Block 2697, lot 003
230 Collingwood St
- City’s use
- Multi-Family Residential
- Built
- 1926
- Stories
- 2
- Units
- 3
- Rooms
- 6 bedrooms, 6 bathrooms
- Building
- 5,641 sq ft
- Lot
- 3,436 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 12, 2023 | Completed final sign-off Nov 2023 | 230 Collingwood St | Crime Watch Security Sys Llc | installation of a new sprinkler monitoring system. ref sprinkler permit 202210124225Details
installation of a new sprinkler monitoring system. ref sprinkler permit 202210124225 | $4,000 |
| Oct 31, 2022 | Completed final sign-off Jan 2024 | 230 Collingwood St | Project Contractor Inc | as built revision app# 202210124225. add two sprinklers head + main pipe shaft positions.Details
as built revision app# 202210124225. add two sprinklers head + main pipe shaft positions. | $1,000 |
| Oct 12, 2022 | Completed final sign-off Jan 2024 | 230 Collingwood St | Project Contractor Inc | installation of 14 fie sprinklers to new unit and relevance egress according to 201912240654 per nfpa 13and underground piping per nfpa 24 (trench,backfill,sidewalk repair by separate permit)Details
installation of 14 fie sprinklers to new unit and relevance egress according to 201912240654 per nfpa 13and underground piping per nfpa 24 (trench,backfill,sidewalk repair by separate permit) | $9,000 |
| Sep 28, 2022 | Completed final sign-off Sep 2022 | 230 Collingwood St | Precision General Contruction | administrate permit to reflect floor plan changes to permit 2019-0829-0195, 20200128-2912, and 2019-1004-3639 revise laundry room location at unit 230 from 2nd story to first revise bathroom plans at unit 2308 232 to eliminate bathroomsDetails
administrate permit to reflect floor plan changes to permit 2019-0829-0195, 20200128-2912, and 2019-1004-3639 revise laundry room location at unit 230 from 2nd story to first revise bathroom plans at unit 2308 232 to eliminate bathrooms | |
| Jun 13, 2022 | Never finaled issued Jun 2022, no final | 228 Collingwood St | per pa #201912240654 new building, add address to rear bldg at pan#2697/003 as; 228 collingwood st.Details
per pa #201912240654 new building, add address to rear bldg at pan#2697/003 as; 228 collingwood st. | ||
| Jan 28, 2020 | Completed final sign-off Sep 2022 | 230 Collingwood St | Zhizhao Liu Construction Co | revision to pa #201908190195. add lot line window at 2nd fl. revisions at bathrooms layout at 2nd & 3rd fls. add laundry sink to 3rd fl laundry room.Details
revision to pa #201908190195. add lot line window at 2nd fl. revisions at bathrooms layout at 2nd & 3rd fls. add laundry sink to 3rd fl laundry room. | $3,000 |
| Dec 24, 2019 | Completed final sign-off Jan 2024 | 230 Collingwood St | Precision General Contruction | to erect a type v-b, 1 story single family dwelling with no basement.Details
to erect a type v-b, 1 story single family dwelling with no basement. | $67,000 |
| Dec 24, 2019 | Completed final sign-off Jan 2024 | 230 Collingwood St | Precision General Contruction | to demolish a type 5, 1-story storage shed.Details
to demolish a type 5, 1-story storage shed. | $5,000 |
| Oct 4, 2019 | Completed final sign-off Sep 2022 | 230 Collingwood St | Precision General Contruction | revision to permit 2019-0829-0195 to relocate rear stair to s.w.corner of the building. remove (e) laudry room enclosure @ rear of building. reconstruct in larger footprint. enlarge garage door.**maher n/a**Details
revision to permit 2019-0829-0195 to relocate rear stair to s.w.corner of the building. remove (e) laudry room enclosure @ rear of building. reconstruct in larger footprint. enlarge garage door.**maher n/a** | $75,000 |
| Aug 29, 2019 | Completed final sign-off Sep 2022 | 230 Collingwood St | Zhizhao Liu Construction Co | interior renovations: relocate 2 kitchens, remodel 2 bathrooms, add 3 new bathrooms. create habitable space at 1st floor connected to 2nd floor with interior stair. lightwell infill at 2nd and 3 floor against blankwall of adj bldg. seismic strengthening at all floors.Details
interior renovations: relocate 2 kitchens, remodel 2 bathrooms, add 3 new bathrooms. create habitable space at 1st floor connected to 2nd floor with interior stair. lightwell infill at 2nd and 3 floor against blankwall of adj bldg. seismic strengthening at all floors. | $250,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Precision General Contruction (4), Project Contractor Inc (2), Zhizhao Liu Construction Co (2), Crime Watch Security Sys Llc
- Architects
- Troy Ksashanipour (6)
- Engineers
- Michael Hom
- Designers
- Crime Watch Security Systems
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.