Permit GraphShortlistSan Francisco building permits since 2000

Stephen Lochte

License
C21377
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C21377 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, engineer, pmt consultant/expediter
Firm
Lochte Architects Group
Based in
San Francisco
On San Francisco permits
Jun 2002 to Jul 2023

109 permits since 2000 (architect on 95 permits, authorized agent-others on 11 permits, engineer on 2 permits, pmt consultant/expediter on 1 permit): 72 completed, 22 never finaled, 15 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Bryan J. Valverde Co (12), Crane Construction Company Inc. (12), Alain Hirsch Construction Corp (10), Plant Construction Company Lp (10), Cannon Constructors North Inc (7), Northern Sun Associates (5), Swinerton Builders (5), Build Group Inc. (4), Fisher Development Inc (4), Dean M Sailors Inc (3), Michilli Inc (3), Dickinson Cameron Construction Company I (2), Integrated Sign Installations Inc (2), Oliver & Company Inc. (2), Ap- Build Inc, Cw Horton General Contractor, Fine Line Group Inc, Jorgensen-Reeve Builders, P 3 Construction & Remodeling Inc, Pacific Wide Builders Inc., Plant Construction Co, Lp, Pribuss Engineering Inc, Rudolph Commercial Interiors Inc, Rci, Thomas Swan Sign Co Inc, Westates Mechanical Corporation Inc
Architects
Chris Harrelson
Engineers
Douglas Snow (2), Jayson Haines (2), Adrian Franks, Jared F. Doescher, Jerome K. Lam, Meng Hsiu Chen, Robert Harris, Robert Trifunovic, Simin Naaseh, Thomas Luong

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

Showing the 100 most recent of 109.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 19, 2023Completed
final sign-off Mar 2025
140 Geary StAlain Hirsch Construction Corpinterior ti retail space including millwork, non load bearing partitions floor, wall and ceiling finishes. ceiling including all ceiling mounted equipment dropped soffits light fixtures, hvac ductwork and equipment.
Details
Permit
202307192486
Permit issued
Sep 12, 2023
Final sign-off
Mar 12, 2025

interior ti retail space including millwork, non load bearing partitions floor, wall and ceiling finishes. ceiling including all ceiling mounted equipment dropped soffits light fixtures, hvac ductwork and equipment.

Open the permit page

$500,000
Mar 3, 2023Completed
final sign-off Feb 2025
140 Geary StNorthern Sun Associatesdemolition permit 3rd fl. remove walls, flooring, ceiling, doors, finishes, millwork. accessibility features deferred per ab-017.
Details
Permit
202303033046
Permit issued
Mar 9, 2023
Final sign-off
Feb 24, 2025

demolition permit 3rd fl. remove walls, flooring, ceiling, doors, finishes, millwork. accessibility features deferred per ab-017.

Open the permit page

$15,000
Mar 25, 2022Completed
final sign-off Oct 2022
3695 Sacramento StPlant Construction Co, Lpinterior ti of retail store. floor finishes, wall non bearing paritions, millwork finsihes, lighting and plumbing fixtures. reclad mullions on both storefronts. replace entry doors to bring entrance to ada compliance.
Details
Permit
202203250930
Permit issued
Jul 12, 2022
Final sign-off
Oct 18, 2022

interior ti of retail store. floor finishes, wall non bearing paritions, millwork finsihes, lighting and plumbing fixtures. reclad mullions on both storefronts. replace entry doors to bring entrance to ada compliance.

Open the permit page

$118,940
Mar 24, 2022Never finaled
issued Apr 2022, no final
140 Geary StAlain Hirsch Construction Corprevision to pa# 202106253279. add high & low door actuator at storefront entry. revised chandelier to support shown in detail 2/5100. revised tenant column connection to building. interior only.
Details
Permit
202203240783
Permit issued
Apr 6, 2022

revision to pa# 202106253279. add high & low door actuator at storefront entry. revised chandelier to support shown in detail 2/5100. revised tenant column connection to building. interior only.

Open the permit page

$8,000
Nov 10, 2021Never finaled
issued Nov 2021, no final
114 Powell StBryan J. Valverde Corevision to pa 2018-0710-4070 & 2020-1106-8384 for installation of (3) door actuators
Details
Permit
202111102209
Permit issued
Nov 23, 2021

revision to pa 2018-0710-4070 & 2020-1106-8384 for installation of (3) door actuators

Open the permit page

$4,000
Sep 17, 2021Never finaled
issued Sep 2021, no final
114 Powell StBryan J. Valverde Corevise structural details to extg app#201912028455 to address extg conditions
Details
Permit
202109178695
Permit issued
Sep 30, 2021

revise structural details to extg app#201912028455 to address extg conditions

Open the permit page

Mar 9, 2021Never finaled
issued Apr 2021, no final
114 Powell StBryan J. Valverde Conon-structural interior demo per ab-017. area of demolition are to remain vacant until future tenant improvement & build-out.
Details
Permit
202103096122
Permit issued
Apr 26, 2021

non-structural interior demo per ab-017. area of demolition are to remain vacant until future tenant improvement & build-out.

Open the permit page

$5,000
Mar 9, 2021Never finaled
issued Apr 2021, no final
120 Powell StBryan J. Valverde Conon-structural interior demo per ab-017. area of demolition are to remain vacant until future tenant improvement & build-out.
Details
Permit
202103096124
Permit issued
Apr 28, 2021

non-structural interior demo per ab-017. area of demolition are to remain vacant until future tenant improvement & build-out.

Open the permit page

$5,000
Nov 12, 2020Never finaled
issued Feb 2021, no final
233 Geary StDickinson Cameron Construction Company Iste #104, ground flr: installation of security gate at interior of entrance. relocate fire pull station just inside entrance. fire alarm modification under seperate permit.
Details
Permit
202011128686
Permit issued
Feb 3, 2021

ste #104, ground flr: installation of security gate at interior of entrance. relocate fire pull station just inside entrance. fire alarm modification under seperate permit.

Open the permit page

$10,000
Nov 6, 2020Never finaled
issued May 2021, no final
114 Powell StBryan J. Valverde Corevision to pa# 2018.0710.4070 and 2018.0726.5686 to incorporate new door locations and duct rooting to louvers location approved under pa# 2018.0710.4070
Details
Permit
202011068384
Permit issued
May 4, 2021

revision to pa# 2018.0710.4070 and 2018.0726.5686 to incorporate new door locations and duct rooting to louvers location approved under pa# 2018.0710.4070

Open the permit page

Oct 2, 2020Completed
final sign-off Jan 2022
120 Powell StBryan J. Valverde Codemo of (e) double glass back door, vestibule walls and ceiling, replacement with a 90 min door and frame with a vision panel and a fire rated wall/ceiling construction, demo of (e) abandoned doors and frame, infill with fire rated construction. mpta 2020-007793pta
Details
Permit
202010025714
Permit issued
Feb 23, 2021
Final sign-off
Jan 31, 2022

demo of (e) double glass back door, vestibule walls and ceiling, replacement with a 90 min door and frame with a vision panel and a fire rated wall/ceiling construction, demo of (e) abandoned doors and frame, infill with fire rated construction. mpta 2020-007793pta

Open the permit page

$110,000
Oct 1, 2020Completed
final sign-off Jan 2022
114 Powell StBryan J. Valverde Codemo of (e) glass back door, replacement with a 90 min. door and frame, demo of 6 (e) windows at demising wall between lot 12 and adjacent lot 11, infill with one layer of brick wall mpta2020-007742pta
Details
Permit
202010015685
Permit issued
May 10, 2021
Final sign-off
Jan 31, 2022

demo of (e) glass back door, replacement with a 90 min. door and frame, demo of 6 (e) windows at demising wall between lot 12 and adjacent lot 11, infill with one layer of brick wall mpta2020-007742pta

Open the permit page

$110,000
Dec 2, 2019Never finaled
issued Dec 2019, no final
114 Powell StBryan J. Valverde Co, Build Group Inc.clarify structural work associated with permit 2018-0710-4070 & 201910305964
Details
Permit
201912028455
Permit issued
Dec 4, 2019

clarify structural work associated with permit 2018-0710-4070 & 201910305964

Open the permit page

$10,000
Oct 30, 2019Never finaled
issued Nov 2019, no final
114 Powell StBryan J. Valverde Co, Build Group Inc.revision to pa 2018-0710-4070 to clarify structural work associated w/the referenced permit scope
Details
Permit
201910305964
Permit issued
Nov 5, 2019

revision to pa 2018-0710-4070 to clarify structural work associated w/the referenced permit scope

Open the permit page

Aug 20, 2019Never finaled
issued Sep 2019, no final
114 Powell StBryan J. Valverde Co, Build Group Inc.demolish selective areas of (e) exterior store front for following purpose, 1) gain info on (e) historic cladding materials for review w/planning, 2) survy header/footer & sidwall connection foundations & utility infrastructures,3) take material samples to confirm presence of hazardous materials
Details
Permit
201908209379
Permit issued
Sep 11, 2019

demolish selective areas of (e) exterior store front for following purpose, 1) gain info on (e) historic cladding materials for review w/planning, 2) survy header/footer & sidwall connection foundations & utility infrastructures,3) take material samples to confirm presence of hazardous materials

Open the permit page

$20,000
Aug 13, 2019Completed
final sign-off Dec 2019
105 Grant AvIntegrated Sign Installations Increplace 2 (e) storefront signs with 2 (n) double-faced illuminated storefront led signs. for "valentino"
Details
Permit
201908138683
Permit issued
Oct 9, 2019
Final sign-off
Dec 12, 2019

replace 2 (e) storefront signs with 2 (n) double-faced illuminated storefront led signs. for "valentino"

Open the permit page

$5,000
Apr 11, 2019Completed
final sign-off Dec 2019
105 Grant AvIntegrated Sign Installations Incinstall electric wall mounted single faced sign - replacement "valentino"
Details
Permit
201904117702
Permit issued
Oct 9, 2019
Final sign-off
Dec 12, 2019

install electric wall mounted single faced sign - replacement "valentino"

Open the permit page

$1,200
Mar 18, 2019Completed
final sign-off Dec 2019
105 Grant AvDickinson Cameron Construction Company Ireplacement in kind of broken entry door and adjacent windows
Details
Permit
201903185519
Permit issued
May 9, 2019
Final sign-off
Dec 20, 2019

replacement in kind of broken entry door and adjacent windows

Open the permit page

$161,298
Mar 14, 2019Completed
final sign-off Oct 2019
125 Grant AvWestates Mechanical Corporation Incfire sprinklers for t.i. basement, ground flr, 2nd flr and equp platform. (e) main piping beyond area of work are to remain. add 111, relocate and change-out 223 sprinklers
Details
Permit
201903145191
Permit issued
Apr 3, 2019
Final sign-off
Oct 22, 2019

fire sprinklers for t.i. basement, ground flr, 2nd flr and equp platform. (e) main piping beyond area of work are to remain. add 111, relocate and change-out 223 sprinklers

Open the permit page

$100,200
Oct 19, 2018Completed
final sign-off Dec 2018
865 Market StPacific Wide Builders Inc.free standing kiosk at 1st flor of mall millwork and electrical work included. n/a for maher
Details
Permit
201810193721
Permit issued
Oct 22, 2018
Final sign-off
Dec 11, 2018

free standing kiosk at 1st flor of mall millwork and electrical work included. n/a for maher

Open the permit page

$15,000
Aug 17, 2018Completed
final sign-off Nov 2019
125 Grant AvSwinerton Buildersinterior t.i. for walls, ceilings, door, millwork, furniture, floor finshes & (2) (n) accessible bathrooms.
Details
Permit
201808177686
Permit issued
Jan 16, 2019
Final sign-off
Nov 8, 2019

interior t.i. for walls, ceilings, door, millwork, furniture, floor finshes & (2) (n) accessible bathrooms.

Open the permit page

$2,700,000
Jul 24, 2018Completed
final sign-off Feb 2020
125 Grant AvSwinerton Builderserect 2 back-lit halo, electric, wall, single faced, sign.
Details
Permit
201807245425
Permit issued
May 8, 2019
Final sign-off
Feb 7, 2020

erect 2 back-lit halo, electric, wall, single faced, sign.

Open the permit page

$3,000
Jul 24, 2018Completed
final sign-off Oct 2019
125 Grant AvSwinerton Builderserect 3 new awning with sign at valance, non-electric, single faced, sign.
Details
Permit
201807245418
Permit issued
May 8, 2019
Final sign-off
Oct 28, 2019

erect 3 new awning with sign at valance, non-electric, single faced, sign.

Open the permit page

$5,000
Jul 24, 2018Completed
final sign-off Feb 2020
125 Grant AvSwinerton Builderserect 1 blade sign, electric, wall, double faced, sign.
Details
Permit
201807245424
Permit issued
May 8, 2019
Final sign-off
Feb 7, 2020

erect 1 blade sign, electric, wall, double faced, sign.

Open the permit page

$1,500
Jul 10, 2018Never finaled
issued Sep 2019, no final
114 Powell StBryan J. Valverde Co, Build Group Inc.storefront replacement @ grd flr, development of design guidelines for storefront. **maher n/a**
Details
Permit
201807104070
Permit issued
Sep 19, 2019

storefront replacement @ grd flr, development of design guidelines for storefront. **maher n/a**

Open the permit page

$1,500,000
Jul 2, 2018Never finaled
issued Sep 2018, no final
114 Powell StBryan J. Valverde Coarministrative permit to memorialize re-painting of union square hotel in kmms conservation district for planning department review. 120 powell street on lot 013 will also be painted. in response to 13000-enf.
Details
Permit
201807023519
Permit issued
Sep 10, 2018

arministrative permit to memorialize re-painting of union square hotel in kmms conservation district for planning department review. 120 powell street on lot 013 will also be painted. in response to 13000-enf.

Open the permit page

Jun 21, 2018Completed
final sign-off Oct 2019
125 Grant Avcore and shell improvement for one new stair, shaft, bldg a bracing, floor leveling & 2 accessible bathrooms.
Details
Permit
201806212572
Permit issued
Aug 9, 2018
Final sign-off
Oct 15, 2019

core and shell improvement for one new stair, shaft, bldg a bracing, floor leveling & 2 accessible bathrooms.

Open the permit page

$649,000
Mar 7, 2018Completed
final sign-off Oct 2019
125 Grant AvSwinerton Buildersproposed bldg facade modification. scope inlcudes window replacement,new entry doors, new security bi-fold gate. sign replacement (separate permit), interior t.i. (work under separate permit)
Details
Permit
201803073092
Permit issued
Nov 27, 2018
Final sign-off
Oct 16, 2019

proposed bldg facade modification. scope inlcudes window replacement,new entry doors, new security bi-fold gate. sign replacement (separate permit), interior t.i. (work under separate permit)

Open the permit page

$243,000
Jun 15, 2017Completed
final sign-off Apr 2018
201 Post StAlain Hirsch Construction Corpelectrical revision only to 2017-05-11-6309
Details
Permit
201706159487
Permit issued
Jun 16, 2017
Final sign-off
Apr 6, 2018

electrical revision only to 2017-05-11-6309

Open the permit page

May 25, 2017Completed
final sign-off Aug 2017
140 Maiden LnNorthern Sun Associatesreplacement of (e) mech unit, in kind no other work
Details
Permit
201705257702
Permit issued
Jun 27, 2017
Final sign-off
Aug 29, 2017

replacement of (e) mech unit, in kind no other work

Open the permit page

$40,000
Apr 20, 2017Completed
final sign-off Mar 2018
201 Post Sterect non-electric double faced projecting sign.
Details
Permit
201704204491
Permit issued
May 30, 2017
Final sign-off
Mar 29, 2018

erect non-electric double faced projecting sign.

Open the permit page

$20,000
Apr 20, 2017Completed
final sign-off Mar 2018
201 Post Sterect an electric single faced wall sign.
Details
Permit
201704204489
Permit issued
May 30, 2017
Final sign-off
Mar 29, 2018

erect an electric single faced wall sign.

Open the permit page

$20,000
Apr 13, 2017Completed
final sign-off Dec 2017
201 Post StAlain Hirsch Construction Corptwo temporary exterior construction barricades.
Details
Permit
201704133913
Permit issued
May 24, 2017
Final sign-off
Dec 18, 2017

two temporary exterior construction barricades.

Open the permit page

$2,000
Feb 21, 2017Completed
final sign-off Apr 2022
166 Geary St(n) designer security gate for simmy choo store along maiden lane - to match gate of adjacent tenant
Details
Permit
201702219794
Permit issued
Jul 27, 2017
Final sign-off
Apr 8, 2022

(n) designer security gate for simmy choo store along maiden lane - to match gate of adjacent tenant

Open the permit page

$10,000
Nov 15, 2016Completed
final sign-off Feb 2018
201 Post StAlain Hirsch Construction Corpinterior ti of (e) basement & ground floor retail store, scope to include (n) stair, elevator, restrooms, partitions, millwork, mep, no exterior work under this permit. fire protection under separate permit
Details
Permit
201611152698
Permit issued
Feb 9, 2017
Final sign-off
Feb 5, 2018

interior ti of (e) basement & ground floor retail store, scope to include (n) stair, elevator, restrooms, partitions, millwork, mep, no exterior work under this permit. fire protection under separate permit

Open the permit page

$1,700,000
Oct 14, 2016Completed
final sign-off Aug 2017
140 Maiden Ln(n) finishes for floor & paint on walls. replacement of some non-historic lighting fixtures w/ led. (e) structure & historic elements to remain.
Details
Permit
201610140344
Permit issued
Jun 27, 2017
Final sign-off
Aug 23, 2017

(n) finishes for floor & paint on walls. replacement of some non-historic lighting fixtures w/ led. (e) structure & historic elements to remain.

Open the permit page

$25,000
Oct 14, 2016Completed
final sign-off Aug 2017
140 Maiden Lnerect non-electric, projecting, double-faced, non-illuminated, replacement sign.
Details
Permit
201610140352
Permit issued
Jun 27, 2017
Final sign-off
Aug 25, 2017

erect non-electric, projecting, double-faced, non-illuminated, replacement sign.

Open the permit page

$10,000
Oct 14, 2016Completed
final sign-off Aug 2017
140 Maiden Lnerect non-electric, wall, single-faced, non-illuminated, new sign.
Details
Permit
201610140350
Permit issued
Jun 27, 2017
Final sign-off
Aug 25, 2017

erect non-electric, wall, single-faced, non-illuminated, new sign.

Open the permit page

$10,000
Oct 7, 2016Completed
final sign-off Jul 2017
150 Post StCrane Construction Company Inc.at the district fire inspector's request - documents (e) fire escape stair from 2nd flr is not used as part of the reqs means of egress. revision and clarification to ref 2015-1218-9542
Details
Permit
201610079822
Permit issued
Oct 11, 2016
Final sign-off
Jul 19, 2017

at the district fire inspector's request - documents (e) fire escape stair from 2nd flr is not used as part of the reqs means of egress. revision and clarification to ref 2015-1218-9542

Open the permit page

Aug 29, 2016Completed
final sign-off Dec 2016
201 Post StNorthern Sun Associatesinterior demo of all existing finishes & non-structural partition walls. removal of stairwell & infill with metal decking & concrete.
Details
Permit
201608296224
Permit issued
Sep 1, 2016
Final sign-off
Dec 16, 2016

interior demo of all existing finishes & non-structural partition walls. removal of stairwell & infill with metal decking & concrete.

Open the permit page

$40,000
Aug 2, 2016Never finaled
issued Aug 2016, no final
150 Post StCrane Construction Company Inc.revision to pa 2015-1218-5542 to show power door operator fire under separate permit
Details
Permit
201608023937
Permit issued
Aug 3, 2016

revision to pa 2015-1218-5542 to show power door operator fire under separate permit

Open the permit page

Jul 11, 2016Completed
final sign-off Jul 2017
150 Post StCrane Construction Company Inc.mechanical revisions only to approve mep permit 2016-0401-3778
Details
Permit
201607111990
Permit issued
Jul 19, 2016
Final sign-off
Jul 12, 2017

mechanical revisions only to approve mep permit 2016-0401-3778

Open the permit page

Jun 24, 2016Completed
final sign-off Jul 2017
150 Post StCrane Construction Company Inc.1/f- revision to pa#201512185542, electrical and plumbing only.
Details
Permit
201606240797
Permit issued
Jun 24, 2016
Final sign-off
Jul 12, 2017

1/f- revision to pa#201512185542, electrical and plumbing only.

Open the permit page

Jun 15, 2016Expired or cancelled
cancelled Aug 2017
150 Post StCrane Construction Company Inc.revision to pa 2015-1218-5542, remove draft curtain between bottom of 2nd floor slab and double height space between grid lines 2-3 & b-d. fully sprinklered building draft curtain not required cbc section 712.1.8
Details
Permit
201606150055
Permit issued
Jun 16, 2016

revision to pa 2015-1218-5542, remove draft curtain between bottom of 2nd floor slab and double height space between grid lines 2-3 & b-d. fully sprinklered building draft curtain not required cbc section 712.1.8

Open the permit page

May 6, 2016Completed
final sign-off Jul 2017
150 Post StCrane Construction Company Inc.revision to pa 2015-1218-5542 to introduce 2 baults inside the store one at ground floor and one at 2nd floor.
Details
Permit
201605066753
Permit issued
May 10, 2016
Final sign-off
Jul 12, 2017

revision to pa 2015-1218-5542 to introduce 2 baults inside the store one at ground floor and one at 2nd floor.

Open the permit page

Mar 21, 2016Never finaled
issued Apr 2016, no final
2047 Fillmore StAlain Hirsch Construction Corp, Michilli Inctenant improvement to lease line including new unisex restroom, new interior stairs, interior millwork
Details
Permit
201603212660
Permit issued
Apr 7, 2016

tenant improvement to lease line including new unisex restroom, new interior stairs, interior millwork

Open the permit page

$450,000
Mar 21, 2016Never finaled
issued Apr 2016, no final
2047 Fillmore StMichilli Incadding 4" shotcret to rear extg exterior wall, new exterior window and replace extg new column on extg rear wall and reverse door swing.
Details
Permit
201603212659
Permit issued
Apr 7, 2016

adding 4" shotcret to rear extg exterior wall, new exterior window and replace extg new column on extg rear wall and reverse door swing.

Open the permit page

$80,000
Feb 3, 2016Completed
final sign-off Sep 2016
600 Stockton StDean M Sailors Increvision to pa#201512225751 as noted on plans delta #2. as built. n/a ordinance #155-13
Details
Permit
201602038737
Permit issued
Feb 11, 2016
Final sign-off
Sep 13, 2016

revision to pa#201512225751 as noted on plans delta #2. as built. n/a ordinance #155-13

Open the permit page

Feb 3, 2016Completed
final sign-off Sep 2016
600 Stockton StDean M Sailors Increvision to pa#201512225751 as noted on plans delta #3 as built. n/a ordinance #155-13
Details
Permit
201602038738
Permit issued
Feb 11, 2016
Final sign-off
Sep 13, 2016

revision to pa#201512225751 as noted on plans delta #3 as built. n/a ordinance #155-13

Open the permit page

Jan 15, 2016Never finaled
issued Dec 2016, no final
150 Post StCrane Construction Company Inc.to erect electric, door/window single faced sign
Details
Permit
201601157262
Permit issued
Dec 20, 2016

to erect electric, door/window single faced sign

Open the permit page

$10,000
Jan 15, 2016Never finaled
issued Dec 2016, no final
150 Post StCrane Construction Company Inc.to erect non electric, projecting , double faced sign
Details
Permit
201601157261
Permit issued
Dec 20, 2016

to erect non electric, projecting , double faced sign

Open the permit page

$7,500
Jan 15, 2016Never finaled
issued Dec 2016, no final
150 Post StCrane Construction Company Inc.to erect non electric, projecting, double faced sign.
Details
Permit
201601157260
Permit issued
Dec 20, 2016

to erect non electric, projecting, double faced sign.

Open the permit page

$3,000
Jan 15, 2016Completed
final sign-off Jul 2017
150 Post StCrane Construction Company Inc.new entry doors & glazing for a retail tenant improvement.
Details
Permit
201601157256
Permit issued
Dec 27, 2016
Final sign-off
Jul 12, 2017

new entry doors & glazing for a retail tenant improvement.

Open the permit page

$35,000
Jan 8, 2016Never finaled
issued Apr 2016, no final
2047 Fillmore StAlain Hirsch Construction Corpupdate existing retail storefront including new retractable awning, blade sign and finishes
Details
Permit
201601086690
Permit issued
Apr 7, 2016

update existing retail storefront including new retractable awning, blade sign and finishes

Open the permit page

$25,000
Dec 22, 2015Completed
final sign-off Sep 2016
600 Stockton StDean M Sailors Incinterior renovation of an existing retail shop within ritz carlton including mechancial & electrical. n/a maher ordinance
Details
Permit
201512225751
Permit issued
Jan 21, 2016
Final sign-off
Sep 13, 2016

interior renovation of an existing retail shop within ritz carlton including mechancial & electrical. n/a maher ordinance

Open the permit page

$300,000
Dec 18, 2015Completed
final sign-off Jul 2017
150 Post StCrane Construction Company Inc.interior t.i. of an extg retail store. add a convenience stair. all other work under separate permit. signage, fire protection, storefront, mep. under seperate permit.
Details
Permit
201512185542
Permit issued
Mar 23, 2016
Final sign-off
Jul 12, 2017

interior t.i. of an extg retail store. add a convenience stair. all other work under separate permit. signage, fire protection, storefront, mep. under seperate permit.

Open the permit page

$3,000,000
Dec 4, 2015Completed
final sign-off Jul 2017
150 Post StCrane Construction Company Inc.soft demo of (e) interior including floor finishes non bearing walls & ceiling. no structural work. ab-017 applies.
Details
Permit
201512044210
Permit issued
Mar 4, 2016
Final sign-off
Jul 12, 2017

soft demo of (e) interior including floor finishes non bearing walls & ceiling. no structural work. ab-017 applies.

Open the permit page

$10,000
Nov 30, 2015Completed
final sign-off Sep 2016
166 Geary StAlain Hirsch Construction Corpinterior t.i. of an existing retail space combining two retail areas on geary street & maiden lane.
Details
Permit
201511303748
Permit issued
Mar 10, 2016
Final sign-off
Sep 16, 2016

interior t.i. of an existing retail space combining two retail areas on geary street & maiden lane.

Open the permit page

$600,000
Nov 20, 2015Completed
final sign-off Jan 2019
166 Geary StAlain Hirsch Construction Corprevision to pa#2015-1130-3748. facade work only. update store fronts for retail store on geary st & maiden lane.
Details
Permit
201511203269
Permit issued
Aug 3, 2016
Final sign-off
Jan 7, 2019

revision to pa#2015-1130-3748. facade work only. update store fronts for retail store on geary st & maiden lane.

Open the permit page

$80,000
Jun 25, 2015Expired or cancelled
withdrawn Feb 2017
117 Post Sterect 1 projecting, double faced, banner sign. n/a for maher ordinance.
Details
Permit
201506259989

erect 1 projecting, double faced, banner sign. n/a for maher ordinance.

Open the permit page

$3,500
Jun 25, 2015Expired or cancelled
withdrawn Feb 2017
117 Post Sterect 1 illuminated halo-lit wall, electric, single faced sign. n/a for maher ordinance.
Details
Permit
201506259991

erect 1 illuminated halo-lit wall, electric, single faced sign. n/a for maher ordinance.

Open the permit page

$5,000
Jun 24, 2015Expired or cancelled
withdrawn Mar 2017
117 Post StNorthern Sun Associatesinterior t.i., demo interior partitions, provide new interior partitions. n/a ordinance #155-13
Details
Permit
201506249769

interior t.i., demo interior partitions, provide new interior partitions. n/a ordinance #155-13

Open the permit page

$1,500
Sep 22, 2014Completed
final sign-off Dec 2014
75 01st StAp- Build Increvision to appl #2014.0514.5757 - work is to add structural framing on roof.
Details
Permit
201409226979
Permit issued
Sep 23, 2014
Final sign-off
Dec 4, 2014

revision to appl #2014.0514.5757 - work is to add structural framing on roof.

Open the permit page

$5,000
Aug 1, 2014Never finaled
issued Sep 2014, no final
301 Pine StJorgensen-Reeve Buildersinterior t.i. for juice bar/lounge area and yoga studio/strech area of extg health club. no exterior work. fire protection under separate permit.
Details
Permit
201408012839
Permit issued
Sep 25, 2014

interior t.i. for juice bar/lounge area and yoga studio/strech area of extg health club. no exterior work. fire protection under separate permit.

Open the permit page

$80,000
Jul 23, 2014Completed
final sign-off Aug 2014
877 Jamestown AvCannon Constructors North Incbldg 7- rev. to pa#9924076s & 201203206497, as built, no work to be performed, not visable from street, elimination of non egress balconies.
Details
Permit
201407231928
Permit issued
Aug 14, 2014
Final sign-off
Aug 18, 2014

bldg 7- rev. to pa#9924076s & 201203206497, as built, no work to be performed, not visable from street, elimination of non egress balconies.

Open the permit page

Jul 23, 2014Completed
final sign-off Aug 2014
833 Jamestown AvCannon Constructors North Incbldg 1- rev. to pa#201203206490 & 200103235127, as built, no work to be performed, not visable from street, elimination of non egress balconies.
Details
Permit
201407231924
Permit issued
Aug 14, 2014
Final sign-off
Aug 20, 2014

bldg 1- rev. to pa#201203206490 & 200103235127, as built, no work to be performed, not visable from street, elimination of non egress balconies.

Open the permit page

Jul 23, 2014Completed
final sign-off Aug 2014
841 Jamestown AvCannon Constructors North Incbldg 10- rev. to pa#9924080s & 201110146791, as built, no work to be performed, not visable from street, elimination of non egress balconies. window replacement in kind, maximum u-factor 0.40
Details
Permit
201407231929
Permit issued
Aug 14, 2014
Final sign-off
Aug 18, 2014

bldg 10- rev. to pa#9924080s & 201110146791, as built, no work to be performed, not visable from street, elimination of non egress balconies. window replacement in kind, maximum u-factor 0.40

Open the permit page

Jul 23, 2014Completed
final sign-off Aug 2014
849 Jamestown AvCannon Constructors North Incbldg 3- rev. to pa#9924078s & 201110146790, as built, no work to be performed, not visable from street, elimination of non egress balconies.
Details
Permit
201407231926
Permit issued
Aug 14, 2014
Final sign-off
Aug 20, 2014

bldg 3- rev. to pa#9924078s & 201110146790, as built, no work to be performed, not visable from street, elimination of non egress balconies.

Open the permit page

Jul 23, 2014Completed
final sign-off Aug 2014
871 Jamestown AvCannon Constructors North Incbldg 6- rev. to pa#9924082s & 201203206499, as built, no work to be performed, not visable from street, elimination of non egress balconies.
Details
Permit
201407231927
Permit issued
Aug 14, 2014
Final sign-off
Aug 18, 2014

bldg 6- rev. to pa#9924082s & 201203206499, as built, no work to be performed, not visable from street, elimination of non egress balconies.

Open the permit page

Jul 23, 2014Completed
final sign-off Aug 2014
843 Jamestown AvCannon Constructors North Incbldg 2 rev. to pa#9924075s & 201110146787, as built, no work to be performed, not visable from street, elimination of non egress balconies.
Details
Permit
201407231925
Permit issued
Aug 14, 2014
Final sign-off
Aug 20, 2014

bldg 2 rev. to pa#9924075s & 201110146787, as built, no work to be performed, not visable from street, elimination of non egress balconies.

Open the permit page

Nov 18, 2013Expired or cancelled
cancelled Jan 2026
1028 Market StP 3 Construction & Remodeling Inctenant improvement of 2/f, non structural demo of existing non load bearing partitions and ceiling. construction of open office and (2) small conference rooms, work also includes upgrade at men's and women's restroom.
Details
Permit
201311182175

tenant improvement of 2/f, non structural demo of existing non load bearing partitions and ceiling. construction of open office and (2) small conference rooms, work also includes upgrade at men's and women's restroom.

Open the permit page

$400,000
Nov 12, 2013Completed
final sign-off Feb 2014
384 Post StAlain Hirsch Construction Corpt.i. for givenchy boutique space (approx 200 sq ft) on ground floor of saks 5th ave. work includes (n) flooring, fixtures, millwork, finishes. no change to mep, fire protection under separate permit.
Details
Permit
201311121637
Permit issued
Jan 17, 2014
Final sign-off
Feb 13, 2014

t.i. for givenchy boutique space (approx 200 sq ft) on ground floor of saks 5th ave. work includes (n) flooring, fixtures, millwork, finishes. no change to mep, fire protection under separate permit.

Open the permit page

$250,000
Feb 22, 2013Completed
final sign-off May 2013
201 Post StMichilli Incinterior ti on ground floor of prada retail store. includes millwork, finishes, furniture, no exterior work mep and fire protection under separate permit
Details
Permit
201302220826
Permit issued
Mar 12, 2013
Final sign-off
May 29, 2013

interior ti on ground floor of prada retail store. includes millwork, finishes, furniture, no exterior work mep and fire protection under separate permit

Open the permit page

$500,000
Feb 21, 2013Expired or cancelled
cancelled Aug 2022
201 Post Stfacade work to be performed including (n) stone facing around (e) windows and doors.
Details
Permit
201302210641

facade work to be performed including (n) stone facing around (e) windows and doors.

Open the permit page

$50,000
Aug 30, 2012Completed
final sign-off Jan 2013
59 Grant AvFisher Development Incnew t.i to include (n) walls, flooring, lighting, finishes, new bathrooms, casework, mech, elect, etc. fire protection & signage under separate permit.
Details
Permit
201208308667
Permit issued
Sep 17, 2012
Final sign-off
Jan 3, 2013

new t.i to include (n) walls, flooring, lighting, finishes, new bathrooms, casework, mech, elect, etc. fire protection & signage under separate permit.

Open the permit page

$250,000
Aug 21, 2012Completed
final sign-off Feb 2018
800 Presidio AvFisher Development Inc, Oliver & Company Inc.to demolish 1 story community center / gym building.
Details
Permit
201208217861
Permit issued
Sep 12, 2014
Final sign-off
Feb 5, 2018

to demolish 1 story community center / gym building.

Open the permit page

$63,000
Apr 16, 2012Completed
final sign-off Feb 2018
800 Presidio AvPribuss Engineering Inc, Fisher Development Inc, Oliver & Company Inc.to erect 5 stories, 50 units community center / housing, mixed used building with 1 basement.
Details
Permit
201204168406
Permit issued
Jun 20, 2014
Final sign-off
Feb 5, 2018

to erect 5 stories, 50 units community center / housing, mixed used building with 1 basement.

Open the permit page

$12,750,000
Sep 23, 2011Completed
final sign-off Dec 2012
181 03rd StPlant Construction Company Lp, Cannon Constructors North Incinterior barrier removal at existing hotel guest rooms only, 24 total guest rooms affected at various floors. minor plumbing work required to relocate some (e) toilets, not change in use or occupancy.(e)fire sprinklers unchanged intent to comply with 2010 c.b.c accessibility req'mts.
Details
Permit
201109235331
Permit issued
Apr 9, 2012
Final sign-off
Dec 14, 2012

interior barrier removal at existing hotel guest rooms only, 24 total guest rooms affected at various floors. minor plumbing work required to relocate some (e) toilets, not change in use or occupancy.(e)fire sprinklers unchanged intent to comply with 2010 c.b.c accessibility req'mts.

Open the permit page

$165,000
Jul 15, 2011Expired or cancelled
cancelled Mar 2020
101 Post StPlant Construction Company Lpstorefront to remain as is-alterations to canopy and new signs only.
Details
Permit
201107150288

storefront to remain as is-alterations to canopy and new signs only.

Open the permit page

$10,000
Sep 14, 2010Completed
final sign-off Dec 2010
125 Maiden LnThomas Swan Sign Co Incerect a non-electric double faced projecting sign.
Details
Permit
201009140857
Permit issued
Dec 1, 2010
Final sign-off
Dec 20, 2010

erect a non-electric double faced projecting sign.

Open the permit page

$500
Aug 5, 2010Completed
final sign-off Sep 2010
181 03rd StRudolph Commercial Interiors Inc, Rcirevision to appl # 201006255328 -revision to number of dwellings,number of rooms reduced by 3 as part of this application, combine room #3103 & # 3105, room #3104 & #3110, room #3114 & #3115.
Details
Permit
201008058233
Permit issued
Aug 10, 2010
Final sign-off
Sep 9, 2010

revision to appl # 201006255328 -revision to number of dwellings,number of rooms reduced by 3 as part of this application, combine room #3103 & # 3105, room #3104 & #3110, room #3114 & #3115.

Open the permit page

Jun 16, 2010Never finaled
issued Aug 2010, no final
200 Post StNorthern Sun Associates1st floor-relocation of (e) display cases, new wood wall panel system on west wall, alteration of (e) display cases. all work to be done on 1st floor only
Details
Permit
201006164593
Permit issued
Aug 26, 2010

1st floor-relocation of (e) display cases, new wood wall panel system on west wall, alteration of (e) display cases. all work to be done on 1st floor only

Open the permit page

$75,000
Apr 2, 2010Expired or cancelled
withdrawn Dec 2011
233 Post StFisher Development Incnew elevator all floors, partial removal 2nd flr slab, structural bacing as reqd, new concrete elevator shaft, new street level entrance lobby at maiden lane, new hvac & lighting ground floor lobby, new ext lighting & paitn, new street level storefronts at post street & maiden lane.
Details
Permit
201004029556

new elevator all floors, partial removal 2nd flr slab, structural bacing as reqd, new concrete elevator shaft, new street level entrance lobby at maiden lane, new hvac & lighting ground floor lobby, new ext lighting & paitn, new street level storefronts at post street & maiden lane.

Open the permit page

$1,250,000
Apr 8, 2009Completed
final sign-off Jun 2009
209 Post StPlant Construction Company Lpto obtain final inspection for work approved under pa#2007801182805.
Details
Permit
200904085888
Permit issued
Apr 15, 2009
Final sign-off
Jun 19, 2009

to obtain final inspection for work approved under pa#2007801182805.

Open the permit page

Apr 8, 2009Completed
final sign-off Jun 2009
209 Post StPlant Construction Company Lpto obtain final inspection for work approved under pa#200708149793. all work has been completed.
Details
Permit
200904085887
Permit issued
Apr 15, 2009
Final sign-off
Jun 19, 2009

to obtain final inspection for work approved under pa#200708149793. all work has been completed.

Open the permit page

Apr 8, 2009Completed
final sign-off Jun 2009
201 Post StPlant Construction Company Lpto obtain final inspection for work approved under pa#200704259710.
Details
Permit
200904085886
Permit issued
Apr 15, 2009
Final sign-off
Jun 19, 2009

to obtain final inspection for work approved under pa#200704259710.

Open the permit page

Apr 8, 2009Completed
final sign-off Apr 2014
201 Post Stto obtain final inspection for work approved under pa#200711027237.
Details
Permit
200904085885
Permit issued
Apr 15, 2009
Final sign-off
Apr 4, 2014

to obtain final inspection for work approved under pa#200711027237.

Open the permit page

Apr 8, 2009Completed
final sign-off Jun 2009
201 Post StPlant Construction Company Lpto obtain final inspection for work approved under pa#200711067437. all work has been completed.
Details
Permit
200904085890
Permit issued
Apr 15, 2009
Final sign-off
Jun 19, 2009

to obtain final inspection for work approved under pa#200711067437. all work has been completed.

Open the permit page

Apr 8, 2009Completed
final sign-off Jun 2009
201 Post StPlant Construction Company Lpto obtain final inspection for work approved under pa#200711057279. all work has been completed.
Details
Permit
200904085884
Permit issued
Apr 15, 2009
Final sign-off
Jun 19, 2009

to obtain final inspection for work approved under pa#200711057279. all work has been completed.

Open the permit page

Apr 8, 2009Completed
final sign-off Jun 2009
201 Post StPlant Construction Company Lpto obtain final inspection for work approved under pa#200706073344. all work has been completed.
Details
Permit
200904085883
Permit issued
Apr 15, 2009
Final sign-off
Jun 19, 2009

to obtain final inspection for work approved under pa#200706073344. all work has been completed.

Open the permit page

Apr 8, 2009Completed
final sign-off Jun 2009
201 Post StPlant Construction Company Lpto obtain final inspection for work approved under pa#200807035966. all work has been completed.
Details
Permit
200904085889
Permit issued
Apr 15, 2009
Final sign-off
Jun 19, 2009

to obtain final inspection for work approved under pa#200807035966. all work has been completed.

Open the permit page

Oct 20, 2008Completed
final sign-off Aug 2010
212 Stockton StPlant Construction Company Lpti application under pa# 2008/07/14/6642. scope of work under this permit is installation of mechanical, electrical, plumbing systems.
Details
Permit
200810204620
Permit issued
Mar 20, 2009
Final sign-off
Aug 26, 2010

ti application under pa# 2008/07/14/6642. scope of work under this permit is installation of mechanical, electrical, plumbing systems.

Open the permit page

$135,000
Oct 9, 2008Expired or cancelled
expired Jul 2011
46 Geary StFine Line Group Incventilation mechanical duct cover (basement to 3rd floor) per approved pa# 2006-1212-9721 and pa# 2008-0919-2177 connection to fiore alarm separate permit.....
Details
Permit
200810093820
Permit issued
Oct 10, 2008

ventilation mechanical duct cover (basement to 3rd floor) per approved pa# 2006-1212-9721 and pa# 2008-0919-2177 connection to fiore alarm separate permit.....

Open the permit page

$2,000
Sep 19, 2008Completed
final sign-off Dec 2009
46 Geary Stinstall hvac system in basement(200612129721 r-2)main unit already in bldg.
Details
Permit
200809192177
Permit issued
Sep 29, 2008
Final sign-off
Dec 24, 2009

install hvac system in basement(200612129721 r-2)main unit already in bldg.

Open the permit page

$45,000
Aug 4, 2008Completed
final sign-off Apr 2009
800 Market Stenergy compliance for new facade at ground and 2nd floors. facade alteration issued under seperate pa# 2008-0213-4729.
Details
Permit
200808048355
Permit issued
Aug 4, 2008
Final sign-off
Apr 22, 2009

energy compliance for new facade at ground and 2nd floors. facade alteration issued under seperate pa# 2008-0213-4729.

Open the permit page

$15,000
Jan 28, 2008Expired or cancelled
expired Jan 2012
181 03rd StCw Horton General Contractorguest room suites renovation to 9 suites total. 6 jr. suites - floor 23-28. 3 extreme suites - floor 31. under separate permit: fire protection/fire alarm, sprinkler, hvac, electrical plumbing.
Details
Permit
200801283403
Permit issued
Feb 21, 2008

guest room suites renovation to 9 suites total. 6 jr. suites - floor 23-28. 3 extreme suites - floor 31. under separate permit: fire protection/fire alarm, sprinkler, hvac, electrical plumbing.

Open the permit page

$180,000
Sep 20, 2007Expired or cancelled
expired Apr 2008
120 Maiden Lnrevision to approved appl. #200705181715. work is to install revised interior glass partitions & glazing on ground floor, mezzanine & 2nd floor.
Details
Permit
200709203206
Permit issued
Sep 21, 2007

revision to approved appl. #200705181715. work is to install revised interior glass partitions & glazing on ground floor, mezzanine & 2nd floor.

Open the permit page

Sep 20, 2007Completed
final sign-off Apr 2008
120 Maiden Lnrevision to appl. #200704209347. revisions include adding (2)fitting rooms on 2nd floor; change to restrooms, closet & vestibule in basement; add kitchenette in basement. infill on 2nd floort adjacent to stairs. no change to lighting or mechanical.
Details
Permit
200709203198
Permit issued
Sep 20, 2007
Final sign-off
Apr 24, 2008

revision to appl. #200704209347. revisions include adding (2)fitting rooms on 2nd floor; change to restrooms, closet & vestibule in basement; add kitchenette in basement. infill on 2nd floort adjacent to stairs. no change to lighting or mechanical.

Open the permit page

$50,000
Jun 8, 2007Completed
final sign-off Apr 2009
800 Market Stinterior non structural demo on all floors in advance of (n) seismic upgrade and full bldg t.i. no exterior work no structural work
Details
Permit
200706083436
Permit issued
Jun 8, 2007
Final sign-off
Apr 1, 2009

interior non structural demo on all floors in advance of (n) seismic upgrade and full bldg t.i. no exterior work no structural work

Open the permit page

$60,000
Apr 25, 2007Expired or cancelled
expired Jun 2009
201 Post Stremove (e) mezzanine at g/f. mezzanine supports only itself. work includes removing (e) floor beams for mezz. and spandall beams at building perimeter. interior demo only.
Details
Permit
200704259710
Permit issued
Apr 25, 2007

remove (e) mezzanine at g/f. mezzanine supports only itself. work includes removing (e) floor beams for mezz. and spandall beams at building perimeter. interior demo only.

Open the permit page

$25,000