Golden Heights Remodeling Inc
- Based in
- Concord
- On San Francisco permits
- Apr 2019 to Oct 2026
- Last 24 months
- 33 permits filed
59 permits since 2000: 41 completed, 13 in progress, 5 never finaled.
Of the 5 never-finaled permits, 5 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1733 20th St | non-structural, interior remodel to existing bathroom, demo existing bathtub,complete walk in shower area, vanity, toilet & removal existing skylight. relocate toilet drain, upgrade all rough plumbing & electrical to meet codes requirements, install exhsaust fan, new skylight same size as previousDetails
non-structural, interior remodel to existing bathroom, demo existing bathtub,complete walk in shower area, vanity, toilet & removal existing skylight. relocate toilet drain, upgrade all rough plumbing & electrical to meet codes requirements, install exhsaust fan, new skylight same size as previous | $18,500 |
| Sep 9, 2026 | In progress issued Sep 2026 | 770 Shotwell St | recommencement and completion of work approved under pa# 202501289195Details
recommencement and completion of work approved under pa# 202501289195 | $12,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 1507 37th Av | non structural, interoir remodel to e bathroom. demo existing bath and wal kin shower. existing wall per plans, demo existing vanity. close existing door entry and closet area. install new tub, new vanity, new walk in shower , new exhause fan, new light fixturesDetails
non structural, interoir remodel to e bathroom. demo existing bath and wal kin shower. existing wall per plans, demo existing vanity. close existing door entry and closet area. install new tub, new vanity, new walk in shower , new exhause fan, new light fixtures | $15,800 |
| Jul 28, 2026 | In progress issued Jul 2026 | 450 Monterey Bl | kitchen remodel like for like. demo existing soffit, remove and replace counter, new applicances. no structural changes.Details
kitchen remodel like for like. demo existing soffit, remove and replace counter, new applicances. no structural changes. | $32,000 |
| Jul 9, 2026 | Completed final sign-off Oct 2026 | 21 Nahua Av | non structural interior remodel to (e) bathroom on upper floor. replace (e) tub with shower. no new habitable square feet, no demo walls, no change to building envelope. no change to site drainage.Details
non structural interior remodel to (e) bathroom on upper floor. replace (e) tub with shower. no new habitable square feet, no demo walls, no change to building envelope. no change to site drainage. | $20,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 89 Teddy Av | revise the scope of p/a #2026-0326-8350 to include the removal and replacement of (8) windows, (2) skylights, and (1) balcony railing assembly.Details
revise the scope of p/a #2026-0326-8350 to include the removal and replacement of (8) windows, (2) skylights, and (1) balcony railing assembly. | $80,000 |
| Jul 2, 2026 | In progress issued Jul 2026 | 45 Ora Wy | unit 208: kitchen and bathroom remodel. remove old tub and replace w/ a shower pan. demo old bath tiles and install new tiles. replace toilet bidet w/ (e) plumbing. install shampoo niche, new exhaust fan, porcelain floor, med cabinets, grab bars and fixtures. paint bath. kitchen - demo (e) cabinets.Details
unit 208: kitchen and bathroom remodel. remove old tub and replace w/ a shower pan. demo old bath tiles and install new tiles. replace toilet bidet w/ (e) plumbing. install shampoo niche, new exhaust fan, porcelain floor, med cabinets, grab bars and fixtures. paint bath. kitchen - demo (e) cabinets. | $23,000 |
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 30 Miraloma Dr | interior remodel 1st fl kitchen and 2nd fl master suite, remodel including the whole house electrical remodel within an (e) fully detaced single family residence. no change to landscaping, no change to parking, no change to impervious area, no change to drainage. modify window on master suite. new dDetails
interior remodel 1st fl kitchen and 2nd fl master suite, remodel including the whole house electrical remodel within an (e) fully detaced single family residence. no change to landscaping, no change to parking, no change to impervious area, no change to drainage. modify window on master suite. new d | $105,000 |
| May 19, 2026 | Completed final sign-off Jun 2026 | 769 Foerster St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,000 |
| Apr 8, 2026 | Completed final sign-off Apr 2026 | 969 Rutland St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,500 |
| Mar 26, 2026 | In progress issued Mar 2026 | 89 Teddy Av | interior remodel, new front stairs, new exterior window and new full bath between the mechanical room and bedroom at the lower floor of fully detached single family residence. no change to landscaping, no change to parking, no change to imperivous area. no change to drainage.Details
interior remodel, new front stairs, new exterior window and new full bath between the mechanical room and bedroom at the lower floor of fully detached single family residence. no change to landscaping, no change to parking, no change to imperivous area. no change to drainage. | $80,000 |
| Mar 23, 2026 | Completed final sign-off May 2026 | 2686 19th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,500 |
| Mar 18, 2026 | Completed final sign-off Mar 2026 | 525 Cordova St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,200 |
| Feb 13, 2026 | Completed final sign-off Mar 2026 | 255 Maywood Dr | reroof. no torch down or hot works.Details
reroof. no torch down or hot works. | $20,000 |
| Feb 4, 2026 | Completed final sign-off Mar 2026 | 1695 Sutter St | re-roofing: demo shingle & flat roof (1 layer) approx 2,500 sq ft, remove all existing vents & flashing, install waterproof under layment approx 1400 sq ft, sloped area, install underlayment flat area approx 1,100 sq ft, install new shingle roof approx 1400 sq ft & install new flat roof approxDetails
re-roofing: demo shingle & flat roof (1 layer) approx 2,500 sq ft, remove all existing vents & flashing, install waterproof under layment approx 1400 sq ft, sloped area, install underlayment flat area approx 1,100 sq ft, install new shingle roof approx 1400 sq ft & install new flat roof approx | $25,000 |
| Feb 4, 2026 | Completed final sign-off May 2026 | 143 21st Av | no structural, interior remodel to existing bathroom, demo existing tub and convert into a walkin shower in same location and same footprint, install new rough plumbing fixtures, no electrical work.Details
no structural, interior remodel to existing bathroom, demo existing tub and convert into a walkin shower in same location and same footprint, install new rough plumbing fixtures, no electrical work. | $7,500 |
| Nov 26, 2025 | In progress issued Dec 2025 | 80 Agua Wy | non structural , interior remodel to existing bath. add one bath. demo existing tub, shower pan, vanity and toilet per plan. replace 2 doors. install new tub, vanity, toilet, and plumbing fixtures. install new exhaust fan and lighting fixtures. retile and paint where needed.Details
non structural , interior remodel to existing bath. add one bath. demo existing tub, shower pan, vanity and toilet per plan. replace 2 doors. install new tub, vanity, toilet, and plumbing fixtures. install new exhaust fan and lighting fixtures. retile and paint where needed. | $35,000 |
| Nov 26, 2025 | Completed final sign-off Dec 2025 | 2299 Sutter St | plywood replacement on roof. revision to pa #202511260512Details
plywood replacement on roof. revision to pa #202511260512 | $5,000 |
| Nov 12, 2025 | Completed final sign-off Dec 2025 | 786 South Van Ness Av | re-roofing (no torch down no hot works)Details
re-roofing (no torch down no hot works) | $25,000 |
| Oct 31, 2025 | Completed final sign-off Feb 2026 | 1820 29th Av | revision to permit 202510278161 - existing bathroom remodel. convert shower pan to tub.Details
revision to permit 202510278161 - existing bathroom remodel. convert shower pan to tub. | |
| Oct 29, 2025 | Completed final sign-off Dec 2025 | 2297 Sutter St | reroof 1380 sq.ft. flat roof torch down. polyglass.Details
reroof 1380 sq.ft. flat roof torch down. polyglass. | $17,750 |
| Oct 27, 2025 | Completed final sign-off Feb 2026 | 1820 29th Av | non structural interior remodel to existing bathroom on 2nd fl. switch toilet and vanity location. convert tub to shower pan. heated tile floor in bath. no new habitable sq ft. no demo walls. no change in building envelope. no change to site drainage.Details
non structural interior remodel to existing bathroom on 2nd fl. switch toilet and vanity location. convert tub to shower pan. heated tile floor in bath. no new habitable sq ft. no demo walls. no change in building envelope. no change to site drainage. | $22,000 |
| Oct 14, 2025 | Completed final sign-off Sep 2026 | 89 Teddy Av | bathroom like for like. add breakers to existing subpanel.Details
bathroom like for like. add breakers to existing subpanel. | $18,000 |
| Oct 3, 2025 | Completed final sign-off Oct 2025 | 56 Dorado Tr | re-roofing. hot works.Details
re-roofing. hot works. | $18,000 |
| Oct 3, 2025 | Completed final sign-off Oct 2025 | 237 Dorado Tr | re-roofing: reroof 1790 sq f torch down (polyglass) replace plywood if needed.Details
re-roofing: reroof 1790 sq f torch down (polyglass) replace plywood if needed. | $18,000 |
| Sep 4, 2025 | Completed final sign-off Sep 2025 | 2208 25th St | re-roofing (with hotworks)Details
re-roofing (with hotworks) | $14,000 |
| Jul 16, 2025 | Completed final sign-off Jul 2025 | 7 Emerson St | new plywood at roof. (ref pa# 202507080339 for re-roof)Details
new plywood at roof. (ref pa# 202507080339 for re-roof) | $30,375 |
| Jul 8, 2025 | Completed final sign-off Jul 2025 | 7 Emerson St | re-roofing hot works.Details
re-roofing hot works. | $20,375 |
| Jun 13, 2025 | Completed final sign-off Oct 2025 | 690 Market St | reroof w/hot workDetails
reroof w/hot work | $90,000 |
| Feb 14, 2025 | Completed final sign-off Mar 2025 | 2949 Jackson St | reroofing- torch down on flat roofDetails
reroofing- torch down on flat roof | $23,000 |
| Jan 28, 2025 | In progress issued Jan 2025 | 770 Shotwell St | revision 202410152927 to include kitchen remodel at upper unit. new beam new closet at bedroom and associated structural workDetails
revision 202410152927 to include kitchen remodel at upper unit. new beam new closet at bedroom and associated structural work | $51,000 |
| Oct 15, 2024 | In progress issued Nov 2024 | 770 Shotwell St | remodel first story dwelling unit to add bedroom and bathroom, new kitchen, and relocate (e) bathroom.remove rear chimney all levels, infill floors and roof, new beam at patio to remove post.Details
remodel first story dwelling unit to add bedroom and bathroom, new kitchen, and relocate (e) bathroom.remove rear chimney all levels, infill floors and roof, new beam at patio to remove post. | $200,000 |
| Oct 8, 2024 | In progress issued Nov 2024 | 72 Townsend St | unit 100:revision to pa #201904299225: bedrm 1- remove pair of door to 1 interior casement window. bedrm 2-remve pair of door to interior fixed window. bedrm 4-remove pair door- 2 interior window, bath 1 grab bar 2/w bench, relocate powder room at bedrm 4, laundry room size room increased,Details
unit 100:revision to pa #201904299225: bedrm 1- remove pair of door to 1 interior casement window. bedrm 2-remve pair of door to interior fixed window. bedrm 4-remove pair door- 2 interior window, bath 1 grab bar 2/w bench, relocate powder room at bedrm 4, laundry room size room increased, | |
| Apr 19, 2024 | In progress issued Apr 2024 | 376 Noe St | reroofingDetails
reroofing | $15,000 |
| Mar 15, 2024 | Completed final sign-off May 2024 | 2900 Pierce St | unit#3: - bathroom remodel like for likeDetails
unit#3: - bathroom remodel like for like | $20,000 |
| Feb 16, 2024 | Completed final sign-off May 2024 | 33 Encanto Av | bathroom remodel like for like. replacing heated floors. no structural.Details
bathroom remodel like for like. replacing heated floors. no structural. | $23,000 |
| Jan 23, 2024 | Completed final sign-off Feb 2024 | 621 Capp St | reroofingDetails
reroofing | $16,000 |
| Oct 16, 2023 | Completed final sign-off Nov 2023 | 953 Naples St | reroofingDetails
reroofing | $20,000 |
| Sep 19, 2023 | Completed final sign-off Mar 2024 | 1427 35th Av | revision to issued permit to 202212239132, add new skylight (30"x48") in 2nd flr ceilingDetails
revision to issued permit to 202212239132, add new skylight (30"x48") in 2nd flr ceiling | $3,000 |
| Aug 31, 2023 | Completed final sign-off Sep 2023 | 38 Lois Ln | reroofing-1125 sqft.Details
reroofing-1125 sqft. | $16,000 |
| Aug 23, 2023 | Completed final sign-off Sep 2023 | 571 Howard St | reroofingDetails
reroofing | $30,000 |
| Jul 25, 2023 | Completed final sign-off Dec 2023 | 3 Coso Av | replace existing siding with new siding at front of the houseDetails
replace existing siding with new siding at front of the house | $10,000 |
| Jun 27, 2023 | Completed final sign-off Jul 2023 | 144 Clement St | reroofingDetails
reroofing | $16,000 |
| Jun 27, 2023 | Completed final sign-off Jul 2023 | 51 Ridgewood Av | reroofingDetails
reroofing | $14,000 |
| Jun 12, 2023 | Completed final sign-off Nov 2023 | 163 Ripley St | interior alteration of ground floor garage space. provide 5/8" type x gyp bd on walls and ceiling under stairs. new r-19 insulation on ceiling. modify lighting system. upgrade 2 (e) elect panels to 200 amp each. new elec meters. add wall & door to enclose staircase. all interiorDetails
interior alteration of ground floor garage space. provide 5/8" type x gyp bd on walls and ceiling under stairs. new r-19 insulation on ceiling. modify lighting system. upgrade 2 (e) elect panels to 200 amp each. new elec meters. add wall & door to enclose staircase. all interior | $20,000 |
| May 9, 2023 | Completed final sign-off Aug 2023 | 807 Columbus Av | reroofing. torch down flat roof 2 big squares. roof to comply with cool roof programDetails
reroofing. torch down flat roof 2 big squares. roof to comply with cool roof program | $14,000 |
| May 4, 2023 | Never finaled issued Jul 2023, no final | 1 Coso Av | rear yard stairs have been partially repaired and will need to be replaced in-kind.Details
rear yard stairs have been partially repaired and will need to be replaced in-kind. | $36,000 |
| Apr 21, 2023 | Never finaled issued Apr 2023, no final | 296 Dalewood Wy | (1) bathroom remodel like for like, replace plumbing fixtures, replace window, replace fan, update e/m/p up to code. replace rl. window not visible from street.Details
(1) bathroom remodel like for like, replace plumbing fixtures, replace window, replace fan, update e/m/p up to code. replace rl. window not visible from street. | $30,000 |
| Mar 21, 2023 | Completed final sign-off Mar 2024 | 1 Coso Av | infill of soft-story @ backyard level for small storage (approx 5.5' x 8') below 2 original bays. replace window with double door. construct new trellis above new double door.Details
infill of soft-story @ backyard level for small storage (approx 5.5' x 8') below 2 original bays. replace window with double door. construct new trellis above new double door. | $25,000 |
| Mar 21, 2023 | Never finaled issued Mar 2023, no final | 231 Scott St | kitchen remodel like for like relocating sink. no structural changes. no moving walls.Details
kitchen remodel like for like relocating sink. no structural changes. no moving walls. | $30,000 |
| Dec 23, 2022 | Completed final sign-off Mar 2024 | 1427 35th Av | ground floor development: new living room, new full bath, new storage room, new mudroom, and new laundry room , 1st fl. deck extension at rear, rebuild stairs in-kindDetails
ground floor development: new living room, new full bath, new storage room, new mudroom, and new laundry room , 1st fl. deck extension at rear, rebuild stairs in-kind | $92,000 |
| Oct 12, 2022 | Never finaled issued Oct 2022, no final | 355 20th Av | unit 2: bathroom remodel like for like, upgrading plumbing. no structural changes.Details
unit 2: bathroom remodel like for like, upgrading plumbing. no structural changes. | $12,000 |
| Sep 7, 2022 | Completed final sign-off Nov 2022 | 42 Richland Av | like for like bathrom remodel: convert tub to walk in shower, adding 4 recessed lights, no structural changes, same layout.Details
like for like bathrom remodel: convert tub to walk in shower, adding 4 recessed lights, no structural changes, same layout. | $16,000 |
| Apr 25, 2022 | Completed final sign-off Nov 2022 | 672 Carolina St | kitchen remodeling per plans, remove non-bearing wall, replace new appliances, new island, update mep up to code, new dryer/washer at kitchen, new hood.Details
kitchen remodeling per plans, remove non-bearing wall, replace new appliances, new island, update mep up to code, new dryer/washer at kitchen, new hood. | $25,000 |
| Jan 28, 2022 | Completed final sign-off Dec 2022 | 2659 Lombard St | unit #304: install new wall between kitchen & bedroom. opening of wall at kitchen. closing/removal of door between toilet & walk in closet.Details
unit #304: install new wall between kitchen & bedroom. opening of wall at kitchen. closing/removal of door between toilet & walk in closet. | $55,000 |
| Jan 4, 2022 | Completed final sign-off Jan 2022 | 233 Alpha St | reroofingDetails
reroofing | $10,000 |
| Dec 10, 2021 | Completed final sign-off Feb 2022 | 9 Wright St | bathroom remodeling in kind, replace plumbing fixtures, shower, 2 sink toilet 3r.l. 2 gf1, 2 switchDetails
bathroom remodeling in kind, replace plumbing fixtures, shower, 2 sink toilet 3r.l. 2 gf1, 2 switch | $10,000 |
| Nov 17, 2021 | Completed final sign-off Dec 2022 | 233 Alpha St | remodel kitchen with wall remodel. remodel bathroom like for like with new fixtures, exhaust fan and electrical up to code. replace (e) door to barn door. legalization of g/f with living roo, laundry room and bathroom.Details
remodel kitchen with wall remodel. remodel bathroom like for like with new fixtures, exhaust fan and electrical up to code. replace (e) door to barn door. legalization of g/f with living roo, laundry room and bathroom. | $35,000 |
| Apr 29, 2019 | Never finaled issued Jul 2023, no final | 72 Townsend St | renovation of an exist residential loft space. scope of work includes demo of exist int. walls, construct new rooms within exist bldg envelope including new plumbing, elect and mech work. reference to approved permits 200705010136s and 201606039116. no new ext work or change in square footageDetails
renovation of an exist residential loft space. scope of work includes demo of exist int. walls, construct new rooms within exist bldg envelope including new plumbing, elect and mech work. reference to approved permits 200705010136s and 201606039116. no new ext work or change in square footage | $200,000 |