Troy Kashanipour
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Oct 2026
502 permits since 2000 (architect on 481 permits, authorized agent-others on 18 permits, engineer on 7 permits, designer on 3 permits, pmt consultant/expediter on 1 permit): 318 completed, 48 in progress, 75 never finaled, 61 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 502.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 2132 Pine St | add garage at street level. new retaining wall at rear of garage replace stairs and landings.Details
add garage at street level. new retaining wall at rear of garage replace stairs and landings. | $205,000 | |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 2132 Pine St | renovate units 2132-2134 pine st. new kitchen, remodel bath, add bath. convert 1st story storage to habitable space adding it to unit 2132. connect with interior stair. replace wood stair at rear with metal in same footprint.Details
renovate units 2132-2134 pine st. new kitchen, remodel bath, add bath. convert 1st story storage to habitable space adding it to unit 2132. connect with interior stair. replace wood stair at rear with metal in same footprint. | $300,000 | |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 250 El Camino Del Mar | mod & replace ext finishes - replace windows and skylight. infill at 2 terraces on 3/f. n/s 2/f - infill patio under overhang. mod front bay. at roof terrace provide (n) w/p membrane, new ceramic paves on pedestals,(n) railings. add sauna & laundry. ab-112Details
mod & replace ext finishes - replace windows and skylight. infill at 2 terraces on 3/f. n/s 2/f - infill patio under overhang. mod front bay. at roof terrace provide (n) w/p membrane, new ceramic paves on pedestals,(n) railings. add sauna & laundry. ab-112 | $790,000 | |
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 2455 Jackson St | Sonoma Build Group Inc | comply nov #201888993: legalize wwop - lightwell infills,deck infills and reconfig of roof. new work: vert/horiz addition at rear of building. addition of rear stairwell for rear yard access. restore and remodel (e) 5 units.Details
comply nov #201888993: legalize wwop - lightwell infills,deck infills and reconfig of roof. new work: vert/horiz addition at rear of building. addition of rear stairwell for rear yard access. restore and remodel (e) 5 units. | $400,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 2231 Turk Bl | Ozkr Company | revisioin to permit #202201045316 for extension and modification of retaining wall at gridline b.6 extension of this wall to be landscape wall. max retained hight is 4Details
revisioin to permit #202201045316 for extension and modification of retaining wall at gridline b.6 extension of this wall to be landscape wall. max retained hight is 4 | $3,000 |
| Jun 24, 2026 | In progress filed Jun 2026, not yet issued | 2445 Ocean Av | demolish 1 (e) type-v, 1-story commercial building.Details
demolish 1 (e) type-v, 1-story commercial building. | $15,000 | |
| Jun 24, 2026 | In progress filed Jun 2026, not yet issued | 2445 Ocean Av | construction of a new 4story type v-b mixed use commercial / residential building with elevator & roof terrace.Details
construction of a new 4story type v-b mixed use commercial / residential building with elevator & roof terrace. | $1,947,000 | |
| May 27, 2026 | In progress issued May 2026 | 874 Lombard St | rear building: install new lot windows per requirements of ab-09 at 876a and 874b lombard st. both units are in rear building.Details
rear building: install new lot windows per requirements of ab-09 at 876a and 874b lombard st. both units are in rear building. | $9,000 | |
| May 27, 2026 | In progress issued Jun 2026 | 250 El Camino Del Mar | Nabi Construction & Engineering Inc | 1) demo (e) stairs & storage and build (n) stair & storage between grid lines b & d. 2) demo (e) stair and build (n) stair & deck between grid lines f & g. to comply with nov 202314852.Details
1) demo (e) stairs & storage and build (n) stair & storage between grid lines b & d. 2) demo (e) stair and build (n) stair & deck between grid lines f & g. to comply with nov 202314852. | $35,000 |
| May 20, 2026 | In progress filed May 2026, not yet issued | 3829 25th St | revision to permit 202506077833: add covered entry over front door, add balcony @ 3rd flr bedroom,modify kitchen & entry layout, additional area of foundation replacement & detail clarification. rooftop hot tub.Details
revision to permit 202506077833: add covered entry over front door, add balcony @ 3rd flr bedroom,modify kitchen & entry layout, additional area of foundation replacement & detail clarification. rooftop hot tub. | $10,000 | |
| Apr 21, 2026 | In progress issued May 2026 | 1917 Mission St | change of use from fitness center/gym to wood working shop w/accessory retail area @ store front. add interior door from room to rear room; add partition wall @ front room. mep deferredDetails
change of use from fitness center/gym to wood working shop w/accessory retail area @ store front. add interior door from room to rear room; add partition wall @ front room. mep deferred | $3,000 | |
| Mar 23, 2026 | In progress issued Mar 2026 | 269 Chattanooga St | rear building- remove water closet and associated walls. remodel kitchen, install (n) beam at ceilingDetails
rear building- remove water closet and associated walls. remodel kitchen, install (n) beam at ceiling | $29,000 | |
| Mar 18, 2026 | In progress issued Apr 2026 | 139 09th Av | Precision General Contruction | in kind replacement of lightwell stair. not visible from streetDetails
in kind replacement of lightwell stair. not visible from street | $15,000 |
| Mar 18, 2026 | Completed final sign-off Sep 2026 | 3692 20th St | Bay Building Structures Inc | unit 3692- remodel restroom to be accessible, remodel kitchenette for accessibility. infill opening between 3698 and 3692 tenant spaceDetails
unit 3692- remodel restroom to be accessible, remodel kitchenette for accessibility. infill opening between 3698 and 3692 tenant space | $27,000 |
| Mar 16, 2026 | In progress issued Jun 2026 | 749 27th St | Devlin/Mcnally Construction | revision to pa# 201611142629, to reflect modified scope of work: minor interior reconfiguration at both levels, eliminate 2nd floor south deck. horizontal addition at rear.Details
revision to pa# 201611142629, to reflect modified scope of work: minor interior reconfiguration at both levels, eliminate 2nd floor south deck. horizontal addition at rear. | $19,944 |
| Mar 2, 2026 | In progress issued Mar 2026 | 365 Hill St | Egoodat Inc | remove (e) deck & stair to yard. replace with (n) deck & stair.Details
remove (e) deck & stair to yard. replace with (n) deck & stair. | $16,000 |
| Jan 28, 2026 | Completed final sign-off Apr 2026 | 700 Post St | permit to address nov #202547048. repair vehicular damage. repair of metal gate and rear service area. in kind replacement of stair for mezzanine storage access. all work exterior.Details
permit to address nov #202547048. repair vehicular damage. repair of metal gate and rear service area. in kind replacement of stair for mezzanine storage access. all work exterior. | $2,000 | |
| Jan 28, 2026 | Completed final sign-off Jun 2026 | 3698 20th St | Bay Building Structures Inc | permit to address nov #202544978: legalize restroomDetails
permit to address nov #202544978: legalize restroom | $2,000 |
| Dec 26, 2025 | In progress issued May 2026 | 163 07th Av | Pinnacle Remodeling Construction | provide steel beam at garage, partial 1/f lightwell infill. create full bath from 2/f water closet (unit 165). remodel kitchen and bath at 3/f (unit 163). modify roof terrace accessible from (e) 4th story. renovate bath. replace cabinetry at wet bar (unit 163)Details
provide steel beam at garage, partial 1/f lightwell infill. create full bath from 2/f water closet (unit 165). remodel kitchen and bath at 3/f (unit 163). modify roof terrace accessible from (e) 4th story. renovate bath. replace cabinetry at wet bar (unit 163) | $225,500 |
| Dec 16, 2025 | In progress issued Jan 2026 | 913 Central Av | Liaison Landscapes Inc | revision to 202505146479: to eliminate 2 posts alter deck framingDetails
revision to 202505146479: to eliminate 2 posts alter deck framing | |
| Nov 25, 2025 | In progress issued Dec 2025 | 715 Duboce Av | San Francisco Design Build | revision to bpa#: 202505216949 to add a 30"h x 8" depth. foundation wall along the west side of 1st fl and one new sink at laundry room. no other proposed changes.Details
revision to bpa#: 202505216949 to add a 30"h x 8" depth. foundation wall along the west side of 1st fl and one new sink at laundry room. no other proposed changes. | |
| Aug 29, 2025 | Completed final sign-off Feb 2026 | 1630 09th Av | Bail Construction | renovate e) bath, turn e) water closet into full bath, removing wall between. remodel kitchen, open wall to breakfast area, add skylights at bath, infill interior lightwell at bathDetails
renovate e) bath, turn e) water closet into full bath, removing wall between. remodel kitchen, open wall to breakfast area, add skylights at bath, infill interior lightwell at bath | $125,000 |
| Jun 25, 2025 | Expired or cancelled suspend Sep 2026 | 3829 25th St | Clarity Construction Group | add lower level dwelling unit. veritical addition to add 3rd story; add rooftop terrace. remove and replace front stair and 2nd level entry.Details
add lower level dwelling unit. veritical addition to add 3rd story; add rooftop terrace. remove and replace front stair and 2nd level entry. | $995,900 |
| Jun 2, 2025 | Completed final sign-off Aug 2026 | 2394 Folsom St | Hl81 Construction Inc. | new stairs from mezzananine to first floor.Details
new stairs from mezzananine to first floor. | $6,000 |
| May 22, 2025 | In progress issued Jun 2025 | 139 09th Av | Precision General Contruction | revision to pemit app#202502059736 for added awork, rear remodel portion of upper level, unit 139 including kitchen and bathroom.Details
revision to pemit app#202502059736 for added awork, rear remodel portion of upper level, unit 139 including kitchen and bathroom. | $150,000 |
| May 21, 2025 | In progress issued Jun 2025 | 715 Duboce Av | San Francisco Design Build | remodel unfinished space to create in office, bathroom, laundry, gym, and media room. replace in kind stree facing window, (1) (n) rear facing slidng door (not visible from public right away).Details
remodel unfinished space to create in office, bathroom, laundry, gym, and media room. replace in kind stree facing window, (1) (n) rear facing slidng door (not visible from public right away). | $85,000 |
| May 15, 2025 | Completed final sign-off Sep 2025 | 2472 Clay St | Barcci Builders Inc | 3/fl- full bathroom additionDetails
3/fl- full bathroom addition | $30,000 |
| May 14, 2025 | Completed final sign-off Aug 2025 | 1396 Pacific Av | Cuan Construction | revision to permit 202501289196 to switch location of washer/dryer closet and water heater/furnance closet.Details
revision to permit 202501289196 to switch location of washer/dryer closet and water heater/furnance closet. | |
| May 14, 2025 | Completed final sign-off Jun 2026 | 823 37th Av | upper level: renovate e) bathroom & add bathroom. ground level: remove bathroom & add new bathroom, create laundry room.Details
upper level: renovate e) bathroom & add bathroom. ground level: remove bathroom & add new bathroom, create laundry room. | $110,000 | |
| May 14, 2025 | In progress issued Oct 2025 | 913 Central Av | Liaison Landscapes Inc | in kind replacement of (e) required egress stair from 3rd fl to ground, replace and expand 3rd fl rear deck. replace egress stair access in original footprint at 2nd flDetails
in kind replacement of (e) required egress stair from 3rd fl to ground, replace and expand 3rd fl rear deck. replace egress stair access in original footprint at 2nd fl | $60,000 |
| May 14, 2025 | In progress filed May 2025, not yet issued | 274 Athens St | remodel (e) ground fl bedroom bath & office. add laundry closet to garageDetails
remodel (e) ground fl bedroom bath & office. add laundry closet to garage | $75,000 | |
| May 9, 2025 | In progress issued Nov 2025 | 333 Roosevelt Wy | legalize (e) dwelling unit as adu (under state program retaining r3 occupancy) @ 1/f and 2/f. general space improvements were completed under pa# 379136 including creating 1st story living room w/o kitchen, 2nd story bedroom and bath. work this permit will legalize a kitchen installed w/o permitDetails
legalize (e) dwelling unit as adu (under state program retaining r3 occupancy) @ 1/f and 2/f. general space improvements were completed under pa# 379136 including creating 1st story living room w/o kitchen, 2nd story bedroom and bath. work this permit will legalize a kitchen installed w/o permit | $25,000 | |
| May 9, 2025 | In progress issued Nov 2025 | 333 Roosevelt Wy | extend stairway to roof, create stair penthouse, add roof terrace, modify fire escape to include an inclined ladder from roof to (e) rear fire escape. provide inclined ladder from fire escapre to ground.Details
extend stairway to roof, create stair penthouse, add roof terrace, modify fire escape to include an inclined ladder from roof to (e) rear fire escape. provide inclined ladder from fire escapre to ground. | $57,200 | |
| Apr 10, 2025 | Completed final sign-off Nov 2025 | 1406 Golden Gate Av | San Francisco Design Build | remodel second floor of a three story condo. 2/fl- remodel to include remodel of kitchen relocate powder room enlarge (e) openings in dining living and kitchen to create arched openings (all interior) mep system will be upgrade as required per code (n) lighting throughout remodeledDetails
remodel second floor of a three story condo. 2/fl- remodel to include remodel of kitchen relocate powder room enlarge (e) openings in dining living and kitchen to create arched openings (all interior) mep system will be upgrade as required per code (n) lighting throughout remodeled | $75,000 |
| Mar 25, 2025 | Completed final sign-off Oct 2026 | 2065 Ofarrell St | Nabi Construction & Engineering Inc | interior remodel: remodel existing kitchen and baths, add bath at each unit. open wall @ kitchen.Details
interior remodel: remodel existing kitchen and baths, add bath at each unit. open wall @ kitchen. | $464,000 |
| Feb 21, 2025 | Expired or cancelled expired Apr 2026 | 249 Richland Av | R & D Construction Co Inc | revision to pa #202405212583 to replace additional area of foundation at rear of building, minor plan changes on 2nd floor closets and kitchenDetails
revision to pa #202405212583 to replace additional area of foundation at rear of building, minor plan changes on 2nd floor closets and kitchen | $8,000 |
| Feb 5, 2025 | In progress issued Mar 2025 | 141 09th Av | Precision General Contruction | remodel rear portion of unit 141 including new kitchen and bath. convert rear portion of garage to habitable space. connect 1st story to 2nd fl with new interior stairDetails
remodel rear portion of unit 141 including new kitchen and bath. convert rear portion of garage to habitable space. connect 1st story to 2nd fl with new interior stair | $251,000 |
| Jan 28, 2025 | In progress issued Jan 2025 | 770 Shotwell St | Golden Heights Remodeling Inc, Bay Building Structures Inc | revision 202410152927 to include kitchen remodel at upper unit. new beam new closet at bedroom and associated structural workDetails
revision 202410152927 to include kitchen remodel at upper unit. new beam new closet at bedroom and associated structural work | $51,000 |
| Jan 28, 2025 | Completed final sign-off Aug 2025 | 1396 Pacific Av | Nabi Construction & Engineering Inc | revision 202411205887 (bathroom remodel) to include additional bathroom remodel kitchen and add closet to bedroomDetails
revision 202411205887 (bathroom remodel) to include additional bathroom remodel kitchen and add closet to bedroom | $70,000 |
| Dec 24, 2024 | In progress filed Dec 2024, not yet issued | 129 Edgehill Wy | administrative permit to document the correct record for approved permit 2019 0201 1902 s. building is single family home and includes an accessory dwelling unit. correct story count is 4 stories with 1 basement. no work under this permit.Details
administrative permit to document the correct record for approved permit 2019 0201 1902 s. building is single family home and includes an accessory dwelling unit. correct story count is 4 stories with 1 basement. no work under this permit. | ||
| Dec 23, 2024 | In progress issued Jan 2025 | 4172 23rd St | Nabi Construction & Engineering Inc | remodel sfd: convert first story storage area to habitable bedroom, bath & laundry closet with (n) stair. remove bath @ 2nd story, add powder room. add bathroom @ top fl & remodel (e) bath. replace aluminum windows at front facadeDetails
remodel sfd: convert first story storage area to habitable bedroom, bath & laundry closet with (n) stair. remove bath @ 2nd story, add powder room. add bathroom @ top fl & remodel (e) bath. replace aluminum windows at front facade | $328,000 |
| Dec 12, 2024 | In progress issued Apr 2025 | 217 Randall St | Paul K Vou | renovate home, remove (e) rear yard extension, relocate kitchen add half bath, (n) bedroom and stair from lower level to rear yard. renovate upper level to add bathroom,construct horizontal addition at rear to add living room and bedroom, rr windows, railings and garage door at the front facade....Details
renovate home, remove (e) rear yard extension, relocate kitchen add half bath, (n) bedroom and stair from lower level to rear yard. renovate upper level to add bathroom,construct horizontal addition at rear to add living room and bedroom, rr windows, railings and garage door at the front facade.... | $643,814 |
| Nov 22, 2024 | Completed final sign-off Sep 2026 | 3724 Pacheco St | remodel kitchen and bathroom. 2nd floor reconfigure hall closet to add wash and dryer.Details
remodel kitchen and bathroom. 2nd floor reconfigure hall closet to add wash and dryer. | $70,000 | |
| Oct 15, 2024 | In progress issued Nov 2024 | 770 Shotwell St | Golden Heights Remodeling Inc, Bay Building Structures Inc | remodel first story dwelling unit to add bedroom and bathroom, new kitchen, and relocate (e) bathroom.remove rear chimney all levels, infill floors and roof, new beam at patio to remove post.Details
remodel first story dwelling unit to add bedroom and bathroom, new kitchen, and relocate (e) bathroom.remove rear chimney all levels, infill floors and roof, new beam at patio to remove post. | $200,000 |
| Oct 8, 2024 | In progress filed Oct 2024, not yet issued | 676 17th Av | remodel (e) bathroom. reconfigure closet and water closet to add full bath. add closet @ entryDetails
remodel (e) bathroom. reconfigure closet and water closet to add full bath. add closet @ entry | $50,000 | |
| Sep 17, 2024 | Expired or cancelled expired Mar 2026 | 160 Noe St | Nabi Construction & Engineering Inc | revision to pa 202406245066 minor reconfiguration of bathroms, closets kitchens 160 & 162. add rear deck and associated firewall. replace rear windows @ dining with door. structural upgrades to rear volumeDetails
revision to pa 202406245066 minor reconfiguration of bathroms, closets kitchens 160 & 162. add rear deck and associated firewall. replace rear windows @ dining with door. structural upgrades to rear volume | $44,000 |
| Sep 6, 2024 | Completed final sign-off Sep 2024 | 3756 22nd St | Martin Tynan & Son Construction | comply with dbi internal audit nov (n) rear 3rd floor exterior deck, new expanded garage level, rearrange stair to grade, delete prop line. windows all in reference to original permit 201305217568 and nov 202305735.Details
comply with dbi internal audit nov (n) rear 3rd floor exterior deck, new expanded garage level, rearrange stair to grade, delete prop line. windows all in reference to original permit 201305217568 and nov 202305735. | |
| Jul 2, 2024 | Completed final sign-off Sep 2024 | 1496 Fulton St | Great Ocean Construction Inc. | divide existing bathroom into 2 bathrooms.Details
divide existing bathroom into 2 bathrooms. | $55,000 |
| Jun 24, 2024 | Completed final sign-off May 2026 | 160 Noe St | Nabi Construction & Engineering Inc | remodel kitchen and bath at unit 160. reconfigure closets and interior partitions, open wall between kitchen and living area. remodel kitchen and bath at unit 162. reconfigure closets and interior partitions, open wall between kitchen and living areaDetails
remodel kitchen and bath at unit 160. reconfigure closets and interior partitions, open wall between kitchen and living area. remodel kitchen and bath at unit 162. reconfigure closets and interior partitions, open wall between kitchen and living area | $433,000 |
| Jun 21, 2024 | Expired or cancelled withdrawn May 2025 | 1600 Jackson St | compliance with accessible business entrance program. ref abe# 202001100826Details
compliance with accessible business entrance program. ref abe# 202001100826 | $20,000 | |
| May 30, 2024 | Expired or cancelled expired Jun 2026 | 265 Castro St | Keaveney Construction | alter site: revision to permit 2021-1221-4807 s; to delete roof deck and spiral stair access to the roof add fixed ladder at rear of building to upper roof, delete rear yard accessory buildingDetails
alter site: revision to permit 2021-1221-4807 s; to delete roof deck and spiral stair access to the roof add fixed ladder at rear of building to upper roof, delete rear yard accessory building | |
| May 21, 2024 | Completed final sign-off Apr 2026 | 249 Richland Av | R & D Construction Co Inc | remove (e) covered porch and stair. 73sf 1-story hoziontal addition over storage space at rear . reconstruct roof over kitchen/dining room .remodel ktichen and relcoate laundry , remodel lower level bathroom and new landing and stair to yard.Details
remove (e) covered porch and stair. 73sf 1-story hoziontal addition over storage space at rear . reconstruct roof over kitchen/dining room .remodel ktichen and relcoate laundry , remodel lower level bathroom and new landing and stair to yard. | $165,508 |
| May 21, 2024 | Completed final sign-off Aug 2024 | 1478 Guerrero St | Belvoir Construction Inc. | remodel 2 baths at 3rd fl, minor interior wall reconfigureation at 1 bathroomDetails
remodel 2 baths at 3rd fl, minor interior wall reconfigureation at 1 bathroom | $60,000 |
| May 21, 2024 | In progress filed May 2024, not yet issued | 582 48th Av | add family room, office,laundry and bathroom at the lower level. remodel kitchen and bathroom at upper level.Details
add family room, office,laundry and bathroom at the lower level. remodel kitchen and bathroom at upper level. | $225,300 | |
| May 14, 2024 | In progress issued Jun 2024 | 217 Randall St | Paul K Vou | replace existing foundaton with slab on gradeDetails
replace existing foundaton with slab on grade | $80,000 |
| Apr 10, 2024 | Completed final sign-off Oct 2025 | 363 Jersey St | permit to revised cfc as a sfd, resciding cfc as 2 dwellings units.no legally qualifying kitchen was install @ lower level.additional unit authorized to be created under permit #2019-0201-1902 was not created per planning dept requirements qualifying kitchen, home to retain sfd status.Details
permit to revised cfc as a sfd, resciding cfc as 2 dwellings units.no legally qualifying kitchen was install @ lower level.additional unit authorized to be created under permit #2019-0201-1902 was not created per planning dept requirements qualifying kitchen, home to retain sfd status. | ||
| Jan 18, 2024 | Completed final sign-off Jul 2024 | 1582 Shafter Av | Bay Building Structures Inc | 2nd fl - open wall between dining room & bedroom. open wall between bedroom & kitchen. bedroom becomes living room. add fire place @ living roomDetails
2nd fl - open wall between dining room & bedroom. open wall between bedroom & kitchen. bedroom becomes living room. add fire place @ living room | $25,000 |
| Jan 11, 2024 | Expired or cancelled expired Feb 2026 | 1612 Vallejo St | Belvoir Construction Inc. | revise permit# 202208251289: to include kitchen remodel at 2nd floor and remodel bath to remove shower to become powder room. revise plan at 3rd floor bath, closets and bedroom. revise sheawall location.Details
revise permit# 202208251289: to include kitchen remodel at 2nd floor and remodel bath to remove shower to become powder room. revise plan at 3rd floor bath, closets and bedroom. revise sheawall location. | $60,000 |
| Jan 11, 2024 | Completed final sign-off Aug 2025 | 2711 37th Av | Jfieco | convert a portion of ground floor to habitable space to add media room; bedroom & bathroom, remodel kitchen @ upper level, partially open wall btw living and dining areaDetails
convert a portion of ground floor to habitable space to add media room; bedroom & bathroom, remodel kitchen @ upper level, partially open wall btw living and dining area | $215,000 |
| Dec 21, 2023 | Completed final sign-off Mar 2025 | 437 40th Av | Traube Construction Company | remodel bathroom and water closet at second floor.Details
remodel bathroom and water closet at second floor. | $36,000 |
| Dec 21, 2023 | Completed final sign-off Aug 2024 | 3438 19th St | Prime Construction & Renovation Inc. | remove (3) dormers at attic level. restore roof framing.Details
remove (3) dormers at attic level. restore roof framing. | $7,500 |
| Dec 15, 2023 | Completed final sign-off May 2024 | 1180 De Haro St | unit# c: (at upper level): remodel kitchen and bath, add sink and expand water closet. add laundry closet to dwelling unit.Details
unit# c: (at upper level): remodel kitchen and bath, add sink and expand water closet. add laundry closet to dwelling unit. | $60,000 | |
| Dec 7, 2023 | In progress issued Jan 2024 | 2389 Mission St | relocate bar @ 2nd fl revise accessible restroom @ 2nd fl. add restroom, reconfigure sink area of ground fl. (ref to renewal pa 202312051944 for 201906294683)Details
relocate bar @ 2nd fl revise accessible restroom @ 2nd fl. add restroom, reconfigure sink area of ground fl. (ref to renewal pa 202312051944 for 201906294683) | $65,000 | |
| Dec 5, 2023 | Completed final sign-off Oct 2024 | 3431 19th St | Paul K Vou | tenant improvement for cannabis dispensary; (n) cabinetry and countertops, break room, private office, sotrage & receiving roomDetails
tenant improvement for cannabis dispensary; (n) cabinetry and countertops, break room, private office, sotrage & receiving room | $100,000 |
| Dec 5, 2023 | In progress issued Dec 2023 | 2389 Mission St | renew permit 201906284683, to obtain final inspection for work approved under pa# 201906284683. all work is complete.Details
renew permit 201906284683, to obtain final inspection for work approved under pa# 201906284683. all work is complete. | ||
| Dec 4, 2023 | Completed final sign-off May 2024 | 1180 De Haro St | unit# a. add bathroom to first floor dwellnig unit. add wetbar to living space.Details
unit# a. add bathroom to first floor dwellnig unit. add wetbar to living space. | $36,000 | |
| Nov 16, 2023 | Completed final sign-off Mar 2024 | 301 Winfield St | Daaron Builders | revision to bpa#202009224687 to delete stair from 3/f to upper terrace of yard, change shingles to cement plaster @ rear elevationDetails
revision to bpa#202009224687 to delete stair from 3/f to upper terrace of yard, change shingles to cement plaster @ rear elevation | |
| Oct 16, 2023 | In progress filed Oct 2023, not yet issued | 1006 Masonic Av | add exclusive use roof deck for upper level unit 1006. add stair penthouse.Details
add exclusive use roof deck for upper level unit 1006. add stair penthouse. | $30,000 | |
| Oct 2, 2023 | Completed final sign-off Oct 2023 | 66 Elsie St | revision to pa# 202207148502, to show glass guardrail at interior and exterior decks.Details
revision to pa# 202207148502, to show glass guardrail at interior and exterior decks. | ||
| Sep 6, 2023 | Completed final sign-off Mar 2024 | 61 Walter St | Clipper Construction Inc. | remodel kitchen & bath.Details
remodel kitchen & bath. | $50,000 |
| Sep 6, 2023 | Completed final sign-off Mar 2024 | 59 Walter St | Clipper Construction Inc. | remodel one kitchen.Details
remodel one kitchen. | $25,000 |
| Aug 22, 2023 | In progress issued Nov 2023 | 279 Topaz Wy | Bay Building Structures Inc | excave crawlspace to become home gym, add window remodel (e) bath to add sauna, remove post, add steel beam, change (e) rear window to sliding door, add exterior railing.Details
excave crawlspace to become home gym, add window remodel (e) bath to add sauna, remove post, add steel beam, change (e) rear window to sliding door, add exterior railing. | $122,000 |
| Aug 7, 2023 | Never finaled filed Aug 2023, never issued | 301 Winfield St | revision to pa# 202009224687, to delete stairs from 3rd flr to upper terrace of yard, change shingles to cement plaster at rear elevation.Details
revision to pa# 202009224687, to delete stairs from 3rd flr to upper terrace of yard, change shingles to cement plaster at rear elevation. | ||
| Aug 7, 2023 | Completed final sign-off Sep 2023 | 71 Gaviota Wy | Belvoir Construction Inc. | revision to pa# 202209283309, to include reconfiguratioin of 2nd flr bathroom, remove fireplace @ front room, remove decorative metal at front windows. (n) siding at rear, (n) windows @ 2nd flr bedroom. (n) subflr & framing @ 1st flr.Details
revision to pa# 202209283309, to include reconfiguratioin of 2nd flr bathroom, remove fireplace @ front room, remove decorative metal at front windows. (n) siding at rear, (n) windows @ 2nd flr bedroom. (n) subflr & framing @ 1st flr. | $9,500 |
| Jul 11, 2023 | Never finaled issued Jul 2023, no final | 1254 Market St | office tenant improvement at suite 200 2nd fl to divide open office into private offices. accessibility improvements at path of travel including front door actuator, new suite 206 entry door restroom improvements for accessibilityDetails
office tenant improvement at suite 200 2nd fl to divide open office into private offices. accessibility improvements at path of travel including front door actuator, new suite 206 entry door restroom improvements for accessibility | $6,000 | |
| Jul 3, 2023 | In progress issued Mar 2025 | 1006 Masonic Av | Finbarr Collins Construction Inc. | revision to permit 202210074012 to add the following work: build accessory dwelling unit at basement level.Details
revision to permit 202210074012 to add the following work: build accessory dwelling unit at basement level. | $100,000 |
| Jun 28, 2023 | Never finaled issued Jul 2023, no final | 555 04th St | Precision General Contruction | unit# 408: build partition wall to divide living & sleeping areas, add door on overhead track.Details
unit# 408: build partition wall to divide living & sleeping areas, add door on overhead track. | $4,000 |
| Jun 21, 2023 | Completed final sign-off Aug 2023 | 68 Park St | Keaveney Construction | open wall between kitchen & dining area, install beam supporting ceiling.Details
open wall between kitchen & dining area, install beam supporting ceiling. | $5,000 |
| Jun 21, 2023 | Completed final sign-off Oct 2023 | 56 Garcia Av | Super Home Builders Inc. | convert existing water closet into bathroom with shower & sink.Details
convert existing water closet into bathroom with shower & sink. | $12,000 |
| May 11, 2023 | Completed final sign-off Apr 2024 | 30 Carl St | Keaveney Construction | rev to pa202102043995: add 3 skylights, 1 fire rated window, minor plan changes at 2/f & 3/f and roof.Details
rev to pa202102043995: add 3 skylights, 1 fire rated window, minor plan changes at 2/f & 3/f and roof. | $10,000 |
| May 2, 2023 | Completed final sign-off Oct 2023 | 101 Knollview Wy | replace 2 upper windows at front of house. replace bathroom window on side of house in same opening. enlarge lower level front window. add skylight at roof.Details
replace 2 upper windows at front of house. replace bathroom window on side of house in same opening. enlarge lower level front window. add skylight at roof. | $8,000 | |
| Apr 17, 2023 | Completed final sign-off May 2024 | 1545 Broadway | Ot Bay Builders Inc. | unit 304: interior renovation, remodel kitchen & (2) bathrooms, remove closet doors/create wardrobe closets, add recessed lighting throughoutDetails
unit 304: interior renovation, remodel kitchen & (2) bathrooms, remove closet doors/create wardrobe closets, add recessed lighting throughout | $40,000 |
| Apr 3, 2023 | In progress issued Dec 2023 | 2231 Turk Bl | Ozkr Company | erect 1 stories, no basement, type v-b, accessory to dwelling at 2233 turk blvdDetails
erect 1 stories, no basement, type v-b, accessory to dwelling at 2233 turk blvd | $25,000 |
| Apr 3, 2023 | In progress issued Dec 2023 | 2231 Turk Bl | Ozkr Company | erect 1 stories, no basement, type v-b, accessory to dwelling at 2231 turk blvdDetails
erect 1 stories, no basement, type v-b, accessory to dwelling at 2231 turk blvd | $60,000 |
| Mar 6, 2023 | Completed final sign-off Oct 2023 | 66 Elsie St | revision to pa 2022-0714-8502 & 2022-0908-2069 modify framing plan & details. revise wood beam on 3rd fl to steel. call for site verification inspection upon issuance of permitDetails
revision to pa 2022-0714-8502 & 2022-0908-2069 modify framing plan & details. revise wood beam on 3rd fl to steel. call for site verification inspection upon issuance of permit | ||
| Jan 31, 2023 | Completed final sign-off Sep 2023 | 2701 Van Ness Av | Modern Art Construction | unit 710: revision to pa# 201905170976 to exclude light cove detail 4/a8.0Details
unit 710: revision to pa# 201905170976 to exclude light cove detail 4/a8.0 | |
| Jan 24, 2023 | Completed final sign-off Oct 2024 | 1124 Irving St | San Francisco Design Build | add ext spiral staircase to (e)3 story, 2 unit res; spiral staircase to be a convenience staircase for rear yard access; exterior changes - 1(n) rear spiral staircase, reconfiguration of 1 (e)rear ext staircase (no changes to front of home or interior work). no change of use or occupancyDetails
add ext spiral staircase to (e)3 story, 2 unit res; spiral staircase to be a convenience staircase for rear yard access; exterior changes - 1(n) rear spiral staircase, reconfiguration of 1 (e)rear ext staircase (no changes to front of home or interior work). no change of use or occupancy | $17,833 |
| Dec 28, 2022 | In progress issued Aug 2025 | 384 Holladay Av | Concannon Construction Inc | erect a new 3-story over 1-basement, type vb, single family dwelling on vacant lot. includes 4 bedrooms, 3.5 baths, 2 car garage, home office, laundry rm, and occupied roof terraces at levels 2 and 3.Details
erect a new 3-story over 1-basement, type vb, single family dwelling on vacant lot. includes 4 bedrooms, 3.5 baths, 2 car garage, home office, laundry rm, and occupied roof terraces at levels 2 and 3. | $594,000 |
| Nov 3, 2022 | Completed final sign-off Mar 2025 | 437 40th Av | Traube Construction Company | convert portion of garage on first fl. into habitable space to include new bedrooms, family room, bath room, powder and laundry room - infill under existing room built on stiltsDetails
convert portion of garage on first fl. into habitable space to include new bedrooms, family room, bath room, powder and laundry room - infill under existing room built on stilts | $111,000 |
| Oct 24, 2022 | In progress issued Aug 2026 | 800 Castro St | Bay Building Structures Inc | remove roof at rear of property,add doors from upper level bedroom,create roof terrace.Details
remove roof at rear of property,add doors from upper level bedroom,create roof terrace. | $10,000 |
| Oct 7, 2022 | Never finaled issued Jun 2023, no final | 1006 Masonic Av | Prospect Construction Inc | to comply with nov 201997801. upgrade (e) fire damage 3 units dwelling and storage area. foundation upgrades and structural work. upgrade construction type to v-aDetails
to comply with nov 201997801. upgrade (e) fire damage 3 units dwelling and storage area. foundation upgrades and structural work. upgrade construction type to v-a | $450,000 |
| Sep 28, 2022 | Completed final sign-off Sep 2023 | 71 Gaviota Wy | remodel lower level to include kitchen, living, dining room remodel 2nd story to add two bedroom, home office, remodel bath rooms, infill tunnel entry and center stair, new stairway and entry doors, new windows at front and rearDetails
remodel lower level to include kitchen, living, dining room remodel 2nd story to add two bedroom, home office, remodel bath rooms, infill tunnel entry and center stair, new stairway and entry doors, new windows at front and rear | $200,000 | |
| Sep 28, 2022 | Completed final sign-off Sep 2022 | 230 Collingwood St | Precision General Contruction | administrate permit to reflect floor plan changes to permit 2019-0829-0195, 20200128-2912, and 2019-1004-3639 revise laundry room location at unit 230 from 2nd story to first revise bathroom plans at unit 2308 232 to eliminate bathroomsDetails
administrate permit to reflect floor plan changes to permit 2019-0829-0195, 20200128-2912, and 2019-1004-3639 revise laundry room location at unit 230 from 2nd story to first revise bathroom plans at unit 2308 232 to eliminate bathrooms | |
| Sep 16, 2022 | Completed final sign-off Feb 2023 | 1612 Vallejo St | Christopher Gate Construction Inc | revision to bpa#202003116795, move partition wall to expand bathDetails
revision to bpa#202003116795, move partition wall to expand bath | |
| Sep 12, 2022 | Never finaled issued Sep 2022, no final | 415 De Haro St | Finbarr Collins Construction Inc. | t.i. for converting (e) commercial bank tenant space to gymDetails
t.i. for converting (e) commercial bank tenant space to gym | $106,000 |
| Sep 8, 2022 | Completed final sign-off Jun 2024 | 66 Elsie St | Paul K Vou | rev to pa 202207148502 to modify floor plan @ 2nd floor bedroom configuration, modify window sizes @ rearDetails
rev to pa 202207148502 to modify floor plan @ 2nd floor bedroom configuration, modify window sizes @ rear | $3,000 |
| Aug 25, 2022 | Expired or cancelled expired Feb 2026 | 1612 Vallejo St | Christopher Gate Construction Inc | remodel (e) 2 bathrooms and rconfigure closets at 3/f. install shear wall & posts per structural drawnings. enclose laundry @ ground floor.Details
remodel (e) 2 bathrooms and rconfigure closets at 3/f. install shear wall & posts per structural drawnings. enclose laundry @ ground floor. | $35,000 |
| Aug 2, 2022 | Completed final sign-off Dec 2023 | 2958 Scott St | Darc Ventures Inc Dba Spl Construction S | rev to pa202102195043 to expand 3/f roof terrace.Details
rev to pa202102195043 to expand 3/f roof terrace. | $5,000 |
| Jul 28, 2022 | Completed final sign-off Jan 2024 | 3552 22nd St | San Francisco Design Build | unit 3552: kitchen and bathroom remodel. (n) bathroom and laundry closet. replace all (e) doors, windows, & roof. new 4 skylight @ west side. re-build in kind rear exit stairs, less than 70% of wall demo as per plan.Details
unit 3552: kitchen and bathroom remodel. (n) bathroom and laundry closet. replace all (e) doors, windows, & roof. new 4 skylight @ west side. re-build in kind rear exit stairs, less than 70% of wall demo as per plan. | $89,328 |
| Jul 15, 2022 | Never finaled issued Jul 2022, no final | 415 De Haro St | Finbarr Collins Construction Inc. | demo only of vacant space (f0rmer bank): remove interior casework, remove panelling and finishes. (no changes to fire rated demising walls). ab-017. return space to warm shell.Details
demo only of vacant space (f0rmer bank): remove interior casework, remove panelling and finishes. (no changes to fire rated demising walls). ab-017. return space to warm shell. | $3,000 |