William Hadinger
- Listed as
- contractor, designer, engineer
- Firm
- Ca United Mechanical, Inc
- Based in
- San Jose
- On San Francisco permits
- Sep 2005 to Nov 2026
44 permits since 2000 (contractor on 43 permits, engineer on 2 permits, designer on 1 permit): 26 completed, 7 in progress, 7 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Stockham Construction
- Architects
- Kevin Schaeffer, William Hadinger
- Engineers
- William Hadinger (9), Aaron J. Strauch, Alexander Pacheco, Bradley Hollub, Chan Siong Loh, Raymond Keane, Timothy Lindfelt, Timothy Wilson
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2026 | In progress filed Nov 2026, not yet issued | 77 Geary St | Ca United Mechanical, Inc | install new closed loop fluid cooler on the roof. reconnect (e) air handlers to (e) condenser water piping.Details
install new closed loop fluid cooler on the roof. reconnect (e) air handlers to (e) condenser water piping. | $618,136 |
| Oct 9, 2026 | In progress issued Oct 2026 | 405 Davis Ct | Ca United Mechanical, Inc | lobby: mech work for 202604209709. exhaust fan and duct work.Details
lobby: mech work for 202604209709. exhaust fan and duct work. | $48,666 |
| Oct 9, 2026 | In progress issued Oct 2026 | 440 Davis Ct | Ca United Mechanical, Inc | lobby: mech work for 202604109219. exhaust for additon of duct work.Details
lobby: mech work for 202604109219. exhaust for additon of duct work. | $48,666 |
| Oct 9, 2026 | In progress issued Oct 2026 | 550 Battery St | Ca United Mechanical, Inc | lobby: mech work . exhaust fan and duct work.Details
lobby: mech work . exhaust fan and duct work. | $48,666 |
| Jul 9, 2026 | In progress issued Aug 2026 | 1 Zoo Rd | Ca United Mechanical, Inc | replace existing gas furnaces with electric heat pump split systems. replace existing gas water heater with heat pump water heater.Details
replace existing gas furnaces with electric heat pump split systems. replace existing gas water heater with heat pump water heater. | $814,075 |
| Jun 26, 2026 | In progress issued Jul 2026 | 4 Embarcadero Center | Ca United Mechanical, Inc | water cooled chiller replacementDetails
water cooled chiller replacement | $1,000,000 |
| May 1, 2026 | In progress issued May 2026 | 180 Howard St | Ca United Mechanical, Inc | remove and replace chw coil in rooftop unit and install new louvers.Details
remove and replace chw coil in rooftop unit and install new louvers. | $598,634 |
| Aug 15, 2025 | Completed final sign-off Oct 2025 | 201 Spear St | Ca United Mechanical, Inc | replace existing fsd. revision to pa#202503111972Details
replace existing fsd. revision to pa#202503111972 | $5,000 |
| Aug 11, 2025 | Expired or cancelled withdrawn Sep 2025 | 201 Spear St | Ca United Mechanical, Inc | 18/f: revision to permit 202503111972. install fire smoke damper to replace smoke control pressurization.Details
18/f: revision to permit 202503111972. install fire smoke damper to replace smoke control pressurization. | $5,000 |
| Mar 11, 2025 | Completed final sign-off Oct 2025 | 201 Spear St | Ca United Mechanical, Inc | 18/fl-ref ti 202412025941- install ductwork to (e) main and (n) vav boxes grilles connect (n) heating hot water piping to (e)Details
18/fl-ref ti 202412025941- install ductwork to (e) main and (n) vav boxes grilles connect (n) heating hot water piping to (e) | $150,000 |
| Dec 22, 2023 | Completed final sign-off May 2025 | 875 Stevenson St | Ca United Mechanical, Inc | replace (3) ahu with new on roof.Details
replace (3) ahu with new on roof. | $1,050,000 |
| Sep 27, 2023 | Never finaled issued Sep 2023, no final | 1199 Bush St | Ca United Mechanical, Inc | demo boiler, boiler replacement. install new boiler primary & secondary pumps, air separtor and expansion tankDetails
demo boiler, boiler replacement. install new boiler primary & secondary pumps, air separtor and expansion tank | $150,000 |
| Jul 29, 2022 | Completed final sign-off Nov 2024 | 535 Mission St | Ca United Mechanical, Inc | install 2 new filtration system for(2) existing cooling towers on the roof.Details
install 2 new filtration system for(2) existing cooling towers on the roof. | $80,000 |
| Aug 6, 2021 | Never finaled issued Aug 2021, no final | 3200 California St | Ca United Mechanical, Inc | 1st floor: install one threeton mini split ac unitDetails
1st floor: install one threeton mini split ac unit | $3,000 |
| Jul 1, 2021 | Never finaled issued Jul 2021, no final | 50 Beale St | Ca United Mechanical, Inc | install new water source heat pump unitDetails
install new water source heat pump unit | $20,000 |
| Apr 1, 2021 | Completed final sign-off Apr 2022 | 875 Howard St | Ca United Mechanical, Inc | 2/f: remove and replace 1 water sourced self contained packaged air conditioning unit. replacement unit matches (e) in capacity and electrical power usage.Details
2/f: remove and replace 1 water sourced self contained packaged air conditioning unit. replacement unit matches (e) in capacity and electrical power usage. | $75,000 |
| Apr 1, 2021 | Never finaled issued Jul 2021, no final | 88 Kearny St | Ca United Mechanical, Inc | furnish and install a new ac split system to serve the elevator machine room.Details
furnish and install a new ac split system to serve the elevator machine room. | $15,000 |
| Mar 1, 2021 | Completed final sign-off May 2024 | 180 Post St | Ca United Mechanical, Inc | replace 1 cooling tower. replace 3 pumps (2 on condenser water loop & 1 on hhw). add 1 heat exchanger.Details
replace 1 cooling tower. replace 3 pumps (2 on condenser water loop & 1 on hhw). add 1 heat exchanger. | $150,000 |
| May 10, 2017 | Completed final sign-off Jun 2018 | 650 California St | Ca United Mechanical, Inc | 4th floor: office t.i. for new ductwork, vav's , heating hot water piping and insulation. ref app#201702270165. n/a for maherDetails
4th floor: office t.i. for new ductwork, vav's , heating hot water piping and insulation. ref app#201702270165. n/a for maher | $300,000 |
| May 10, 2017 | Completed final sign-off Jun 2018 | 650 California St | Ca United Mechanical, Inc | 5th,6th,7th floors: office t.i. for new ductwork, vav's , heating hot water piping and insulation. ref app#201702270162. n/a for maherDetails
5th,6th,7th floors: office t.i. for new ductwork, vav's , heating hot water piping and insulation. ref app#201702270162. n/a for maher | $300,000 |
| Dec 29, 2016 | Never finaled issued Mar 2017, no final | 1700 California St | Ca United Mechanical, Inc | 2,3,4,5th flr: replace (e) diffusers in central cooridors & restrooms. add new registers & rebalance vavs for improved air distribution maher na. no new duct work. no cfm changes. ref arch 2016/08/30/6354Details
2,3,4,5th flr: replace (e) diffusers in central cooridors & restrooms. add new registers & rebalance vavs for improved air distribution maher na. no new duct work. no cfm changes. ref arch 2016/08/30/6354 | $4,000 |
| Jun 24, 2016 | Completed final sign-off Aug 2016 | 1 Christmas Tree Point Rd | Ca United Mechanical, Inc | disconnect electrical. remove hvac unit, demo wall. cut (e) equip pad. new concrete curb. build new section of wall. reset hvac unit and reconnect electrical. revision to approved pa# 201506290253, electrilyte under 50 gallon.Details
disconnect electrical. remove hvac unit, demo wall. cut (e) equip pad. new concrete curb. build new section of wall. reset hvac unit and reconnect electrical. revision to approved pa# 201506290253, electrilyte under 50 gallon. | $90,000 |
| Jun 22, 2016 | Never finaled issued Jul 2016, no final | 101 California St | Ca United Mechanical, Inc | suite # 1550:reuse (e) 15th floor air handler & (e) duct mains. provide new duct diffusers & thermostats. provide (1) inline transfer fan for it closet. ref pa 2016-0428-5954. maher naDetails
suite # 1550:reuse (e) 15th floor air handler & (e) duct mains. provide new duct diffusers & thermostats. provide (1) inline transfer fan for it closet. ref pa 2016-0428-5954. maher na | |
| Dec 10, 2015 | Completed final sign-off Apr 2016 | 450 Shotwell St | Ca United Mechanical, Inc | t.i. project involving addition of three (n) fan coils & associated ductwork & air outlets. (n) exhaust fan, new supply fan and associated ductwork. ref pa 2015-1001-8631. maher naDetails
t.i. project involving addition of three (n) fan coils & associated ductwork & air outlets. (n) exhaust fan, new supply fan and associated ductwork. ref pa 2015-1001-8631. maher na | $40,000 |
| Dec 10, 2015 | Completed final sign-off Feb 2016 | 438 Shotwell St | Ca United Mechanical, Inc | ti project involving addition of low side ductwork & air outlets to match the new floor plan ref pa 2015-1007-9063. maher naDetails
ti project involving addition of low side ductwork & air outlets to match the new floor plan ref pa 2015-1007-9063. maher na | $30,000 |
| Oct 8, 2015 | Completed final sign-off Nov 2015 | 1 Sansome St | Stockham Construction, Ca United Mechanical, Inc | 37th floor: upgrade of (e) hvac including new vav's. rebalance of (e) vavs' & new air outlets. ref pa 2015 0904 6182 & 1369906Details
37th floor: upgrade of (e) hvac including new vav's. rebalance of (e) vavs' & new air outlets. ref pa 2015 0904 6182 & 1369906 | $25,000 |
| Jul 23, 2015 | Completed final sign-off Nov 2015 | 855 Harrison St | Ca United Mechanical, Inc | modify existing ductwork. add cooling system for wine storage. mechanical submittal for 201505015118. compliance with maher ordinance no. 155-13 not required.Details
modify existing ductwork. add cooling system for wine storage. mechanical submittal for 201505015118. compliance with maher ordinance no. 155-13 not required. | $151,238 |
| Jul 8, 2015 | Expired or cancelled cancelled Jan 2026 | 465 California St | Ca United Mechanical, Inc | add 4 fire smoke dampers for rated room. revision to 201504274706Details
add 4 fire smoke dampers for rated room. revision to 201504274706 | $2,400 |
| May 18, 2015 | Completed final sign-off Sep 2015 | 333 Bush St | Ca United Mechanical, Inc | 12th floor: ti and reroute of (e) mechanical vav's on new vav. ref pa 2015 0423 4408Details
12th floor: ti and reroute of (e) mechanical vav's on new vav. ref pa 2015 0423 4408 | $136,920 |
| Apr 27, 2015 | Completed final sign-off Mar 2016 | 465 California St | Ca United Mechanical, Inc | basement: install 3 vapor hoods and 1 ef. modify (e) fan coil ductwork. ref# 2013-0816-4527. maher naDetails
basement: install 3 vapor hoods and 1 ef. modify (e) fan coil ductwork. ref# 2013-0816-4527. maher na | $65,000 |
| Apr 27, 2015 | Never finaled issued Apr 2015, no final | 455 The Embarcadero | Ca United Mechanical, Inc | 1st flr: work in common area - revise ductwork at (e) wshp units. relocate 2 wshp that are (e) ref pa 2014 0630 9966Details
1st flr: work in common area - revise ductwork at (e) wshp units. relocate 2 wshp that are (e) ref pa 2014 0630 9966 | $160,000 |
| Mar 2, 2015 | Expired or cancelled expired Apr 2021 | 1390 Market St | Ca United Mechanical, Inc | #820- hvac for office ti including 2 new vavs. ref 201412153700Details
#820- hvac for office ti including 2 new vavs. ref 201412153700 | $23,400 |
| Jan 16, 2015 | Completed final sign-off May 2015 | 50 Beale St | Ca United Mechanical, Inc | install 3 heat pumps, 2 fans, 9 variable air volume boxesDetails
install 3 heat pumps, 2 fans, 9 variable air volume boxes | |
| Jan 16, 2015 | Completed final sign-off May 2015 | 50 Beale St | Ca United Mechanical, Inc | on 12 th fl replace heat pump 2 fans, 2 boxes, 6 201411242376 maher not reqDetails
on 12 th fl replace heat pump 2 fans, 2 boxes, 6 201411242376 maher not req | $218,077 |
| Oct 27, 2014 | Completed final sign-off Feb 2015 | 200 Kansas St | Ca United Mechanical, Inc | revision to 201410068201: ductwork retrofit to new floor plan layout.Details
revision to 201410068201: ductwork retrofit to new floor plan layout. | $47,000 |
| May 16, 2014 | Completed final sign-off Jul 2014 | 27 South Park | Ca United Mechanical, Inc | relocation of ductwork from an existing heating system. addition of grilles for new offices. ref. permit appl. 201403271843. maher n/a.Details
relocation of ductwork from an existing heating system. addition of grilles for new offices. ref. permit appl. 201403271843. maher n/a. | $3,400 |
| Jan 8, 2014 | Completed final sign-off Mar 2014 | 33 New Montgomery St | Ca United Mechanical, Inc | ste 300: relocate 3 wshp a/c units & install one new van for future, remove existing vav ductwork for new layout. compliance with ordinance #155-13 not required. excavation <50 cu. yd.Details
ste 300: relocate 3 wshp a/c units & install one new van for future, remove existing vav ductwork for new layout. compliance with ordinance #155-13 not required. excavation <50 cu. yd. | $55,000 |
| Oct 16, 2013 | Completed final sign-off Jul 2014 | 2720 Taylor St | Ca United Mechanical, Inc | remove existing 25 year old cooling tower and replace with new of same size and capacityDetails
remove existing 25 year old cooling tower and replace with new of same size and capacity | $92,389 |
| May 19, 2011 | Completed final sign-off Sep 2012 | 480 Sutter St | Ca United Mechanical, Inc | marriott hotel. mech work. replace air handler. replace tan and new vav boxes. 31st floor, fire alarm under separate permit.Details
marriott hotel. mech work. replace air handler. replace tan and new vav boxes. 31st floor, fire alarm under separate permit. | $75,000 |
| Oct 5, 2010 | Completed final sign-off Sep 2012 | 480 Sutter St | Ca United Mechanical, Inc | replace cooling tower. marriot hotel.Details
replace cooling tower. marriot hotel. | $20,000 |
| Nov 13, 2006 | Completed final sign-off Jun 2007 | 199 Fremont St | Ca United Mechanical, Inc | oti-2 5th floor, el, meDetails
oti-2 5th floor, el, me | $75,000 |
| Nov 13, 2006 | Completed final sign-off Jun 2007 | 199 Fremont St | Ca United Mechanical, Inc | oti-2, 6th floor, el, me.Details
oti-2, 6th floor, el, me. | $100,000 |
| Sep 26, 2006 | Expired or cancelled expired Nov 2007 | 88 Kearny St | Ca United Mechanical, Inc | oti-2 12th floor me | $8,000 |
| Sep 30, 2005 | Completed final sign-off Mar 2017 | 2130 Fulton St | rev.appl#200507127459 scope of work to install new mechanical equipment & ducting not shown on original appl#200507127459.mep only.Details
rev.appl#200507127459 scope of work to install new mechanical equipment & ducting not shown on original appl#200507127459.mep only. | $20,000 |