Golden Heights Remodeling Inc
- Based in
- Concord
- On San Francisco permits
- Apr 2019 to Oct 2026
- Last 24 months
- 33 permits filed
59 permits since 2000: 41 completed, 13 in progress, 5 never finaled.
Of the 5 never-finaled permits, 5 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 10 completed, 7 in progress, 2 never finaled. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1733 20th St | non-structural, interior remodel to existing bathroom, demo existing bathtub,complete walk in shower area, vanity, toilet & removal existing skylight. relocate toilet drain, upgrade all rough plumbing & electrical to meet codes requirements, install exhsaust fan, new skylight same size as previousDetails
non-structural, interior remodel to existing bathroom, demo existing bathtub,complete walk in shower area, vanity, toilet & removal existing skylight. relocate toilet drain, upgrade all rough plumbing & electrical to meet codes requirements, install exhsaust fan, new skylight same size as previous | $18,500 |
| Aug 6, 2026 | In progress issued Aug 2026 | 1507 37th Av | non structural, interoir remodel to e bathroom. demo existing bath and wal kin shower. existing wall per plans, demo existing vanity. close existing door entry and closet area. install new tub, new vanity, new walk in shower , new exhause fan, new light fixturesDetails
non structural, interoir remodel to e bathroom. demo existing bath and wal kin shower. existing wall per plans, demo existing vanity. close existing door entry and closet area. install new tub, new vanity, new walk in shower , new exhause fan, new light fixtures | $15,800 |
| Jul 9, 2026 | Completed final sign-off Oct 2026 | 21 Nahua Av | non structural interior remodel to (e) bathroom on upper floor. replace (e) tub with shower. no new habitable square feet, no demo walls, no change to building envelope. no change to site drainage.Details
non structural interior remodel to (e) bathroom on upper floor. replace (e) tub with shower. no new habitable square feet, no demo walls, no change to building envelope. no change to site drainage. | $20,000 |
| Jul 2, 2026 | In progress issued Jul 2026 | 45 Ora Wy | unit 208: kitchen and bathroom remodel. remove old tub and replace w/ a shower pan. demo old bath tiles and install new tiles. replace toilet bidet w/ (e) plumbing. install shampoo niche, new exhaust fan, porcelain floor, med cabinets, grab bars and fixtures. paint bath. kitchen - demo (e) cabinets.Details
unit 208: kitchen and bathroom remodel. remove old tub and replace w/ a shower pan. demo old bath tiles and install new tiles. replace toilet bidet w/ (e) plumbing. install shampoo niche, new exhaust fan, porcelain floor, med cabinets, grab bars and fixtures. paint bath. kitchen - demo (e) cabinets. | $23,000 |
| Mar 26, 2026 | In progress issued Mar 2026 | 89 Teddy Av | interior remodel, new front stairs, new exterior window and new full bath between the mechanical room and bedroom at the lower floor of fully detached single family residence. no change to landscaping, no change to parking, no change to imperivous area. no change to drainage.Details
interior remodel, new front stairs, new exterior window and new full bath between the mechanical room and bedroom at the lower floor of fully detached single family residence. no change to landscaping, no change to parking, no change to imperivous area. no change to drainage. | $80,000 |
| Feb 4, 2026 | Completed final sign-off May 2026 | 143 21st Av | no structural, interior remodel to existing bathroom, demo existing tub and convert into a walkin shower in same location and same footprint, install new rough plumbing fixtures, no electrical work.Details
no structural, interior remodel to existing bathroom, demo existing tub and convert into a walkin shower in same location and same footprint, install new rough plumbing fixtures, no electrical work. | $7,500 |
| Nov 26, 2025 | In progress issued Dec 2025 | 80 Agua Wy | non structural , interior remodel to existing bath. add one bath. demo existing tub, shower pan, vanity and toilet per plan. replace 2 doors. install new tub, vanity, toilet, and plumbing fixtures. install new exhaust fan and lighting fixtures. retile and paint where needed.Details
non structural , interior remodel to existing bath. add one bath. demo existing tub, shower pan, vanity and toilet per plan. replace 2 doors. install new tub, vanity, toilet, and plumbing fixtures. install new exhaust fan and lighting fixtures. retile and paint where needed. | $35,000 |
| Oct 31, 2025 | Completed final sign-off Feb 2026 | 1820 29th Av | revision to permit 202510278161 - existing bathroom remodel. convert shower pan to tub.Details
revision to permit 202510278161 - existing bathroom remodel. convert shower pan to tub. | |
| Oct 27, 2025 | Completed final sign-off Feb 2026 | 1820 29th Av | non structural interior remodel to existing bathroom on 2nd fl. switch toilet and vanity location. convert tub to shower pan. heated tile floor in bath. no new habitable sq ft. no demo walls. no change in building envelope. no change to site drainage.Details
non structural interior remodel to existing bathroom on 2nd fl. switch toilet and vanity location. convert tub to shower pan. heated tile floor in bath. no new habitable sq ft. no demo walls. no change in building envelope. no change to site drainage. | $22,000 |
| Oct 14, 2025 | Completed final sign-off Sep 2026 | 89 Teddy Av | bathroom like for like. add breakers to existing subpanel.Details
bathroom like for like. add breakers to existing subpanel. | $18,000 |
| Oct 15, 2024 | In progress issued Nov 2024 | 770 Shotwell St | remodel first story dwelling unit to add bedroom and bathroom, new kitchen, and relocate (e) bathroom.remove rear chimney all levels, infill floors and roof, new beam at patio to remove post.Details
remodel first story dwelling unit to add bedroom and bathroom, new kitchen, and relocate (e) bathroom.remove rear chimney all levels, infill floors and roof, new beam at patio to remove post. | $200,000 |
| Oct 8, 2024 | In progress issued Nov 2024 | 72 Townsend St | unit 100:revision to pa #201904299225: bedrm 1- remove pair of door to 1 interior casement window. bedrm 2-remve pair of door to interior fixed window. bedrm 4-remove pair door- 2 interior window, bath 1 grab bar 2/w bench, relocate powder room at bedrm 4, laundry room size room increased,Details
unit 100:revision to pa #201904299225: bedrm 1- remove pair of door to 1 interior casement window. bedrm 2-remve pair of door to interior fixed window. bedrm 4-remove pair door- 2 interior window, bath 1 grab bar 2/w bench, relocate powder room at bedrm 4, laundry room size room increased, | |
| Mar 15, 2024 | Completed final sign-off May 2024 | 2900 Pierce St | unit#3: - bathroom remodel like for likeDetails
unit#3: - bathroom remodel like for like | $20,000 |
| Feb 16, 2024 | Completed final sign-off May 2024 | 33 Encanto Av | bathroom remodel like for like. replacing heated floors. no structural.Details
bathroom remodel like for like. replacing heated floors. no structural. | $23,000 |
| Apr 21, 2023 | Never finaled issued Apr 2023, no final | 296 Dalewood Wy | (1) bathroom remodel like for like, replace plumbing fixtures, replace window, replace fan, update e/m/p up to code. replace rl. window not visible from street.Details
(1) bathroom remodel like for like, replace plumbing fixtures, replace window, replace fan, update e/m/p up to code. replace rl. window not visible from street. | $30,000 |
| Dec 23, 2022 | Completed final sign-off Mar 2024 | 1427 35th Av | ground floor development: new living room, new full bath, new storage room, new mudroom, and new laundry room , 1st fl. deck extension at rear, rebuild stairs in-kindDetails
ground floor development: new living room, new full bath, new storage room, new mudroom, and new laundry room , 1st fl. deck extension at rear, rebuild stairs in-kind | $92,000 |
| Oct 12, 2022 | Never finaled issued Oct 2022, no final | 355 20th Av | unit 2: bathroom remodel like for like, upgrading plumbing. no structural changes.Details
unit 2: bathroom remodel like for like, upgrading plumbing. no structural changes. | $12,000 |
| Dec 10, 2021 | Completed final sign-off Feb 2022 | 9 Wright St | bathroom remodeling in kind, replace plumbing fixtures, shower, 2 sink toilet 3r.l. 2 gf1, 2 switchDetails
bathroom remodeling in kind, replace plumbing fixtures, shower, 2 sink toilet 3r.l. 2 gf1, 2 switch | $10,000 |
| Nov 17, 2021 | Completed final sign-off Dec 2022 | 233 Alpha St | remodel kitchen with wall remodel. remodel bathroom like for like with new fixtures, exhaust fan and electrical up to code. replace (e) door to barn door. legalization of g/f with living roo, laundry room and bathroom.Details
remodel kitchen with wall remodel. remodel bathroom like for like with new fixtures, exhaust fan and electrical up to code. replace (e) door to barn door. legalization of g/f with living roo, laundry room and bathroom. | $35,000 |