Axiom Construction Inc
- Based in
- Lafayette
- On San Francisco permits
- Jul 2009 to Jul 2022
- Last 24 months
- 0 permits filed
12 permits since 2000: 11 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2022 | Completed final sign-off Jul 2022 | 75 Pierce St | rev pa 202007210584 show (e) skylights on per building inspections on second floor. remove previously proposed fireplaceDetails
rev pa 202007210584 show (e) skylights on per building inspections on second floor. remove previously proposed fireplace | |
| Jul 21, 2020 | Completed final sign-off Jul 2022 | 75 Pierce St | revision to app#201912311086 to incorporate rear facade window changes, replacement of decking a misc. interior structural revisions.Details
revision to app#201912311086 to incorporate rear facade window changes, replacement of decking a misc. interior structural revisions. | $35,000 |
| Dec 31, 2019 | Completed final sign-off Jul 2022 | 75 Pierce St | 75a & 75b pierce street: interior remodel of 2nd & 3rd fl. bathroom demo & reframing non bearing walls, new mill work and lighting 2nd and 3rd fl. remodel unit a for structural upgrade & 1 kitchen, 1 bath remodel & remodel bathoom.Details
75a & 75b pierce street: interior remodel of 2nd & 3rd fl. bathroom demo & reframing non bearing walls, new mill work and lighting 2nd and 3rd fl. remodel unit a for structural upgrade & 1 kitchen, 1 bath remodel & remodel bathoom. | $130,000 |
| Dec 12, 2019 | Never finaled issued Dec 2019, no final | 369 Corbett Av | per pa #201407221872, add address to old lot #052 for two units condo for cfc, after job completed, owner has to correct the address from 3198 market st 2659/052 to 369 corbett ave unit at ot #065, unit 2 at lot #066 to cmply with condo conversation.Details
per pa #201407221872, add address to old lot #052 for two units condo for cfc, after job completed, owner has to correct the address from 3198 market st 2659/052 to 369 corbett ave unit at ot #065, unit 2 at lot #066 to cmply with condo conversation. | |
| Sep 10, 2019 | Completed final sign-off Apr 2020 | 341 Winfield St | revision to 201904057252 structural and demo. updated strucutral and demo plans needed to correct hidden damage and on site conditionsDetails
revision to 201904057252 structural and demo. updated strucutral and demo plans needed to correct hidden damage and on site conditions | $5,000 |
| Apr 5, 2019 | Completed final sign-off Apr 2020 | 341 Winfield St | improving fire & thermal separation, dryrot & water damage repairs, enlarged rear windows, added sklights. ground fl seismic upgrade, partial reroofing, added bathroom, added bedroom, remodeled kitchen, remodeled bathroom, new space heating system.Details
improving fire & thermal separation, dryrot & water damage repairs, enlarged rear windows, added sklights. ground fl seismic upgrade, partial reroofing, added bathroom, added bedroom, remodeled kitchen, remodeled bathroom, new space heating system. | $180,000 |
| Apr 4, 2019 | Completed final sign-off Aug 2019 | 57 Downey St | remove 2 existing windows & 1 french door at rear of house; install new sliding glass door in existing opening with u factor of .28Details
remove 2 existing windows & 1 french door at rear of house; install new sliding glass door in existing opening with u factor of .28 | $4,000 |
| Feb 5, 2019 | Completed final sign-off Nov 2019 | 57 Downey St | replace west bedroom window on 2nd floor. wiht same size same locaton. not visible from public right of way. max u-facotr .30Details
replace west bedroom window on 2nd floor. wiht same size same locaton. not visible from public right of way. max u-facotr .30 | $1,200 |
| Nov 27, 2017 | Completed final sign-off Dec 2019 | 3198 Market St | revision to pa 201407221872(s1) structural revision form and pier layout adjusted for 3-story new construction.Details
revision to pa 201407221872(s1) structural revision form and pier layout adjusted for 3-story new construction. | $2,500 |
| Jul 18, 2016 | Completed final sign-off Nov 2016 | 1355 Market St | install three compartment sink, hand sink, ice machine, coffee brewer. counter tops, shelving.Details
install three compartment sink, hand sink, ice machine, coffee brewer. counter tops, shelving. | $32,000 |
| Aug 2, 2011 | Completed final sign-off Oct 2011 | 1254 Utah St | general bathroom remodel: toilet, sink, shower will be relocated. no wall changes. bath fan added. elec to be updatedDetails
general bathroom remodel: toilet, sink, shower will be relocated. no wall changes. bath fan added. elec to be updated | $18,000 |
| Jul 20, 2009 | Completed final sign-off Oct 2009 | 35 Collingwood St | remove and replace current cabinet configuration in kind. bring outlets up to code. replace sink and drain configurationDetails
remove and replace current cabinet configuration in kind. bring outlets up to code. replace sink and drain configuration | $12,000 |