Block 0843, lot 015
676 Page St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 31, 2023 | Completed final sign-off Sep 2023 | 676 Page St | Harmony Design & Development Inc | interior remodel in unit 676 page st. remodel existing bathroom (4th fl)Details
interior remodel in unit 676 page st. remodel existing bathroom (4th fl) | $12,000 |
| Sep 12, 2022 | Completed final sign-off May 2023 | 668 Page St | Gadi Construction Inc | all work to be done within the existing boundary of the building. revision to 202109037758. remove kitchen remodel work from scope. remove roposed closet indressing room. remove proposed 2nd window in dressing room. change bathroom w sliding doorDetails
all work to be done within the existing boundary of the building. revision to 202109037758. remove kitchen remodel work from scope. remove roposed closet indressing room. remove proposed 2nd window in dressing room. change bathroom w sliding door | |
| Mar 15, 2022 | Completed final sign-off Aug 2022 | 672 Page St | Untitled Labs Inc Dba Made Renovation | 3/f: expand existing 56.8 sq.ft. bathroom into adjacent closets. add new partition wall to create 2 bathrooms totaling 98 sq.ft. bath a: 40 sf with all new curbed shower, toilet, and vanity. bath b: 58 sf replace existing with new tub/shower, toilet, and vanity. no structural work.Details
3/f: expand existing 56.8 sq.ft. bathroom into adjacent closets. add new partition wall to create 2 bathrooms totaling 98 sq.ft. bath a: 40 sf with all new curbed shower, toilet, and vanity. bath b: 58 sf replace existing with new tub/shower, toilet, and vanity. no structural work. | $30,000 |
| Sep 3, 2021 | Never finaled issued Feb 2022, no final | 668 Page St | #668: interior kitchen and bath remodel of 1 unit. includes new finishes and fixtures, electrical, plumbing, and minor structural.Details
#668: interior kitchen and bath remodel of 1 unit. includes new finishes and fixtures, electrical, plumbing, and minor structural. | $50,000 | |
| Jan 30, 2020 | Completed final sign-off May 2021 | 670 Page St | remodel kitchen and bathrooms.Details
remodel kitchen and bathrooms. | $82,000 | |
| Feb 25, 2019 | Never finaled issued Feb 2019, no final | 674 Page St | street spaceDetails
street space | ||
| Nov 14, 2018 | Completed final sign-off Oct 2019 | 674 Page St | Talcon Builders | full remodel of kitchen and 1 bathrooms, including electrical, mechanical, plumbing and minor structural. total area of work 358.5 sq ft. no work visible from street. addition of 2nd full bathDetails
full remodel of kitchen and 1 bathrooms, including electrical, mechanical, plumbing and minor structural. total area of work 358.5 sq ft. no work visible from street. addition of 2nd full bath | $125,000 |
| Oct 22, 2018 | Never finaled issued Oct 2018, no final | 668 Page St | street spaceDetails
street space | ||
| Mar 9, 2018 | Completed final sign-off Aug 2018 | 668 Page St | Mulhall Construction Inc. | revision to app#201707111583. removal of interior walls and addition of shearwalls per soft story retrofit. electie work done by the owner is not to be passed onto the other tenants to pay. soft story retrofit per sfebc capter 4d: 2016 cebc appendix a-4Details
revision to app#201707111583. removal of interior walls and addition of shearwalls per soft story retrofit. electie work done by the owner is not to be passed onto the other tenants to pay. soft story retrofit per sfebc capter 4d: 2016 cebc appendix a-4 | $1,000 |
| Jul 11, 2017 | Completed final sign-off Aug 2018 | 668 Page St | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $20,000 |
| Apr 5, 2017 | Completed final sign-off May 2017 | 668 Page St | to obstain a final inspection for work alredy approved uner pa# 201408063121 & 201103313220, all work is completeDetails
to obstain a final inspection for work alredy approved uner pa# 201408063121 & 201103313220, all work is complete | ||
| Aug 6, 2014 | Completed final sign-off May 2017 | 668 Page St | to comply with physical inspection report #cc-7743Details
to comply with physical inspection report #cc-7743 | $4,000 | |
| Mar 31, 2011 | Completed final sign-off May 2017 | 668 Page St | Grace Roofing & Construction | reroofing address: 668-678 page st.Details
reroofing address: 668-678 page st. | $15,500 |
| Sep 6, 2005 | Expired or cancelled cancelled Aug 2014 | 672 Page St | Cas Construction | repair scattered dryrot to rear stairs, less than 50%Details
repair scattered dryrot to rear stairs, less than 50% | $1,000 |
| May 13, 2004 | Completed final sign-off May 2004 | 668 Page St | Fox Structural & Termite | item 3a 3b of fox str. and termite report #10612 dated 3/21/03Details
item 3a 3b of fox str. and termite report #10612 dated 3/21/03 | $5,500 |
| Sep 11, 2002 | Completed final sign-off Oct 2002 | 668 Page St | repair rear stairs per nov 200229660Details
repair rear stairs per nov 200229660 | $500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.