Block 0563, lot 007
2350 Broadway
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 1
- Rooms
- 5 bedrooms, 8 bathrooms
- Building
- 9,079 sq ft
- Lot
- 5,500 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 2350 Broadway | Oxypower Inc Dba Occidental Power | solar permit: installing 25 solar pv modules, 435 watts per module, total no. of rating 10.875 kw. mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 15 kwh each in capacity, ess units will not be closer than 3 feet | install pv and bess syDetails
solar permit: installing 25 solar pv modules, 435 watts per module, total no. of rating 10.875 kw. mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 15 kwh each in capacity, ess units will not be closer than 3 feet | install pv and bess sy | $86,325 |
| Jun 17, 2026 | In progress issued Jun 2026 | 2350 Broadway | Modern Times Custom Builders Inc | in-kind one kitchen, one kitchenette, and 8 bathrooms remodel - non structural.Details
in-kind one kitchen, one kitchenette, and 8 bathrooms remodel - non structural. | $3,000,000 |
| Jul 7, 2025 | In progress filed Jul 2025, not yet issued | 2350 Broadway | infill of (e) spa at 1st fl. all (n) finishes to match (e) with minor structural work to support infill.Details
infill of (e) spa at 1st fl. all (n) finishes to match (e) with minor structural work to support infill. | $25,000 | |
| Mar 8, 2012 | Never finaled issued Mar 2012, no final | 2350 Broadway | street spaceDetails
street space | ||
| Feb 1, 2012 | Completed final sign-off Oct 2012 | 2350 Broadway | Thompson Suskind L P | revision to 201009271718 and 201010082625 to include removal of e balcony at 4/f rear, reconfigure doors/windows at 4/f rear and 4/f office/playroom include new moment frame upgrade & ceiling rework, make e roof at rear into roof deck with new guards (4ft high max) and parapet extensions,Details
revision to 201009271718 and 201010082625 to include removal of e balcony at 4/f rear, reconfigure doors/windows at 4/f rear and 4/f office/playroom include new moment frame upgrade & ceiling rework, make e roof at rear into roof deck with new guards (4ft high max) and parapet extensions, | $9,500 |
| Dec 30, 2011 | Completed final sign-off Sep 2012 | 2350 Broadway | Thompson Suskind L P | repair & replace exsiting stucco and half timber trim at facade in kind to match (e).Details
repair & replace exsiting stucco and half timber trim at facade in kind to match (e). | $30,000 |
| Sep 16, 2011 | Never finaled issued Sep 2011, no final | 2350 Broadway | street space permitDetails
street space permit | ||
| Sep 16, 2011 | Completed final sign-off Aug 2012 | 2350 Broadway | Thompson Suskind L P | dry rot repairs. remove and rpelace 3rd floor roofs at west proerty lineDetails
dry rot repairs. remove and rpelace 3rd floor roofs at west proerty line | $20,000 |
| Jul 21, 2011 | Completed final sign-off Nov 2012 | 2350 Broadway | Plumbworks Inc. /Chris Goodwin Plumbing | install new nfpa 13 and 24 fire sprinkler system through out basement to 4th floor, total 110 heads, include new 2" water fire service; 21/2 -inch from city connection to riserDetails
install new nfpa 13 and 24 fire sprinkler system through out basement to 4th floor, total 110 heads, include new 2" water fire service; 21/2 -inch from city connection to riser | $35,000 |
| Mar 30, 2011 | Completed final sign-off Oct 2012 | 2350 Broadway | Thompson Suskind L P | revision to pa# 2010.09.27.1718 to modify foundation s detail btw grid lines 1-2 below grade only. changes shown as delta 1 of 03/23/11Details
revision to pa# 2010.09.27.1718 to modify foundation s detail btw grid lines 1-2 below grade only. changes shown as delta 1 of 03/23/11 | |
| Mar 16, 2011 | Completed final sign-off Oct 2012 | 2350 Broadway | Thompson Suskind L P | rear yard landscaping with new concrete retaining walls 3 to 7 ft in height above gradeDetails
rear yard landscaping with new concrete retaining walls 3 to 7 ft in height above grade | $68,000 |
| Mar 3, 2011 | Never finaled issued Mar 2011, no final | 2350 Broadway | street space permitDetails
street space permit | ||
| Oct 8, 2010 | Completed final sign-off Nov 2012 | 2350 Broadway | Thompson Suskind L P | (n) addition at rear-basement under (e) deck, (n) portable spa in basement interior, horizontal addition at 1st floor under (e) rear deck, new deck addition at 1st floor rear, new exterior spiral stair at rear between 1st & 2nd rear decks. (e) drawings based on (e) pa# 2010/09/27/1718.Details
(n) addition at rear-basement under (e) deck, (n) portable spa in basement interior, horizontal addition at 1st floor under (e) rear deck, new deck addition at 1st floor rear, new exterior spiral stair at rear between 1st & 2nd rear decks. (e) drawings based on (e) pa# 2010/09/27/1718. | $115,000 |
| Sep 27, 2010 | Completed final sign-off Nov 2012 | 2350 Broadway | Thompson Suskind L P | complete interior renovtion including:replace in kind all exterior street facade windows with new insul units to match: infill (e) east light well @ 3rd & 4th floor. excavate (e) basement/crawl for new basement floor at rear;remodel all floors provide new interior stairs;new skylights at roof.Details
complete interior renovtion including:replace in kind all exterior street facade windows with new insul units to match: infill (e) east light well @ 3rd & 4th floor. excavate (e) basement/crawl for new basement floor at rear;remodel all floors provide new interior stairs;new skylights at roof. | $625,000 |
| Mar 6, 2009 | Completed final sign-off May 2009 | 2350 Broadway | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $48,300 |
| Sep 20, 2004 | Never finaled issued Sep 2004, no final | 2350 Broadway | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Thompson Suskind L P (7), Modern Times Custom Builders Inc, Oxypower Inc Dba Occidental Power, Plumbworks Inc. /Chris Goodwin Plumbing, Tom Lee Roofing Inc.
- Architects
- John Maniscalco (2)
- Engineers
- David Strandberg (2)