Randy Collins
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- Ftf Structural Engineering
- Based in
- San Francisco
- On San Francisco permits
- Jun 2003 to Aug 2026
245 permits since 2000 (engineer on 225 permits, architect on 13 permits, designer on 4 permits, authorized agent-others on 2 permits, attorney on 1 permit): 164 completed, 27 in progress, 18 never finaled, 36 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 245.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Sep 2026 | 2829 Pacific Av | Cook Construction | int. remodel of a 4-story sfr including the addition of a retractable and a fixed skylight @ (e) roof; alteration to (e) window openings and (n) windows in primary bedrooms and (n) windows in (e) openings in 3/f & 4/f facing rear yard; (n) interior elevator connecting all stories; kitchen remodel.Details
int. remodel of a 4-story sfr including the addition of a retractable and a fixed skylight @ (e) roof; alteration to (e) window openings and (n) windows in primary bedrooms and (n) windows in (e) openings in 3/f & 4/f facing rear yard; (n) interior elevator connecting all stories; kitchen remodel. | $1,804,290 |
| Jul 2, 2026 | In progress filed Jul 2026, not yet issued | 2360 Washington St | Thompson Suskind L P | demo and replace the dormer at the front facade to create a useable ceiling height at the interior and create symmetry from the exterior. this permit is also to replace one property line window with a fire rated unit. this window will match the dimensions of other existing windows.Details
demo and replace the dormer at the front facade to create a useable ceiling height at the interior and create symmetry from the exterior. this permit is also to replace one property line window with a fire rated unit. this window will match the dimensions of other existing windows. | $22,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 428 15th Av | Bianchi-Tillett Developers Inc | revision to pa# 202204071831. permeation grouting to stabilize subsoil, adjacent property work at 430 15th ave ref pa# 202606304326. similarly the matt slab foundation along the property line w/ 426 15th ave, has been modified by the eor to avoid undermining.Details
revision to pa# 202204071831. permeation grouting to stabilize subsoil, adjacent property work at 430 15th ave ref pa# 202606304326. similarly the matt slab foundation along the property line w/ 426 15th ave, has been modified by the eor to avoid undermining. | $20,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 430 15th Av | Bianchi-Tillett Developers Inc | permeation grouting below (e) foundation to stabilize sandy soil for property, adjacent excavation on 428 15th ave ref pa# 202606304320Details
permeation grouting below (e) foundation to stabilize sandy soil for property, adjacent excavation on 428 15th ave ref pa# 202606304320 | $20,000 |
| Jun 10, 2026 | In progress issued Jul 2026 | 201 Buena Vista East Av | Krekow Jennings Inc. | revision 202401043396- add (n) beam and post @music room ceiling.Details
revision 202401043396- add (n) beam and post @music room ceiling. | |
| Mar 10, 2026 | In progress issued Apr 2026 | 215 Buena Vista East Av | Krekow Jennings Inc. | permit amendment to pa #202401043399 including a revised retaining wall and associated structural detailsDetails
permit amendment to pa #202401043399 including a revised retaining wall and associated structural details | |
| Feb 27, 2026 | Completed final sign-off Sep 2026 | 2011 Filbert St | revision to permit 202101202957-s1. shear walls at southern elevation (rear elevation) revised. revised beams at northern (front) bay window.Details
revision to permit 202101202957-s1. shear walls at southern elevation (rear elevation) revised. revised beams at northern (front) bay window. | ||
| Feb 13, 2026 | Completed final sign-off May 2026 | 2315 Broadway | Perez Construction Llc. | removal of (e) winding stair & extension of 3-flight stair from 2nd flr of the dwelling unit to 3rd flr. relocation of (e) laundry on 3rd flr to new location, new layout for bath 204, removal of 5 windows & replacement of one window in-kind @ north facade.Details
removal of (e) winding stair & extension of 3-flight stair from 2nd flr of the dwelling unit to 3rd flr. relocation of (e) laundry on 3rd flr to new location, new layout for bath 204, removal of 5 windows & replacement of one window in-kind @ north facade. | $10,000 |
| Feb 12, 2026 | In progress filed Feb 2026, not yet issued | 601 Laguna St | W E Lyons Construction Co | pacifica sfo is renovating an existing residential care facility for the elderly into an adult residential facility for sf dph as part of a purchase agreement with ccsf. the scope of work includes repair, replacement & or restoration of finishes, replacement of hvac equipment, accessibility upgradesDetails
pacifica sfo is renovating an existing residential care facility for the elderly into an adult residential facility for sf dph as part of a purchase agreement with ccsf. the scope of work includes repair, replacement & or restoration of finishes, replacement of hvac equipment, accessibility upgrades | $1,264,297 |
| Jan 20, 2026 | In progress issued Jan 2026 | 3701 Buchanan St | Acg Construction Inc | foundation revision to 202210033598. remove brick and concrete footings at exterior wall on gridline d and 7 and extending new mat slab under walls.Details
foundation revision to 202210033598. remove brick and concrete footings at exterior wall on gridline d and 7 and extending new mat slab under walls. | |
| Dec 29, 2025 | In progress issued May 2026 | 201 Buena Vista East Av | Krekow Jennings Inc. | permit amendment to bpa #202401043396 to include the renovation to first-floor unit with structural improvements, and modifications to the terrace, courtyard, and yard.Details
permit amendment to bpa #202401043396 to include the renovation to first-floor unit with structural improvements, and modifications to the terrace, courtyard, and yard. | $250,000 |
| Dec 23, 2025 | Expired or cancelled withdrawn May 2026 | 2011 Filbert St | construct rear 1-story, type 5b accessory building - office/exercise room with full bathroom as part of unit #1.Details
construct rear 1-story, type 5b accessory building - office/exercise room with full bathroom as part of unit #1. | $50,000 | |
| Dec 18, 2025 | In progress issued May 2026 | 2360 Washington St | Thompson Suskind L P | revision to pa 202305177995 layout changes to 1st fl layount; 2nd fl layout & 3rd floor layout; new interior stair; reduced scope @ 3rd fl & roof; reduced horizontal addition - more existing roof line to remainDetails
revision to pa 202305177995 layout changes to 1st fl layount; 2nd fl layout & 3rd floor layout; new interior stair; reduced scope @ 3rd fl & roof; reduced horizontal addition - more existing roof line to remain | |
| Nov 25, 2025 | In progress issued Dec 2025 | 1279 34th Av | Elux Construction Inc | partial conversion of a 1st fl garage into habitable space including the creation of a new opening into the rear yard. no exterior additions to the (e) garage footprint are proposed. dwelling unit count to remain.Details
partial conversion of a 1st fl garage into habitable space including the creation of a new opening into the rear yard. no exterior additions to the (e) garage footprint are proposed. dwelling unit count to remain. | $150,000 |
| Oct 20, 2025 | Completed final sign-off Aug 2026 | 3294 Clay St | Msa Framing | unit #6: refinish floors, replace (e) windows retrofit street facing, plumbing, electrical, hvac, carpentry, exterior 2 deck including railings. 2 bathroom replace in-kind. hvac: 2 fans, electrical heater, exterior dormer.Details
unit #6: refinish floors, replace (e) windows retrofit street facing, plumbing, electrical, hvac, carpentry, exterior 2 deck including railings. 2 bathroom replace in-kind. hvac: 2 fans, electrical heater, exterior dormer. | $250,000 |
| Oct 17, 2025 | In progress issued Jan 2026 | 231 West Portal Av | Westport Construction | no-plans, non-structural demolition of a vacant tenant space per ab-017. reference p/a 2025-1017-7580 for similar p/a in another tenant space in the building.Details
no-plans, non-structural demolition of a vacant tenant space per ab-017. reference p/a 2025-1017-7580 for similar p/a in another tenant space in the building. | |
| Sep 12, 2025 | In progress issued Oct 2025 | 352 17th Av | Forma Construction | remodel kitchen, sunroom, and bathroom on 1st level.Details
remodel kitchen, sunroom, and bathroom on 1st level. | $10,000 |
| Sep 11, 2025 | In progress issued Sep 2025 | 231 West Portal Av | Westport Construction | demo existing non-structural partitions and non-structural ceiling joists. ab-17Details
demo existing non-structural partitions and non-structural ceiling joists. ab-17 | $20,000 |
| Sep 10, 2025 | In progress issued Oct 2025 | 119 26th Av | Forma Construction | new stairs at 2/f. remove post at basement and bearing wall piers at 2/f. add new windows and doors at west (rear) elevation of building at basement and 2/f.Details
new stairs at 2/f. remove post at basement and bearing wall piers at 2/f. add new windows and doors at west (rear) elevation of building at basement and 2/f. | $50,000 |
| Aug 19, 2025 | Completed final sign-off Feb 2026 | 751 36th Av | S A Baxter Inc. | amend 202505297470 for additional work: removal & replacement of all stucco at the facade only. all work in-kind. no structural work.Details
amend 202505297470 for additional work: removal & replacement of all stucco at the facade only. all work in-kind. no structural work. | $10,000 |
| Aug 19, 2025 | Completed final sign-off Mar 2026 | 739 36th Av | S A Baxter Inc. | revision 202505297468- to include replacement of rot damaged rim joists and removal and replacement of all stucco at the facade and rear facing exterior wall in kindDetails
revision 202505297468- to include replacement of rot damaged rim joists and removal and replacement of all stucco at the facade and rear facing exterior wall in kind | $15,000 |
| Aug 19, 2025 | Completed final sign-off Mar 2026 | 757 36th Av | S A Baxter Inc. | expansion of scope to 202505297469- to include replacement of rot damaged rim joists and removal and replacement of all stucco at the facade and rear facing exterior wall in kindDetails
expansion of scope to 202505297469- to include replacement of rot damaged rim joists and removal and replacement of all stucco at the facade and rear facing exterior wall in kind | $15,000 |
| Jun 11, 2025 | In progress issued Jun 2025 | 3536 22nd St | Mission Home Remodeling Inc | revision to pa# 2025-0416-4505 (foundation)Details
revision to pa# 2025-0416-4505 (foundation) | $80,000 |
| May 16, 2025 | Completed final sign-off Mar 2026 | 418 Liberty St | Aaron Gordon Construction Inc | revision to 202209212864, 202210275300, and 202212098030. update wall, floor, ceiling details to reflect e conditions. remove non required fire rated construction details. revisoini to roofdeck. (no change to net area), exterior doors, windows, guardrail,rear yard stair.Details
revision to 202209212864, 202210275300, and 202212098030. update wall, floor, ceiling details to reflect e conditions. remove non required fire rated construction details. revisoini to roofdeck. (no change to net area), exterior doors, windows, guardrail,rear yard stair. | |
| May 6, 2025 | Completed final sign-off Feb 2026 | 2105 Broderick St | Aspect Builders Llc. | voluntary brick foundation improvement with a layer of reinforced shotcrete overlay.Details
voluntary brick foundation improvement with a layer of reinforced shotcrete overlay. | $100,000 |
| Apr 16, 2025 | In progress issued May 2025 | 3536 22nd St | Mission Home Remodeling Inc | whole home remodel: add bathrooms at 1st and 2nd level. remove fireplace & chimney, replace w/gas fireplace & flue. replace electrical wiring & outlets throughout. selective demo of interior spaces remodel kitchen & bath. (n) appliances fixtures & finishes. mep under separate permitDetails
whole home remodel: add bathrooms at 1st and 2nd level. remove fireplace & chimney, replace w/gas fireplace & flue. replace electrical wiring & outlets throughout. selective demo of interior spaces remodel kitchen & bath. (n) appliances fixtures & finishes. mep under separate permit | $478,000 |
| Feb 14, 2025 | In progress filed Feb 2025, not yet issued | 2504 Scott St | horizontal expansion of garage to the est. at 1st level, new unconditioned spa and interior renovation of the hall north of the spa. at 2nd fl, new unconditioned attic space at the rear of garage.Details
horizontal expansion of garage to the est. at 1st level, new unconditioned spa and interior renovation of the hall north of the spa. at 2nd fl, new unconditioned attic space at the rear of garage. | $45,000 | |
| Feb 10, 2025 | Completed final sign-off Sep 2025 | 3630 Jackson St | Forma Construction | cosmetic remodeling of fireplace at first floor living room.Details
cosmetic remodeling of fireplace at first floor living room. | $10,000 |
| Jan 3, 2025 | Completed final sign-off Jul 2025 | 78 Wawona St | Reveal Partners | revision to pa 202410032243 sheet s-200, site change to foundation designDetails
revision to pa 202410032243 sheet s-200, site change to foundation design | |
| Dec 3, 2024 | In progress issued Sep 2025 | 505 Burnett Av | erect a type vb, (4) story w/ basement two family dwelling.Details
erect a type vb, (4) story w/ basement two family dwelling. | $1,000,000 | |
| Nov 22, 2024 | Completed final sign-off Jan 2026 | 2250 Green St | Mulhall Construction Inc. | voluntary seismic upgrade per cebc 2022 ch-a4 on ground floor. 1st floor and 2nd floor.Details
voluntary seismic upgrade per cebc 2022 ch-a4 on ground floor. 1st floor and 2nd floor. | $100,000 |
| Oct 3, 2024 | Completed final sign-off Jul 2025 | 78 Wawona St | Reveal Partners | replace lower bathroom in kind. add a landing for bath fl. foundation replacement in the vicinity of the bathDetails
replace lower bathroom in kind. add a landing for bath fl. foundation replacement in the vicinity of the bath | $880,000 |
| Sep 23, 2024 | Completed final sign-off Mar 2026 | 418 Liberty St | Aaron Gordon Construction Inc | rev to pa# 202209212864, pa# 20221298030 & pa# 202210275300 to change e.o.r. & include revision to replace building foundation with mat slab & replace retaining wall @ garage to backyard transition. minor revision to shear wall length & beam sizes @ upper floors. minor revision to framing details.Details
rev to pa# 202209212864, pa# 20221298030 & pa# 202210275300 to change e.o.r. & include revision to replace building foundation with mat slab & replace retaining wall @ garage to backyard transition. minor revision to shear wall length & beam sizes @ upper floors. minor revision to framing details. | $200,000 |
| Sep 20, 2024 | In progress issued May 2025 | 239 Bartlett St | Gech Inc. | revision to 202208090177. revise rear stair.Details
revision to 202208090177. revise rear stair. | $6,000 |
| Aug 6, 2024 | Completed final sign-off May 2025 | 288 29th Av | Colindres & Associates | basement: revision to permit 202404230539 and 202403067211: reframe ceiling at lower interior stair landing and match of ceiling joists at new bathroom. relocate bar. revise bathroom location.Details
basement: revision to permit 202404230539 and 202403067211: reframe ceiling at lower interior stair landing and match of ceiling joists at new bathroom. relocate bar. revise bathroom location. | |
| May 31, 2024 | Expired or cancelled expired May 2026 | 3662 Clay St | Clayton Timbrell & Co | revision 202402065307: revision to interior stair framing & n) skylight, demo e) winddow at stair wall & add additional windows. new additional 9 sf at breakfast nookDetails
revision 202402065307: revision to interior stair framing & n) skylight, demo e) winddow at stair wall & add additional windows. new additional 9 sf at breakfast nook | $50,000 |
| Apr 23, 2024 | Completed final sign-off Feb 2025 | 288 29th Av | Colindres & Associates | replace foundation for the north, south and west walls of the speakeasy room, reinforce the exiting drop beam in the speakeasy roomDetails
replace foundation for the north, south and west walls of the speakeasy room, reinforce the exiting drop beam in the speakeasy room | $35,000 |
| Apr 18, 2024 | Expired or cancelled expired Mar 2026 | 1362 36th Av | Dotto Construction Co | excavation and separation of common foundation between 1366 36th ave and subject property for approved foundation work under pa# 202205103951 (1366 36th ave). to comply with nov 202421455Details
excavation and separation of common foundation between 1366 36th ave and subject property for approved foundation work under pa# 202205103951 (1366 36th ave). to comply with nov 202421455 | |
| Apr 18, 2024 | Expired or cancelled expired Mar 2026 | 1370 36th Av | Dotto Construction Co | excavation and separation of common foundation between 1366 36th ave and subject property for approved foundation work under pa# 202205103951 (1366 36th ave). to comply with nov 202421458Details
excavation and separation of common foundation between 1366 36th ave and subject property for approved foundation work under pa# 202205103951 (1366 36th ave). to comply with nov 202421458 | |
| Feb 8, 2024 | Completed final sign-off Feb 2025 | 201 Buchanan St | O'connor Pipelines Inc, Pioneer Builders, O'shaughnessy Construction | replacement of existing brick retaining wall new with new reinforced cmu retaining wall at front. existing iron fence to be repaired and reinstalled.Details
replacement of existing brick retaining wall new with new reinforced cmu retaining wall at front. existing iron fence to be repaired and reinstalled. | $250,000 |
| Jan 17, 2024 | Completed final sign-off Apr 2025 | 18 Caselli Av | Seismic Retrofitters Inc. | voluntary structural retrofit (upgrade) of basement & foundationDetails
voluntary structural retrofit (upgrade) of basement & foundation | $65,000 |
| Jan 4, 2024 | In progress issued Nov 2025 | 201 Buena Vista East Av | Krekow Jennings Inc. | seismic foundation improvement. addition of deck and stair to improve second egress. terrace, yard and landscape improvements. renovation to accomodate trash area w/i pl. freestanding arbor. sidewalk planting improvements and sidewalk repair in row.Details
seismic foundation improvement. addition of deck and stair to improve second egress. terrace, yard and landscape improvements. renovation to accomodate trash area w/i pl. freestanding arbor. sidewalk planting improvements and sidewalk repair in row. | $200,000 |
| Jan 4, 2024 | In progress issued Feb 2026 | 215 Buena Vista East Av | Krekow Jennings Inc. | site improvements including new terraces, stairs, walls and landscape.Details
site improvements including new terraces, stairs, walls and landscape. | $200,000 |
| Nov 3, 2023 | Completed final sign-off Mar 2024 | 600 Battery St | Bcci Construction Company | revision to addendum 1 to site permit 202211216981, this permit revision adds notes of existing foundation information for record. install dayton type 2 mechanical couplers to connect exist. rebars.Details
revision to addendum 1 to site permit 202211216981, this permit revision adds notes of existing foundation information for record. install dayton type 2 mechanical couplers to connect exist. rebars. | |
| Aug 10, 2023 | Completed final sign-off Oct 2023 | 2 05th Av | Eastwood Development Incorporated | permeation grouting of the soils along the existing foundation.Details
permeation grouting of the soils along the existing foundation. | $8,000 |
| Aug 4, 2023 | Completed final sign-off Mar 2024 | 84 Commonwealth Av | Colindres & Associates | revision to 202203089446. repair/reconstruction of northwest chimney due to (e) structual damage.Details
revision to 202203089446. repair/reconstruction of northwest chimney due to (e) structual damage. | $1,000 |
| May 17, 2023 | In progress issued Dec 2024 | 2360 Washington St | Thompson Suskind L P | rear horizontal addition at second floor, and horizontal additions to east, west, and north sides at third floor. interior alterations at all levels including a new elevator that will serve all floors. new occupied roof at rear of third floor.Details
rear horizontal addition at second floor, and horizontal additions to east, west, and north sides at third floor. interior alterations at all levels including a new elevator that will serve all floors. new occupied roof at rear of third floor. | $900,000 |
| Dec 19, 2022 | In progress issued Feb 2025 | 228 Jersey St | 415 Remodeling Inc, Aaron Gordon Construction Inc | renovation of an (e) 2-story single family home, including: (1) demo (e) rear yard porch, (2) new single story addition at rear, (3) new interior wall layout, (4) replacing existing foundation w/ associated excavation work, (5) repair/replace exterior finishes, (6) replacing exterior windows & doorsDetails
renovation of an (e) 2-story single family home, including: (1) demo (e) rear yard porch, (2) new single story addition at rear, (3) new interior wall layout, (4) replacing existing foundation w/ associated excavation work, (5) repair/replace exterior finishes, (6) replacing exterior windows & doors | $400,000 |
| Nov 23, 2022 | Completed final sign-off Nov 2023 | 776 Carolina St | Murphymckenna Construction | revision to bpa#202209293460 replace in-kind (e) concrete wall @ front entry (rev to original bpa# 201812067579Details
revision to bpa#202209293460 replace in-kind (e) concrete wall @ front entry (rev to original bpa# 201812067579 | $10,000 |
| Oct 3, 2022 | In progress issued Jun 2024 | 3701 Buchanan St | Acg Construction Inc | core and shell improvements and compliance with abeDetails
core and shell improvements and compliance with abe | $500,000 |
| May 18, 2022 | Never finaled issued Aug 2023, no final | 1366 36th Av | Dotto Construction Co | to renovate the (e) second and third flr of the main residence complete. to add new bedroom and a bathroom on the third flr addition. legalize the (e) first flr dwelling unit under separate application#202205103951 sDetails
to renovate the (e) second and third flr of the main residence complete. to add new bedroom and a bathroom on the third flr addition. legalize the (e) first flr dwelling unit under separate application#202205103951 s | $275,000 |
| May 10, 2022 | Never finaled issued Aug 2023, no final | 1366 36th Av | Dotto Construction Co | to respond to nov 2020-004900enf and legalize the (e) first flr dwelling unit.Details
to respond to nov 2020-004900enf and legalize the (e) first flr dwelling unit. | $75,000 |
| Mar 31, 2022 | Completed final sign-off May 2022 | 88 Turquoise Wy | Aaron Gordon Construction Inc | replace in-kind (e) 152 sf deck with (n) ipe decking. (n) ipe posts, & (n) steel cable rail sitting on (e) steel beams to remain, built to (e) footprint.Details
replace in-kind (e) 152 sf deck with (n) ipe decking. (n) ipe posts, & (n) steel cable rail sitting on (e) steel beams to remain, built to (e) footprint. | $10,000 |
| Mar 16, 2022 | Never finaled issued Mar 2022, no final | 37 Rivoli St | Dollard Construction Inc. | revision to pa 202009093815 - new concrete wall in rear of property. cap existing concrete wallDetails
revision to pa 202009093815 - new concrete wall in rear of property. cap existing concrete wall | $20,000 |
| Mar 8, 2022 | Completed final sign-off Mar 2024 | 84 Commonwealth Av | Colindres & Associates | interior renovation on all levels, facade aleration at rear wall, installation of elevator.Details
interior renovation on all levels, facade aleration at rear wall, installation of elevator. | $195,000 |
| Jan 7, 2022 | Completed final sign-off Feb 2022 | 201 Buena Vista East Av | renew 201504083133 for final inspectionDetails
renew 201504083133 for final inspection | ||
| Dec 23, 2021 | Completed final sign-off Apr 2024 | 84 Commonwealth Av | Colindres & Associates | renovation of basement level and new stair to 1/f. work includes excavation for rooms down and new foundation.Details
renovation of basement level and new stair to 1/f. work includes excavation for rooms down and new foundation. | $240,000 |
| Dec 7, 2021 | Completed final sign-off Nov 2022 | 101 Horne Av | Navarro Concrete Construction | exterior: install a new concrete slab for the (e) propane tank on southeast corner of building.Details
exterior: install a new concrete slab for the (e) propane tank on southeast corner of building. | $1,000 |
| Nov 19, 2021 | In progress issued Jul 2024 | 814 31st Av | finish basement as new space. add (1) bedroom and (1) bathroom to house. new front steps to be in row (compliant). new skylight at roof.Details
finish basement as new space. add (1) bedroom and (1) bathroom to house. new front steps to be in row (compliant). new skylight at roof. | $296,000 | |
| Nov 17, 2021 | In progress issued Aug 2024 | 814 31st Av | deck and stair addition to back of houseDetails
deck and stair addition to back of house | $68,000 | |
| Sep 15, 2021 | Completed final sign-off Sep 2024 | 47 Jordan Av | J M K Construction Inc, Di Vine Construction | rooms down to lower floor of e crawlspace and basement to add media room, office, guest room to create patio area outside at the level of basement for bike storage.Details
rooms down to lower floor of e crawlspace and basement to add media room, office, guest room to create patio area outside at the level of basement for bike storage. | $75,000 |
| Aug 4, 2021 | Never finaled issued Aug 2021, no final | 850 Powell St | Wickman Development And Construction | revision to pa 021-0426-9291 repair of existing steel beams on grade within garhoe. also replacement of concrete lid over access in-kindDetails
revision to pa 021-0426-9291 repair of existing steel beams on grade within garhoe. also replacement of concrete lid over access in-kind | $40,000 |
| Jul 28, 2021 | Completed final sign-off May 2023 | 450 Sansome St | Gci, Inc | 16/f: demo non-structural partitions, fixtures, millwork & finishes. construction of new non-structural partitions, fixtures, millwork & finishes. structural support (1) moveable partitionDetails
16/f: demo non-structural partitions, fixtures, millwork & finishes. construction of new non-structural partitions, fixtures, millwork & finishes. structural support (1) moveable partition | $692,514 |
| Feb 16, 2021 | Completed final sign-off Sep 2021 | 303 Oak St | Aspect Builders Llc. | revision to pa# 201912139560. partial replacement of (e) brick foundation with new concrete foundation at storage area.Details
revision to pa# 201912139560. partial replacement of (e) brick foundation with new concrete foundation at storage area. | $5,000 |
| Jan 20, 2021 | Completed final sign-off Sep 2026 | 2011 Filbert St | Ace Drilling & Excavation | to erect 4 stories, no basement, type v-b, 2-unit residenceDetails
to erect 4 stories, no basement, type v-b, 2-unit residence | $1,675,000 |
| Nov 17, 2020 | Completed final sign-off Oct 2021 | 26 Topaz Wy | Aaron Gordon Construction Inc | selectrive structural improvements of floor framing; add laundry on lower floor.Details
selectrive structural improvements of floor framing; add laundry on lower floor. | $10,000 |
| Oct 17, 2020 | Completed final sign-off Feb 2022 | 225 Ashton Av | add new half-bath on 1/f. new rear deck on 1/f & new exterior deck at 2/f. fill in under (e) room on posts. new rear garage door for access into the rear yard. new pavers in rear yard. interior renovations per plans.Details
add new half-bath on 1/f. new rear deck on 1/f & new exterior deck at 2/f. fill in under (e) room on posts. new rear garage door for access into the rear yard. new pavers in rear yard. interior renovations per plans. | $94,500 | |
| Dec 13, 2019 | Completed final sign-off Sep 2021 | 303 Oak St | Aspect Builders Llc. | voluntary structural improvements at storage area on ground level. no work in unit #1. building is exempt from sfbc chapter 34b.Details
voluntary structural improvements at storage area on ground level. no work in unit #1. building is exempt from sfbc chapter 34b. | $35,000 |
| Oct 10, 2019 | Completed final sign-off Nov 2021 | 612 Howard St | J..H. Construction Co./John A Huerta Co | t.i. new convenience stairDetails
t.i. new convenience stair | $2,000 |
| Oct 7, 2019 | Never finaled issued Nov 2019, no final | 844 Duncan St | Clayton Timbrell & Co | remove wall in master bedroom. ducument slight layout change to bathrooms and kitchen (without wall layout change) under separate pa 201909303017Details
remove wall in master bedroom. ducument slight layout change to bathrooms and kitchen (without wall layout change) under separate pa 201909303017 | $40,000 |
| Sep 30, 2019 | Completed final sign-off Jan 2021 | 151 Saturn St | Saturn Construction Co | interior remodel including new stair, bathroom and storage rooms, new partitionsDetails
interior remodel including new stair, bathroom and storage rooms, new partitions | $50,000 |
| Jun 10, 2019 | Never finaled issued Jun 2019, no final | 37 05th Av | Acri Ddc | reinforcing the interior north retaining wall and replace the west interior retaining wall in kind in the mechanical room. mitigating settlement @ rear of house using helical anchorsDetails
reinforcing the interior north retaining wall and replace the west interior retaining wall in kind in the mechanical room. mitigating settlement @ rear of house using helical anchors | $5,000 |
| May 23, 2019 | Completed final sign-off May 2019 | 1160 Green St | Bailey General Contracting Co Inc | rev to pa201709148106 - structural/framing; for mandatory soft-story retrofit for soft story mandate using iebc ch.a4.Details
rev to pa201709148106 - structural/framing; for mandatory soft-story retrofit for soft story mandate using iebc ch.a4. | $5,000 |
| May 23, 2019 | Expired or cancelled withdrawn May 2025 | 49 Walter St | rev to pa201808217918. structural/framing for soft-story retrofit per soft-story mandate using iebc ch.a4.Details
rev to pa201808217918. structural/framing for soft-story retrofit per soft-story mandate using iebc ch.a4. | $5,000 | |
| May 8, 2019 | Completed final sign-off Jul 2020 | 2014 17th Av | Colvin Construction Dba A A Construction | voluntary seismic retrofit of single family residence. n/a for maher.Details
voluntary seismic retrofit of single family residence. n/a for maher. | $10,000 |
| Apr 19, 2019 | Completed final sign-off Oct 2021 | 1707 Jones St | Brady Construction Inc | interior remodel, new windows at side & rear facades, partial basement excavation.Details
interior remodel, new windows at side & rear facades, partial basement excavation. | $225,000 |
| Feb 4, 2019 | Never finaled issued Feb 2019, no final | 37 05th Av | Acri Ddc | replacement of front entry stairs.Details
replacement of front entry stairs. | $1,000 |
| Nov 21, 2018 | Completed final sign-off Jul 2020 | 1205 04th Av | A -1 Roof Management & Construction, Inc | minor wood framing repair at wood deck and common stair beam. less than 50%. to comply w/his nov #201787731, dated 7/3/2017, item #7Details
minor wood framing repair at wood deck and common stair beam. less than 50%. to comply w/his nov #201787731, dated 7/3/2017, item #7 | $20,000 |
| Aug 21, 2018 | Completed final sign-off May 2025 | 49 Walter St | Bailey General Contracting Co Inc | soft story retrofit per sfebc chaper 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chaper 4d: 2016 cebc appendix a-4 | $20,000 |
| Aug 15, 2018 | Completed final sign-off Apr 2019 | 1159 Church St | Stonebridge Construction Inc | revision to 201802221987, remove selected partitions at 2nd fl kitchen and living rmDetails
revision to 201802221987, remove selected partitions at 2nd fl kitchen and living rm | $9,500 |
| May 8, 2018 | Completed final sign-off Feb 2019 | 163 Dorchester Wy | revision to existing permit #201804237094, for interior kitchen & bath remodel without plans. scope of revision is removal of (e) wall at kitchen/dining room and installation of new beam & posts; shear walls, holdowns at foundation per plans.Details
revision to existing permit #201804237094, for interior kitchen & bath remodel without plans. scope of revision is removal of (e) wall at kitchen/dining room and installation of new beam & posts; shear walls, holdowns at foundation per plans. | $2,000 | |
| Apr 19, 2018 | Expired or cancelled expired Sep 2020 | 926 Taylor St | Westgate Renovators Inc | revision to 201708225561 revision to sheets s-2.0 & s-3.1 detail 14Details
revision to 201708225561 revision to sheets s-2.0 & s-3.1 detail 14 | $2,000 |
| Apr 10, 2018 | Completed final sign-off Nov 2021 | 1754 Fell St | Crown Construction San Francisco | basement: new foundation, replace (e) rear ratining walls; new ext. openings/int. layout; 1/f: new ext. door @ kitchen, new wood deck/stone patio, new ext. stair to basement; 2/f: new bathroom & closets, remove (e) brick chimney @ rear - not visible from street.Details
basement: new foundation, replace (e) rear ratining walls; new ext. openings/int. layout; 1/f: new ext. door @ kitchen, new wood deck/stone patio, new ext. stair to basement; 2/f: new bathroom & closets, remove (e) brick chimney @ rear - not visible from street. | $100,000 |
| Mar 9, 2018 | Completed final sign-off Aug 2018 | 668 Page St | Mulhall Construction Inc. | revision to app#201707111583. removal of interior walls and addition of shearwalls per soft story retrofit. electie work done by the owner is not to be passed onto the other tenants to pay. soft story retrofit per sfebc capter 4d: 2016 cebc appendix a-4Details
revision to app#201707111583. removal of interior walls and addition of shearwalls per soft story retrofit. electie work done by the owner is not to be passed onto the other tenants to pay. soft story retrofit per sfebc capter 4d: 2016 cebc appendix a-4 | $1,000 |
| Mar 2, 2018 | Never finaled issued Mar 2018, no final | 643 Edna St | 415 Remodeling Inc | remodel of 1st flr to include kitchen and dining room and adding guest bathroom. remodel master bathroom on 2nd flr. reframe interior stair & garage foundation replacementDetails
remodel of 1st flr to include kitchen and dining room and adding guest bathroom. remodel master bathroom on 2nd flr. reframe interior stair & garage foundation replacement | $46,000 |
| Feb 5, 2018 | Completed final sign-off Mar 2019 | 3647 Washington St | J M K Construction Inc | revision to 201705116326 revised dormer structural work and revised skylight structural work maher naDetails
revision to 201705116326 revised dormer structural work and revised skylight structural work maher na | |
| Feb 5, 2018 | Completed final sign-off Mar 2019 | 3647 Washington St | J M K Construction Inc | revision to 201702179644 revised interior layout and foundation changes maher naDetails
revision to 201702179644 revised interior layout and foundation changes maher na | |
| Jan 26, 2018 | Completed final sign-off Feb 2018 | 624 Wawona St | Jln Builders | repair replacing of exiting footting at property line. (4 feet)Details
repair replacing of exiting footting at property line. (4 feet) | $1,000 |
| Jan 12, 2018 | Completed final sign-off Jul 2019 | 1319 46th Av | Aspect Builders Llc. | mandatory retrofit of soft story using fema p-807Details
mandatory retrofit of soft story using fema p-807 | $10,000 |
| Nov 30, 2017 | Completed final sign-off Feb 2019 | 47 Noe St | Bailey General Contracting Co Inc | soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $50,000 |
| Oct 26, 2017 | Completed final sign-off Dec 2018 | 1469 Mcallister St | Karah Construction Co | remove one door to rear deck & one window, replace with folding panel door system., (nanwall).Details
remove one door to rear deck & one window, replace with folding panel door system., (nanwall). | $14,000 |
| Sep 14, 2017 | Completed final sign-off Sep 2019 | 3535 Washington St | Bailey General Contracting Co Inc | soft story retrofit per sfebc chapter 4d, engineering criteria, 2016 cebc appendix a-4. no exterior work.Details
soft story retrofit per sfebc chapter 4d, engineering criteria, 2016 cebc appendix a-4. no exterior work. | $60,000 |
| Sep 14, 2017 | Completed final sign-off Sep 2019 | 3541 Washington St | Bailey General Contracting Co Inc | soft story retrofit per sfebc chapter 4d, engineering criteria, 2016 cebc appendix a-4. no exterior work.Details
soft story retrofit per sfebc chapter 4d, engineering criteria, 2016 cebc appendix a-4. no exterior work. | $60,000 |
| Sep 14, 2017 | Completed final sign-off May 2019 | 1158 Green St | Bailey General Contracting Co Inc | soft story retrofit per sfebc ch4d-2016 iebc appendex a-4.Details
soft story retrofit per sfebc ch4d-2016 iebc appendex a-4. | $80,000 |
| Sep 12, 2017 | Expired or cancelled withdrawn Dec 2017 | 1466 25th Av | Andrew Moore Consulting, Turley Construction | new rear deck & stair for single family residence.Details
new rear deck & stair for single family residence. | $10,000 |
| Aug 22, 2017 | Expired or cancelled expired Sep 2020 | 926 Taylor St | Westgate Renovators Inc | mandatory soft story retrofit per soft story mandate using iebc ch a4Details
mandatory soft story retrofit per soft story mandate using iebc ch a4 | $50,000 |
| Aug 21, 2017 | Completed final sign-off May 2018 | 4545 18th St | lower unit (1st floor) - work to include renovation kitchen & bath, replace (e) window with a door, minimal exterior structural work. add one bedroom and bath. soft story work on first floor.Details
lower unit (1st floor) - work to include renovation kitchen & bath, replace (e) window with a door, minimal exterior structural work. add one bedroom and bath. soft story work on first floor. | $149,951 | |
| Aug 18, 2017 | Expired or cancelled expired Sep 2022 | 3824 18th St | Wickman Development And Construction | soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $40,000 |
| Aug 16, 2017 | Completed final sign-off Aug 2017 | 3821 Jackson St | Baywest Remodeling Construction Inc | revision to 201701278077, change from structural steel fabricated support to sister lvl w joist hanger. remove special inspection requirment by orig pa#201701278077.Details
revision to 201701278077, change from structural steel fabricated support to sister lvl w joist hanger. remove special inspection requirment by orig pa#201701278077. | |
| Jul 21, 2017 | Expired or cancelled withdrawn Aug 2018 | 1319 46th Av | Aspect Builders Llc. | mandatory retrofit of soft story using fema p-807Details
mandatory retrofit of soft story using fema p-807 | $10,000 |