David Strandberg
- Listed as
- architect, engineer
- Firm
- Strandberg Engineering
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Jun 2026
230 permits since 2000 (engineer on 225 permits, architect on 6 permits): 135 completed, 30 in progress, 31 never finaled, 34 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 230.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 2, 2026 | In progress filed Jun 2026, not yet issued | 1348 South Van Ness Av | Saturn Construction Co | rear carport/cottage detached structure. addition of 1 story type vb over existing carport. kitchenette with 2 burnerDetails
rear carport/cottage detached structure. addition of 1 story type vb over existing carport. kitchenette with 2 burner | $350,000 |
| Apr 1, 2026 | In progress issued Apr 2026 | 237 Hartford St | Sasso Construction Inc. | shoring design establishes a strategy for soil shoring, excavation segmented pouring for proposed foundation work under 202305268680. deferred submittal for soil shoring engineering only.Details
shoring design establishes a strategy for soil shoring, excavation segmented pouring for proposed foundation work under 202305268680. deferred submittal for soil shoring engineering only. | $5,000 |
| Mar 30, 2026 | In progress issued Apr 2026 | 2765 Vallejo St | Ggd Inc. | revision to pa 202508213594 structural work only . change plywood shear wall to concrete. modify concrete slab to adjust to field conditions. no exterior work . revision requested by building inspectorDetails
revision to pa 202508213594 structural work only . change plywood shear wall to concrete. modify concrete slab to adjust to field conditions. no exterior work . revision requested by building inspector | $4,500 |
| Feb 19, 2026 | Completed final sign-off Apr 2026 | 3117 16th St | Little Feet Renovation | voluntary foundation upgrade to the basement. new foundation will be poured under (e) posts. the (e) posts and beams will be strengthened with sistered members.Details
voluntary foundation upgrade to the basement. new foundation will be poured under (e) posts. the (e) posts and beams will be strengthened with sistered members. | $15,000 |
| Jan 6, 2026 | In progress issued May 2026 | 214 Spruce St | Young & Burton Inc | rev 202410293938: structural field changes, minor interior layout changes and expand basement addition (548sf) including new mechanical room.Details
rev 202410293938: structural field changes, minor interior layout changes and expand basement addition (548sf) including new mechanical room. | $60,000 |
| Dec 14, 2025 | In progress issued May 2026 | 1030 Francisco St | Design Line Construction | to erect 3 stories, type v, no basement, single family residence and attached adu.Details
to erect 3 stories, type v, no basement, single family residence and attached adu. | $3,500,000 |
| Nov 13, 2025 | In progress issued Dec 2025 | 214 Spruce St | Young & Burton Inc | course of construction revision to pa 202410293938: updated foundation and details only; all other revisions under pa 202508122863 (rev 3). no work in public right of wayDetails
course of construction revision to pa 202410293938: updated foundation and details only; all other revisions under pa 202508122863 (rev 3). no work in public right of way | $12,900 |
| Oct 21, 2025 | In progress issued Nov 2025 | 882 Carolina St | Ben Hardy & Company | replace (e) exterior wall finishes, softit finishes, replace (e) windows, doors, lights in vivid. structural repairs. no plumbing fixturesDetails
replace (e) exterior wall finishes, softit finishes, replace (e) windows, doors, lights in vivid. structural repairs. no plumbing fixtures | $200,000 |
| Oct 16, 2025 | In progress issued Dec 2025 | 9 25th Ave North Av | Ggd Inc. | new construction of adu: a 2-story type-v with fire sprinklersDetails
new construction of adu: a 2-story type-v with fire sprinklers | $150,000 |
| Sep 25, 2025 | In progress issued Oct 2025 | 585 Connecticut St | construct new hss posts and beams supported on a new concrete foundation to support a new wood bench, fence and plant wall adjacent to the side property line. all materials to be protected with intumescent paint to provide 1-hour fire resistance rating.Details
construct new hss posts and beams supported on a new concrete foundation to support a new wood bench, fence and plant wall adjacent to the side property line. all materials to be protected with intumescent paint to provide 1-hour fire resistance rating. | $1,000 | |
| Sep 5, 2025 | In progress issued Dec 2025 | 2765 Vallejo St | Ggd Inc. | construction of 1 detached adu: 2 story type v-b ~1000sf.Details
construction of 1 detached adu: 2 story type v-b ~1000sf. | $308,000 |
| Aug 11, 2025 | In progress issued Sep 2025 | 1170 Harrison St | Achill Beg Construction Inc | fl infill of e space between 1st and 2nd fl. ada upgrades to existing restrooms on 1st and second floors.Details
fl infill of e space between 1st and 2nd fl. ada upgrades to existing restrooms on 1st and second floors. | $215,000 |
| Aug 5, 2025 | In progress issued Oct 2025 | 2765 Vallejo St | Ggd Inc. | construct (n) 1250 sf roof deck over (e) 3rd fl; install (n) access to deck via (e) internal stair & existing glass hatch to roof. ref pa 202506249352Details
construct (n) 1250 sf roof deck over (e) 3rd fl; install (n) access to deck via (e) internal stair & existing glass hatch to roof. ref pa 202506249352 | $32,525 |
| Jul 22, 2025 | In progress issued Aug 2025 | 10 Seacliff Av | Citywest Construction Inc. | revision to 202206216738, 202407106140, 202504094044. rebuild stud walls along gl09 btw gl c and f and around the bay windows south gl9 due to dryrot per correction notice 0n g5.7. rebuild bay window, new footing below, new steps to wine storage new skylight avove stair. mis interior changesDetails
revision to 202206216738, 202407106140, 202504094044. rebuild stud walls along gl09 btw gl c and f and around the bay windows south gl9 due to dryrot per correction notice 0n g5.7. rebuild bay window, new footing below, new steps to wine storage new skylight avove stair. mis interior changes | $65,000 |
| Jul 7, 2025 | In progress filed Jul 2025, not yet issued | 2350 Broadway | infill of (e) spa at 1st fl. all (n) finishes to match (e) with minor structural work to support infill.Details
infill of (e) spa at 1st fl. all (n) finishes to match (e) with minor structural work to support infill. | $25,000 | |
| Jun 5, 2025 | In progress issued Jul 2025 | 2912 Pacific Av | Black Mountain Development | remodel to (e) primary bathroom, closets, office, kitchen and butlers pantry. fixture and cabinetry improvements at baths, laundry and wet bar. redesign at living room & family room fireplace surround & topDetails
remodel to (e) primary bathroom, closets, office, kitchen and butlers pantry. fixture and cabinetry improvements at baths, laundry and wet bar. redesign at living room & family room fireplace surround & top | $120,000 |
| May 30, 2025 | In progress issued Jun 2025 | 585 Connecticut St | Nima Construction | revision to pa 202103166680 extension of existing rear deck; extend rear deck @ level 1 an additional 3'-6". deck is less than 10'-0" above existing grade and is an allowed obstruction per sf planning code sec 136.c,25.b.iiDetails
revision to pa 202103166680 extension of existing rear deck; extend rear deck @ level 1 an additional 3'-6". deck is less than 10'-0" above existing grade and is an allowed obstruction per sf planning code sec 136.c,25.b.ii | $5,000 |
| May 21, 2025 | In progress issued Sep 2025 | 67 Potomac St | revision to pa# 202205103946. new elevator at all 4 floors & changes to interior layout to accomodate new elevator, building footprint is the same as previously permitted drawings. revised structural design & calculations.Details
revision to pa# 202205103946. new elevator at all 4 floors & changes to interior layout to accomodate new elevator, building footprint is the same as previously permitted drawings. revised structural design & calculations. | ||
| Jan 3, 2025 | In progress issued Jun 2025 | 214 Spruce St | Young & Burton Inc | full interior remodel and 1684 sf addition, including various exterior improvements and mep upgrades throughout the area of work.Details
full interior remodel and 1684 sf addition, including various exterior improvements and mep upgrades throughout the area of work. | $2,998,304 |
| Nov 6, 2024 | In progress issued Mar 2025 | 2765 Vallejo St | Millennial Concrete Inc | construction of (n) retaining wall consisting of lagging and two soldier piers at the soutwest portion of the subject property. 6'0" property line fence and other work under pa: 202009083673Details
construction of (n) retaining wall consisting of lagging and two soldier piers at the soutwest portion of the subject property. 6'0" property line fence and other work under pa: 202009083673 | $5,000 |
| Oct 3, 2024 | In progress issued Aug 2025 | 840 El Camino Del Mar | Redhorse Constructors Inc. | new landscape retaining walls adjacent to existing stairs. no new square footage added to existing residence. ref pa# 201910033457 & neighbor's pa# 202211106320.Details
new landscape retaining walls adjacent to existing stairs. no new square footage added to existing residence. ref pa# 201910033457 & neighbor's pa# 202211106320. | $250,000 |
| Jul 30, 2024 | In progress issued Sep 2024 | 2616 Jackson St | Clayton Timbrell & Co | revision pa 2019-0607-2887 interior renovation, renovation of level 3 deck & backyard repalce guardrailDetails
revision pa 2019-0607-2887 interior renovation, renovation of level 3 deck & backyard repalce guardrail | |
| Jul 30, 2024 | In progress issued Sep 2024 | 2618 Jackson St | Clayton Timbrell & Co | revision to pa #2019-0607-2888 interior revision to level 1 & 4, new glazing at north facadeDetails
revision to pa #2019-0607-2888 interior revision to level 1 & 4, new glazing at north facade | |
| Jul 19, 2024 | Completed final sign-off Sep 2024 | 166 Woodland Av | Design Line Construction | revision to pa 201904047179 layout changes, permitted roof deck removed, added windowDetails
revision to pa 201904047179 layout changes, permitted roof deck removed, added window | $1,500 |
| Jul 3, 2024 | Expired or cancelled expired Apr 2026 | 2845 Fillmore St | Redhorse Constructors Inc. | revision to pa #2020-0930-5544 replace (e) slab at garage, remove (e) column, add (n) steel beam, columns & footing. (e) garage doors to be replaced in kindDetails
revision to pa #2020-0930-5544 replace (e) slab at garage, remove (e) column, add (n) steel beam, columns & footing. (e) garage doors to be replaced in kind | $10,000 |
| Jun 6, 2024 | Completed final sign-off Sep 2024 | 669 Marina Bl | O'sullivan & Son Construction Inc | voluntary structural strengthening in garage along north, east, west & south wall, by adding plywood sheathing and sill anchors.Details
voluntary structural strengthening in garage along north, east, west & south wall, by adding plywood sheathing and sill anchors. | $40,000 |
| Mar 14, 2024 | Expired or cancelled expired Apr 2026 | 2845 Fillmore St | Redhorse Constructors Inc. | revision to pa# 202312212916 (n) raised planer bed along (e) property line retaining wall. (n) grade beams & lagging at (e) tree. rear yard workDetails
revision to pa# 202312212916 (n) raised planer bed along (e) property line retaining wall. (n) grade beams & lagging at (e) tree. rear yard work | $10,000 |
| Feb 6, 2024 | Completed final sign-off Mar 2025 | 3363 Washington St | Dollard Construction Inc. | revision to pa# 202205164340 lvl 1- floor framing alteration of au pair room 103 & au pair bath 104. lvl 2- floor framing alteration to accommodate kitchen revision- 206 layout, lvl 3- floor framing alteration to accommodate revision primary bath 1- 306,Details
revision to pa# 202205164340 lvl 1- floor framing alteration of au pair room 103 & au pair bath 104. lvl 2- floor framing alteration to accommodate kitchen revision- 206 layout, lvl 3- floor framing alteration to accommodate revision primary bath 1- 306, | $29,000 |
| Dec 19, 2023 | Completed final sign-off Oct 2025 | 1195 Tennessee St | revision to issued pa#202211146393(foundation). new entry stair to provide access to basement level. existing entry door and window to swap postion within existing old garage door opening.Details
revision to issued pa#202211146393(foundation). new entry stair to provide access to basement level. existing entry door and window to swap postion within existing old garage door opening. | ||
| Dec 13, 2023 | In progress issued Aug 2024 | 4024 25th St | Cook Construction | to erect a 4-story, 2 residential units, r-3, type vb building.Details
to erect a 4-story, 2 residential units, r-3, type vb building. | $1,600,000 |
| Aug 31, 2023 | Completed final sign-off Aug 2025 | 10 Seacliff Av | Citywest Construction Inc. | demo exploratory. prep for sheetrock repairDetails
demo exploratory. prep for sheetrock repair | $2,000 |
| Aug 17, 2023 | Completed final sign-off Mar 2025 | 3363 Washington St | Dollard Construction Inc. | revision to pa# 202105261115, new concrete walls to replace existing brick garage walls due to structural failure. ref 202106222973 for shoring permit.Details
revision to pa# 202105261115, new concrete walls to replace existing brick garage walls due to structural failure. ref 202106222973 for shoring permit. | $35,000 |
| May 26, 2023 | In progress issued Jan 2026 | 237 Hartford St | Sasso Construction Inc. | interior/exterior renovation of an (e)2 unit,wood framed residence,including reinforcement of(e)brick foundations & seismic stiffening.new kitchens,plumbing upgrades,electrical upgrades, new fixtures, (n)moment frames,garage/basement beams to replace column obstructions, (n) rear yard patio to allowDetails
interior/exterior renovation of an (e)2 unit,wood framed residence,including reinforcement of(e)brick foundations & seismic stiffening.new kitchens,plumbing upgrades,electrical upgrades, new fixtures, (n)moment frames,garage/basement beams to replace column obstructions, (n) rear yard patio to allow | $750,000 |
| May 18, 2023 | Never finaled issued Aug 2023, no final | 210 Laidley St | Forma Construction | rev to pa# 202108065994, scope of permit i sto remove pool & equipment vault from scopeDetails
rev to pa# 202108065994, scope of permit i sto remove pool & equipment vault from scope | |
| Dec 19, 2022 | In progress issued Jun 2024 | 464 Hill St | horizontal and vertical addition. interior remodel throughout, minor exterior alterations & addition, and rear yard alterations to an existing 3-story + mezzanine. single-family residence.Details
horizontal and vertical addition. interior remodel throughout, minor exterior alterations & addition, and rear yard alterations to an existing 3-story + mezzanine. single-family residence. | $1,250,000 | |
| Dec 16, 2022 | Completed final sign-off Aug 2023 | 2712 Broadway | Pete Moffat Construction Inc | new opening in existing concrete foundation wall to create new access to an existing storage area beneath existing deckDetails
new opening in existing concrete foundation wall to create new access to an existing storage area beneath existing deck | $28,000 |
| Sep 7, 2022 | Expired or cancelled expired Sep 2026 | 600 Wisconsin St | Nima Construction | rev to pa202111192835: structural updates to foundation design, architectural updates to interior plan, no change to scope. no change to demo calculations, interior work only.Details
rev to pa202111192835: structural updates to foundation design, architectural updates to interior plan, no change to scope. no change to demo calculations, interior work only. | |
| Jun 29, 2022 | Completed final sign-off Jan 2025 | 3363 Washington St | Dollard Construction Inc. | revision to pa# 202106222973. shoring work only. ref pa# 202105261115. foundation permit.Details
revision to pa# 202106222973. shoring work only. ref pa# 202105261115. foundation permit. | |
| Jun 29, 2022 | Never finaled issued Jul 2022, no final | 835 Sanchez St | Forsythe General Contractors | structural revision to pa 201705015349 s3/r1. foundation changes due field conditions.Details
structural revision to pa 201705015349 s3/r1. foundation changes due field conditions. | |
| Jun 21, 2022 | In progress issued Jun 2024 | 10 Seacliff Av | Citywest Construction Inc. | horizontal addition at rear on 2nd floor, new decks on all floors at rear, new bow window, new sun room at 3rd floor, new raised roof. interior remodel at all levels. new windows at all levels above grade.Details
horizontal addition at rear on 2nd floor, new decks on all floors at rear, new bow window, new sun room at 3rd floor, new raised roof. interior remodel at all levels. new windows at all levels above grade. | $1,250,000 |
| May 10, 2022 | In progress issued Dec 2024 | 67 Potomac St | horizontal additions at 4 floors, legalize attic as new 4th floor with new stair, interior remodel, facade to be preserved as-is, replace windows in-kind.Details
horizontal additions at 4 floors, legalize attic as new 4th floor with new stair, interior remodel, facade to be preserved as-is, replace windows in-kind. | $500,501 | |
| Mar 29, 2022 | Expired or cancelled expired May 2026 | 2845 Fillmore St | Redhorse Constructors Inc. | new retaining wall and fence at south property line and fenceDetails
new retaining wall and fence at south property line and fence | $40,000 |
| Mar 3, 2022 | Expired or cancelled expired May 2026 | 2845 Fillmore St | add 80 sqft addition at first floor on southwest side, remodel existing bathrooms and bedrooms at first floor. cut back exterior second floor deck along west elevation and add new metal spiral stair. new at laundry room and new at north property line . rev to pa 202009305544Details
add 80 sqft addition at first floor on southwest side, remodel existing bathrooms and bedrooms at first floor. cut back exterior second floor deck along west elevation and add new metal spiral stair. new at laundry room and new at north property line . rev to pa 202009305544 | $350,000 | |
| Feb 16, 2022 | Completed final sign-off May 2024 | 2312 Washington St | Redhorse Constructors Inc. | revision to 202009164333 replacement doors and windows throughout e windows lacked waterproofing. new proposed primary bath configuration. cosmetic upgrades to mud bath and bath 402. recess garage door to provide exterior pge meter access, proposed hot tub in backyardDetails
revision to 202009164333 replacement doors and windows throughout e windows lacked waterproofing. new proposed primary bath configuration. cosmetic upgrades to mud bath and bath 402. recess garage door to provide exterior pge meter access, proposed hot tub in backyard | $128,000 |
| Jan 14, 2022 | Completed final sign-off Jun 2023 | 4273 22nd St | Custom Construction Enterprises | revision to (e) permit 2020-0831-3006 to correct tunnel discovered in garage during demolition. new foundation/slab work.Details
revision to (e) permit 2020-0831-3006 to correct tunnel discovered in garage during demolition. new foundation/slab work. | $90,000 |
| Dec 8, 2021 | Completed final sign-off Sep 2026 | 600 Wisconsin St | Nima Construction | renov per plans, add 1,021 sq. ft. 3/f, unconditioned decks, office/ bedrm w/closet, bathrm, (n) stucco finish parapet/roof @ 3/f add, raise ceiling height l2, replace/reconfig ext envelope/stucco/wd siding, modification to (e) bay window to accommodate (n) 3/f additionDetails
renov per plans, add 1,021 sq. ft. 3/f, unconditioned decks, office/ bedrm w/closet, bathrm, (n) stucco finish parapet/roof @ 3/f add, raise ceiling height l2, replace/reconfig ext envelope/stucco/wd siding, modification to (e) bay window to accommodate (n) 3/f addition | $500,000 |
| Dec 7, 2021 | Expired or cancelled expired Jul 2026 | 830 El Camino Del Mar | Redhorse Constructors Inc. | new landscape retaining wall & landscape stair 9' in overall lengthDetails
new landscape retaining wall & landscape stair 9' in overall length | $25,000 |
| Nov 24, 2021 | Expired or cancelled cancelled Nov 2025 | 62 Laidley St | Design Line Construction | revision pa 2018-0808-6786 s-2 concrete foundation reduced in thickness to 8" between b & h. l1 & l2 wall changed from concrete to wood framing. rear stair revised to use wood framed walls.Details
revision pa 2018-0808-6786 s-2 concrete foundation reduced in thickness to 8" between b & h. l1 & l2 wall changed from concrete to wood framing. rear stair revised to use wood framed walls. | |
| Nov 12, 2021 | Never finaled filed Nov 2021, never issued | 795 Noriega St | addition and renovation of an r3 occupancy single family home in an rh-1 district. the project scope will include a one-story vertical addition and convert a portion of the currently uninhabitable crawlspace into a habitable story.Details
addition and renovation of an r3 occupancy single family home in an rh-1 district. the project scope will include a one-story vertical addition and convert a portion of the currently uninhabitable crawlspace into a habitable story. | $475,000 | |
| Oct 14, 2021 | In progress issued Apr 2024 | 2616 Jackson St | Clayton Timbrell & Co | construction of new metal spiral stair leading from the level 2 roof deck of 2616 jackson st. to a ground level backyard deck (shared by 2616 jackson st. and 2618 jackson st.)Details
construction of new metal spiral stair leading from the level 2 roof deck of 2616 jackson st. to a ground level backyard deck (shared by 2616 jackson st. and 2618 jackson st.) | $15,000 |
| Oct 14, 2021 | In progress issued Apr 2024 | 2618 Jackson St | Clayton Timbrell & Co | construction of new metal spiral stair in backyard deck shared by 2616 jackson st. and 2618 jackson st.Details
construction of new metal spiral stair in backyard deck shared by 2616 jackson st. and 2618 jackson st. | $15,000 |
| Oct 12, 2021 | Expired or cancelled withdrawn Nov 2023 | 239 Connecticut St | renovation & addition to residential duplex. no variances sought. upgrades to mechanical/electrical/lighting. repair/replace (e) roofDetails
renovation & addition to residential duplex. no variances sought. upgrades to mechanical/electrical/lighting. repair/replace (e) roof | $400,000 | |
| Sep 17, 2021 | Completed final sign-off Dec 2024 | 1141 Wisconsin St | Pristine Builders Group | remodel & expand single family dwelling. to include: (n) horizontal addition to rear within set back. structural upgrade as reqd. interior remodel throughout. plumbing & elect via separate permit. solar panels via separate permit.Details
remodel & expand single family dwelling. to include: (n) horizontal addition to rear within set back. structural upgrade as reqd. interior remodel throughout. plumbing & elect via separate permit. solar panels via separate permit. | $350,000 |
| Aug 25, 2021 | Never finaled filed Aug 2021, never issued | 196 States St | structural shoring for work associated w/ pa 201907085276.Details
structural shoring for work associated w/ pa 201907085276. | ||
| Aug 6, 2021 | Never finaled issued Sep 2022, no final | 210 Laidley St | Partners Contracting Inc. | rear yard landscape includes new in ground swimming pool and equip. single family residence previously approved under pa# 2014-0128-7293Details
rear yard landscape includes new in ground swimming pool and equip. single family residence previously approved under pa# 2014-0128-7293 | $50,000 |
| Jun 22, 2021 | Completed final sign-off Jan 2025 | 3363 Washington St | Clayton Timbrell & Co | shoring. for sfd, structural work only.Details
shoring. for sfd, structural work only. | $50,000 |
| May 5, 2021 | Completed final sign-off May 2024 | 2312 Washington St | Redhorse Constructors Inc. | revision to pa# 202009164333. new proposed kitchen configuration. replacement door + window in kitchen/family room. new access door to crawl space. revised main stair layout. change from shower to tub in bath #2.Details
revision to pa# 202009164333. new proposed kitchen configuration. replacement door + window in kitchen/family room. new access door to crawl space. revised main stair layout. change from shower to tub in bath #2. | $181,500 |
| Mar 22, 2021 | Completed final sign-off Jun 2024 | 3621 Washington St | Clayton Timbrell & Co | revision to pa# 201903155359. new planter on retaining wall.Details
revision to pa# 201903155359. new planter on retaining wall. | $1,000 |
| Mar 16, 2021 | Expired or cancelled suspend Mar 2026 | 585 Connecticut St | Nima Construction, Devlin/Mcnally Construction | remodel of (e) sfh w/ (n) horizontal addition at rear. the house will be lifted vertically 5'-10". upgrade of mechanical, electtical, & structural systems to the current codes. addition of new nfpa 13r sprinkler systems per cbc 903.3.1.3 under separate permit.Details
remodel of (e) sfh w/ (n) horizontal addition at rear. the house will be lifted vertically 5'-10". upgrade of mechanical, electtical, & structural systems to the current codes. addition of new nfpa 13r sprinkler systems per cbc 903.3.1.3 under separate permit. | $200,000 |
| Dec 18, 2020 | Completed final sign-off Dec 2022 | 2 Embarcadero Center | Hathaway Dinwiddie Co. | deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033419.Details
deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033419. | |
| Dec 1, 2020 | Completed final sign-off Nov 2022 | 76 Montcalm St | Forsythe General Contractors | revision to pa# 201411141573. reduced scope of work: reduce proposed floor area (1912sf to 1709sf). eliminate approved 11.5"lx9.5"wx9.5"h horizontal addition at 3rd fl. revise window sizes & adjust floor plan. (relocate stairways & 3rd fl bathroom) to accomodate decreased area.Details
revision to pa# 201411141573. reduced scope of work: reduce proposed floor area (1912sf to 1709sf). eliminate approved 11.5"lx9.5"wx9.5"h horizontal addition at 3rd fl. revise window sizes & adjust floor plan. (relocate stairways & 3rd fl bathroom) to accomodate decreased area. | |
| Nov 30, 2020 | Completed final sign-off Apr 2025 | 140 Belgrave Av | Box Canyon Builders Dba The Englander | project is a single family remodel w/ a proposed horizonal & vertical addition. improvements include expansion on the main level & basement toward rear yard.Details
project is a single family remodel w/ a proposed horizonal & vertical addition. improvements include expansion on the main level & basement toward rear yard. | $870,000 |
| Nov 30, 2020 | Expired or cancelled cancelled Jul 2021 | 2411 Broadway | Black Mountain Development | replacement of existing rear yard fence on east & west.Details
replacement of existing rear yard fence on east & west. | $4,500 |
| Nov 30, 2020 | Expired or cancelled cancelled Nov 2024 | 508 Belvedere St | renovations and foundation upgrade at garage level & interior garage renovations with new `Details
renovations and foundation upgrade at garage level & interior garage renovations with new ` | $52,000 | |
| Nov 24, 2020 | Completed final sign-off Mar 2021 | 4015 21st St | Aaron Gordon Construction Inc | voluntary structural upgrade to the ground floor andupgrade to the framing members at the main level deck per 2019 cbc.Details
voluntary structural upgrade to the ground floor andupgrade to the framing members at the main level deck per 2019 cbc. | $25,000 |
| Nov 9, 2020 | Completed final sign-off Mar 2023 | 1501 Monterey Bl | Wilkinson Preservation Fine Home Mainten | voluntary garage strengthening to non-conforming structure. rev to ext. rear site stairs.Details
voluntary garage strengthening to non-conforming structure. rev to ext. rear site stairs. | $50,000 |
| Nov 9, 2020 | Completed final sign-off Sep 2022 | 1501 Monterey Bl | Wilkinson Preservation Fine Home Mainten | interior stair remodel from 1st to 2nd floor. all within (e) building envelope. revision to bpa # 2019-0122-0918.Details
interior stair remodel from 1st to 2nd floor. all within (e) building envelope. revision to bpa # 2019-0122-0918. | $80,000 |
| Oct 21, 2020 | Completed final sign-off Jan 2024 | 59 Potomac St | Seapoint Construction | new rear windows & doors at second level, new windows at attic, infill lightwell at 2nd level and shifted exterior stair location. 3 new skylights. rev to bpa 201804196759.Details
new rear windows & doors at second level, new windows at attic, infill lightwell at 2nd level and shifted exterior stair location. 3 new skylights. rev to bpa 201804196759. | $1,500 |
| Oct 2, 2020 | Completed final sign-off Jul 2021 | 339 27th St | repair eighty feet of backyard fencing according to attached plan. fence is wood construction and less than ten feet tallDetails
repair eighty feet of backyard fencing according to attached plan. fence is wood construction and less than ten feet tall | $2,500 | |
| Sep 23, 2020 | Completed final sign-off Jun 2021 | 61 Carmelita St | Brady Construction Inc | seismic strengthening for the garage and a new header for the garage opening.Details
seismic strengthening for the garage and a new header for the garage opening. | $23,770 |
| Sep 20, 2020 | Expired or cancelled withdrawn Nov 2020 | 170 Palo Alto Av | Ggd Inc. | re-grading site, subsequent retaining walls, landscaping work and stairs.Details
re-grading site, subsequent retaining walls, landscaping work and stairs. | $50,000 |
| Sep 17, 2020 | Never finaled issued Jun 2021, no final | 56 Laidley St | Design Line Construction | temporary shoring for permits approved under 2018-0808-6786 and 2019-0516-0825.Details
temporary shoring for permits approved under 2018-0808-6786 and 2019-0516-0825. | $5,000 |
| Sep 17, 2020 | Never finaled issued Jun 2021, no final | 70 Laidley St | Design Line Construction | temporary shoring for permits approved under 2018-0808-6786 and 2019-0516-0825.Details
temporary shoring for permits approved under 2018-0808-6786 and 2019-0516-0825. | $5,000 |
| Sep 8, 2020 | Completed final sign-off Feb 2025 | 2765 Vallejo St | Ggd Inc. | below-grade horizontal addition at rear of building to expand garage level and first floor. no visible changes to facade from street. interior remodel at all floors with relocation of stair and (n) passenger elevator. (n) nfpa 13 fire sprinkler system under separate permit. maher applicable.Details
below-grade horizontal addition at rear of building to expand garage level and first floor. no visible changes to facade from street. interior remodel at all floors with relocation of stair and (n) passenger elevator. (n) nfpa 13 fire sprinkler system under separate permit. maher applicable. | $1,600,000 |
| Aug 31, 2020 | Completed final sign-off Feb 2026 | 4273 22nd St | Custom Construction Enterprises | demo (e) deck and dining room and replace with three story horizontal addition at rear of property.Details
demo (e) deck and dining room and replace with three story horizontal addition at rear of property. | $225,000 |
| Jun 18, 2020 | Expired or cancelled withdrawn Sep 2026 | 160 Richland Av | area of work limited to (e) rear accessory garage structure only. no work in existing resiential units. scope of work to include: voluntary seismic upgrade, conditioning of interior to habitable space, addf 1/2 bath, add wet bar, dry rot repair, re-roofing, new windows & skylights, elec upgrades.Details
area of work limited to (e) rear accessory garage structure only. no work in existing resiential units. scope of work to include: voluntary seismic upgrade, conditioning of interior to habitable space, addf 1/2 bath, add wet bar, dry rot repair, re-roofing, new windows & skylights, elec upgrades. | $50,000 | |
| Mar 13, 2020 | Completed final sign-off Mar 2022 | 737 Buena Vista Ave West Av | Redhorse Constructors Inc. | revision to pa 2015-1225-5984 (s4) to document & expand details of previously approved retaining wall & fence: front fence sections meets planning code section 136 for transparencyDetails
revision to pa 2015-1225-5984 (s4) to document & expand details of previously approved retaining wall & fence: front fence sections meets planning code section 136 for transparency | $1,000 |
| Feb 13, 2020 | Completed final sign-off Jan 2021 | 2720 Pierce St | The Toboni Group | rev to pa201909232345: from poured in-place to shotcrete only. no additional scope. no additional scope of work.Details
rev to pa201909232345: from poured in-place to shotcrete only. no additional scope. no additional scope of work. | |
| Feb 4, 2020 | Never finaled issued Jul 2022, no final | 830 El Camino Del Mar | Redhorse Constructors Inc. | rev to pa# 201312134207. remove living rm roof monitor & pool from scope. highten courtyard glass roof. enlarge 3 bay windows. relocate guest room windows. replace lower level exterior finishes on se & sw. reconfigure interior partitions master bath, guest bedrm / bath. lower level bath.adjust floorDetails
rev to pa# 201312134207. remove living rm roof monitor & pool from scope. highten courtyard glass roof. enlarge 3 bay windows. relocate guest room windows. replace lower level exterior finishes on se & sw. reconfigure interior partitions master bath, guest bedrm / bath. lower level bath.adjust floor | |
| Dec 31, 2019 | Completed final sign-off Jul 2022 | 75 Pierce St | Axiom Construction Inc | 75a & 75b pierce street: interior remodel of 2nd & 3rd fl. bathroom demo & reframing non bearing walls, new mill work and lighting 2nd and 3rd fl. remodel unit a for structural upgrade & 1 kitchen, 1 bath remodel & remodel bathoom.Details
75a & 75b pierce street: interior remodel of 2nd & 3rd fl. bathroom demo & reframing non bearing walls, new mill work and lighting 2nd and 3rd fl. remodel unit a for structural upgrade & 1 kitchen, 1 bath remodel & remodel bathoom. | $130,000 |
| Dec 20, 2019 | Never finaled issued Dec 2019, no final | 170 Palo Alto Av | Ggd Inc. | new enclosure of existing pool house with open air courtyard, workshop, and associated washroomDetails
new enclosure of existing pool house with open air courtyard, workshop, and associated washroom | $30,000 |
| Nov 25, 2019 | Completed final sign-off Mar 2021 | 2840 Pierce St | Tomrose Construction Inc. | front bldg, 2nd fl - remodel kitchen, guest bath, laundry. new windows not visible from streetDetails
front bldg, 2nd fl - remodel kitchen, guest bath, laundry. new windows not visible from street | $200,000 |
| Nov 14, 2019 | Completed final sign-off Jun 2022 | 1032 Broadway | Art Of Construction Inc | revision to pa 2019-0326-6241 interior remodel to (e) residence including kitchen and bathrooms, and reconfigured floor plan. no exterior changes. no increase habitable area or conditioned volumeDetails
revision to pa 2019-0326-6241 interior remodel to (e) residence including kitchen and bathrooms, and reconfigured floor plan. no exterior changes. no increase habitable area or conditioned volume | $300,000 |
| Nov 12, 2019 | Never finaled issued Jul 2021, no final | 2760 Divisadero St | Fma Builders | interior renovation work on (e) upper (4) levels, replace exterior stucco & (n) windows, doors, rustication & railing to exterior facades. structural work included. retain building envelope & roofline. no work at the (2) basement levels. ** maher: n/a **Details
interior renovation work on (e) upper (4) levels, replace exterior stucco & (n) windows, doors, rustication & railing to exterior facades. structural work included. retain building envelope & roofline. no work at the (2) basement levels. ** maher: n/a ** | $1,500,000 |
| Oct 18, 2019 | Never finaled issued Feb 2020, no final | 2760 Divisadero St | Fma Builders | revision to 201812208895: same scope with smaller excavation. workshop changed to gym (excavation and finishes to enlarge basement and garage) all exterior changes per approved on prior permit. structural changes. no work on e upper 4 levelsDetails
revision to 201812208895: same scope with smaller excavation. workshop changed to gym (excavation and finishes to enlarge basement and garage) all exterior changes per approved on prior permit. structural changes. no work on e upper 4 levels | |
| Oct 17, 2019 | Completed final sign-off Jun 2022 | 2636 Union St | Ggd Inc. | replace e stair and landing at rear at basement level. new lanscaping in rear yard with widend openings at rear basement lvel. remodel mster bath and bedroom. remodel interior top levelDetails
replace e stair and landing at rear at basement level. new lanscaping in rear yard with widend openings at rear basement lvel. remodel mster bath and bedroom. remodel interior top level | $300,000 |
| Oct 16, 2019 | Completed final sign-off Mar 2023 | 2467 Pacific Av | Design Line Construction | renovation of 4 story over basement multi-family res bldg @ 2467 pacific av. the use remains unchanged as a 2 unit res bldg. modifications include renovate of all floors, (n) garage at basement level and elevator to 1st fl, new dormer, addition of 3 bathrooms, new roof deck at 4th levelDetails
renovation of 4 story over basement multi-family res bldg @ 2467 pacific av. the use remains unchanged as a 2 unit res bldg. modifications include renovate of all floors, (n) garage at basement level and elevator to 1st fl, new dormer, addition of 3 bathrooms, new roof deck at 4th level | $150,000 |
| Oct 3, 2019 | Never finaled issued Dec 2019, no final | 840 El Camino Del Mar | Redhorse Constructors Inc. | improvement to front yard, including new landscaping, new concrete driveway and entry walk paving, new fence and gate, new low concrete retaining wall, tree replacement at street, and sidewalk replacement due to new utility runs.Details
improvement to front yard, including new landscaping, new concrete driveway and entry walk paving, new fence and gate, new low concrete retaining wall, tree replacement at street, and sidewalk replacement due to new utility runs. | $25,000 |
| Sep 23, 2019 | Never finaled issued Sep 2019, no final | 454 15th Av | Andrew Moore Consulting | add master bedroom to 2nd fl. remodel e 2nd fl bath all lighting in bathroom to led high effDetails
add master bedroom to 2nd fl. remodel e 2nd fl bath all lighting in bathroom to led high eff | $45,000 |
| Sep 19, 2019 | Completed final sign-off Jul 2024 | 3621 Washington St | Clayton Timbrell & Co | revision to pa 201603081434. driveway foundation wallDetails
revision to pa 201603081434. driveway foundation wall | $15,000 |
| Jul 1, 2019 | In progress issued Oct 2024 | 323 10th St | Eco Logic Construction & Design Inc. | ext'r/int'r remodel & addition to(e)1-story accessory structure @ rear property line. proposed ground fl addition is 143 sf, 305 sf added to ground fl. no change to (e)height of 18'-6". occupancy from u to b, design professional office, (n)ada bathr, (n)electricalDetails
ext'r/int'r remodel & addition to(e)1-story accessory structure @ rear property line. proposed ground fl addition is 143 sf, 305 sf added to ground fl. no change to (e)height of 18'-6". occupancy from u to b, design professional office, (n)ada bathr, (n)electrical | $200,000 |
| Jun 27, 2019 | Expired or cancelled withdrawn Aug 2020 | 744 Duncan St | remodel of (e) crawl space under (e) deck to the rear yard, to add a (n) bedroom & (n) bathroom connected to (e) house by (e) interior stairs. (n) patio door to (e) garden with (n) relocated exterior stair to connect (e) deck above.Details
remodel of (e) crawl space under (e) deck to the rear yard, to add a (n) bedroom & (n) bathroom connected to (e) house by (e) interior stairs. (n) patio door to (e) garden with (n) relocated exterior stair to connect (e) deck above. | $200,000 | |
| Jun 27, 2019 | Completed final sign-off Sep 2019 | 742 Valencia St | Upcycle Builders Inc. | revision to app#201906214170 for structural details. sht s3.0: change in sheathing location mezzanine wall(detail 6,7,8,9,11,12). addition of 2x6 blocking/alternate a35 clip top of wall(detail 4)Details
revision to app#201906214170 for structural details. sht s3.0: change in sheathing location mezzanine wall(detail 6,7,8,9,11,12). addition of 2x6 blocking/alternate a35 clip top of wall(detail 4) | |
| Jun 21, 2019 | Never finaled issued Jul 2019, no final | 752 Duncan St | Frank & Grossman Landscaping Contr Inc | landscape constructon; new bckyard with metal pergola that will hold gas heaters & to provide shade. remove all existing structures (green house, bench) height shall be 8'-10"Details
landscape constructon; new bckyard with metal pergola that will hold gas heaters & to provide shade. remove all existing structures (green house, bench) height shall be 8'-10" | $10,000 |
| Jun 17, 2019 | Completed final sign-off Aug 2021 | 2500 Steiner St | Dowbuilt Inc. | apt #5: renovation of an extg apartment within the highrise residential bldg. nw interior partition walls to be provided for nw bathrooms, 2 additional bedrooms, a study, and louge area. nw finishes and fixtures throughout. new window to match (e) wood double hung windows.Details
apt #5: renovation of an extg apartment within the highrise residential bldg. nw interior partition walls to be provided for nw bathrooms, 2 additional bedrooms, a study, and louge area. nw finishes and fixtures throughout. new window to match (e) wood double hung windows. | $837,002 |
| May 16, 2019 | Expired or cancelled cancelled May 2025 | 60 Laidley St | Design Line Construction | erect type 5, single family, 3 story bldg with 1 basement.type 5Details
erect type 5, single family, 3 story bldg with 1 basement.type 5 | $1,750,000 |
| Apr 29, 2019 | Completed final sign-off May 2022 | 490 West Portal Av | Oliver & Company Inc. | revision to 201612235805 s1. structural sheathing to non gravity load bearing walls to be fire retardant-treated plywood per cbc 603.1 ex 1.1.1.2, updated 4" max. recess in the strucutral slab at column locations, updated curb thickness. updated site wall due to e site conditions, maher not reqDetails
revision to 201612235805 s1. structural sheathing to non gravity load bearing walls to be fire retardant-treated plywood per cbc 603.1 ex 1.1.1.2, updated 4" max. recess in the strucutral slab at column locations, updated curb thickness. updated site wall due to e site conditions, maher not req | |
| Mar 22, 2019 | Completed final sign-off Jun 2019 | 1177 Guerrero St | Brady Construction Inc | structural strengtheningDetails
structural strengthening | $4,000 |
| Mar 18, 2019 | Completed final sign-off Nov 2020 | 200 John F Shelley Dr | Cazadoro Construction | renovation of a picnic area and playground. replacement of asphalt paths, concrete and site furnishing. upgrade to utilities including irrigation & drainage. new playground safety surfacing & equip installationDetails
renovation of a picnic area and playground. replacement of asphalt paths, concrete and site furnishing. upgrade to utilities including irrigation & drainage. new playground safety surfacing & equip installation | $750,000 |
| Jan 31, 2019 | Completed final sign-off Mar 2022 | 737 Buena Vista West Av | Redhorse Constructors Inc. | revision to 201512285984 addenda 2 - interior structural revision to garageDetails
revision to 201512285984 addenda 2 - interior structural revision to garage |