Steven Tipping
- Listed as
- architect, engineer
- Firm
- Tipping Mar & Associates
- Based in
- Berkeley
- On San Francisco permits
- Dec 2004 to Aug 2016
19 permits since 2000 (engineer on 14 permits, architect on 5 permits): 16 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 10, 2016 | Completed final sign-off Dec 2019 | 2675 Geary Bl | Nibbi Bros Assoc Inc. | exterior facade remodel & raw shell improvements for tenant space under (e) car ramp - in parking lot "c". ** maher: n/a **Details
exterior facade remodel & raw shell improvements for tenant space under (e) car ramp - in parking lot "c". ** maher: n/a ** | $150,000 |
| Jan 30, 2015 | Completed final sign-off Oct 2015 | 755 Ocean Av | voluntary seismic upgrade to classroom roof and wall connection. n/a ordinance #155-13Details
voluntary seismic upgrade to classroom roof and wall connection. n/a ordinance #155-13 | $295,000 | |
| Dec 18, 2013 | Completed final sign-off Jun 2015 | 2123 Pierce St | Keegan Contruction Inc. | revision to appl #2011.0204.9646: supplemental information for structural steel frame.Details
revision to appl #2011.0204.9646: supplemental information for structural steel frame. | |
| Dec 17, 2013 | Completed final sign-off Dec 2017 | 110 The Embarcadero | Oliver & Company Inc. | structural upgrade of (e) foundation. tenant improvement 1st & 2nd floor. add 1 story to accomade assembly, office & storage. sprinkler & fire alarm on separate permit.Details
structural upgrade of (e) foundation. tenant improvement 1st & 2nd floor. add 1 story to accomade assembly, office & storage. sprinkler & fire alarm on separate permit. | $6,800,000 |
| Dec 18, 2012 | Completed final sign-off Mar 2013 | 333 Dolores St | Plant Construction Company Lp | modify cast - in - place concrete wall to shotcrete. revisoin to pa# 201206253376Details
modify cast - in - place concrete wall to shotcrete. revisoin to pa# 201206253376 | |
| Dec 5, 2012 | Never finaled issued Feb 2013, no final | 333 Grant Av | Access Systems & Solutions Inc | install new secondary structural support members at roof level for support of window washing equipment.Details
install new secondary structural support members at roof level for support of window washing equipment. | $15,000 |
| Dec 3, 2012 | Completed final sign-off Jul 2013 | 1 Market St | Dpr Construction | steuart tower, 2nd floor. t.i. non load bearing partitions, ceilings, furnishing, modify (e) mech, elec, plumbing systems. fire sprinkler, fire alarm & life safety under separate permit.Details
steuart tower, 2nd floor. t.i. non load bearing partitions, ceilings, furnishing, modify (e) mech, elec, plumbing systems. fire sprinkler, fire alarm & life safety under separate permit. | $1,925,520 |
| Dec 3, 2012 | Completed final sign-off Jul 2013 | 1 Market St | Dpr Construction | steuart tower - 3rd floor. t.i. non load bearing partitions, ceilings, furnishing, modify (e) mech, elec, plumbing systems. fire alarm & fire sprinkler under separate permit.Details
steuart tower - 3rd floor. t.i. non load bearing partitions, ceilings, furnishing, modify (e) mech, elec, plumbing systems. fire alarm & fire sprinkler under separate permit. | $3,268,920 |
| Jan 10, 2012 | Completed final sign-off Jun 2013 | 25 Essex St | Cahill Contractors Inc | install & operate a liebherr 316 ec-h-12 litronic tower crane.Details
install & operate a liebherr 316 ec-h-12 litronic tower crane. | $350,000 |
| Aug 4, 2011 | Completed final sign-off Jan 2012 | 208 Utah St | Cci Com'l Constr & Improv**See 985808*** | revision to app# 200011226404. storage shellings anchorage plans & detail ground floor.Details
revision to app# 200011226404. storage shellings anchorage plans & detail ground floor. | $10,000 |
| Mar 16, 2011 | Completed final sign-off Dec 2011 | 699 08th St | Plant Construction Company Lp | structural work consist of excavation into extg slab,new waterproofing, finish pit with concrete walls and floor.no mechanical, fire life safety, electrical or plumbing scope of work.Details
structural work consist of excavation into extg slab,new waterproofing, finish pit with concrete walls and floor.no mechanical, fire life safety, electrical or plumbing scope of work. | $5,000 |
| Aug 26, 2008 | Completed final sign-off Feb 2009 | 301 Brannan St | Gci, Inc | remove convenience stair and slab infill for existing cut out to fill open space between 3rd and 4th floors. refer to 20080808720 for all arch, path of travel, and disabled access.Details
remove convenience stair and slab infill for existing cut out to fill open space between 3rd and 4th floors. refer to 20080808720 for all arch, path of travel, and disabled access. | $12,000 |
| Apr 2, 2008 | Completed final sign-off Oct 2008 | 1 Market St | Dpr Construction Inc | new structural steel support for operable wall (skyfold door). ref arch #200803036055Details
new structural steel support for operable wall (skyfold door). ref arch #200803036055 | $8,000 |
| Dec 3, 2007 | Completed final sign-off Jun 2014 | 680 Folsom St | Plant Construction Company Lp | total building renovation including seismic upgrade horizontal & 2 story vertical additon to existing building. work includes new exterior cladding, new toilet rooms, elevators, mep fire & life safety systems. building to be leed certified "gold".Details
total building renovation including seismic upgrade horizontal & 2 story vertical additon to existing building. work includes new exterior cladding, new toilet rooms, elevators, mep fire & life safety systems. building to be leed certified "gold". | $82,500,000 |
| Aug 16, 2006 | Completed final sign-off Oct 2006 | 333 Grant Av | P G Construction Co | per inspector request: provide special inspection (welding) for work under appl#200503046821 and #200602033763Details
per inspector request: provide special inspection (welding) for work under appl#200503046821 and #200602033763 | $5,000 |
| Apr 3, 2006 | Completed final sign-off Dec 2006 | 1 South Van Ness Av | Plant Construction Company Lp | extend existing cooling tower support structure for future redundant cooling tower.Details
extend existing cooling tower support structure for future redundant cooling tower. | $56,000 |
| Sep 9, 2005 | Expired or cancelled withdrawn Dec 2005 | 843 Montgomery St | revision to app#200004217880s1 & s2. seismic upgrade details.Details
revision to app#200004217880s1 & s2. seismic upgrade details. | $75,000 | |
| Jun 2, 2005 | Completed final sign-off Jul 2008 | 601 King St | install 15 indicator test piles on vancant lot, new const under 200411098808s.Details
install 15 indicator test piles on vancant lot, new const under 200411098808s. | $20,000 | |
| Dec 17, 2004 | Never finaled issued Mar 2005, no final | 175 Bluxome St | (e)elevator servicing basement & podium levels to be extended to service 2nd & 3rd levelsDetails
(e)elevator servicing basement & podium levels to be extended to service 2nd & 3rd levels | $100,000 |