Mike Hom
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Top Flange Design
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to May 2026
308 permits since 2000 (engineer on 252 permits, architect on 32 permits, authorized agent-others on 16 permits, designer on 5 permits, pmt consultant/expediter on 4 permits): 216 completed, 27 in progress, 24 never finaled, 41 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 308.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 4, 2026 | In progress issued May 2026 | 880 Pacheco St | Cej Construction Llc | revision to pa# 202410032261 and 202505297482 and 202509225809 at rear yard along north property line, modify retaining wall to inlcude a planter.Details
revision to pa# 202410032261 and 202505297482 and 202509225809 at rear yard along north property line, modify retaining wall to inlcude a planter. | |
| Apr 28, 2026 | In progress issued Apr 2026 | 145 Garcia Av | Ray Lui Construction Inc | add a bedroom, enclose balcony, add skylights, interior remodel on the 2nd fl. legalize bedroom and playroom on the 1st fl, remodel 1st fl, add 2 bathroom and laundy on 1st fl. infill one window on the 1st floor. replace all windows/doors. replace water heater and furnace. upgrade plumb/elec.Details
add a bedroom, enclose balcony, add skylights, interior remodel on the 2nd fl. legalize bedroom and playroom on the 1st fl, remodel 1st fl, add 2 bathroom and laundy on 1st fl. infill one window on the 1st floor. replace all windows/doors. replace water heater and furnace. upgrade plumb/elec. | $250,000 |
| Mar 19, 2026 | Expired or cancelled cancelled Jul 2026 | 1519 Ofarrell St | Northbay Home Construction Solutions Inc | reference to bpa 202512222412; floor framing alteration as a result of load-bearing wall removal. add new posts and footing to support re-distributed loads. this is not considered substantial structural alteration per engineer's evaluation. see s2.3Details
reference to bpa 202512222412; floor framing alteration as a result of load-bearing wall removal. add new posts and footing to support re-distributed loads. this is not considered substantial structural alteration per engineer's evaluation. see s2.3 | $6,500 |
| Mar 17, 2026 | In progress issued Mar 2026 | 620 02nd Av | Damar Construction And Remodeling Inc | revision to pa # 202512030805, scope of work is limited to the revised strucutral foundation plan and details, and shoring plans. no other changes to original scope of work.Details
revision to pa # 202512030805, scope of work is limited to the revised strucutral foundation plan and details, and shoring plans. no other changes to original scope of work. | |
| Feb 23, 2026 | In progress issued Feb 2026 | 1634 Dolores St | Vonnegut Thoreau Construction | level 1: interior work including remodel of (e) bathroom and new laundry. no proposed work on level 2.Details
level 1: interior work including remodel of (e) bathroom and new laundry. no proposed work on level 2. | $50,000 |
| Jan 27, 2026 | In progress issued Apr 2026 | 273 Vienna St | Hawk Hill Construction Inc | rebuild front staircaseDetails
rebuild front staircase | $5,000 |
| Dec 26, 2025 | In progress issued May 2026 | 163 07th Av | Pinnacle Remodeling Construction | provide steel beam at garage, partial 1/f lightwell infill. create full bath from 2/f water closet (unit 165). remodel kitchen and bath at 3/f (unit 163). modify roof terrace accessible from (e) 4th story. renovate bath. replace cabinetry at wet bar (unit 163)Details
provide steel beam at garage, partial 1/f lightwell infill. create full bath from 2/f water closet (unit 165). remodel kitchen and bath at 3/f (unit 163). modify roof terrace accessible from (e) 4th story. renovate bath. replace cabinetry at wet bar (unit 163) | $225,500 |
| Dec 19, 2025 | In progress issued Dec 2025 | 350 Lawton St | Sunset Builders Llc. | revision to permit 202510147313 to remove post at ground floor family room.Details
revision to permit 202510147313 to remove post at ground floor family room. | $10,000 |
| Dec 18, 2025 | In progress issued Apr 2026 | 2122 34th Av | Alder Construction | revision to permit 202506269590. conversion of (e) unconditioned garage space to new conditioned space including 2 bedrooms, 2 bathrooms and laundry closet.Details
revision to permit 202506269590. conversion of (e) unconditioned garage space to new conditioned space including 2 bedrooms, 2 bathrooms and laundry closet. | $175,000 |
| Dec 16, 2025 | In progress issued Jan 2026 | 913 Central Av | Liaison Landscapes Inc | revision to 202505146479: to eliminate 2 posts alter deck framingDetails
revision to 202505146479: to eliminate 2 posts alter deck framing | |
| Oct 27, 2025 | In progress issued Apr 2026 | 1407 Dolores St | A T Prime Builders | revision to permit 202508183269. interior remodel to (e) dwelling units on 2/f and 3/f including 2 (e) kitchens and bathroom and add 1 new bathroom per unit (2 total). add roof deck a top 2nd floor projection. rebuild rear stair in revised configuration. replace all windows and doors on 2nd and 3rdDetails
revision to permit 202508183269. interior remodel to (e) dwelling units on 2/f and 3/f including 2 (e) kitchens and bathroom and add 1 new bathroom per unit (2 total). add roof deck a top 2nd floor projection. rebuild rear stair in revised configuration. replace all windows and doors on 2nd and 3rd | $150,000 |
| Oct 3, 2025 | Completed final sign-off Jun 2026 | 723 46th Av | A+G Design+Build | infill of existing property-line lightwell with new roof and wall, structural framing changes. new skylights and parapet wall. replace ligthwell stair, and replace the kitchen and bath.Details
infill of existing property-line lightwell with new roof and wall, structural framing changes. new skylights and parapet wall. replace ligthwell stair, and replace the kitchen and bath. | $109,391 |
| Sep 22, 2025 | In progress issued Sep 2025 | 880 Pacheco St | Cej Construction Llc | revision to 202410032261 and 202505297482. at rear yard - (e) rear fence to remain, new fence to be built in-board from (e) fence. foundation to be replaced in a sequence of sections. add floor drains to new patio concrete slab. new drainage detail for landscape retaining walls.Details
revision to 202410032261 and 202505297482. at rear yard - (e) rear fence to remain, new fence to be built in-board from (e) fence. foundation to be replaced in a sequence of sections. add floor drains to new patio concrete slab. new drainage detail for landscape retaining walls. | |
| Sep 15, 2025 | In progress issued Sep 2025 | 3351 Jackson St | Axel8 Construction | revision to 202504164517. layout change in kitchen and pantry (scullery). pantry to be moved to south of kitchen, adjacent to primary bath. replacement of 2 windows in kitchen and 1 window in new pantry location with in-kind wood frame double-hung windows. new window locations due to layout change.Details
revision to 202504164517. layout change in kitchen and pantry (scullery). pantry to be moved to south of kitchen, adjacent to primary bath. replacement of 2 windows in kitchen and 1 window in new pantry location with in-kind wood frame double-hung windows. new window locations due to layout change. | $22,000 |
| Aug 4, 2025 | Completed final sign-off May 2026 | 1570 Sanchez St | Citidev Inc. | replace exterior front stairs. replace deck, fence and guardrail at rear yead. replace exterior doors and windows at rear yard. remove property line window and in-fill opening.Details
replace exterior front stairs. replace deck, fence and guardrail at rear yead. replace exterior doors and windows at rear yard. remove property line window and in-fill opening. | $25,000 |
| Jun 27, 2025 | In progress issued Aug 2025 | 666 Cayuga Av | Benjamin Shaw | 1/f - the project will condition an (e) 518 sq.ft storage area to a new bedroom, laundry area, and full bathroom. the (e) interior stairs will be relocated. 2 bathrooms and 3 closets on 2/f will be remodeled. one new door and one new window will replace 2 (e) windows at 1/f, rear of building.Details
1/f - the project will condition an (e) 518 sq.ft storage area to a new bedroom, laundry area, and full bathroom. the (e) interior stairs will be relocated. 2 bathrooms and 3 closets on 2/f will be remodeled. one new door and one new window will replace 2 (e) windows at 1/f, rear of building. | $85,000 |
| Jun 27, 2025 | Completed final sign-off Jun 2026 | 1500 06th Av | Connemara Fine Trim Inc Dba Highland Bui | revision to pa #202207198809. ref pa 202412136808. 1)new mech platform at roof. 2) framing revisions at decks. 3) new concreate footing at existing posts.Details
revision to pa #202207198809. ref pa 202412136808. 1)new mech platform at roof. 2) framing revisions at decks. 3) new concreate footing at existing posts. | $5,000 |
| Jun 18, 2025 | In progress filed Jun 2025, not yet issued | 2151 31st Av | rear horizontal addition and interior remodel. 1st fl: add a bedroom, extend family room, add a bathroom, relocate bathroom & remodel garage door. 2nd fl: add a master bedroom, with a (n) bathroom, remodel (e) bathroom and kitchenDetails
rear horizontal addition and interior remodel. 1st fl: add a bedroom, extend family room, add a bathroom, relocate bathroom & remodel garage door. 2nd fl: add a master bedroom, with a (n) bathroom, remodel (e) bathroom and kitchen | $250,000 | |
| May 30, 2025 | Completed final sign-off Mar 2026 | 1390 Rhode Island St | Line Construction Llc | revision to pa # 202410032218: to replace (e) skylight at 3/f hallway. skylight shall comply w/ crc r3086.9. replace deck framing at 3/f with double 2x12 joist with necessary calcs per city inspector requestDetails
revision to pa # 202410032218: to replace (e) skylight at 3/f hallway. skylight shall comply w/ crc r3086.9. replace deck framing at 3/f with double 2x12 joist with necessary calcs per city inspector request | $5,500 |
| May 29, 2025 | In progress issued May 2025 | 880 Pacheco St | Cej Construction Llc | revision to permit 20241003226 to include the removal of the existing foundation with a new, pier supporated foundation to accommodate a slighe increase in the grade at the rear yard, remove and replace associated exterior wood stairs.Details
revision to permit 20241003226 to include the removal of the existing foundation with a new, pier supporated foundation to accommodate a slighe increase in the grade at the rear yard, remove and replace associated exterior wood stairs. | $15,000 |
| May 20, 2025 | In progress issued May 2025 | 230 Cherry St | Sean O'neill Construction | revision to pa #2024-0813-8552 update framing direction to reflect field conditions. replace partial foundation at rearDetails
revision to pa #2024-0813-8552 update framing direction to reflect field conditions. replace partial foundation at rear | $5,000 |
| Apr 21, 2025 | In progress issued Sep 2025 | 180 De Soto St | Hong's General Construction Inc | excavating e) basement to create 9' ceiling & add new bathroom, bedroom, and family room at basement level. align exterior wall below first floor roof deck at south elevationDetails
excavating e) basement to create 9' ceiling & add new bathroom, bedroom, and family room at basement level. align exterior wall below first floor roof deck at south elevation | $100,000 |
| Mar 31, 2025 | In progress filed Mar 2025, not yet issued | 137 Beulah St | Sage Construction Services | g/f:new bedrm,family rm,bath,laundry and closet.new foundation & slab.2/f:remodel/reconfig (e) kitchen, bath,media rm,dining rm, and new stairs.replace (e) deck & stairs at rear.3/f: remodel (e) bath and reconfig closets in bedrm.front:replace (e)wood sashes to match (e).Details
g/f:new bedrm,family rm,bath,laundry and closet.new foundation & slab.2/f:remodel/reconfig (e) kitchen, bath,media rm,dining rm, and new stairs.replace (e) deck & stairs at rear.3/f: remodel (e) bath and reconfig closets in bedrm.front:replace (e)wood sashes to match (e). | $625,000 |
| Mar 6, 2025 | In progress issued Jun 2025 | 38 Van Buren St | Proano Construction | horizontal addition 4 ft back, 1/2 width of property. kitchen & bath remodelDetails
horizontal addition 4 ft back, 1/2 width of property. kitchen & bath remodel | $80,000 |
| Feb 5, 2025 | Completed final sign-off Jul 2025 | 540 Victoria St | R & D Construction Co Inc | revision 202408269432 and ref 202412066311- replace slab at garage, modify retaining wall to field conditions for new height of 5'9". shoring plans for property line foundation consturctionDetails
revision 202408269432 and ref 202412066311- replace slab at garage, modify retaining wall to field conditions for new height of 5'9". shoring plans for property line foundation consturction | $3,000 |
| Jan 31, 2025 | In progress issued Oct 2025 | 342 23rd Av | Sunset Builders Llc. | rear lot: erect a new type v-b, 2 story, single family dwelling with 3 bedrooms & 2.5 bathrooms.Details
rear lot: erect a new type v-b, 2 story, single family dwelling with 3 bedrooms & 2.5 bathrooms. | $200,000 |
| Jan 10, 2025 | In progress issued Jan 2025 | 1550 Diamond St | Roly Construction | new conditioned space within existing first floor. replace 2 windows in kind - renovate kitchen and bath, relocate partitions at second floor - new furnace - add 1 new windowDetails
new conditioned space within existing first floor. replace 2 windows in kind - renovate kitchen and bath, relocate partitions at second floor - new furnace - add 1 new window | $45,000 |
| Nov 7, 2024 | In progress issued May 2025 | 342 23rd Av | Sunset Builders Llc. | modify (e) house to provide egress from new dwelling at rear to sidewalk. 1) new walls. 2)new footings & concrete slab. 3) remove/replace & add doors. 4) remove window at rear. 5) relocate toilet fixture.Details
modify (e) house to provide egress from new dwelling at rear to sidewalk. 1) new walls. 2)new footings & concrete slab. 3) remove/replace & add doors. 4) remove window at rear. 5) relocate toilet fixture. | $50,000 |
| Oct 29, 2024 | Completed final sign-off Apr 2025 | 2116 29th Av | Sunset Builders Llc. | rev to pa# 2023-0302-2947 revise soldier pile diameter and depthDetails
rev to pa# 2023-0302-2947 revise soldier pile diameter and depth | |
| Oct 9, 2024 | Completed final sign-off Jun 2025 | 3948 Mission St | T T General Construction | remodel lower unit. replace and expand existing deck under 30" in height facing rear yard.Details
remodel lower unit. replace and expand existing deck under 30" in height facing rear yard. | $75,000 |
| Oct 3, 2024 | Expired or cancelled expired May 2026 | 1226 De Haro St | Andrew Mark Construction Inc | rev 202204111943- remove proposed property line windows from scope. revise holdowns at masonry foundationDetails
rev 202204111943- remove proposed property line windows from scope. revise holdowns at masonry foundation | |
| Sep 26, 2024 | Completed final sign-off Sep 2025 | 17 30th St | revision to bpa#: 202407085990 and 202408239370. new 1 hr fire rated west interior wall on both floors.Details
revision to bpa#: 202407085990 and 202408239370. new 1 hr fire rated west interior wall on both floors. | ||
| Sep 25, 2024 | Completed final sign-off Jan 2025 | 1505 Revere Av | Reliable Construction Inc | unit 101- kitchen/bath remodel, add bathroom and remove walls.Details
unit 101- kitchen/bath remodel, add bathroom and remove walls. | $65,000 |
| Sep 12, 2024 | Completed final sign-off Dec 2024 | 243 12th Av | Sunset Builders Llc. | rev 202312212897 and ref 202408239331 to add seismic upgrade at first floor with plywood shearwalls and holdowns. replace siding at exterior rear wallDetails
rev 202312212897 and ref 202408239331 to add seismic upgrade at first floor with plywood shearwalls and holdowns. replace siding at exterior rear wall | $15,000 |
| Aug 23, 2024 | In progress issued Sep 2024 | 1466 Dolores St | rev 202202087548- reduction of scope to include remodel kitchen with addition of island, bathroom in kind and (n) master suite and removal of wall between (e) bedroom and dining room area. all work is on 2nd floorDetails
rev 202202087548- reduction of scope to include remodel kitchen with addition of island, bathroom in kind and (n) master suite and removal of wall between (e) bedroom and dining room area. all work is on 2nd floor | ||
| Aug 23, 2024 | Completed final sign-off Dec 2024 | 243 12th Av | Sunset Builders Llc. | rev to pa# 2023-1221-2897; add new header beam to support (e) stairs, reinforce (e) stair opening beams and replace (e) brick foundation refer to permit for special inspection item and formDetails
rev to pa# 2023-1221-2897; add new header beam to support (e) stairs, reinforce (e) stair opening beams and replace (e) brick foundation refer to permit for special inspection item and form | $60,000 |
| Aug 22, 2024 | In progress issued Feb 2025 | 2929 Clay St | Sonoma Build Group Inc | 1/f: (n) bath and storage, (n) front entry window and door. 2/f: kitchen remodel, removal of fireplace and addition of new closets in bedroom. 3/f: kitchen and bathroom remodel, removal of fireplace and addition of (n) closets in bedroom.Details
1/f: (n) bath and storage, (n) front entry window and door. 2/f: kitchen remodel, removal of fireplace and addition of new closets in bedroom. 3/f: kitchen and bathroom remodel, removal of fireplace and addition of (n) closets in bedroom. | $87,300 |
| Jul 26, 2024 | In progress issued Jul 2024 | 1627 Beach St | Kag Designs And Construction Llc | garage foundation work. delta 2 milestone on stamped plans. revision to pa#202204152362Details
garage foundation work. delta 2 milestone on stamped plans. revision to pa#202204152362 | $35,000 |
| Jul 16, 2024 | Completed final sign-off Jul 2025 | 260 Montana St | D3 Construction | revision to pa 2024-0607-3929 reinforce roof at rear. replace part of foundation at rear between gridlines 4 to 6.Details
revision to pa 2024-0607-3929 reinforce roof at rear. replace part of foundation at rear between gridlines 4 to 6. | |
| Jul 2, 2024 | In progress issued Jul 2024 | 200 Clement St | Traube Construction Company | t.i. improve e) cafe space & restroom to meet ada requirement, replace/ repair cafe's damage equipments & finishes, & add new equipment. 2 mew exterior windows on 3rd av. new electric water heater and new heat pumpDetails
t.i. improve e) cafe space & restroom to meet ada requirement, replace/ repair cafe's damage equipments & finishes, & add new equipment. 2 mew exterior windows on 3rd av. new electric water heater and new heat pump | $80,000 |
| Jun 21, 2024 | In progress issued Jun 2024 | 1766 16th Av | K L W Construction Inc | revision to pa# 202209233072: to include structural framing plans; minor modifications to interior stairDetails
revision to pa# 202209233072: to include structural framing plans; minor modifications to interior stair | $25,000 |
| Jun 11, 2024 | Completed final sign-off Sep 2024 | 2666 16th Av | Kirk G Construction | revision to permit 202306079481. add the correct measurement for existing and new wall location.Details
revision to permit 202306079481. add the correct measurement for existing and new wall location. | |
| Jun 7, 2024 | Completed final sign-off Apr 2025 | 527 29th St | Huff Construction Company Inc | rev 202303234225- reframe front porch and replace finishes in kind due to dry rot. replace and repair more than 50% of porch facing street.Details
rev 202303234225- reframe front porch and replace finishes in kind due to dry rot. replace and repair more than 50% of porch facing street. | $18,000 |
| Apr 3, 2024 | Completed final sign-off May 2025 | 914 Wisconsin St | unit 5 on 1/f: remodel from a 2 bedrooms/ 1 bathroom to a 3 bedrooms/ 2 bathrooms. (5) windows on the rear and side will be replaced. the existing entry stairs will be relocated. no expansion to the subject building.Details
unit 5 on 1/f: remodel from a 2 bedrooms/ 1 bathroom to a 3 bedrooms/ 2 bathrooms. (5) windows on the rear and side will be replaced. the existing entry stairs will be relocated. no expansion to the subject building. | $160,000 | |
| Feb 28, 2024 | Completed final sign-off Feb 2025 | 1944 Great Hy | K 2 Builders Inc | revision to pa# 202311080469, roof hatch size with adequate head clearance plus add 1 hr fire parapet 30" above opening. (not visible fron the street)Details
revision to pa# 202311080469, roof hatch size with adequate head clearance plus add 1 hr fire parapet 30" above opening. (not visible fron the street) | |
| Dec 13, 2023 | Completed final sign-off Jun 2024 | 149 Elsie St | Prosper Construction Dev Inc. | revision to pa# 2023-0307-3142 removal of reinforcing steel from special inspections. revision to structural details to reflect field condition installation changesDetails
revision to pa# 2023-0307-3142 removal of reinforcing steel from special inspections. revision to structural details to reflect field condition installation changes | |
| Dec 6, 2023 | Completed final sign-off Aug 2024 | 14 Vicksburg St | Aurora Builders | (e) kitchen & full bathroom renovation. replace 1 side door & add 1 skylight (not visible from st)Details
(e) kitchen & full bathroom renovation. replace 1 side door & add 1 skylight (not visible from st) | $85,000 |
| Nov 17, 2023 | Completed final sign-off Aug 2024 | 2244 19th St | Edenavow Construction & Design | revision to permit 202105110179-s1 to include framing change due to field coordination, change of finish at stairs and floor at level 3, and a new glass guardrail @ level 2 stair opening.Details
revision to permit 202105110179-s1 to include framing change due to field coordination, change of finish at stairs and floor at level 3, and a new glass guardrail @ level 2 stair opening. | |
| Nov 17, 2023 | Completed final sign-off Aug 2025 | 3325 Pierce St | Ewen Utting Inc. | interior remoddel and rebuild side rear stairs at 1st fl. fill in under e popout at 2nd fl. remodel kitchen, add bath, remodel primary bedroomDetails
interior remoddel and rebuild side rear stairs at 1st fl. fill in under e popout at 2nd fl. remodel kitchen, add bath, remodel primary bedroom | $125,000 |
| Sep 25, 2023 | Completed final sign-off Dec 2023 | 1290 28th Av | Lindquist Custom Construction Inc | document as-built conditions to comply with nov 202310100. add 2 storage rooms at g/f. add 2 openings in level 2 bearing wall.Details
document as-built conditions to comply with nov 202310100. add 2 storage rooms at g/f. add 2 openings in level 2 bearing wall. | $15,000 |
| Aug 24, 2023 | Completed final sign-off Jun 2024 | 1845 08th Av | Ryan Construction | mandatory seismic retrofit to comply with 2016 sfebc chapter 4d & ab-107.Details
mandatory seismic retrofit to comply with 2016 sfebc chapter 4d & ab-107. | $30,000 |
| Aug 11, 2023 | Completed final sign-off Feb 2025 | 1944 Great Hy | interior renovation on all floors due to roof membrane collapse and roof leak. g/f: (e) bathroom remodel. 2/f and 3/f: (e) bathroom and kitchen remodel on both units.Details
interior renovation on all floors due to roof membrane collapse and roof leak. g/f: (e) bathroom remodel. 2/f and 3/f: (e) bathroom and kitchen remodel on both units. | $400,000 | |
| Jun 27, 2023 | Expired or cancelled expired Oct 2025 | 163 Carl St | Dave Mason Building | replace dry rotted (e) deck w/ new deck & stairs at reat of house. no work inside houseDetails
replace dry rotted (e) deck w/ new deck & stairs at reat of house. no work inside house | $35,000 |
| Jun 7, 2023 | Completed final sign-off Aug 2024 | 834 31st Av | Cepheus Builders Inc | revision to 202212148246: modification foundation designDetails
revision to 202212148246: modification foundation design | |
| May 2, 2023 | Completed final sign-off Nov 2023 | 342 26th Av | Prosper Construction Dev Inc. | replace (e) interior stairs. fill in (e) courtyard at 2/f. remodel (e) bathroom and kitchen.Details
replace (e) interior stairs. fill in (e) courtyard at 2/f. remodel (e) bathroom and kitchen. | $125,000 |
| May 1, 2023 | Completed final sign-off Apr 2025 | 1759 08th Av | Puac Construction Llc | interior remodeling of a 2 story single family house. infill portion (e) 1/f breezeway and (e) 2/f interior lightwell (not visible from the street). no exterior work to be done except widen garage door width.Details
interior remodeling of a 2 story single family house. infill portion (e) 1/f breezeway and (e) 2/f interior lightwell (not visible from the street). no exterior work to be done except widen garage door width. | $300,000 |
| Apr 18, 2023 | Expired or cancelled expired Jul 2024 | 281 Madison St | revision to pa# 202104158646 & 201706300869, replace dry rotted on 2nd flr framing and new additional foundation workDetails
revision to pa# 202104158646 & 201706300869, replace dry rotted on 2nd flr framing and new additional foundation work | $6,000 | |
| Mar 23, 2023 | Never finaled filed Mar 2023, never issued | 1371 20th Av | comply w/nov#20163931.legalize an illegal unit under the adu process per ordinance# 95-17 .legalize kitchen & bath to previously permitted rms down.replace doors & add modify walls where req'd for 1 hr separation.separate unit from unit above with soundproofing & 1 hr ceilingDetails
comply w/nov#20163931.legalize an illegal unit under the adu process per ordinance# 95-17 .legalize kitchen & bath to previously permitted rms down.replace doors & add modify walls where req'd for 1 hr separation.separate unit from unit above with soundproofing & 1 hr ceiling | $74,350 | |
| Mar 16, 2023 | Completed final sign-off Jun 2023 | 105 Franconia St | Kirk G Construction | in-kind replacement of landscape retaining wall at north property line. no change in elevation. approx. 32'Details
in-kind replacement of landscape retaining wall at north property line. no change in elevation. approx. 32' | $60,000 |
| Mar 15, 2023 | Completed final sign-off Jul 2024 | 924 Ortega St | Winwin Construction Inc | 1/f: add guess bedroom, office, full bath and recreation room to include a kitchenette. 2/f: remodel kitchen, bathroom and stairs to 1/f and repair 50 percent or less (e) rear deck. 3/f: remodel of 2 (e) bathroom, adding a 3rd bathroom and re-coating an ext. roof deck. add recessed lights.Details
1/f: add guess bedroom, office, full bath and recreation room to include a kitchenette. 2/f: remodel kitchen, bathroom and stairs to 1/f and repair 50 percent or less (e) rear deck. 3/f: remodel of 2 (e) bathroom, adding a 3rd bathroom and re-coating an ext. roof deck. add recessed lights. | $380,000 |
| Feb 22, 2023 | Completed final sign-off Oct 2023 | 57 Princeton St | Hungto Co Incorporation | revision to pa# 202211166616, replace center line beam at garage and foundations at gridline approx 18ft.Details
revision to pa# 202211166616, replace center line beam at garage and foundations at gridline approx 18ft. | $8,000 |
| Feb 15, 2023 | Completed final sign-off Feb 2023 | 2116 Great Hy | Ccf Construction, Llc | minor revision to 202206247104: footing detailDetails
minor revision to 202206247104: footing detail | |
| Jan 27, 2023 | Expired or cancelled cancelled Jan 2026 | 650 Visitacion Av | Tako Studios Llc. | revision to 202010196851: new bathroom @ ground fl, and a wet bar, 3 new interior doorsDetails
revision to 202010196851: new bathroom @ ground fl, and a wet bar, 3 new interior doors | $38,600 |
| Sep 23, 2022 | Completed final sign-off Sep 2023 | 1336 Shrader St | Mcmahon Construction | replace rear deck and stairs in kind.Details
replace rear deck and stairs in kind. | $25,000 |
| Sep 16, 2022 | Completed final sign-off Dec 2023 | 2177 17th Av | Qualisopus Construction | revision to bpa#202110080098. structural updates to reflect field conditionsDetails
revision to bpa#202110080098. structural updates to reflect field conditions | $3,000 |
| Sep 2, 2022 | Completed final sign-off Aug 2024 | 1562 15th Av | Kingfish Construction Llc. | lower flr: convert (e) storage area into (n) dining/living, kitchen and half bath, remove (e) and replace with (n) stairs connecting foyer to lower floor , remove (e) exterior rear deck and stairs (n) rear exterior doors, (n) foyer closet. upper flr: add (n) closet and full bath to (e) family rm (n)Details
lower flr: convert (e) storage area into (n) dining/living, kitchen and half bath, remove (e) and replace with (n) stairs connecting foyer to lower floor , remove (e) exterior rear deck and stairs (n) rear exterior doors, (n) foyer closet. upper flr: add (n) closet and full bath to (e) family rm (n) | $150,000 |
| Jun 29, 2022 | Never finaled issued Aug 2022, no final | 3100 18th St | Roman Hunt | interior remodel: interior partitions, accessible bath. repair existing windows, replace skylights, roof repair, repair less than 50% existing exterior stair in kind, new finishes.Details
interior remodel: interior partitions, accessible bath. repair existing windows, replace skylights, roof repair, repair less than 50% existing exterior stair in kind, new finishes. | $250,000 |
| Jun 24, 2022 | Completed final sign-off Feb 2023 | 2116 Great Hy | Ccf Construction, Llc | to comply wiht nov 2022-88098 replace (e) rusty deck hardware, reinforce framing as req'd replace concrete deck footings, no change to deck layout (e) fire escapes to remain. visible from the streetDetails
to comply wiht nov 2022-88098 replace (e) rusty deck hardware, reinforce framing as req'd replace concrete deck footings, no change to deck layout (e) fire escapes to remain. visible from the street | $16,000 |
| Jun 22, 2022 | Completed final sign-off Nov 2022 | 887 Capp St | Moreno Construction | replace in kind (e) stairs and landings art rear yard. required egress.Details
replace in kind (e) stairs and landings art rear yard. required egress. | $25,000 |
| Jun 15, 2022 | Completed final sign-off Nov 2023 | 2858 22nd St | Gracon Construction Inc, R C Construction | interior remodel of 2 story sfr expand into lower level garage/storage space to increase habitable space by 1,105 sqft add (3) new bedrooms + bathroom add (n) laundry room.Details
interior remodel of 2 story sfr expand into lower level garage/storage space to increase habitable space by 1,105 sqft add (3) new bedrooms + bathroom add (n) laundry room. | $160,000 |
| May 31, 2022 | Completed final sign-off Dec 2024 | 173 Jordan Av | Barron Construction Inc. | excavate at 1st flr & increase clg ht. convert storage to habitable. remodel (e) sfh replace foundations new stair throughout. no work to be done on front besides replace glazing of front windows. keep (e) window frame and trim. add/replace of rear & side window & doors. new mech system to be designDetails
excavate at 1st flr & increase clg ht. convert storage to habitable. remodel (e) sfh replace foundations new stair throughout. no work to be done on front besides replace glazing of front windows. keep (e) window frame and trim. add/replace of rear & side window & doors. new mech system to be design | $750,000 |
| May 27, 2022 | Completed final sign-off May 2023 | 2546 42nd Av | Reliable Construction Inc | revision to pa# 202008312961. reinforce additional foundations along grideline 1 between b & c.Details
revision to pa# 202008312961. reinforce additional foundations along grideline 1 between b & c. | $10,000 |
| May 4, 2022 | Completed final sign-off Apr 2023 | 181 Duncan St | San Francisco Design Build | 2/f: kitchen remodel, new powder room. 3/f: remodel exist.bathroom and add one full bath. exterior: 1 new window, 1 new rear facing 2/f, 4 (e) windows replacement, 2 new skylights (no changes to the front of the house, and the propose changes are not visible from street).Details
2/f: kitchen remodel, new powder room. 3/f: remodel exist.bathroom and add one full bath. exterior: 1 new window, 1 new rear facing 2/f, 4 (e) windows replacement, 2 new skylights (no changes to the front of the house, and the propose changes are not visible from street). | $60,000 |
| May 4, 2022 | Completed final sign-off Oct 2024 | 843 41st Av | T & T Construction | replace (e) pantry into a half bathroom and fill-in non-sharing light well on 2/f. 2/f: remodel kithcn, bathroom. remodel interior stair (2nd to 1st flr). 1/f: remodel (for new bedroom, office, bathroom, laundry room and mudroom). replace or repair front stair in kind.Details
replace (e) pantry into a half bathroom and fill-in non-sharing light well on 2/f. 2/f: remodel kithcn, bathroom. remodel interior stair (2nd to 1st flr). 1/f: remodel (for new bedroom, office, bathroom, laundry room and mudroom). replace or repair front stair in kind. | $200,000 |
| Apr 26, 2022 | Completed final sign-off Dec 2024 | 2558 17th Av | R & D Construction Co Inc | remodel kitchen and 3 bedrooms, relocate 2 baths. new deck over (e) roof accessible from 3/f. convert part of garage into conditioned area: new bedroom and bath, laundry and powder room, new family room.Details
remodel kitchen and 3 bedrooms, relocate 2 baths. new deck over (e) roof accessible from 3/f. convert part of garage into conditioned area: new bedroom and bath, laundry and powder room, new family room. | $500,000 |
| Apr 21, 2022 | Completed final sign-off Apr 2023 | 255 Chenery St | Dunros Construction | remodel the (e) 1st story and 2nd story, relocate (e) plumbing, create a hallway to have the residence separated from the garage on the 1st story, remove the (e) half bath on the 1st story, replace the (e) hvac system with energy star rated equipment reconfigure the (e) plumbing on the 2nd storyDetails
remodel the (e) 1st story and 2nd story, relocate (e) plumbing, create a hallway to have the residence separated from the garage on the 1st story, remove the (e) half bath on the 1st story, replace the (e) hvac system with energy star rated equipment reconfigure the (e) plumbing on the 2nd story | $450,000 |
| Apr 11, 2022 | Expired or cancelled expired May 2026 | 1226 De Haro St | Andrew Mark Construction Inc | to remove chiimney & remodel kitchen, new windows on front, (3) new one-hour rated property line windows, remodel lower floor, add bedroom w/in (e) foot print.Details
to remove chiimney & remodel kitchen, new windows on front, (3) new one-hour rated property line windows, remodel lower floor, add bedroom w/in (e) foot print. | $50,000 |
| Apr 6, 2022 | Completed final sign-off Dec 2023 | 3875 Clay St | Citidev Inc. | revision to permit 202201276748. replace beam at garage.Details
revision to permit 202201276748. replace beam at garage. | $15,000 |
| Mar 29, 2022 | Completed final sign-off Mar 2023 | 703 San Bruno Av | amend permit 201907125802 to add 2 metal steel joists on 2/f and posts. structural change only.Details
amend permit 201907125802 to add 2 metal steel joists on 2/f and posts. structural change only. | ||
| Mar 22, 2022 | Completed final sign-off Dec 2023 | 89 Forest Knolls Dr | X O Builders | rev to pa 202104229155 and pa 202111172561. switch ridge bm to steel.Details
rev to pa 202104229155 and pa 202111172561. switch ridge bm to steel. | $1,000 |
| Mar 16, 2022 | Expired or cancelled withdrawn May 2024 | 124 Forest Side Av | 1/f: remodel (e) habitable spaces, new family room, and new interior stair to connect to the 2/f. 2/f: remove interior walls to provide new kitchen. 3/f: remodel (e) bathroom, new laundry closet and add ensuite bathroom in front bedroom.Details
1/f: remodel (e) habitable spaces, new family room, and new interior stair to connect to the 2/f. 2/f: remove interior walls to provide new kitchen. 3/f: remodel (e) bathroom, new laundry closet and add ensuite bathroom in front bedroom. | $450,000 | |
| Feb 7, 2022 | Completed final sign-off May 2023 | 447 Teresita Bl | interior remodel at ground/1st floor: add new bedroom, bath and gym. add playroom and deck at basement.Details
interior remodel at ground/1st floor: add new bedroom, bath and gym. add playroom and deck at basement. | $120,000 | |
| Jan 5, 2022 | Completed final sign-off Jan 2024 | 133 Stanyan St | Bravo Building Co Inc | remodel existing kitchen. infill existing internal courtyard. new skylights. no alteration of exterior envelope. no alteration of exterior facades.Details
remodel existing kitchen. infill existing internal courtyard. new skylights. no alteration of exterior envelope. no alteration of exterior facades. | $250,000 |
| Jan 4, 2022 | Completed final sign-off Feb 2022 | 183 Saint Germain Av | Quality Home Builders Construction Inc | addition of a new manually operated skylight and related structural work.Details
addition of a new manually operated skylight and related structural work. | $15,000 |
| Dec 8, 2021 | Completed final sign-off Nov 2023 | 445 Duncan St | M G Home Renovations | rev to pa# 2019-1114-7292: change ceiling at living and tv room/ceiling structure and reroof (e) roof areaDetails
rev to pa# 2019-1114-7292: change ceiling at living and tv room/ceiling structure and reroof (e) roof area | $20,000 |
| Nov 22, 2021 | Completed final sign-off May 2022 | 45 Massasoit St | L S Construction | revision to permit 202108176587. seismic upgrade at ground level.Details
revision to permit 202108176587. seismic upgrade at ground level. | $30,000 |
| Nov 18, 2021 | Completed final sign-off Oct 2022 | 4136 21st St | D N Construction | rev to pa# 202109138336: renovate and reconfigure kitchen layout, remodel and recongigure baths at 1st & 3rd fl. add second bath at 3rd fl. replace rear deck doors at 2nd floor, new door at 1st fl. rearDetails
rev to pa# 202109138336: renovate and reconfigure kitchen layout, remodel and recongigure baths at 1st & 3rd fl. add second bath at 3rd fl. replace rear deck doors at 2nd floor, new door at 1st fl. rear | $80,000 |
| Oct 18, 2021 | Completed final sign-off Dec 2022 | 2217 16th Av | Yao Star Construction | interior remodel, kitchen and bath remodel, add full bath, remodel interior stair, no expansion of bldg envelope or work at front facade visible from street.Details
interior remodel, kitchen and bath remodel, add full bath, remodel interior stair, no expansion of bldg envelope or work at front facade visible from street. | $120,000 |
| Sep 29, 2021 | Never finaled issued Feb 2022, no final | 634 27th Av | Mcmahon Construction | interior remodel. 1/f: replace stairs, develop habitable area, new bathroom, half bath, guest bedroom, family room and 2 storage. 2/f: remodel kitchen relocate half bath. 3/f: add new bathroom, upgrade (e) bath, fixtures and finishes. relocate master closet.Details
interior remodel. 1/f: replace stairs, develop habitable area, new bathroom, half bath, guest bedroom, family room and 2 storage. 2/f: remodel kitchen relocate half bath. 3/f: add new bathroom, upgrade (e) bath, fixtures and finishes. relocate master closet. | $425,000 |
| Sep 29, 2021 | Completed final sign-off Oct 2023 | 2231 Steiner St | Bay Building Structures Inc | revision to pa#202002275623. structural modifications. (n) steel beam and revisions to foundations.Details
revision to pa#202002275623. structural modifications. (n) steel beam and revisions to foundations. | $15,000 |
| Sep 13, 2021 | Completed final sign-off Mar 2022 | 4541 Irving St | Mizen Construction Inc | revision to 20210225331. revision to rear framing based on e conditionsDetails
revision to 20210225331. revision to rear framing based on e conditions | $5,000 |
| Sep 3, 2021 | Completed final sign-off Oct 2022 | 20 Walter St | Michael De Jong Construction | at front setback, replace in kind ext. entry stairs. at rear yard, replace in kind ext stairs. at 2/f, remodel kitchen, bath, laundry and sunroom. at 3/f, remodel bath, sunroom. at rear elevation, replace siding and windows. new furnace for lower unit. new heat pump for upper unit.Details
at front setback, replace in kind ext. entry stairs. at rear yard, replace in kind ext stairs. at 2/f, remodel kitchen, bath, laundry and sunroom. at 3/f, remodel bath, sunroom. at rear elevation, replace siding and windows. new furnace for lower unit. new heat pump for upper unit. | $70,000 |
| Sep 2, 2021 | Completed final sign-off Sep 2023 | 2831 Kirkham St | S L Y Construction Company | interior remodel: g/f add bedroom, family room, and full bath, wet bar, remodel laundry. upper floor: add interior stair, bath, remodel kitchen. new and replacement exterior doors and windows. no expansion of envelope. no more than 75% interior walls demolishedDetails
interior remodel: g/f add bedroom, family room, and full bath, wet bar, remodel laundry. upper floor: add interior stair, bath, remodel kitchen. new and replacement exterior doors and windows. no expansion of envelope. no more than 75% interior walls demolished | $280,000 |
| Aug 17, 2021 | Never finaled issued Jan 2022, no final | 650 Delancey St | Core Construction | #105: remodel kitchen. reconfigure bathrooms, relocate washer and dryer, (n) stair in (e) stair location. relocate water heater & furnace. add cooling, (n) glass guardrail at loft.Details
#105: remodel kitchen. reconfigure bathrooms, relocate washer and dryer, (n) stair in (e) stair location. relocate water heater & furnace. add cooling, (n) glass guardrail at loft. | $55,000 |
| Jul 16, 2021 | Completed final sign-off Jan 2022 | 2610 Greenwich St | Citadel Pg | interior remodel to the upper level unit with work being done in the kitchen, master bedroom and bathroom and demolition of an existing restroom, aka 2612 greenwich st.Details
interior remodel to the upper level unit with work being done in the kitchen, master bedroom and bathroom and demolition of an existing restroom, aka 2612 greenwich st. | $40,000 |
| Jun 10, 2021 | Completed final sign-off Apr 2024 | 2726 Greenwich St | Cej Construction Llc | revision of pa # 2020 1202 0093. extend replacement to perimeter foundationDetails
revision of pa # 2020 1202 0093. extend replacement to perimeter foundation | $20,000 |
| Jun 8, 2021 | Completed final sign-off Dec 2022 | 558 09th Av | Toni's Construction Inc | kitchen renovation, infill lightwell 1 story only. replace windows and doors at rear of kitchen and dining roomDetails
kitchen renovation, infill lightwell 1 story only. replace windows and doors at rear of kitchen and dining room | $25,000 |
| Jun 2, 2021 | Expired or cancelled withdrawn Jun 2024 | 1912 Sloat Bl | enclose the existing front tunnel entray, remove (e) interior stairs, new skylights, new recessed wod entry door.Details
enclose the existing front tunnel entray, remove (e) interior stairs, new skylights, new recessed wod entry door. | $50,000 | |
| May 24, 2021 | Completed final sign-off Apr 2022 | 65 San Lorenzo Wy | Brady Construction Inc | window replacement and interior kitchen, bathroom, and basement remodel. add new half bathDetails
window replacement and interior kitchen, bathroom, and basement remodel. add new half bath | $50,000 |
| May 24, 2021 | Never finaled issued Sep 2022, no final | 126 Cole St | Sunset Builders Llc. | horizontal addition@rear of ground,2nd,3rd,levels. roof terrace over ground&third level addition, 2 dormers&(3)skylights@roof level,replace foundation,excavate(less than 50 cy)@rear rooms,permeable pavers&plantings @front setback,full interior remodel per plans.relocate stairs on all level,(n)roof.Details
horizontal addition@rear of ground,2nd,3rd,levels. roof terrace over ground&third level addition, 2 dormers&(3)skylights@roof level,replace foundation,excavate(less than 50 cy)@rear rooms,permeable pavers&plantings @front setback,full interior remodel per plans.relocate stairs on all level,(n)roof. | $400,000 |