Paul K. Vou
- Listed as
- authorized agent-others, contractor, pmt consultant/expediter
- Firm
- Paul K Vou
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Oct 2025
42 permits since 2000 (contractor on 42 permits, authorized agent-others on 3 permits, pmt consultant/expediter on 1 permit): 37 completed, 3 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 8, 2025 | In progress issued Oct 2025 | 851 Church St | Ben Chen Design And Construction Inc, Paul K Vou | remove existing decks and stairs at rear of building. replace deck and stair in similar configurationDetails
remove existing decks and stairs at rear of building. replace deck and stair in similar configuration | $15,000 |
| Dec 12, 2024 | In progress issued Apr 2025 | 217 Randall St | Paul K Vou | renovate home, remove (e) rear yard extension, relocate kitchen add half bath, (n) bedroom and stair from lower level to rear yard. renovate upper level to add bathroom,construct horizontal addition at rear to add living room and bedroom, rr windows, railings and garage door at the front facade....Details
renovate home, remove (e) rear yard extension, relocate kitchen add half bath, (n) bedroom and stair from lower level to rear yard. renovate upper level to add bathroom,construct horizontal addition at rear to add living room and bedroom, rr windows, railings and garage door at the front facade.... | $643,814 |
| May 14, 2024 | In progress issued Jun 2024 | 217 Randall St | Paul K Vou | replace existing foundaton with slab on gradeDetails
replace existing foundaton with slab on grade | $80,000 |
| Dec 5, 2023 | Completed final sign-off Oct 2024 | 3431 19th St | Paul K Vou | tenant improvement for cannabis dispensary; (n) cabinetry and countertops, break room, private office, sotrage & receiving roomDetails
tenant improvement for cannabis dispensary; (n) cabinetry and countertops, break room, private office, sotrage & receiving room | $100,000 |
| Sep 27, 2023 | Completed final sign-off Dec 2023 | 227 Clinton Pk | Paul K Vou | unit #4: remodel 1 bathroom in kind- change tile, cabinet, sink, new paint. remodel 1 kitchen in kind- change cabinet, counter, sink, faucet, stove, new paint. all in kind. no structural work. no floor layout change. no wall layout change.Details
unit #4: remodel 1 bathroom in kind- change tile, cabinet, sink, new paint. remodel 1 kitchen in kind- change cabinet, counter, sink, faucet, stove, new paint. all in kind. no structural work. no floor layout change. no wall layout change. | $15,000 |
| Apr 4, 2023 | Completed final sign-off Oct 2023 | 48 Dearborn St | Paul K Vou | rev to pa# 2022-1018-4624: replace drywall at living room with 5/8" type x sheetrockDetails
rev to pa# 2022-1018-4624: replace drywall at living room with 5/8" type x sheetrock | |
| Oct 18, 2022 | Completed final sign-off Oct 2023 | 48 Dearborn St | Paul K Vou | remodeling one bathroom and one kitchen. change new water heater, add new heater. change new electric wire.Details
remodeling one bathroom and one kitchen. change new water heater, add new heater. change new electric wire. | $35,000 |
| Sep 8, 2022 | Completed final sign-off Jun 2024 | 66 Elsie St | Paul K Vou | rev to pa 202207148502 to modify floor plan @ 2nd floor bedroom configuration, modify window sizes @ rearDetails
rev to pa 202207148502 to modify floor plan @ 2nd floor bedroom configuration, modify window sizes @ rear | $3,000 |
| Jul 14, 2022 | Completed final sign-off Oct 2023 | 66 Elsie St | Paul K Vou | revision to no-plan pa 202204202626. additional renovations: open wall at 3/f btw kitchen and living room. replace windows & sliding door, add prop. line window w/ab-09. 2/f: relocate bath, expand closet. modify windows at rear. replace sliding door. (continue)Details
revision to no-plan pa 202204202626. additional renovations: open wall at 3/f btw kitchen and living room. replace windows & sliding door, add prop. line window w/ab-09. 2/f: relocate bath, expand closet. modify windows at rear. replace sliding door. (continue) | $130,000 |
| Apr 20, 2022 | Completed final sign-off Oct 2023 | 66 Elsie St | Paul K Vou | remodeling kitchen and two bathrooms. non structural.Details
remodeling kitchen and two bathrooms. non structural. | $10,000 |
| Mar 15, 2022 | Completed final sign-off Jul 2024 | 105 08th Av | Paul K Vou | remodel unit 105 to connect to 1st story. convert storage & garage space into 2 bedroom & 2 baths. remodel 2nd story kitchen & bath. add stair to connect to lower level.Details
remodel unit 105 to connect to 1st story. convert storage & garage space into 2 bedroom & 2 baths. remodel 2nd story kitchen & bath. add stair to connect to lower level. | $150,000 |
| Oct 25, 2021 | Completed final sign-off Apr 2022 | 46 Dearborn St | Paul K Vou | remodeling one bathroom and one kitchen. new tile, bathtop, faucet, cabinet, countertop. new paint. change new water heater. add the new heater. non structural.Details
remodeling one bathroom and one kitchen. new tile, bathtop, faucet, cabinet, countertop. new paint. change new water heater. add the new heater. non structural. | $20,000 |
| Apr 26, 2021 | Completed final sign-off May 2022 | 114 Linda St | Paul K Vou | remodel kitchen & bath. add washer/dryer to unit. remove wall between kitchen & bedroom. move bedroom to front.Details
remodel kitchen & bath. add washer/dryer to unit. remove wall between kitchen & bedroom. move bedroom to front. | $65,000 |
| Mar 12, 2021 | Completed final sign-off Jul 2021 | 103 08th Av | Paul K Vou | kitchen and bathroom remodel in kind. replace water heater & furnise.Details
kitchen and bathroom remodel in kind. replace water heater & furnise. | $45,000 |
| Jul 20, 2020 | Completed final sign-off Sep 2020 | 808 Washington St | Paul K Vou | to comply with nov # 201902771 . unit b: bathroom remodel in kind, (~200 sq ft), remove damaged sheet rock. replace with new sheet rock and tile and paint.Details
to comply with nov # 201902771 . unit b: bathroom remodel in kind, (~200 sq ft), remove damaged sheet rock. replace with new sheet rock and tile and paint. | $15,000 |
| Jun 17, 2019 | Completed final sign-off May 2023 | 319 Moultrie St | Paul K Vou | Details
| $2,000 |
| Feb 21, 2019 | Completed final sign-off Sep 2020 | 231 Gates St | Paul K Vou | interior renovations (n) kitchen (n) bathroom. create habitable space @ 1st floor connected to 2nd level with interior stair 2 beds, 2 baths. add (n) home office and bath @ basement level. lightwell infill @ 2nd floor blank wall of adjacent buildingDetails
interior renovations (n) kitchen (n) bathroom. create habitable space @ 1st floor connected to 2nd level with interior stair 2 beds, 2 baths. add (n) home office and bath @ basement level. lightwell infill @ 2nd floor blank wall of adjacent building | $200,000 |
| Jul 12, 2018 | Completed final sign-off Jan 2019 | 506 Banks St | Paul K Vou | revision to ba# 201710272530. eliminate 2nd flr powder rm and closet, add skylight, and structural revisions at roof framing planDetails
revision to ba# 201710272530. eliminate 2nd flr powder rm and closet, add skylight, and structural revisions at roof framing plan | |
| May 4, 2018 | Completed final sign-off Sep 2018 | 223 Anderson St | Paul K Vou | remodeling kitchen - replace kitchen counter, sinkDetails
remodeling kitchen - replace kitchen counter, sink | $10,000 |
| May 3, 2018 | Completed final sign-off Jan 2019 | 506 Banks St | Paul K Vou | provide temp vertical shoring for ground floor foundation replacementDetails
provide temp vertical shoring for ground floor foundation replacement | |
| Jan 2, 2018 | Completed final sign-off Apr 2018 | 149 Bradford St | Paul K Vou | revision to 201708084186 to note wood framed sub floor over e concrete slab per field inspector request. shearwalls as shown on orig permitDetails
revision to 201708084186 to note wood framed sub floor over e concrete slab per field inspector request. shearwalls as shown on orig permit | |
| Oct 27, 2017 | Completed final sign-off Feb 2019 | 506 Banks St | Paul K Vou | create habitable space at ground floor to include a new bedroom, closet & bath. 2nd floor remodel kitchen bath, bedroom, living, and dining. add powder. reconstruction interior stair. nw 2nd floor deck and stair. lightwell infill at blank wall of adjacent bldg.Details
create habitable space at ground floor to include a new bedroom, closet & bath. 2nd floor remodel kitchen bath, bedroom, living, and dining. add powder. reconstruction interior stair. nw 2nd floor deck and stair. lightwell infill at blank wall of adjacent bldg. | $190,000 |
| Sep 1, 2017 | Expired or cancelled expired Dec 2024 | 146 Tucker Av | Paul K Vou | removing all aluminum siding to expose original wood siding underneath; selective repair of existing wood siding. replace two front facing windows at 3rd floor and one dormer window on each side facade - 4 windows total all aluminum clad wood. no structural work. upgrade panel to 200 ampDetails
removing all aluminum siding to expose original wood siding underneath; selective repair of existing wood siding. replace two front facing windows at 3rd floor and one dormer window on each side facade - 4 windows total all aluminum clad wood. no structural work. upgrade panel to 200 amp | $5,000 |
| Aug 14, 2017 | Completed final sign-off Sep 2017 | 146 Tucker Av | Paul K Vou | reroofingDetails
reroofing | $3,000 |
| Aug 8, 2017 | Completed final sign-off Apr 2018 | 149 Bradford St | Paul K Vou | infill under rear overhang (less than 12' above grade); 1st floor renovations - add master bedroom, bathroom and remodel family room; remodel kitchen and bath on 2nd floor. add (n) skylightsDetails
infill under rear overhang (less than 12' above grade); 1st floor renovations - add master bedroom, bathroom and remodel family room; remodel kitchen and bath on 2nd floor. add (n) skylights | $50,000 |
| Jul 5, 2017 | Completed final sign-off Dec 2017 | 126 Randolph St | Paul K Vou | remodel 1 ½ bathroom located at the second floor - remodel kitchen , new plumbing , revised 2nd floor electrical, new dry wall and insulation, outside painting, change window, repair roof -window at the front will be wood interior exterior aluminum cladding. please note all interior work will be onDetails
remodel 1 ½ bathroom located at the second floor - remodel kitchen , new plumbing , revised 2nd floor electrical, new dry wall and insulation, outside painting, change window, repair roof -window at the front will be wood interior exterior aluminum cladding. please note all interior work will be on | $110,000 |
| Apr 4, 2017 | Completed final sign-off Jul 2017 | 1224 Grant Av | Paul K Vou, Alsterlind Construction Inc. | extend current bar to meet ada reqs. replace 3 compartment & prep sink as advised by dph and handwash sink as advised by dph, more light switches add outletsDetails
extend current bar to meet ada reqs. replace 3 compartment & prep sink as advised by dph and handwash sink as advised by dph, more light switches add outlets | $20,000 |
| Aug 31, 2016 | Completed final sign-off Sep 2016 | 751 Madrid St | Paul K Vou | to comply with nov#201609591: fix window and door. paint, clean mold & fix heater.Details
to comply with nov#201609591: fix window and door. paint, clean mold & fix heater. | $2,000 |
| Sep 21, 2007 | Completed final sign-off Jan 2008 | 1200 Taylor St | Paul K Vou | 1 bthroom 1 kitchen remodel. replacing in kind. no structural. 50% of kitchen wattage to be fluorescant. bathroom lighting to be fluorescant or on occupant sensor.Details
1 bthroom 1 kitchen remodel. replacing in kind. no structural. 50% of kitchen wattage to be fluorescant. bathroom lighting to be fluorescant or on occupant sensor. | $14,500 |
| Jul 16, 2007 | Completed final sign-off May 2008 | 2190 26th Av | Paul K Vou | to legalize existing family room and bathroom, and add a guest room in 1st floor. remodel existing bath & kitchen in 2nd floor. replace all existing windowsDetails
to legalize existing family room and bathroom, and add a guest room in 1st floor. remodel existing bath & kitchen in 2nd floor. replace all existing windows | $40,000 |
| Jul 3, 2007 | Completed final sign-off Aug 2007 | 1200 Taylor St | Paul K Vou | unit#6, 10, 14: frame in new non bearing wall between living room and dining room with doors in units 6, 10 and 14 on 1/f, 2/f & 3/f respectively.Details
unit#6, 10, 14: frame in new non bearing wall between living room and dining room with doors in units 6, 10 and 14 on 1/f, 2/f & 3/f respectively. | $9,300 |
| Jul 2, 2007 | Completed final sign-off Dec 2007 | 1200 Taylor St | Paul K Vou | unit #24-kitchen to legalize work done without permit to comply with complaint# 200706762-no changes to partitions or windows. 50% of kitchen light watts must be flourscentDetails
unit #24-kitchen to legalize work done without permit to comply with complaint# 200706762-no changes to partitions or windows. 50% of kitchen light watts must be flourscent | $6,300 |
| Mar 8, 2007 | Completed final sign-off May 2007 | 1200 Taylor St | Paul K Vou | replace 1 kchn in kind on unit #2. cabinets tile counter tops and paint sink. replace 1 bathroom in kind tile. paintDetails
replace 1 kchn in kind on unit #2. cabinets tile counter tops and paint sink. replace 1 bathroom in kind tile. paint | $16,800 |
| Jan 17, 2007 | Completed final sign-off Mar 2007 | 1200 Taylor St | Paul K Vou | replace 1 kitchen in kind-cabinets, tile, counter tops, paint. replace 1 bathroom in kind-tile and paint. no window or door work.Details
replace 1 kitchen in kind-cabinets, tile, counter tops, paint. replace 1 bathroom in kind-tile and paint. no window or door work. | $15,000 |
| Nov 3, 2006 | Completed final sign-off May 2007 | 1200 Taylor St | Paul K Vou | basement drywall work on room 1,2,3,4 and 5. to legalize work done without a permit comply w/comlaint#200676850.Details
basement drywall work on room 1,2,3,4 and 5. to legalize work done without a permit comply w/comlaint#200676850. | $3,800 |
| Oct 12, 2006 | Completed final sign-off Nov 2006 | 1200 Taylor St | Paul K Vou | work @ unit# 4 only. replace 1 kitchen counter & tile floor. replace shower door & tile floor at 1 bathroom.Details
work @ unit# 4 only. replace 1 kitchen counter & tile floor. replace shower door & tile floor at 1 bathroom. | $3,000 |
| Oct 6, 2006 | Completed final sign-off Mar 2007 | 1200 Taylor St | Paul K Vou | kitchen to legalize work done without a permit. to comply w/complaint#200671107 50% high efficacy lighting.Details
kitchen to legalize work done without a permit. to comply w/complaint#200671107 50% high efficacy lighting. | $6,800 |
| Oct 5, 2006 | Completed final sign-off Apr 2007 | 1200 Taylor St | Paul K Vou | his comply complaint# 200670826. replace deteriorated furnace flues. repair weather proofing on siding. repair stairs. repair handrails.Details
his comply complaint# 200670826. replace deteriorated furnace flues. repair weather proofing on siding. repair stairs. repair handrails. | $9,300 |
| Jul 25, 2006 | Completed final sign-off Jan 2007 | 707 03rd Av | Paul K Vou | bathroom & kitchen remodel. replacing in kind. no structural work.Details
bathroom & kitchen remodel. replacing in kind. no structural work. | $45,000 |
| Jun 28, 2006 | Completed final sign-off Jul 2006 | 1743 Grove St | Paul K Vou | to comply w/3r report #3r-4397Details
to comply w/3r report #3r-4397 | $7,000 |
| Jun 28, 2006 | Completed final sign-off Sep 2006 | 1200 Taylor St | Paul K Vou | remodel kitchen & bathrm in kind no work in bedrms.Details
remodel kitchen & bathrm in kind no work in bedrms. | $18,000 |
| Nov 17, 2005 | Expired or cancelled expired Feb 2009 | 1200 Taylor St | Paul K Vou, Forum Renovation Co. Inc | legalize roof deck. this includes adding steps to fire escape. in comply with nov#200566763.Details
legalize roof deck. this includes adding steps to fire escape. in comply with nov#200566763. | $4,500 |