Block 3583, lot 019
4030 19th St
- City’s use
- Multi-Family Residential
- Built
- 1964
- Stories
- 5
- Units
- 15
- Rooms
- 19 bathrooms
- Building
- 15,753 sq ft
- Lot
- 6,090 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 14, 2025 | Completed final sign-off May 2025 | 4030 19th St | Hon's Construction Inc. | repair losen hand railing or rusted components at balconies. touch up with stucco & paint or sealant at the repair place as needed. replace plywood substrate at unit 15 with new. remove & replace damaged facia board at unit #15.Details
repair losen hand railing or rusted components at balconies. touch up with stucco & paint or sealant at the repair place as needed. replace plywood substrate at unit 15 with new. remove & replace damaged facia board at unit #15. | $22,606 |
| Mar 24, 2022 | Completed final sign-off Jul 2022 | 4030 19th St | Boss Construction Inc. | #11. rehab existing kitchen, rehab existing bathroom. install washer/dryer. no removal of walls.Details
#11. rehab existing kitchen, rehab existing bathroom. install washer/dryer. no removal of walls. | $40,000 |
| Jul 28, 2021 | Expired or cancelled cancelled Jan 2026 | 4030 19th St | unit # 12: rev to pa# 2021-0604-1672 rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer & dryerDetails
unit # 12: rev to pa# 2021-0604-1672 rehabilitate (e) kitchen, rehabilitate (e) bathroom, install washer & dryer | $25,000 | |
| Jun 4, 2021 | Completed final sign-off Feb 2022 | 4030 19th St | Boss Construction Inc. | #12; remodel existing kitchen, like for like. remodel existing bath (2) like for like. upgrade electrical subpanel.Details
#12; remodel existing kitchen, like for like. remodel existing bath (2) like for like. upgrade electrical subpanel. | $35,000 |
| Mar 16, 2021 | Completed final sign-off Oct 2021 | 4030 19th St | Boss Construction Inc. | unit 7: remodel (e) kitchen and bath. add self condensing electric washer/dryer in (e) closet. upgrade electrical.Details
unit 7: remodel (e) kitchen and bath. add self condensing electric washer/dryer in (e) closet. upgrade electrical. | $30,000 |
| Dec 9, 2020 | Completed final sign-off Jun 2021 | 4030 19th St | Boss Construction Inc. | unit #14: remodel existing kitchen & 2 bath. add self condensing washer/dryer in existing. upgrade electrical sub-panel.Details
unit #14: remodel existing kitchen & 2 bath. add self condensing washer/dryer in existing. upgrade electrical sub-panel. | $35,000 |
| Nov 17, 2020 | Completed final sign-off Apr 2021 | 4030 19th St | Boss Construction Inc. | remodel e kitchen and bath(2) add self condensing washer dryer in existing closet. upgrade electricalDetails
remodel e kitchen and bath(2) add self condensing washer dryer in existing closet. upgrade electrical | $35,000 |
| Oct 15, 2020 | Completed final sign-off Apr 2023 | 4030 19th St | Hue & Cry Security System | voluntary upgrade of fire alarm like for like with additions of low frequency sounders in all sleeping areas to meet code 1107-7-61.Details
voluntary upgrade of fire alarm like for like with additions of low frequency sounders in all sleeping areas to meet code 1107-7-61. | $57,589 |
| Sep 22, 2020 | Completed final sign-off Feb 2021 | 4030 19th St | Boss Construction Inc. | unit 15. remodel exist kitchen & bath. add self condensing washer dryer in exist closet. update electricalDetails
unit 15. remodel exist kitchen & bath. add self condensing washer dryer in exist closet. update electrical | $30,000 |
| Jun 1, 2020 | Expired or cancelled cancelled Feb 2025 | 4030 19th St | reconfigure former storage spaces on first story and basement levels to become (2) new adu units (per ordinance 162-16) modify existing sprinklers as required at area of work; under separate permit.Details
reconfigure former storage spaces on first story and basement levels to become (2) new adu units (per ordinance 162-16) modify existing sprinklers as required at area of work; under separate permit. | $60,000 | |
| Apr 8, 2019 | Completed final sign-off Oct 2019 | 4030 19th St | U S Prime Contractor Inc | mandatory soft story seismic retrofit per sfbc 2016 ordinance 66-13 2016 cebc appendix a-4Details
mandatory soft story seismic retrofit per sfbc 2016 ordinance 66-13 2016 cebc appendix a-4 | $143,000 |
| Jan 15, 2004 | Expired or cancelled expired Jul 2019 | 4030 19th St | R B Roofing Co Inc | reroofingDetails
reroofing | $13,400 |
| Aug 30, 2001 | Completed final sign-off Nov 2001 | 4030 19th St | City Property Restoration | repair fire damage @ kitchen, replaceupper & lower cabinets, counter. reset sink, replace dishwasheDetails
repair fire damage @ kitchen, replaceupper & lower cabinets, counter. reset sink, replace dishwashe | $15,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.