer. 2nd floor.Details
unit 105 - convert (e) kitchen to bedroom; relocate kitchen; rehabilitate (e) bathrom and install washer/dryer. 2nd floor. | $40,000 |
| Sep 9, 2019 | Completed final sign-off Nov 2019 | 22 Vandewater St | Boss Construction Inc. | unit 206: remodel existing kitchen. remodel existing bath and add washer/dryer. outlet upgrade electrical subpanel in unit 206. no change of (e) floor plan.Details
unit 206: remodel existing kitchen. remodel existing bath and add washer/dryer. outlet upgrade electrical subpanel in unit 206. no change of (e) floor plan. | $20,000 |
| Sep 9, 2019 | Completed final sign-off Nov 2019 | 22 Vandewater St | Boss Construction Inc. | unit 306: remodel existing kitchen. remodel existing bath and add washer/dryer. outlet upgrade electrical subpanel in unit 306. no change of (e) floor plan.Details
unit 306: remodel existing kitchen. remodel existing bath and add washer/dryer. outlet upgrade electrical subpanel in unit 306. no change of (e) floor plan. | $20,000 |
| Aug 16, 2019 | Completed final sign-off Jan 2020 | 969 Bush St | Boss Construction Inc. | unit 505 - convert (e) kitchen to bedroom. relocate kitchen rehabilitate (e) bathroom. install w/dDetails
unit 505 - convert (e) kitchen to bedroom. relocate kitchen rehabilitate (e) bathroom. install w/d | $40,000 |
| Jun 21, 2019 | Completed final sign-off Sep 2019 | 630 Grand View Av | Boss Construction Inc. | unit 305: remodel existing kitchen and bathroom. add self condensing washer/dryer unit in existing closet. upgrade electrical to be title 24 compliant. all lighting to be led.Details
unit 305: remodel existing kitchen and bathroom. add self condensing washer/dryer unit in existing closet. upgrade electrical to be title 24 compliant. all lighting to be led. | $25,000 |
| Jun 5, 2019 | Completed final sign-off Sep 2019 | 630 Grand View Av | Boss Construction Inc. | #104: remodel existing kitchen & bath. add self condensing (no vent) wash/dryer unit in existing closet. no structural work - no wall/ framing modification.Details
#104: remodel existing kitchen & bath. add self condensing (no vent) wash/dryer unit in existing closet. no structural work - no wall/ framing modification. | $30,000 |
| Jun 5, 2019 | Completed final sign-off Aug 2019 | 630 Grand View Av | Boss Construction Inc. | #206: remodel existing kitchen & bath. add self condensing (no vent) wash/dryer unit in existing closet. no structural work - no wall/ framing modification.Details
#206: remodel existing kitchen & bath. add self condensing (no vent) wash/dryer unit in existing closet. no structural work - no wall/ framing modification. | $30,000 |
| Jun 5, 2019 | Completed final sign-off Aug 2019 | 642 Alvarado St | Boss Construction Inc. | unit #103: remodel existing bath and kitchen. add self condensing washer/dryer unit. (no vent) all new lighting to be led. replace existing fans in bath.Details
unit #103: remodel existing bath and kitchen. add self condensing washer/dryer unit. (no vent) all new lighting to be led. replace existing fans in bath. | $30,000 |
| Jun 5, 2019 | Completed final sign-off Oct 2019 | 630 Grand View Av | Boss Construction Inc. | #208: remodel existing kitchen & bath. add self condensing (no vent) wash/dryer unit in existing closet. no structural work - no wall/ framing modification.Details
#208: remodel existing kitchen & bath. add self condensing (no vent) wash/dryer unit in existing closet. no structural work - no wall/ framing modification. | $30,000 |
| May 9, 2019 | Completed final sign-off Jul 2019 | 642 Alvarado St | Boss Construction Inc. | unit 107. remodel (e) kitchen & bath, in-kind. upgrade electrical, comply w/ 150.0k3 & 150.0k5. add washer / dryer in (e) closet. connect to drain louvered door.Details
unit 107. remodel (e) kitchen & bath, in-kind. upgrade electrical, comply w/ 150.0k3 & 150.0k5. add washer / dryer in (e) closet. connect to drain louvered door. | $25,000 |
| Apr 19, 2019 | Completed final sign-off Jun 2019 | 1025 Post St | Boss Construction Inc. | unit # 26: remodel existing kitchen like for like. upgrade electrical, replace toilet and pedestal sink in bathroom.Details
unit # 26: remodel existing kitchen like for like. upgrade electrical, replace toilet and pedestal sink in bathroom. | $15,000 |
| Apr 19, 2019 | Completed final sign-off Aug 2019 | 259 Cervantes Bl | Boss Construction Inc. | unit 263: remodel e kitchen, existing hall bath, add washer dryer outlet. no change e floor planDetails
unit 263: remodel e kitchen, existing hall bath, add washer dryer outlet. no change e floor plan | $38,000 |
| Mar 22, 2019 | Never finaled issued Mar 2019, no final | 642 Alvarado St | Boss Construction Inc. | unit # 210 remodel (e) kitchen (8x9) remodel () bathroom (5x7) add washer/dryer in (e) closet self condensing unitDetails
unit # 210 remodel (e) kitchen (8x9) remodel () bathroom (5x7) add washer/dryer in (e) closet self condensing unit | $20,000 |
| Mar 20, 2019 | Completed final sign-off Aug 2019 | 430 Baker St | Boss Construction Inc. | convert e kitchen to bedroom, krelocate kitchen, rehabilitate #7 -e bath, install washer dryerDetails
convert e kitchen to bedroom, krelocate kitchen, rehabilitate #7 -e bath, install washer dryer | $30,000 |
| Feb 28, 2019 | Completed final sign-off Apr 2019 | 977 Pine St | Boss Construction Inc. | apt 205: remodel (e) kitchen & bathroom, like for like. upgrade electrical as needed. maher n/a.Details
apt 205: remodel (e) kitchen & bathroom, like for like. upgrade electrical as needed. maher n/a. | $15,000 |
| Jan 24, 2019 | Completed final sign-off Mar 2019 | 1599 Green St | Boss Construction Inc. | unit 205: remodel kitchen and bath like for like. upgrade electrical 5x7 (bath) kitchen (9x12)Details
unit 205: remodel kitchen and bath like for like. upgrade electrical 5x7 (bath) kitchen (9x12) | $30,000 |
| Jan 24, 2019 | Completed final sign-off Mar 2019 | 1599 Green St | Boss Construction Inc. | unit 305: remodel kitchen and bath like for like. upgrade electrical 5x7 (bath) kitchen (9x12)Details
unit 305: remodel kitchen and bath like for like. upgrade electrical 5x7 (bath) kitchen (9x12) | $30,000 |
| Dec 21, 2018 | Completed final sign-off May 2019 | 430 Scott St | Boss Construction Inc. | unit #2: 1)rehabilitate extg bathroom and kitchen 2)install washer/dryerDetails
unit #2: 1)rehabilitate extg bathroom and kitchen 2)install washer/dryer | $20,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2019 | 1405 Franklin St | Boss Construction Inc. | unit #204: rehabilitate existing kitchen, rebabilitate existing bathroom, install washer/dryer.Details
unit #204: rehabilitate existing kitchen, rebabilitate existing bathroom, install washer/dryer. | $28,000 |
| Aug 28, 2018 | Completed final sign-off Jun 2019 | 430 Scott St | Boss Construction Inc. | unit #4 - convert (e) kitchen to bedroom. relocate kitchen. rehabilate (e) bathroom. install washer & dryerDetails
unit #4 - convert (e) kitchen to bedroom. relocate kitchen. rehabilate (e) bathroom. install washer & dryer | $35,000 |
| Aug 28, 2018 | Completed final sign-off Aug 2019 | 430 Scott St | Boss Construction Inc. | unit #3 - convert (e) kitchen to bedroom. relocate kitchen. rehabilate (e) bathroom. install washer & dryerDetails
unit #3 - convert (e) kitchen to bedroom. relocate kitchen. rehabilate (e) bathroom. install washer & dryer | $35,000 |
| May 29, 2018 | Completed final sign-off May 2019 | 333 Hyde St | Boss Construction Inc. | unit 12 on 3rd floor - rehabilitate (e) kitchen, rehabilitate bathroom, convert (e) dining room into (n) studyDetails
unit 12 on 3rd floor - rehabilitate (e) kitchen, rehabilitate bathroom, convert (e) dining room into (n) study | $25,000 |
| Apr 19, 2018 | Completed final sign-off Oct 2018 | 1405 Franklin St | Boss Construction Inc. | unit 207. rehabilitate existing kitchen & existing bathroom, install washer dryer. comply with sffc 1103.7.6.1 for fire alarm upgrade entire building. various unit work exceed 50,000 total for building. fire alarm separate permit.Details
unit 207. rehabilitate existing kitchen & existing bathroom, install washer dryer. comply with sffc 1103.7.6.1 for fire alarm upgrade entire building. various unit work exceed 50,000 total for building. fire alarm separate permit. | $28,000 |
| Apr 19, 2018 | Completed final sign-off Oct 2018 | 1405 Franklin St | Boss Construction Inc. | #607: rehabilitate exising kitchen, rehabilitate existing bathroom, install washer dryer. comply with sffc 1103.7.6.1 for fire alarm upgrade entire building.Details
#607: rehabilitate exising kitchen, rehabilitate existing bathroom, install washer dryer. comply with sffc 1103.7.6.1 for fire alarm upgrade entire building. | $28,000 |
| Apr 17, 2018 | Completed final sign-off Sep 2018 | 259 Cervantes Bl | Boss Construction Inc. | work in #259 renovate existing kitchen like for like 10x10, renovate two existing bathrooms 5x7 full electrical upgrade lighting per ce,cDetails
work in #259 renovate existing kitchen like for like 10x10, renovate two existing bathrooms 5x7 full electrical upgrade lighting per ce,c | $40,000 |
| Apr 13, 2018 | Completed final sign-off Apr 2019 | 1025 Sutter St | Boss Construction Inc. | relocate living rm, relocate bedroom, rehabilitate existing kitche, rehabilitate existing bath, install washer dryerDetails
relocate living rm, relocate bedroom, rehabilitate existing kitche, rehabilitate existing bath, install washer dryer | $38,000 |
| Feb 6, 2018 | Completed final sign-off Oct 2018 | 1405 Franklin St | Boss Construction Inc. | #307: convert e closet to study, remodel e kitchen and bath, install washer dryerDetails
#307: convert e closet to study, remodel e kitchen and bath, install washer dryer | $28,000 |
| Jan 18, 2018 | Completed final sign-off Jul 2018 | 1405 Franklin St | Boss Construction Inc. | unit 507 - convert existing closet to study, rehabilitate kitchen, rehabilitate existing bathroom, install washer & dryerDetails
unit 507 - convert existing closet to study, rehabilitate kitchen, rehabilitate existing bathroom, install washer & dryer | $30,000 |
| Jan 18, 2018 | Completed final sign-off Oct 2018 | 1405 Franklin St | Boss Construction Inc. | unit 406 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer & dryerDetails
unit 406 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer & dryer | $35,000 |
| Jan 18, 2018 | Completed final sign-off Aug 2018 | 1405 Franklin St | Boss Construction Inc. | unit 306 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer & dryerDetails
unit 306 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer & dryer | $35,000 |