Block 3595, lot 070
2389 Mission St
- City’s use
- Commercial Retail
- Built
- 1928
- Stories
- 1
- Units
- 1
- Rooms
- 3 bathrooms
- Building
- 5,198 sq ft
- Lot
- 3,800 sq ft
- Zoning
- NC3
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 10, 2026 | Completed final sign-off Mar 2026 | 2389 Mission St | to obtain final inspection for work approved under pa 201906284683 & 202312072130. all work is completeDetails
to obtain final inspection for work approved under pa 201906284683 & 202312072130. all work is complete | ||
| Dec 7, 2023 | In progress issued Jan 2024 | 2389 Mission St | relocate bar @ 2nd fl revise accessible restroom @ 2nd fl. add restroom, reconfigure sink area of ground fl. (ref to renewal pa 202312051944 for 201906294683)Details
relocate bar @ 2nd fl revise accessible restroom @ 2nd fl. add restroom, reconfigure sink area of ground fl. (ref to renewal pa 202312051944 for 201906294683) | $65,000 | |
| Dec 5, 2023 | In progress issued Dec 2023 | 2389 Mission St | renew permit 201906284683, to obtain final inspection for work approved under pa# 201906284683. all work is complete.Details
renew permit 201906284683, to obtain final inspection for work approved under pa# 201906284683. all work is complete. | ||
| Jun 14, 2021 | Completed final sign-off Dec 2021 | 2389 Mission St | Flow Masters Plumbing Inc | modify existing fire sprinkler system for remodeling ada restroomarea only per nfpa 13. total 6 heads.Details
modify existing fire sprinkler system for remodeling ada restroomarea only per nfpa 13. total 6 heads. | $1,500 |
| Jun 28, 2019 | Never finaled issued Sep 2019, no final | 2389 Mission St | 1)build new ada bathroom, relocate extg men/women bathroom. 2)reconfigure extg stair at ground floor. ref pa#200809080938. sprinkler/fa under sep permit. fire rated corridor for exit sep <1/3 ref pa 200507208133.Details
1)build new ada bathroom, relocate extg men/women bathroom. 2)reconfigure extg stair at ground floor. ref pa#200809080938. sprinkler/fa under sep permit. fire rated corridor for exit sep <1/3 ref pa 200507208133. | $80,000 | |
| Sep 8, 2008 | Completed final sign-off Mar 2009 | 2389 Mission St | change of use to convert ex. office on the 2/f to be included in 1/f restaurant space. now bldg. is an 1-2 occupancy. "b" acessory. new service area 2/f and grab bar in ex. restrooms 1/f revise occupant load for assembly use permit. ref. #200609061490 new 90 min. windows.Details
change of use to convert ex. office on the 2/f to be included in 1/f restaurant space. now bldg. is an 1-2 occupancy. "b" acessory. new service area 2/f and grab bar in ex. restrooms 1/f revise occupant load for assembly use permit. ref. #200609061490 new 90 min. windows. | $1,000 | |
| Sep 6, 2006 | Completed final sign-off Apr 2007 | 2389 Mission St | occupant load calculation as requested by sffd for documenation purposes only. reference to pa# 2005/07/20/8133. no work being done under this permit. and as built revision to pa# 2005/07/20/8133.Details
occupant load calculation as requested by sffd for documenation purposes only. reference to pa# 2005/07/20/8133. no work being done under this permit. and as built revision to pa# 2005/07/20/8133. | ||
| Mar 22, 2006 | Completed final sign-off Jun 2006 | 2389 Mission St | Draeger Construction Inc. | remove existing roof system to deck-install 4 ply capsheet built-up. 3900 sq feetDetails
remove existing roof system to deck-install 4 ply capsheet built-up. 3900 sq feet | $11,000 |
| Feb 10, 2006 | Completed final sign-off Aug 2006 | 2389 Mission St | Emerald Plbg & Fire Protection | demo unused pipe to provide additional clearance and add 24 (new) heads where needed, demo 7 fire spk headsDetails
demo unused pipe to provide additional clearance and add 24 (new) heads where needed, demo 7 fire spk heads | $5,000 |
| Jul 22, 2005 | Expired or cancelled expired Apr 2010 | 2389 Mission St | replace (e) posts & beam as shown on plans @ 1st floor level.Details
replace (e) posts & beam as shown on plans @ 1st floor level. | $25,000 | |
| Jul 20, 2005 | Completed final sign-off Aug 2006 | 2389 Mission St | violation corrections: repair fire door, removal non-permitted horizontal addition, removal of defunct wiring, new snd means of egress, new ada bar area.review occ load for sffd a-3 permit application.Details
violation corrections: repair fire door, removal non-permitted horizontal addition, removal of defunct wiring, new snd means of egress, new ada bar area.review occ load for sffd a-3 permit application. | $40,000 | |
| Jun 24, 2004 | Expired or cancelled cancelled Jun 2006 | 2389 Mission St | correction of violation 200119118, refurbish firedoors,remove illegal addition infill existing wallDetails
correction of violation 200119118, refurbish firedoors,remove illegal addition infill existing wall | $6,700 | |
| Feb 22, 2001 | Expired or cancelled expired Jun 2001 | 2389 Mission St | Master Protection Corp. | inspect system installation and upgrade to ul-300 std & test permit with s.f. fire prev.Details
inspect system installation and upgrade to ul-300 std & test permit with s.f. fire prev. | $1,350 |
| Jun 28, 2000 | Expired or cancelled expired Aug 2002 | 2389 Mission St | addendum to 200005186425Details
addendum to 200005186425 | ||
| May 18, 2000 | Expired or cancelled expired Aug 2002 | 2389 Mission St | repair & replace wall covering & electrical work in kitchen, replace (e) equipment removed from kitcDetails
repair & replace wall covering & electrical work in kitchen, replace (e) equipment removed from kitc | $20,000 | |
| May 18, 2000 | Expired or cancelled expired Aug 2002 | 2389 Mission St | Star Plumbing & Fire Const Co. | install fire suppression system for kitchen hood & duct only.Details
install fire suppression system for kitchen hood & duct only. | $1,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Draeger Construction Inc., Emerald Plbg & Fire Protection, Flow Masters Plumbing Inc, Master Protection Corp., Star Plumbing & Fire Const Co.
- Architects
- Stephanie Felch (2), Troy Kashanipour
- Engineers
- Abraham Zavala
- Authorized agent-otherss
- Stephanie Felch, Troy Kashanipour
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.