Back to kitchen remodel contractors
Golden Heights Remodeling Inc
- Based in
- Concord
- On San Francisco permits
- Apr 2019 to Oct 2026
- Last 24 months
- 33 permits filed
59 permits since 2000: 41 completed, 13 in progress, 5 never finaled.
Of the 5 never-finaled permits, 5 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
9 kitchen remodel permits: 3 completed, 5 in progress, 1 never finaled. Typically 2 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2026 | In progress issued Jul 2026 | 450 Monterey Bl | kitchen remodel like for like. demo existing soffit, remove and replace counter, new applicances. no structural changes.Details
kitchen remodel like for like. demo existing soffit, remove and replace counter, new applicances. no structural changes. | $32,000 |
| Jul 2, 2026 | In progress issued Jul 2026 | 45 Ora Wy | unit 208: kitchen and bathroom remodel. remove old tub and replace w/ a shower pan. demo old bath tiles and install new tiles. replace toilet bidet w/ (e) plumbing. install shampoo niche, new exhaust fan, porcelain floor, med cabinets, grab bars and fixtures. paint bath. kitchen - demo (e) cabinets.Details
unit 208: kitchen and bathroom remodel. remove old tub and replace w/ a shower pan. demo old bath tiles and install new tiles. replace toilet bidet w/ (e) plumbing. install shampoo niche, new exhaust fan, porcelain floor, med cabinets, grab bars and fixtures. paint bath. kitchen - demo (e) cabinets. | $23,000 |
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 30 Miraloma Dr | interior remodel 1st fl kitchen and 2nd fl master suite, remodel including the whole house electrical remodel within an (e) fully detaced single family residence. no change to landscaping, no change to parking, no change to impervious area, no change to drainage. modify window on master suite. new dDetails
interior remodel 1st fl kitchen and 2nd fl master suite, remodel including the whole house electrical remodel within an (e) fully detaced single family residence. no change to landscaping, no change to parking, no change to impervious area, no change to drainage. modify window on master suite. new d | $105,000 |
| Jan 28, 2025 | In progress issued Jan 2025 | 770 Shotwell St | revision 202410152927 to include kitchen remodel at upper unit. new beam new closet at bedroom and associated structural workDetails
revision 202410152927 to include kitchen remodel at upper unit. new beam new closet at bedroom and associated structural work | $51,000 |
| Oct 15, 2024 | In progress issued Nov 2024 | 770 Shotwell St | remodel first story dwelling unit to add bedroom and bathroom, new kitchen, and relocate (e) bathroom.remove rear chimney all levels, infill floors and roof, new beam at patio to remove post.Details
remodel first story dwelling unit to add bedroom and bathroom, new kitchen, and relocate (e) bathroom.remove rear chimney all levels, infill floors and roof, new beam at patio to remove post. | $200,000 |
| Mar 21, 2023 | Never finaled issued Mar 2023, no final | 231 Scott St | kitchen remodel like for like relocating sink. no structural changes. no moving walls.Details
kitchen remodel like for like relocating sink. no structural changes. no moving walls. | $30,000 |
| Apr 25, 2022 | Completed final sign-off Nov 2022 | 672 Carolina St | kitchen remodeling per plans, remove non-bearing wall, replace new appliances, new island, update mep up to code, new dryer/washer at kitchen, new hood.Details
kitchen remodeling per plans, remove non-bearing wall, replace new appliances, new island, update mep up to code, new dryer/washer at kitchen, new hood. | $25,000 |
| Jan 28, 2022 | Completed final sign-off Dec 2022 | 2659 Lombard St | unit #304: install new wall between kitchen & bedroom. opening of wall at kitchen. closing/removal of door between toilet & walk in closet.Details
unit #304: install new wall between kitchen & bedroom. opening of wall at kitchen. closing/removal of door between toilet & walk in closet. | $55,000 |
| Nov 17, 2021 | Completed final sign-off Dec 2022 | 233 Alpha St | remodel kitchen with wall remodel. remodel bathroom like for like with new fixtures, exhaust fan and electrical up to code. replace (e) door to barn door. legalization of g/f with living roo, laundry room and bathroom.Details
remodel kitchen with wall remodel. remodel bathroom like for like with new fixtures, exhaust fan and electrical up to code. replace (e) door to barn door. legalization of g/f with living roo, laundry room and bathroom. | $35,000 |